80MSFC19R0010_Amendment_P00002_Attachment_L-1__Excel_Pricing_Model_(EPM)_(PPC).xlsx

XLSX spreadsheet 178 KB Posted

Attached to
Consolidated Program Support Services (CPSS) Program, Planning, and Control (PP&C) Federal contract opportunity
Solicitation number
80MSFC19R0010
Issued by
National Aeronautics and Space Administration Marshall Space Flight Center

About this file

80MSFC19R0010 Amendment P00002 Attachment L-1, EPM

View the file

Other files for this federal contract opportunity

Other files attached to Consolidated Program Support Services (CPSS) Program, Planning, and Control (PP&C), newest first.
File Type Posted
80MSFC19R0010 Amendment P00005 SF30 - Summary of Changes.pdf PDF
80MSFC19R0010_CPSS_PP&C_Amendment_P00004.pdf PDF
Amendment_P00003_Attachment_A_and_B.pdf PDF
80MSFC19R0010_CPSS_PP&C_Amendment_P0003_SF30.pdf PDF
80MSFC19R0010_CPSS_PP&C_Final__RFP_-_Amendment_P00003.docx DOCX document
80MSFC19R0010_CPSS_PP&C_Amendment_P0002_SF30.pdf PDF
80MSFC19R0010_CPSS_PP&C_Final__RFP_-_Amendment_P00002.docx DOCX document
Amendment_P00002_Attachment_A_and_B.pdf PDF
80MSFC19R0010_Amendment_P00001_Attachment_L-1__Excel_Pricing_Model_(EPM)_(PPC).xlsx XLSX spreadsheet
80MSFC19R0010_CPSS_PP&C_Amendment_P0001_SF30.pdf PDF
Amendment_P00001_Attachment_A_and_B.pdf PDF
80MSFC19R0010_CPSS_PP&C_Final__RFP_-_Amendment_P00001.docx DOCX document
CPSS_PP&C_RFP_Cover_Letter.pdf PDF
80MSFC19R0010_Attachment_L-1__Excel_Pricing_Model_(EPM)_(PPC)_Final.xlsx XLSX spreadsheet
80MSFC19R0010_CPSS_PP&C_SF33.pdf PDF
80MSFC19R0010_CPSS_PP&C_Final__RFP.docx DOCX document
80MSFC19P0020_CPSS_PP&C_SF1449.pdf PDF
ATOMS_Guide_10_2_19.pdf PDF
CPSS_Interested_Parties_List.pdf PDF
80MSFC19R0010_CPSS_PP&C_Industry_Overview_Charts.pdf PDF
80MSFC19R0010_CPSS_PP&C_DRFP.docx DOCX document
80MSFC19R0010_CPSS_PP&C_DRFP_Cover_Letter.pdf PDF
80MSFC19R0010_Attachment_L-1__Excel_Pricing_Model_(EPM)_(PPC).xlsx XLSX spreadsheet
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX PPC

Company Name: Company XYZ, Inc. INDEX PPC

Attachment L-1

TabTitleSpecific Instruction
A-1Summary of Total PriceThis tab is designed to summarize the total price (mission and IDIQ) for the entire contract effort. Offerors shall input the applicable burden rate(s) to be applied to the IDIQ ODC (e.g., travel, training). This tab is linked to other tabs within the workbook. Most of this tab will automatically fill in once the other tabs have been completed. The Government-provided IDIQ ODC (e.g., travel, training) values are pre-populated in this tab.
No Subcontractor manual input required.Prime
A-2Summary of Mission by SubcontractorTab A-2 shall be completed by the offeror only. The tab is linked to Tabs B-1 and B-2. Rows 8 through 14 compute the total WYEs and Mission Labor Price for the individual company (offeror or applicable subcontractor (exceeding $15M over the life of the contract)) who is filling the EPM. Subcontractors do not need to input any information on Tab A-2.

This tab compiles each subcontractor’s participation in mission labor. The top table is linked to each subsequent tab (Tabs B-1 and B-2) used to compute a total mission price for the company completing the EPM. The tables below are where the offeror would include each subcontractor's price for the work assigned to them.

