8-2 - SB26018 - Workforce Grounds Maintenance - Cost Proposal Form (3 year).xlsx
XLSX spreadsheet 97 KB Posted
- Solicitation number
- SB26018
- Issued by
- Grand County, Utah
About this file
This is a Cost Proposal Form for grounds maintenance services issued by the State of Utah Division of Facilities Construction and Management (DFCM) for a three-year contract serving the Cedar City Courthouse, Workforce Services, and DNR locations. The contract encompasses routine grounds maintenance services including spring and fall clean-up and preparation, year-round maintenance, fertilization, annual flower planting, flower cost-plus arrangements, and sprinkler repairs at the primary service location of Cedar City Workforce at 176 East 200 North, Cedar City, UT 84720. Contractors must submit pricing for all three contract years using the specified cost proposal form, with options to provide either hourly rates or lump sum fees for each service category depending on the service type.
The evaluation methodology ranks contractors based on competitive pricing across service line items, with the lowest-cost bidder receiving maximum points for each item and subsequent bidders receiving points on a 10% spread scale. Service line items carry varying point allocations: Past Performance Rating (20 points), Spring Clean-up and Preparation (20 points), Fall Clean-up and Preparation (20 points), Routine Grounds Maintenance (8 points), Fertilization (4 points), Annual Flower Planting (4 points), Flowers Cost-plus Fee (4 points), and Sprinkler Repair (4 points). For flower planting with cost-plus arrangements, contractors must provide only the fee markup as a percentage rather than total costs. All yellow cells in the cost proposal form require completion, except where contractors need provide only either an hourly rate or fee based on the service structure specified in the Grounds Maintenance Scope of Work.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Grounds Cost Proposal 1.21.2026
DFCM GROUNDS MAINTENANCE 3 YEAR COST PROPOSAL FORM
| Contractors are to fill in ALL YELLOW cells, except where there is an option to provide a hourly rate or a fee only one is required. | |
| Contractor Name: | |
| U3P Reference #: | SB26018 |
| Service Location(s): | Cedar City Workforce - 176 East 200 North, Cedar City, UT 84720 |
| Contract Year | Services: Details regrding what is required for each service is provided in the solicitation in the Grounds Maintenance Scope of Work: 'Standard Grounds Service Specifications and General Services', items 1 - 6. | Hourly Rate | Total Hours | Lump Sum Fee | % Fee | Routine Grounds Maintenance Including Year Round Services | ||
| 1 | Spring Clean-up and Preparation | OR | ||||||
| Fall Clean-up and Preparation | OR | Hours/Week: | ||||||
| Fertilization - Lump Sum Fee per Application | AND | |||||||
| Annual Flower Planting Hourly Rate | Weekly Fee: | |||||||
| Flowers: Cost + Fee, Contractor is to provide only the fee (mark-up) as a percentage | 35.0% | OR | ||||||
| Sprinkler Repair Hourly Rate | Hourly Rate: | |||||||
| Other: | *Hide this row unless needed according to FM* | OR | OR |
| 2 | Spring Clean-up and Preparation Hourly Rate | OR | |||
| Fall Clean-up and Preparation Hourly Rate | OR | Hours/Week: | |||
| Fertilization - Lump Sum Fee per Application | AND | ||||
| Annual Flower Planting Hourly Rate | Weekly Fee: | ||||
| Flowers: Cost + Fee, Contractor is to provide only the fee (mark-up) as a percentage | OR | ||||
| Sprinkler Repair Hourly Rate | Hourly Rate: | ||||
| Other Hourly Rate: | *Hide this row unless needed according to FM* | OR | OR |
| 3 | Spring Clean-up and Preparation Hourly Rate | OR | |||
| Fall Clean-up and Preparation Hourly Rate | OR | Hours/Week: | |||
| Fertilization - Lump Sum Fee per Application | AND | ||||
| Annual Flower Planting Hourly Rate | Weekly Fee: | ||||
| Flowers: Cost + Fee, Contractor is to provide only the fee (mark-up) as a percentage | OR | ||||
| Sprinkler Repair Hourly Rate | Hourly Rate: | ||||
| Other Hourly Rate: | *Hide this row unless needed according to FM* | OR | OR |
| Evaluation of Cost Proposals | |
| For each year the cost proposed for each service line item will be averaged to provide one cost. Each service line item will be ranked against other bidding contractors (1,2,3,etc.). For each service line item, the contractor ranked '1' will receive the maximum points for that item. All other contractors will be assigned points with a 10% spread between rankings. Example: The maximum point value for service line item #1 is 20 points. The contractor with the lowest hourly rate will receive a ranking of '1' for that line item and will receive 20 points. The contractor with the second lowest bid will be ranked '2' and will receive 90% of the possible 20 points for that line item, etc. The point values for each service line item are provided below. | |
| Service Line Item Point Values | |
| 20 | Past Performance Rating |
| 20 | Spring Clean-up and Preparation |
| 20 | Fall Clean-up and Preparation |
| 8 | Routine Grounds Maintenance Including Year Round Services |
| 4 | Fertilization - Lump Sum Fee per Application |
| 4 | Annual Flower Planting Hourly Rate |
| 4 | Flowers: Cost + Fee, Contractor is to provide only the 'fee' as a percentage |
| 4 | Sprinkler Repair Hourly Rate |
image1.png
File details come from the government source that posted it. Updated .