9-Attachment FF - Heat Protection Safety Requirements.pdf

PDF 43 KB Posted

Attached to
ITB – Emergency Services for Debris Hauling and Operation of Debris Management Sites for Harris County (FEMA)
Solicitation number
25/0347
Issued by
Harris County, Texas

About this file

This document is Attachment FF, a Heat Protection Safety Requirement for a construction or outdoor work project, detailing comprehensive safety guidelines for workers during various weather conditions. The attachment mandates that the project's Safety Plan must include provisions to protect workers from heat-related and cold-related illnesses, with specific requirements for when temperatures reach over 90 degrees (either in actual temperature or heat index). The Prime Contractor is required to provide worker accommodations during extended periods of adverse weather conditions.

The document specifically outlines a project-specific Heat Awareness Plan that must include provisions for worker acclimatization, access to water, rest periods, and shade when temperatures exceed 90 degrees. Vendors must acknowledge and agree to these safety requirements by signing the Bid Acknowledgement at the time of submission, demonstrating their commitment to maintaining worker safety in potentially challenging environmental conditions. The attachment emphasizes a proactive approach to preventing heat-related workplace incidents by establishing clear guidelines and expectations for worker protection.

View the file

Other files

File Type Posted
24-Attachment MM - Federal Highway Administration (FHWA).pdf PDF
5-Attachment I - Performance Bond for Public Works over 100,000.pdf PDF
10-Attachment CC – MWBE Utilization Plan Commitment Form.pdf PDF
12-Attachment G - Contractor Profile.pdf PDF
21-Attachment JJ - Stump Conversion Table.pdf PDF
15-Attachment L - Certification of Compliance with Federal Standards Requirements.pdf PDF
25-Attachment R - Standards and Specifications.pdf PDF
16-Attachment M - Harris County Minimum Insurance Requirements (Construction).pdf PDF
2-Attachment C - Certification Regarding Lobbying.pdf PDF
11-Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf PDF
17-Attachment P - Required Contract Provisions.pdf PDF
1-Attachment B - Bid Schedule - Pricing Form.pdf PDF
8-Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf PDF
13-Attachment A - Bid Addenda Acknowledgement.pdf PDF
18-Attachment GG - Q4 - 2025 - Road and Bridge Prevailing Wage Rates.pdf PDF
19-Attachment HH - Policy for Payment.pdf PDF
20-Attachment LL - CPI-W Based Price Adjustment Calculations.pdf PDF
7-Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf PDF
27-Attachment II - Questionnaire.pdf PDF
23-Attachment BB - MWBE Goal Participation Information Packet .pdf PDF
6-Attachment K - Payment Bond.pdf PDF
14-Attachment Z - Harris County Minimum Wage Policy and Certification.pdf PDF
26-Federal IFB General Conditions and Specifications - Construction.pdf PDF
3-Attachment D - Statement of Bidder Qualifications.pdf PDF
4-Attachment F - References.pdf PDF
22-Attachment KK - Appendix A.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment FF

Heat Protection Safety Requirement

Guidance for all weather-related safety of workers, including but not limited to, extreme heat, cold weather or any adverse weather conditions shall be included in the project

Safety Plan. At a minimum, this must include provisions for keeping workers safe from heat related and/or cold related illnesses throughout the execution of their work. During extended periods of adverse weather conditions, the Prime Contractor shall provide accommodations to the workers as deemed necessary. This may include a project specific Heat Awareness Plan when temperatures reach over 90 degrees (temperature or heat index) with provisions for acclimatization, water, rest and shade.

Vendor understands by signing the Bid Acknowledgement at the time of submission that they agree to follow this heat protection safety requirement.

File details come from the government source that posted it. Updated .