No Subcontractor manual input required.Prime
B-1 thru B-2Computation of Mission Price by Center (JSC or MSFC) (to be completed by Offeror and Applicable Subcontractors)Tab B-1 shall be completed by the offeror and applicable subcontractors (exceeding $15M over the life of the contract). Rows 8 through 29 are pre-filled with the total required WYEs. These rows shall be revised to reflect the offeror's or applicable subcontractor's WYEs for their own workshare. Row 33 requires input of the offeror's productive hours. Rows 39 through 60 generate labor hours. Rows 66 through 87 require input of the offeror's fully burdened labor rates (FBLR) for the labor category that is included in their workshare. Rows 92 through 113 generate total proposed labor dollars.

Tab B-2 shall be completed by the offeror and applicable subcontractors (exceeding $15M over the life of the contract). Rows 6 through 31 are pre-filled with the total required WYEs. These rows shall be revised to reflect the offeror's or applicable subcontractor's WYEs for their own workshare. Row 35 requires input of the offeror's productive hours. Rows 39 through 64 generate labor hours. Rows 69 through 94 requires input of the offeror's fully burdened labor rates (FBLR) for the labor category that is included in their workshare. Rows 98 through 123 generate total proposed labor dollars.

This tab is used to calculate the fully burdened labor dollars using the proposed WYEs multiplied by the proposed fully burden labor rates and the productive factor generated from the available hours for that contract period. The WYEs have been pre-populated by the Government in accordance with RFP Attachment J-1A. The worksheet automatically calculates hours and dollars once other tabs are completed within this workbook.Prime & Applicable Subcontractor
********* PRIME ONLY PRIME ONLY PRIME ONLY PRIME ONLY *********
C-1 thru C-11Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by CenterThis tab calculates the IDIQ labor price by Center. The labor hours have been pre-populated by the Government for each labor category for each period of performance. These rates must include all anticipated subcontract rates as well as the offeror's handling and profit.

Note: The Government-provided pre-populated hours are provided only as a means of establishing a total proposed price for evaluation purposes. Offerors shall ensure that fully-burdened labor rates are provided for all labor categories, for all years of performance, for all Centers. Prime

NOTE: Offerors shall fill in the areas highlighted in yellow.

&"Times New Roman,Bold Italic"RFP# 80MSFC19R0010

&"Times New Roman,Bold"Page &P of &N &"Times New Roman,Bold"&F &A

Tab A - 1

Company XYZ, Inc.
Summary of Total Price
PP&C

ELEMENTS Base Yr. Option Yr. 1 Option Yr. 2 Option Yr. 3 Option Yr. 4 Totals

WYE - Mission
JSC- 026.526.526.515.595.0
MSFC77.477.477.077.076.0384.6
Total WYE77.4103.9103.5103.591.5479.6
Fully Burdened Labor - Mission
JSC$0$0$0$0$0$0
MSFC$0$0$0$0$0$0
Total Mission Labor Price$0$0$0$0$0$0Should Match Section B of the contract
FFP Program, Planning, and Control (PP&C) IDIQ Labor by CenterCLIN 2CLIN 5CLIN 8CLIN 11CLIN 14Total
AFRC$0$0$0$0$0$0
ARC$0$0$0$0$0$0
GRC$0$0$0$0$0$0
GSFC$0$0$0$0$0$0
HQ$0$0$0$0$0$0
JSC$0$0$0$0$0$0
KSC$0$0$0$0$0$0
LaRC$0$0$0$0$0$0
MSFC$0$0$0$0$0$0
MAF$0$0$0$0$0$0
SSC$0$0$0$0$0$0
Total IDIQ Labor$0$0$0$0$0$0
T&M Programmatic Subject Matter Expert (SME) IDIQCLIN 3CLIN 6CLIN 9CLIN 12CLIN 15Total
AFRC$0$0$0$0$0$0
ARC$0$0$0$0$0$0
GRC$0$0$0$0$0$0
GSFC$0$0$0$0$0$0
HQ$0$0$0$0$0$0
JSC$0$0$0$0$0$0
KSC$0$0$0$0$0$0
LaRC$0$0$0$0$0$0
MSFC$0$0$0$0$0$0
MAF$0$0$0$0$0$0
SSC$0$0$0$0$0$0
Total IDIQ Labor$0$0$0$0$0$0
PP&C IDIQ ODC Value$500,000$500,000$500,000$500,000$500,000$2,500,000
SME IDIQ ODC Value$1,000,000$1,000,000$1,000,000$1,000,000$1,000,000$5,000,000
IDIQ ODC Burden (%)0%0%0%0%0%
Total IDIQ ODC Burden$0$0$0$0$0$0
Total IDIQ Labor and Burden$0$0$0$0$0$0

