Amendment_P00002_Attachment_A_and_B.pdf
PDF 260 KB Posted
- Attached to
- Consolidated Program Support Services (CPSS) Program, Planning, and Control (PP&C) Federal contract opportunity
- Solicitation number
- 80MSFC19R0010
About this file
Amendment P00002 Page 3, Q&As, and change log
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
80MSFC19R0010P00002
BLOCK 14. DESCRIPTION OF AMENDMENT/MODIFICATION (continued)
(a) The purpose of this amendment is to respond to Request for Proposal (RFP) questions and comments in relation to Consolidated Program Support Services (CPSS), Program, Planning, and
Control (PP&C). Responses to questions/comments are provided in Attachment A, Responses to
Industry RFP Amendment P00002 Questions. Resulting changes to the RFP are provided in
Attachment B, Summary of Changes between Amendment P00001 and Amendment P00002.
(b) In relation to Section L, Provision MSFC 52.205-90, Designated Point of Contact, paragraph
(b), the period for questions or comments relative to this acquisition has closed (i.e., questions and comments relative to this acquisition were previously due no later than 2:00 p.m. Central
Time, October 24, 2019). At this time, the Government is no longer accepting additional questions or comments in relation to the solicitation, as released on October 4, 2019, or the
Amendment P00001, as released on October 25, 2019. That notwithstanding, new questions or comments are conditionally permitted, provided they are limited to Amendment P00002 changes/information contained herein. Submission of questions or comments in relation to
Amendment P00002 shall be submitted via email to the designated point of contact (in accordance with the aforementioned provision), no later than 2:00 p.m. Central Time, October
31, 2019.
(c) Except as provided herein, all other terms and conditions of this solicitation remain unchanged.
ATTACHMENT A – RESPONSES TO INDUSTRY RFP QUESTIONS
Index Reference Question Answer
1 Final RFP 80MSFCR00010, Attachment A, Clarifications to All
Potential Offerors
Attachment J-1-A, Mission Labor
Requirements, Pages J1A-6 – J1A-7
Attachment L-2, Projected
Task Order Requirements
While the Government has made it clear that the PP&C requirements for Johnson Space Center (JSC) are in the Mission Services effort effective with Option Year 1 (CLIN 0004), there remains confusion over both the timing for the initiation of the Projected Task Order requirements for JSC as well as the content, i.e. type of labor skills.
The Government’s answer to Question #11 in Reference 1) states that
JSC has approval to retain HSFTIC SOW 10.0 – Cost Estimating and
Assessments through the base year of HSFTIC and will transfer to
CPSS on or about October 1, 2021. Reference 3) states on page L-2-1
“The PP&C task order requirements below are anticipated to be initiated and awarded during phase-in period with an effective date of the contract start date (i.e. 3/15/2021) via the Government-provided
Automated Task Order Management System (ATOMS)” and lists the
JSC Projected Task Order Requirements on Page L-2-6. In addition, the JSC Projected Task Order Requirements includes PWS references to PP&C Integration, Scheduling, Earned Value Management, and
Risk Management in addition to Cost Estimating and Cost Analysis
(CE&CA).
Will the Government clarify its anticipation for the timing of the JSC
Projected Task Order requirements, i.e. during the CPSS phase-in period to begin on 3/15/21, or on or about October 1, 2021?
Additionally, will the Government clarify whether it’s only the
CE&CA that remains with HSFTIC through the base year and then transfers to CPSS by IDIQ, or is it all JSC PP&C activities will transfer to CPSS upon completion of the HSFTIC base year?
The anticipated start date for the JSC projected task orders is on or about 10/1/2021. Attachment L-2, Projected Task Order Requirements, is revised as part of this amendment. The requirements included under
Attachment J-1, Performance Work Statement, Appendix
A.2, JSC Requirements are a direct correlation to the requirements that will be included in each task order request under the JSC projected task orders in
Attachment L-2 during the base year of CPSS.
2 Amendment 1, Attachment L-1, Worksheet B-2 MSFC, Column A
Rows 43, 73, and 102 currently reference Program Analyst 2
(HQ). Should these rows reference Program Analyst 2 (Kennedy) instead? Rows 46, 76, and 105 currently reference Program Analyst 4
(Kennedy). Should these rows reference Program Analyst 4 (HQ) instead?
Please correct for consistency.
Yes to all questions. Attachment L-1, Excel Pricing
Model (EPM), is revised as part of this amendment.
3 RFP document
80MSFC19R0010_Amendment_P00
001_Attachment_L-
1_Excell_Pricing_Model_(EPM)_(P
PC)
Contains a formula error (TAB A-1), Line 37 G (total) the formula should total left to right B:37:F37), however it’s off by one line the spreadsheet has B:36:F36. Are we allowed to update the formula or will you be issuing Amendment P00002, how should we processed?
No, the offeror should not change the formulas included in Attachment L-1. Cell G37 should read
“=sum(B37:F37)” instead of “=sum(B36:F36)”.
