3-B-Grounds Maintenance Cost Proposal Form (3 year), 1.21.26.xlsx
XLSX spreadsheet 97 KB Posted
- Solicitation number
- SB26018
- Issued by
- Grand County, Utah
About this file
This is a Three-Year Cost Proposal Form for Grounds Maintenance Services issued by the State of Utah Division of Facilities Construction and Management (DFCM) for grounds maintenance, landscaping, and lawn care services at Cedar City Courthouse, Workforce Services, and DNR facilities. The solicitation requests bids for routine grounds maintenance services including spring clean-up and preparation, fall clean-up and preparation, fertilization, annual flower planting, flowers with cost-plus fees, and sprinkler repair. Contractors must submit cost proposals for all three contract years, with pricing structured as hourly rates, lump sum fees, or percentage-based fees depending on the service category. The contract term is three years.
Contractors are required to complete all yellow cells in the cost proposal form, selecting either hourly rates or flat fees for each service line item as applicable. The evaluation methodology ranks contractors by service line item based on lowest proposed cost, with the lowest-cost bidder receiving maximum points for that item and subsequent bidders receiving points on a ten-percent spread scale. Maximum point allocations by service line are as follows: Past Performance Rating (20 points), Spring Clean-up and Preparation (20 points), Fall Clean-up and Preparation (20 points), Routine Grounds Maintenance Including Year Round Services (8 points), Fertilization per Application (4 points), Annual Flower Planting Hourly Rate (4 points), Flowers Cost-Plus Fee percentage (4 points), and Sprinkler Repair Hourly Rate (4 points). For flower plantings with cost-plus fees, contractors must provide only the markup percentage rather than total costs.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Grounds Cost Proposal 1.21.2026
DFCM GROUNDS MAINTENANCE 3 YEAR COST PROPOSAL FORM
| Contractors are to fill in ALL YELLOW cells, except where there is an option to provide a hourly rate or a fee only one is required. |
| Contractor Name: |
| U3P Reference #: |
| Service Location(s): |
| Contract Year | Services: Details regrding what is required for each service is provided in the solicitation in the Grounds Maintenance Scope of Work: 'Standard Grounds Service Specifications and General Services', items 1 - 6. | Hourly Rate | Total Hours | Lump Sum Fee | % Fee | Routine Grounds Maintenance Including Year Round Services | ||
| 1 | Spring Clean-up and Preparation | OR | ||||||
| Fall Clean-up and Preparation | OR | Hours/Week: | ||||||
| Fertilization - Lump Sum Fee per Application | AND | |||||||
| Annual Flower Planting Hourly Rate | Weekly Fee: | |||||||
| Flowers: Cost + Fee, Contractor is to provide only the fee (mark-up) as a percentage | 35.0% | OR | ||||||
| Sprinkler Repair Hourly Rate | Hourly Rate: | |||||||
| Other: | *Hide this row unless needed according to FM* | OR | OR |
| 2 | Spring Clean-up and Preparation Hourly Rate | OR | |||
| Fall Clean-up and Preparation Hourly Rate | OR | Hours/Week: | |||
| Fertilization - Lump Sum Fee per Application | AND | ||||
| Annual Flower Planting Hourly Rate | Weekly Fee: | ||||
| Flowers: Cost + Fee, Contractor is to provide only the fee (mark-up) as a percentage | OR | ||||
| Sprinkler Repair Hourly Rate | Hourly Rate: | ||||
| Other Hourly Rate: | *Hide this row unless needed according to FM* | OR | OR |
| 3 | Spring Clean-up and Preparation Hourly Rate | OR | |||
| Fall Clean-up and Preparation Hourly Rate | OR | Hours/Week: | |||
| Fertilization - Lump Sum Fee per Application | AND | ||||
| Annual Flower Planting Hourly Rate | Weekly Fee: | ||||
| Flowers: Cost + Fee, Contractor is to provide only the fee (mark-up) as a percentage | OR | ||||
| Sprinkler Repair Hourly Rate | Hourly Rate: | ||||
| Other Hourly Rate: | *Hide this row unless needed according to FM* | OR | OR |
| Evaluation of Cost Proposals | |
| For each year the cost proposed for each service line item will be averaged to provide one cost. Each service line item will be ranked against other bidding contractors (1,2,3,etc.). For each service line item, the contractor ranked '1' will receive the maximum points for that item. All other contractors will be assigned points with a 10% spread between rankings. Example: The maximum point value for service line item #1 is 20 points. The contractor with the lowest hourly rate will receive a ranking of '1' for that line item and will receive 20 points. The contractor with the second lowest bid will be ranked '2' and will receive 90% of the possible 20 points for that line item, etc. The point values for each service line item are provided below. | |
| Service Line Item Point Values | |
| 20 | Past Performance Rating |
| 20 | Spring Clean-up and Preparation |
| 20 | Fall Clean-up and Preparation |
| 8 | Routine Grounds Maintenance Including Year Round Services |
| 4 | Fertilization - Lump Sum Fee per Application |
| 4 | Annual Flower Planting Hourly Rate |
| 4 | Flowers: Cost + Fee, Contractor is to provide only the 'fee' as a percentage |
| 4 | Sprinkler Repair Hourly Rate |
image1.png
File details come from the government source that posted it. Updated .