Total Price - Mission and IDIQ $0 $0 $0 $0 $0 $0

Areas in Yellow Require Manual Input
It is the offeror's responsibility to provide an accurate proposal. The IDIQ ODC dollars are not included in the total price.
Acronyms for NASA Centers
AFRC - Armstrong Flight Research Center, Edwards, CAKSC - Kennedy Space Center, Merritt Island, FL

ARC - Ames Research Center, Moffett Field, CA LaRC - Langley Research Center, Hampton, VA

GRC - Glenn Research Center, Cleveland, OH MSFC - Marshall Space Flight Center, Huntsville, AL

GSFC - Goddard Space Flight Center, Greenbelt, MD MAF - Michoud Assembly Facility, New Orleans, LA

HQ - NASA Headquarters Acquisition Division, Washington, DC SSC - Stennis Space Center, Bay St. Louis, MS

JSC - Johnson Space Center, Houston, TX

RFP# 80MSFC19R0010

&"Times New Roman,Bold"Page &P of &N &"Times New Roman,Bold"&F &A

Tab A -2

Company XYZ, Inc.
Summary of Mission Price by Subcontractor
PP&C
ELEMENTSBase Yr.Option Yr. 1Option Yr. 2Option Yr. 3Option Yr. 4Totals
Prime (or offeror completing the EPM)
WYE - Mission
JSC- 026.5026.5026.5015.5095.00Tab A-2 shall be completed by the offeror only. The tab is linked to Tabs B-1 and B-2. Rows 8 through 14 compute the total WYEs and Mission Labor Price for the individual company (offeror or applicable subcontractor (exceeding $15M over the life of the contract)) who is filling the EPM. Subcontractors do not need to input any information on Tab A-2.
MSFC77.3577.3576.9576.9575.95384.55
Total WYE77.35103.85103.45103.4591.45479.55
Fully Burdened Labor - Mission
JSC$0$0$0$0$0$0
MSFC$0$0$0$0$0$0
Mission Labor Price - Prime$0$0$0$0$0$0
Subcontractor Name #1
WYE - MissionBase Yr.Option Yr. 1Option Yr. 2Option Yr. 3Option Yr. 4Totals
JSC0.0
MSFC0.0
Total WYE0.00.00.00.00.00.0
Fully Burdened Labor - Mission
JSC$0.00
MSFC$0.00
Mission Labor Price - Sub 1$0$0$0$0$0$0
Subcontractor Name #2
WYE - MissionBase Yr.Option Yr. 1Option Yr. 2Option Yr. 3Option Yr. 4Totals
JSC0.0
MSFC0.0
Total WYE0.00.00.00.00.00.0
Fully Burdened Labor - Mission
JSC$0.00
MSFC$0.00
Mission Labor Price - Sub 2$0$0$0$0$0$0
Subcontractor Name #3
WYE - MissionBase Yr.Option Yr. 1Option Yr. 2Option Yr. 3Option Yr. 4Totals
JSC0.0
MSFC0.0
Total WYE0.00.00.00.00.00.0
Fully Burdened Labor - Mission
JSC$0.00
MSFC$0.00
Mission Labor Price - Sub 3$0$0$0$0$0$0
Subcontractor Name #4
WYE - MissionBase Yr.Option Yr. 1Option Yr. 2Option Yr. 3Option Yr. 4Totals
JSC0.0
MSFC0.0
Total WYE0.00.00.00.00.00.0
Fully Burdened Labor - Mission
JSC$0.00
MSFC$0.00
Mission Labor Price - Sub 4$0$0$0$0$0$0

Repeat the Above table for each subcontractor and add to totals

Total Team WYE and Labor for Mission
WYE - MissionBase Yr.Option Yr. 1Option Yr. 2Option Yr. 3Option Yr. 4Totals
JSC- 026.526.526.515.595.0
MSFC77.477.477.077.076.0384.6
Total WYE77.4103.9103.5103.591.5479.6
Fully Burdened Labor - Mission
JSC$0$0$0$0$0$0
MSFC$0$0$0$0$0$0
Mission Labor Price$0$0$0$0$0$0