Attachment L-1, Excel Pricing Model (EPM), is revised as part of this amendment.
4 Vol. I Mission Suitability Factor
Instructions, Subfactor I MA, (3)
Page L-17
The Government has modified the PWS Missions Services Assignment
Table and incorporated a Note below the table. Since the number of
WYEs change each year as depicted in Attachment L-2, this will require a minimum of four (4) Missions Service Assignment Tables. Is it the intent of the Government that four additional pages be allocated to this new requirement?
No. Additional tables (i.e., more than two) are considered unnecessary unless the offeror will reassign the work from one company to another between Option periods. In such case, offerors shall provide a table for each year in which WYE assignments are revised. The Mission
Suitability PWS Mission Services Assignment Matrix is revised as part of this amendment.
5 Vol. III Past Performance Factor
Instructions, Section II, (2) Page L-
The Government modified the PWS Mission Services Assignment
Table from Draft RFP to final to remove PWS 4.4 and 4.6. The directions state “…assignment of all PWS elements,…”, therefore is it the intent for the Offeror to insert the missing PWS elements?
No. The offeror should not include PWS 4.4 or 4.6 to the
Past Performance PWS Mission Services WYE
Assignment Matrix.
6 Vol. III Past Performance Factor
Instructions, Section II, (2) Page L-
The Government has modified the PWS Missions Services Assignment
Table to now to include subcontractors with WYE assignments at JSC in Option Period 1, to be “noted” below Table. The intent of this request is unclear for situation where each subcontractor including the prime would have assignments at JSC in Option Period 1. Therefore, it seems another table would be needed for Option Period 1 WYE
Assignment Matrix. Is it the intent of the Government to require another Table or attempt to narrate the assignments in Note below existing table?
It is not the intent of the Government to require an additional Table if the narrative provided as a “Note” below the table sufficiently describes the allocation of work to the company(s) assigned to perform effort at JSC beginning in Option Period 1.
7 Vol. III Past Performance Factor
Instructions, Section II, (2) Page L-
Is the PWS Assignment IDIQ Matrix only intended to show subcontractors for whom there is a past performance citation included in Section I, or all subcontractors?
The purpose of the matrix is to indicate the anticipated assignment of work for the offeror’s team for whom past performance reference contracts or subcontracts are submitted.
ATTACHMENT B – SUMMARY OF CHANGES BETWEEN AMENDMENT P00001 AND AMENDMENT P00002
This attachment delineates changes made to the RFP Amendment P0001, which was posted to FedBizOpps on October 25, 2019. The changes are a result of comments and questions received from industry and internal reviews. These changes represent all significant changes, but are not intended to be all-inclusive. Grammatical, typographical, and other non-substantive changes have been corrected throughout the RFP.
Index Section Clause or Provision From To
Page
Number(s)
1 J
Attachment J-1, Performance Work
Statement, Appendix
A, Center-Specific
Mission Requirements
MSFC-30 MSFC-30
28. Provide the following reports:
(a) Weekly activity reports
(b) Monthly Program Office report
(c) Program Office products, reports, presentation packages
(d) PO & Mission requirements documentation creation and revisions
(e) Post-review summary report
(f) PIR presentation preparation
J-1-52
2 J
Attachment J-1A, Mission Labor
Requirements
MSFC-30, Requesting Organization: ST24 MSFC-30, Requesting Organization: ST30 J-1A-5
3 L
MSFC 52.205-90,
Designated Point of
Contact
(b) Questions and comments relative to this acquisition shall be submitted via email to the point of contact specified above no later than October 29, 2019, 2:00 p.m., Central Time.
(b) Questions and comments relative to this acquisition shall be submitted via email to the point of contact specified above no later than October 31, 2019, 2:00 p.m., Central Time.
L-12
Number(s)
4 L
Volume I – Mission
Suitability Factor
Instructions paragraph
(c), Subfactor 1 –
Management
Approach (MA), (MA-1) General
Management
Approach
(3) Teaming and subcontracting arrangements to include rationale for each of the arrangements, assignment of work by company (to be provided in the Performance
Work Statement (PWS) Mission Services WYE
Assignment Matrix provided below) to account for all
WYEs required by Attachment J-1A, Mission Labor
Requirements, lines of authority, integration of team members or subcontractors into the management and supervisory hierarchy, how management and control policies will be implemented, limitations or exclusions of work by subcontractors, and how work will be performed, controlled, reported, and reviewed. Include potential delegations of authority to site-specific (Center) organizations, as well as organizational and geographical placement of authority to include potential IDIQ requirements across the Agency.
(3) Teaming and subcontracting arrangements to include rationale for each of the arrangements, assignment of work by company (to be provided in the Performance
Work Statement (PWS) Mission Services WYE
Assignment Matrix provided below for the first two years of performance and the PWS Assignment IDIQ Matrix below for the first year of performance) to account for all
WYEs required by Attachment J-1A, Mission Labor
Requirements and Attachment L-2, Projected Task Order
Requirements, lines of authority, integration of team members or subcontractors into the management and supervisory hierarchy, how management and control policies will be implemented, limitations or exclusions of work by subcontractors, and how work will be performed, controlled, reported, and reviewed. Include potential delegations of authority to site-specific (Center) organizations, as well as organizational and geographical placement of authority to include potential IDIQ requirements across the Agency.
