10-!-DA26052-26189700 DFCM Addendum 1-Stage II.pdf
PDF 153 KB Posted
- Solicitation number
- DA26052-Stage II
- Issued by
- Utah
About this file
This is an Addendum #1 (Stage II) issued by the Utah Division of Facilities Construction and Management (DFCM) on July 13, 2026, for the Washburn Entrance Addition and Landscaping project at Snow College's Richfield Campus (DFCM Project #26189700, U3P Event #DA26052). The addendum is directed to short-listed general contractors and constitutes part of the contract documents. This Stage II solicitation represents an Invitation to Bid phase of a multistage selection process, with only contractors previously short-listed during the Stage I Request for Proposals process eligible to submit bids. The project involves construction of an entrance addition on the south side of the Washburn building and landscaping renovation around the south and west sides of the building, with a construction cost estimate of $5,400,000. Bidders are required to acknowledge receipt of this addendum upon bid submission, with failure to do so potentially resulting in disqualification.
The addendum identifies solicitation schedule changes detailed in a separate "Revised Solicitation" document available in the U3P platform, specifically affecting Page 2 and the Performance & Payment Bond requirement on Page 6. No DFCM-specific addendum items or Architect/Engineer addendum items are indicated in this document. Bidders must reference the updated solicitation schedule and bond requirements when preparing their bids for this multistage construction procurement.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DFCM Addendum Cover Page, 2.26.2026
DFCM Addendum #1 Reference: Washburn Entrance Addition and Landscaping
Snow College – Richfield Campus DFCM Project #26189700 U3P Event #DA26052-Stage II
Date: July 13, 2026
To: Short Listed General Contractors
From: The Division of Facilities Construction and Management
Note: This Addendum shall be included as part of the Contract Documents. Items in this Addendum apply to all drawings and specification sections whether referenced or not involving the portion of the work added, deleted, modified, or otherwise addressed in the Addendum. Bidders are required to acknowledge receipt of this Addendum when their bid is submitted. Failure to do so may subject the Bidder to disqualification.
Addendum Items
Solicitation Schedule Changes: See the ‘Revised Solicitation’ document attached under the ‘Supporting Documents’ in U3P. Changes have been made to the following events: Page 2 and Performance & Payment Bond requirement (page 6)
DFCM Addendum Items: N/A
Click to enter text Click to enter text Click to enter text
A/E Addendum Items: A/E Addendum # N/A Click to enter text
Total Attached Pages: 0
File details come from the government source that posted it. Updated .