Areas in Yellow Require Manual Input

RFP# 80MSFC19R0010

&"Times New Roman,Bold"Page &P of &N &"Times New Roman,Bold"&F &A

B-1 JSC

Company XYZ, Inc.B-1 JSC
NASA CenterJSC
Computation of Mission Price By Center (JSC)
WYE WYE WYE WYE
NASA Labor CategoryOfferor Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
JSCTab B-1 shall be completed by the offeror and applicable subcontractors (exceeding $15M over the life of the contract). Rows 8 through 29 are pre-filled with the total required WYEs. These rows shall be revised to reflect the offeror's or applicable subcontractor's WYEs for their own workshare. Row 32 requires input of the offeror's productive hours. Rows 38 through 58 generate labor hours. Rows 64 through 84 require input of the offeror's fully burdened labor rates (FBLR) for the labor category that is included in their workshare. Rows 89 through 109 generate total proposed labor dollars.
Program Analyst 1- 0
Program Analyst 2- 0
Program Analyst 32.002.002.00- 06.00
Program Analyst 412.5012.5012.5010.5048.00
Scheduler 1- 0
Scheduler 2- 0
Scheduler 31.001.001.001.004.00
Scheduler 45.005.005.002.0017.00
Risk Management Analyst 1- 0
Risk Management Analyst 2- 0
Risk Management Analyst 3- 0
Risk Management Analyst 40.500.500.500.502.00
Cost Estimating Analyst 1- 0
Cost Estimating Analyst 2- 0
Cost Estimating Analyst 31.001.001.00- 03.00
Cost Estimating Analyst 44.504.504.501.5015.00
Cost Modeling Specialist 1- 0
Cost Modeling Specialist 2- 0
Cost Modeling Specialist 3- 0
Cost Modeling Specialist 4- 0
Cost Modeling Specialist 5- 0
Total WYE- 026.5026.5026.5015.5095.00
Base Yr.Option 1Option 2Option 3Option 4
Total Productive Hours
HRS HRS HRS HRS HRS
NASA Labor CategoryOfferor Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
JSC
Program Analyst 1- 0- 0- 0- 0- 0- 0
Program Analyst 2- 0- 0- 0- 0- 0- 0
Program Analyst 3- 0- 0- 0- 0- 0- 0
Program Analyst 4- 0- 0- 0- 0- 0- 0
Scheduler 1- 0- 0- 0- 0- 0- 0
Scheduler 2- 0- 0- 0- 0- 0- 0
Scheduler 3- 0- 0- 0- 0- 0- 0
Scheduler 4- 0- 0- 0- 0- 0- 0
Risk Management Analyst 1- 0- 0- 0- 0- 0- 0
Risk Management Analyst 2- 0- 0- 0- 0- 0- 0
Risk Management Analyst 3- 0- 0- 0- 0- 0- 0
Risk Management Analyst 4- 0- 0- 0- 0- 0- 0
Cost Estimating Analyst 1- 0- 0- 0- 0- 0- 0
Cost Estimating Analyst 2- 0- 0- 0- 0- 0- 0
Cost Estimating Analyst 3- 0- 0- 0- 0- 0- 0
Cost Estimating Analyst 4- 0- 0- 0- 0- 0- 0
Cost Modeling Specialist 1- 0- 0- 0- 0- 0- 0
Cost Modeling Specialist 2- 0- 0- 0- 0- 0- 0
Cost Modeling Specialist 3- 0- 0- 0- 0- 0- 0
Cost Modeling Specialist 4- 0- 0- 0- 0- 0- 0
Cost Modeling Specialist 5- 0- 0- 0- 0- 0- 0
Total Hours------
FBLR FBLR FBLR FBLR
NASA Labor CategoryOfferor Labor CategoryBase Yr.Option 1Option 2Option 3Option 4
JSC
Program Analyst 1
Program Analyst 2
Program Analyst 3
Program Analyst 4
Scheduler 1
Scheduler 2
Scheduler 3
Scheduler 4
Risk Management Analyst 1
Risk Management Analyst 2
Risk Management Analyst 3
Risk Management Analyst 4
Cost Estimating Analyst 1
Cost Estimating Analyst 2
Cost Estimating Analyst 3
Cost Estimating Analyst 4
Cost Modeling Specialist 1
Cost Modeling Specialist 2
Cost Modeling Specialist 3
Cost Modeling Specialist 4
Cost Modeling Specialist 5
$$$ $$$ $$$ $$$
NASA Labor CategoryOfferor Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
JSC
Program Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total Labor Dollars$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Areas in Yellow Require Manual Input