L-16 and L-
Number(s)
5 L
Volume I – Mission
Suitability Factor
Instructions, Paragraph (c)
Subfactor 1 –
Management
Approach (MA), (MA-1) General
Management
Approach (3), PWS
Mission Services
WYE Assignment
Matrix
Title: PWS Mission Services WYE Assignment Matrix
Note: Table may be modified to account for additional subcontractors. If the assignment of work by company is anticipated to remain static over the life of the contract, the offeror shall so state and provide a single matrix using
WYEs for the base period only. If company assignment will change (e.g., subcontractor will be assigned effort at
JSC beginning in Option Period 1) provide an additional matrix to indicate the revised size of staffing. Provide additional matrices as appropriate beyond Option Period
1 only to reflect reallocation of assigned work.
Title: PWS Mission Services WYE Assignment Matrix
(Base Period)
Note: Table may be modified to account for additional subcontractors (e.g., use of landscape format within existing margin restrictions).
Added new matrix titled “PWS Mission Services WYE
Assignment Matrix (Option Period 1)” and “Note: If the assignment of work by company is anticipated to remain static for the remainder of the contract, the offeror shall so state. If company assignment will change, provide an additional table(s) to indicate the revised size of staffing.”
Added new matrix titled “PWS Assignment IDIQ
Matrix”
L-17 to
L-19
6 L
Volume III – Past
Performance Factor
Instructions, (e)
SECTION II, (2) PWS
Mission Services
WYE Assignment
Matrix
Headings “Prime Contractor” and “Subcontractor”
Column: “Total WYEs” Deleted headings and column. L-31
7 1 L Attachment L-1, Excel
Pricing Model (EPM) Entire excel file.
Replaced in its entirety to revise Tab A-1 Cell G37 to be
“=sum(B37:F37)” and revise the locations of the KSC and HQ support under Tab B-2.
N/A
Number(s)
8 L
Attachment L-2, Projected Task Order
Requirements
N/A
The PP&C JSC task order requirements below are anticipated to be initiated and awarded during the base period of the contract with an effective date of
10/01/2021 via the Government-provided Automated
Task Order Management System (ATOMS). The
Government is not obligated to award these task orders.
This list does not exclude JSC from adding IDIQ efforts during phase-in.
L-2-6
9 L
Attachment L-2, Projected Task Order
Requirements
Center Task Order # MSFC/SME-6*
*Note: The SLS Program Office requires Programmatic
SME support during the design, development, and test phases of the SLS Program which requires access to classified information up to the Top Secret (TS) level, to include access to Sensitive Compartmented Information
(SCI). The Contractor will only have access to SCI material at Government facilities. The Contractor shall be knowledgeable of, and responsible for, adhering to NPR
1600.2, NASA Classified National Security Information
(CNSI); DoD 5220.22-M, National Industrial Security
Program Operating Manual; and all applicable
Intelligence Community Directives (ICD). All classified visits involving access to TS/SCI information shall be coordinated through the MSFC Protective Services and
Export Control Office (PSECO) Special Security Officer
(SSO).
Center Task Order # MSFC/SME-12*
*Note: The SLS Program Office requires Programmatic
SME support during the design, development, and test phases of the SLS Program which requires access to classified information up to the Top Secret (TS) level, to include access to Sensitive Compartmented Information
(SCI). The Contractor will only have access to SCI material at Government facilities. The Contractor shall be knowledgeable of, and responsible for, adhering to NPR
1600.2, NASA Classified National Security Information
(CNSI); DoD 5220.22-M, National Industrial Security
Program Operating Manual; and all applicable
Intelligence Community Directives (ICD). All classified visits involving access to TS/SCI information shall be coordinated through the MSFC Protective Services and
Export Control Office (PSECO) Special Security Officer
(SSO).
L-2-10 and
L-2-11
Number(s)
10 L
Attachment L-2, Projected Task Order
Requirements
Location of Work Performed:
MSFC/SME-12: MSFC
MSFC/SME-13: MSFC
MSFC/SME-15: MSFC
MSFC/SME-18: MSFC
MSFC/SME-39: MSFC
Location of Work Performed:
MSFC/SME-12: MSFC and MAF
MSFC/SME-13: MSFC and MAF
MSFC/SME-15: KSC
MSFC/SME-18: MAF
MSFC/SME-39: HQ
L-2-11 to
L-2-20
11 L
Attachment L-3, Past
Performance
Questionnaire Form
Please forward the completed evaluation to NASA at the above email address to ensure it is received by the
Government no later than November 7, 2019.
Please forward the completed evaluation to NASA at the above email address to ensure it is received by the
Government no later than 2:00 p.m. Central Time, November 7, 2019.
L-3-12