9-2 - SB26018 - Courthouse Grounds Maintenance - Cost Proposal Form (3 year).xlsx
XLSX spreadsheet 97 KB Posted
- Solicitation number
- SB26018
- Issued by
- Grand County, Utah
About this file
This is a cost proposal form for grounds maintenance services solicited by the State of Utah Division of Facilities Construction and Management (DFCM) for the Cedar City Courthouse, Workforce Services, and DNR facilities. The contract is a three-year award requiring contractors to provide comprehensive grounds maintenance services including spring and fall clean-up and preparation, routine year-round maintenance, fertilization, annual flower planting, flower cost-plus fees, and sprinkler repair services. Contractors must submit detailed cost proposals for each service line item across all three contract years, with the option to provide hourly rates, lump sum fees, weekly fees, or percentage-based markups depending on the service type. The solicitation references the Grounds Maintenance Scope of Work document for detailed specifications of required services.
The cost proposal evaluation methodology employs a ranking system where each service line item is assigned specific point values based on competitive bidding, with the lowest cost bidder for each line item receiving the maximum points and subsequent bidders receiving points on a 10% spread basis. Service line items are weighted as follows: past performance rating (20 points), spring clean-up and preparation (20 points), fall clean-up and preparation (20 points), routine grounds maintenance (8 points), fertilization (4 points), annual flower planting (4 points), flowers cost-plus fee percentage (4 points), and sprinkler repair hourly rate (4 points). For each contract year, the costs proposed for each service line item will be averaged to determine a single cost figure, which will then be evaluated and ranked against other bidding contractors' proposals to determine the overall award.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Grounds Cost Proposal 1.21.2026
DFCM GROUNDS MAINTENANCE 3 YEAR COST PROPOSAL FORM
| Contractors are to fill in ALL YELLOW cells, except where there is an option to provide a hourly rate or a fee only one is required. | |
| Contractor Name: | |
| U3P Reference #: | SB26018 |
| Service Location(s): | Cedar City Courthouse - 40 North 100 East, Cedar City, UT 84720 |
| Contract Year | Services: Details regrding what is required for each service is provided in the solicitation in the Grounds Maintenance Scope of Work: 'Standard Grounds Service Specifications and General Services', items 1 - 6. | Hourly Rate | Total Hours | Lump Sum Fee | % Fee | Routine Grounds Maintenance Including Year Round Services | ||
| 1 | Spring Clean-up and Preparation | OR | ||||||
| Fall Clean-up and Preparation | OR | Hours/Week: | ||||||
| Fertilization - Lump Sum Fee per Application | AND | |||||||
| Annual Flower Planting Hourly Rate | Weekly Fee: | |||||||
| Flowers: Cost + Fee, Contractor is to provide only the fee (mark-up) as a percentage | 35.0% | OR | ||||||
| Sprinkler Repair Hourly Rate | Hourly Rate: | |||||||
| Other: | *Hide this row unless needed according to FM* | OR | OR |
| 2 | Spring Clean-up and Preparation Hourly Rate | OR | |||
| Fall Clean-up and Preparation Hourly Rate | OR | Hours/Week: | |||
| Fertilization - Lump Sum Fee per Application | AND | ||||
| Annual Flower Planting Hourly Rate | Weekly Fee: | ||||
| Flowers: Cost + Fee, Contractor is to provide only the fee (mark-up) as a percentage | OR | ||||
| Sprinkler Repair Hourly Rate | Hourly Rate: | ||||
| Other Hourly Rate: | *Hide this row unless needed according to FM* | OR | OR |
| 3 | Spring Clean-up and Preparation Hourly Rate | OR | |||
| Fall Clean-up and Preparation Hourly Rate | OR | Hours/Week: | |||
| Fertilization - Lump Sum Fee per Application | AND | ||||
| Annual Flower Planting Hourly Rate | Weekly Fee: | ||||
| Flowers: Cost + Fee, Contractor is to provide only the fee (mark-up) as a percentage | OR | ||||
| Sprinkler Repair Hourly Rate | Hourly Rate: | ||||
| Other Hourly Rate: | *Hide this row unless needed according to FM* | OR | OR |
| Evaluation of Cost Proposals | |
| For each year the cost proposed for each service line item will be averaged to provide one cost. Each service line item will be ranked against other bidding contractors (1,2,3,etc.). For each service line item, the contractor ranked '1' will receive the maximum points for that item. All other contractors will be assigned points with a 10% spread between rankings. Example: The maximum point value for service line item #1 is 20 points. The contractor with the lowest hourly rate will receive a ranking of '1' for that line item and will receive 20 points. The contractor with the second lowest bid will be ranked '2' and will receive 90% of the possible 20 points for that line item, etc. The point values for each service line item are provided below. | |
| Service Line Item Point Values | |
| 20 | Past Performance Rating |
| 20 | Spring Clean-up and Preparation |
| 20 | Fall Clean-up and Preparation |
| 8 | Routine Grounds Maintenance Including Year Round Services |
| 4 | Fertilization - Lump Sum Fee per Application |
| 4 | Annual Flower Planting Hourly Rate |
| 4 | Flowers: Cost + Fee, Contractor is to provide only the 'fee' as a percentage |
| 4 | Sprinkler Repair Hourly Rate |
image1.png
File details come from the government source that posted it. Updated .