RFP 80MSFC19R0010 &F&A

B-2 MSFC

Company XYZ, Inc.B-2 MSFC
NASA CenterMSFC/KSC/HQ
Computation of Mission Price By Center
WYE WYE WYE WYE
NASA Labor CategoryOfferor Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Agency Wide Program Manager1.001.001.001.001.005.00Tab B-2 shall be completed by the offeror and applicable subcontractors (exceeding $15M over the life of the contract). Rows 6 through 31 are pre-filled with the total required WYEs. These rows shall be revised to reflect the offeror's or applicable subcontractor's WYEs for their own workshare. Row 35 requires input of the offeror's productive hours. Rows 39 through 64 generate labor hours. Rows 69 through 94 requires input of the offeror's fully burdened labor rates (FBLR) for the labor category that is included in their workshare. Rows 98 through 123 generate total proposed labor dollars.
MSFC/KSC/HQ
Program Analyst 12.002.002.002.002.0010.00
Program Analyst 27.007.007.007.007.0035.00
Program Analyst 2 (KSC)1.001.001.001.001.005.00
Program Analyst 310.6510.6510.2510.259.2551.05
Program Analyst 412.0012.0012.0012.0012.0060.00
Program Analyst 4 (HQ)1.001.001.001.001.005.00
Scheduler 18.008.008.008.008.0040.00
Scheduler 29.009.009.009.009.0045.00
Scheduler 37.007.007.007.007.0035.00
Scheduler 47.507.507.507.507.5037.50
Risk Management Analyst 1- 0
Risk Management Analyst 2- 0
Risk Management Analyst 3- 0
Risk Management Analyst 46.006.006.006.006.0030.00
Cost Estimating Analyst 1- 0
Cost Estimating Analyst 2- 0
Cost Estimating Analyst 31.001.001.001.001.005.00
Cost Estimating Analyst 41.001.001.001.001.005.00
Cost Modeling Specialist 1- 0
Cost Modeling Specialist 20.500.500.500.500.502.50
Cost Modeling Specialist 3- 0
Cost Modeling Specialist 41.701.701.701.701.708.50
Cost Modeling Specialist 5- 0
Documentation Librarian1.001.001.001.001.005.00
Total WYE77.3577.3576.9576.9575.95384.55
Base Yr.Option 1Option 2Option 3Option 4
Total Productive Hours
HRS HRS HRS HRS
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Agency Wide Program Manager- 0- 0- 0- 0- 0- 0
MSFC/KSC/HQ
Program Analyst 1- 0- 0- 0- 0- 0- 0
Program Analyst 2- 0- 0- 0- 0- 0- 0
Program Analyst 2 (KSC)- 0- 0- 0- 0- 0
Program Analyst 3- 0- 0- 0- 0- 0- 0
Program Analyst 4- 0- 0- 0- 0- 0- 0
Program Analyst 4 (HQ)- 0- 0- 0- 0- 0
Scheduler 1- 0- 0- 0- 0- 0- 0
Scheduler 2- 0- 0- 0- 0- 0- 0
Scheduler 3- 0- 0- 0- 0- 0- 0
Scheduler 4- 0- 0- 0- 0- 0- 0
