Shapell Center Equipment List.pdf
PDF 50 KB Posted
- Solicitation number
- 95476725R1010
- Issued by
-
United States Holocaust Memorial Museum
About this file
The document is an Equipment List for the Shapell Center, detailing mechanical and HVAC equipment located in the Chiller/Boiler Room #210 and MER Room #210. The comprehensive inventory includes multiple systems such as chillers, boilers, cooling towers, air handling units (AHUs), dehumidifiers, condenser units, pumps, and other critical infrastructure components. Key equipment includes two York Centrifugal Magnetic Drive Chillers, three hot water boilers, two steam boilers, six air handling units serving different areas like collections storage, conservation labs, public spaces, workshops, and specialized rooms like paint booths and cold rooms. Additional infrastructure includes cooling towers, control air compressors, multiple dehumidifiers, heat exchangers, domestic hot water systems, and a fire pump. The facility also has 99 Variable Air Volume (VAV) units and 20 exhaust fans (EF's), indicating a complex and comprehensive mechanical system designed to support various operational needs of the Shapell Center.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Shapell Center Equipment List
Chiller #1 Chiller/ Boiler Room # 210 York Centrifugal Magnetic Drive Chiller
Chiller #2 Chiller/ Boiler Room # 210 York Centrifugal Magnetic Drive Chiller
Hot Water Boiler #1 Chiller/ Boiler Room # 210 Heating Hot Water
Hot Water Boiler #2 Chiller/ Boiler Room # 210 Heating Hot Water
Hot Water Boiler #3 Chiller/ Boiler Room # 210 Heating Hot Water
Steam Boiler #1 Chiller/ Boiler Room # 210 Humidity control steam supply
Steam Boiler #2 Chiller/ Boiler Room # 210 Humidity control steam supply
Cooling Tower #1 MER Room # 210 Forced air tower
Cooling Tower #2 MER Room # 210 Forced air tower
AHU #1A MER Room # 210 Collections Storage Vaults supply air
AHU #1B MER Room # 210 Collections Storage Vaults supply air
Transfer Fan #1 MER Room # 210 AHU #2 Make up air fan from AHU1A/1B
AHU #2 MER Room # 210 Conservation/ Lab supply air
AHU #3 Chiller/ Boiler Room # 210 Paint Booth/ Silk screen/ Dark Room Supply air
AHU #4 MER Room # 210 Public areas/ some offices
AHU #5 MER Room # 210 Wood Shop supply air
AHU #6 MER Room # 210 Metal Shop Supply air
Control Air Compressor MER Room # 210 Pneumatic control air supply
RAC #1 Dehumidifier MER Room # 210 Dehumidifier Cold Room
RAC #2 Dehumidifier MER Room # 210 Dehumidifier Cold Room
RAC #3 Dehumidifier MER Room # 210 Dehumidifier Cool Room
RAC #4 Dehumidifier MER Room # 210 Dehumidifier Cool Room
Condenser Unit #1 MER Room # 210 Cool Room A/C
Condenser Unit #2 MER Room # 210 Cool Room A/C
Condenser Unit #3 MER Room # 210 Cold Room A/C
Condenser Unit #4 MER Room # 210 Cold Room A/C
Supply Fan #7 MER Room # 210 Cool Room dehumidifier supply air
Supply Fan # 14 MER Room # 210 Cold Room dehumidifier supply air
HVU #1 MER Room # 210 Heating Ventilating Unit Operations Storage
Shapell Center Equipment List
HVU #2 Chiller/ Boiler Room # 210 Heating Ventilating Unit Paint Shop Make Up Air
CHWP #1 Chiller/ Boiler Room # 210 Chilled water pump
CHWP #2 Chiller/ Boiler Room # 210 Chilled water Pump
CWP #1 Chiller/ Boiler Room # 210 Condenser Water Pump
CWP #2 Chiller/ Boiler Room # 210 Condenser Water Pump
HHWP #1 Chiller/ Boiler Room # 210 Heating Hot Water Pump
HHWP #2 Chiller/ Boiler Room # 210 Heating Hot Water Pump
BFW #1 Chiller/ Boiler Room # 210 Boiler Feed Water Pump
BFW #2 Chiller/ Boiler Room # 210 Boiler Feed water Pump
BFW #3 Chiller/ Boiler Room # 210 Boiler Feed Water pump
PP #1 Chiller/ Boiler Room # 210 Power Pure Water Pump
HXP #1 Chiller/ Boiler Room # 210 Heat Exchanger Pump
HXP #2 Chiller/ Boiler Room # 210 Heat Exchanger Pump
DHW #1 Chiller/ Boiler Room # 210 Domestic Hot Water Heater
DHW #2 Chiller/ Boiler Room # 210 Domestic Hot Water Heater
DHWRP Chiller/ Boiler Room # 210 Domestic Hot Water Recirculation Pump
FP Fire Pump Room Fire Pump
99 VAV’s
20 EF’s
File details come from the government source that posted it. Updated .