This Addendum #1 is issued by the Utah Division of Facilities Construction and Management (DFCM) for the Washburn Entrance Addition and Landscaping project at Snow College's Richfield Campus (Project #26189700). The addendum, dated July 13, 2026, modifies the solicitation schedule and contract requirements for the Stage II Invitation to Bid process, which is limited to three short-listed general contractors: Paulsen Construction, SIRQ Construction, and Westland Construction. The project encompasses an entrance addition on the south side of the Washburn building and landscaping renovation on the south and west sides, totaling approximately 5,073 square feet of nonresidual space with structural steel and masonry construction, slab-on-grade flooring, and site improvements. Bids are due July 28, 2026, with questions due July 16, 2026, and subcontractors lists due July 29, 2026. Substantial completion is required by July 30, 2027, with liquidated damages assessed at $1,000 per day for delays beyond that date.
The construction cost estimate is $5.4 million. Bidders must provide a bid bond equal to 5% of the bid amount and performance and payment bonds of 100% of the contract sum on specified AIA forms within ten business days of contract receipt. The addendum specifically addresses revisions to the solicitation schedule and Performance & Payment Bond requirements as detailed in the Revised Solicitation document. All bidders are required to acknowledge receipt of this addendum with their bid submissions, and failure to do so may result in disqualification. Contractors must obtain all required permits, including fugitive dust and stormwater pollution prevention plans, with all associated fees and delays being the contractor's responsibility. A Health Insurance Statement of Compliance Form is required prior to issuance of the Notice to Proceed.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DFCM Addendum Cover Page, 2.26.2026
DFCM Addendum #1 Reference: Washburn Entrance Addition and Landscaping
Snow College – Richfield Campus DFCM Project #26189700 U3P Event #DA26052-Stage II
Date: July 13, 2026
To: Short Listed General Contractors
From: The Division of Facilities Construction and Management
Note: This Addendum shall be included as part of the Contract Documents. Items in this Addendum apply to all drawings and specification sections whether referenced or not involving the portion of the work added, deleted, modified, or otherwise addressed in the Addendum. Bidders are required to acknowledge receipt of this Addendum when their bid is submitted. Failure to do so may subject the Bidder to disqualification.
Addendum Items
Solicitation Schedule Changes: See the ‘Revised Solicitation’ document attached under the ‘Supporting Documents’ in U3P. Changes have been made to the following events: Page 2 and Performance & Payment Bond requirement (page 6)
DFCM Addendum Items: N/A
Click to enter text Click to enter text Click to enter text
A/E Addendum Items: A/E Addendum # N/A Click to enter text
Total Attached Pages: 0
File details come from the government source that posted it. Updated .