Risk Management Analyst 1- 0- 0- 0- 0- 0- 0
Risk Management Analyst 2- 0- 0- 0- 0- 0- 0
Risk Management Analyst 3- 0- 0- 0- 0- 0- 0
Risk Management Analyst 4- 0- 0- 0- 0- 0- 0
Cost Estimating Analyst 1- 0- 0- 0- 0- 0- 0
Cost Estimating Analyst 2- 0- 0- 0- 0- 0- 0
Cost Estimating Analyst 3- 0- 0- 0- 0- 0- 0
Cost Estimating Analyst 4- 0- 0- 0- 0- 0- 0
Cost Modeling Specialist 1- 0- 0- 0- 0- 0- 0
Cost Modeling Specialist 2- 0- 0- 0- 0- 0- 0
Cost Modeling Specialist 3- 0- 0- 0- 0- 0- 0
Cost Modeling Specialist 4- 0- 0- 0- 0- 0- 0
Cost Modeling Specialist 5- 0- 0- 0- 0- 0- 0
Documentation Librarian- 0- 0- 0- 0- 0- 0
Total Hours------
FBLR FBLR FBLR FBLR
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4
Agency Wide Program Manager
MSFC/KSC/HQ
Program Analyst 1
Program Analyst 2
Program Analyst 2 (KSC)
Program Analyst 3
Program Analyst 4
Program Analyst 4 (HQ)
Scheduler 1
Scheduler 2
Scheduler 3
Scheduler 4
Risk Management Analyst 1
Risk Management Analyst 2
Risk Management Analyst 3
Risk Management Analyst 4
Cost Estimating Analyst 1
Cost Estimating Analyst 2
Cost Estimating Analyst 3
Cost Estimating Analyst 4
Cost Modeling Specialist 1
Cost Modeling Specialist 2
Cost Modeling Specialist 3
Cost Modeling Specialist 4
Cost Modeling Specialist 5
Documentation Librarian
$$$ $$$ $$$ $$$ $$$
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Agency Wide Program Manager$ -$ -$ -$ -$ -$ -
MSFC/KSC/HQ
Program Analyst 1$ -$ -$ -$ -$ -$ -
Program Analyst 2$ -$ -$ -$ -$ -$ -
Program Analyst 2 (KSC)$ -$ -$ -$ -$ -$ -
Program Analyst 3$ -$ -$ -$ -$ -$ -
Program Analyst 4$ -$ -$ -$ -$ -$ -
Program Analyst 4 (HQ)$ -$ -$ -$ -$ -$ -
Scheduler 1$ -$ -$ -$ -$ -$ -
Scheduler 2$ -$ -$ -$ -$ -$ -
Scheduler 3$ -$ -$ -$ -$ -$ -
Scheduler 4$ -$ -$ -$ -$ -$ -
Risk Management Analyst 1$ -$ -$ -$ -$ -$ -
Risk Management Analyst 2$ -$ -$ -$ -$ -$ -
Risk Management Analyst 3$ -$ -$ -$ -$ -$ -
Risk Management Analyst 4$ -$ -$ -$ -$ -$ -
Cost Estimating Analyst 1$ -$ -$ -$ -$ -$ -
Cost Estimating Analyst 2$ -$ -$ -$ -$ -$ -
Cost Estimating Analyst 3$ -$ -$ -$ -$ -$ -
Cost Estimating Analyst 4$ -$ -$ -$ -$ -$ -
Cost Modeling Specialist 1$ -$ -$ -$ -$ -$ -
Cost Modeling Specialist 2$ -$ -$ -$ -$ -$ -
Cost Modeling Specialist 3$ -$ -$ -$ -$ -$ -
Cost Modeling Specialist 4$ -$ -$ -$ -$ -$ -
Cost Modeling Specialist 5$ -$ -$ -$ -$ -$ -
Documentation Librarian$ -$ -$ -$ -$ -$ -
Total Labor Dollars$ -$ -$ -$ -$ -$ -

Areas in Yellow Require Manual Input

RFP 80MSFC19R0010 &F&A

C-1 AFRC

Company XYZ, Inc.C-1 AFRC
NASA Center:AFRC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor RatesIDIQ HoursIDIQ Dollars
AFRCAFRCAFRC
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4TotalNASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Program Analyst 1Program Analyst 1100010001000100010005000Program Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 2Program Analyst 2100010001000100010005000Program Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 3Program Analyst 3100010001000100010005000Program Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 4Program Analyst 4100010001000100010005000Program Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 1Scheduler 1100010001000100010005000Scheduler 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 2Scheduler 2100010001000100010005000Scheduler 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 3Scheduler 3100010001000100010005000Scheduler 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 4Scheduler 4100010001000100010005000Scheduler 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 1Risk Management Analyst 1100010001000100010005000Risk Management Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 2Risk Management Analyst 2100010001000100010005000Risk Management Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 3Risk Management Analyst 3100010001000100010005000Risk Management Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 4Risk Management Analyst 4100010001000100010005000Risk Management Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 1Cost Estimating Analyst 1100010001000100010005000Cost Estimating Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 2Cost Estimating Analyst 2100010001000100010005000Cost Estimating Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 3Cost Estimating Analyst 3100010001000100010005000Cost Estimating Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 4Cost Estimating Analyst 4100010001000100010005000Cost Estimating Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 1Cost Modeling Specialist 1100010001000100010005000Cost Modeling Specialist 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 2Cost Modeling Specialist 2100010001000100010005000Cost Modeling Specialist 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 3Cost Modeling Specialist 3100010001000100010005000Cost Modeling Specialist 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 4Cost Modeling Specialist 4100010001000100010005000Cost Modeling Specialist 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 5Cost Modeling Specialist 5100010001000100010005000Cost Modeling Specialist 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal2100021000210002100021000105000Subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Base Yr.Option 1Option 2Option 3Option 4TotalBase Yr.Option 1Option 2Option 3Option 4Total
SME 1SME 1100010001000100010005000SME 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SME 2SME 2100010001000100010005000SME 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SME 3SME 3100010001000100010005000SME 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal SME3000300030003000300015000Subtotal SME$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total IDIQ Model hours2400024000240002400024000120000Total IDIQ Model Dollars$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit.
Areas in Yellow Require Manual Input

&"Times New Roman,Bold Italic"&K00B0F0RFP#80MSFC19R0010

&F &A

C-2 ARC

Company XYZ, Inc.C-2 ARC
NASA Center:ARC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor RatesIDIQ HoursIDIQ Dollars
ARCARCARC
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4TotalNASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Program Analyst 1Program Analyst 1100010001000100010005000Program Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 2Program Analyst 2100010001000100010005000Program Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 3Program Analyst 3100010001000100010005000Program Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 4Program Analyst 4100010001000100010005000Program Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 1Scheduler 1100010001000100010005000Scheduler 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 2Scheduler 2100010001000100010005000Scheduler 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 3Scheduler 3100010001000100010005000Scheduler 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 4Scheduler 4100010001000100010005000Scheduler 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 1Risk Management Analyst 1100010001000100010005000Risk Management Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 2Risk Management Analyst 2100010001000100010005000Risk Management Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 3Risk Management Analyst 3100010001000100010005000Risk Management Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 4Risk Management Analyst 4100010001000100010005000Risk Management Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 1Cost Estimating Analyst 1100010001000100010005000Cost Estimating Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 2Cost Estimating Analyst 2100010001000100010005000Cost Estimating Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 3Cost Estimating Analyst 3100010001000100010005000Cost Estimating Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 4Cost Estimating Analyst 4100010001000100010005000Cost Estimating Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 1Cost Modeling Specialist 1100010001000100010005000Cost Modeling Specialist 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 2Cost Modeling Specialist 2100010001000100010005000Cost Modeling Specialist 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 3Cost Modeling Specialist 3100010001000100010005000Cost Modeling Specialist 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 4Cost Modeling Specialist 4100010001000100010005000Cost Modeling Specialist 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 5Cost Modeling Specialist 5100010001000100010005000Cost Modeling Specialist 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal2100021000210002100021000105000Subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Base Yr.Option 1Option 2Option 3Option 4TotalBase Yr.Option 1Option 2Option 3Option 4Total
SME 1SME 1100010001000100010005000SME 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SME 2SME 2100010001000100010005000SME 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SME 3SME 3100010001000100010005000SME 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal SME3000300030003000300015000Subtotal SME$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total IDIQ Model hours2400024000240002400024000120000Total IDIQ Model Dollars$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit.
Areas in Yellow Require Manual Input

&"Times New Roman,Bold Italic"&K00B0F0RFP#80MSFC19R0010

C-3 GRC

Company XYZ, Inc.C-3 GRC
NASA Center:GRC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor RatesIDIQ HoursIDIQ Dollars
GRCGRCGRC
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4TotalNASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Program Analyst 1Program Analyst 1100010001000100010005000Program Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 2Program Analyst 2100010001000100010005000Program Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 3Program Analyst 3100010001000100010005000Program Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 4Program Analyst 4100010001000100010005000Program Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 1Scheduler 1100010001000100010005000Scheduler 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 2Scheduler 2100010001000100010005000Scheduler 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 3Scheduler 3100010001000100010005000Scheduler 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 4Scheduler 4100010001000100010005000Scheduler 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 1Risk Management Analyst 1100010001000100010005000Risk Management Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 2Risk Management Analyst 2100010001000100010005000Risk Management Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 3Risk Management Analyst 3100010001000100010005000Risk Management Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 4Risk Management Analyst 4100010001000100010005000Risk Management Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 1Cost Estimating Analyst 1100010001000100010005000Cost Estimating Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 2Cost Estimating Analyst 2100010001000100010005000Cost Estimating Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 3Cost Estimating Analyst 3100010001000100010005000Cost Estimating Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 4Cost Estimating Analyst 4100010001000100010005000Cost Estimating Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 1Cost Modeling Specialist 1100010001000100010005000Cost Modeling Specialist 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 2Cost Modeling Specialist 2100010001000100010005000Cost Modeling Specialist 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 3Cost Modeling Specialist 3100010001000100010005000Cost Modeling Specialist 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 4Cost Modeling Specialist 4100010001000100010005000Cost Modeling Specialist 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 5Cost Modeling Specialist 5100010001000100010005000Cost Modeling Specialist 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal2100021000210002100021000105000Subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Base Yr.Option 1Option 2Option 3Option 4TotalBase Yr.Option 1Option 2Option 3Option 4Total
SME 1SME 1100010001000100010005000SME 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SME 2SME 2100010001000100010005000SME 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SME 3SME 3100010001000100010005000SME 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal SME3000300030003000300015000Subtotal SME$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total IDIQ Model hours2400024000240002400024000120000Total IDIQ Model Dollars$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit.
Areas in Yellow Require Manual Input

&"Times New Roman,Bold Italic"&K00B0F0RFP#80MSFC19R0010

C-4 GSFC

Company XYZ, Inc.C-4 GSFC
NASA Center:GSFC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor RatesIDIQ HoursIDIQ Dollars
GSFCGSFCGSFC
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4TotalNASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Program Analyst 1Program Analyst 1100010001000100010005000Program Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 2Program Analyst 2100010001000100010005000Program Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 3Program Analyst 3100010001000100010005000Program Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 4Program Analyst 4100010001000100010005000Program Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 1Scheduler 1100010001000100010005000Scheduler 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 2Scheduler 2100010001000100010005000Scheduler 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 3Scheduler 3100010001000100010005000Scheduler 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 4Scheduler 4100010001000100010005000Scheduler 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 1Risk Management Analyst 1100010001000100010005000Risk Management Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 2Risk Management Analyst 2100010001000100010005000Risk Management Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 3Risk Management Analyst 3100010001000100010005000Risk Management Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 4Risk Management Analyst 4100010001000100010005000Risk Management Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 1Cost Estimating Analyst 1100010001000100010005000Cost Estimating Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 2Cost Estimating Analyst 2100010001000100010005000Cost Estimating Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 3Cost Estimating Analyst 3100010001000100010005000Cost Estimating Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 4Cost Estimating Analyst 4100010001000100010005000Cost Estimating Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 1Cost Modeling Specialist 1100010001000100010005000Cost Modeling Specialist 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 2Cost Modeling Specialist 2100010001000100010005000Cost Modeling Specialist 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 3Cost Modeling Specialist 3100010001000100010005000Cost Modeling Specialist 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 4Cost Modeling Specialist 4100010001000100010005000Cost Modeling Specialist 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 5Cost Modeling Specialist 5100010001000100010005000Cost Modeling Specialist 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal2100021000210002100021000105000Subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Base Yr.Option 1Option 2Option 3Option 4TotalBase Yr.Option 1Option 2Option 3Option 4Total
SME 1SME 1100010001000100010005000SME 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SME 2SME 2100010001000100010005000SME 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SME 3SME 3100010001000100010005000SME 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal SME3000300030003000300015000Subtotal SME$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total IDIQ Model hours2400024000240002400024000120000Total IDIQ Model Dollars$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit.
Areas in Yellow Require Manual Input

&"Times New Roman,Bold Italic"&K00B0F0RFP#80MSFC19R0010

C-5 HQ

Company XYZ, Inc.C-5 HQ
NASA Center:HQ

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor RatesIDIQ HoursIDIQ Dollars
HQHQHQ
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4TotalNASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Program Analyst 1Program Analyst 1100010001000100010005000Program Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 2Program Analyst 2100010001000100010005000Program Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 3Program Analyst 3100010001000100010005000Program Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 4Program Analyst 4100010001000100010005000Program Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 1Scheduler 1100010001000100010005000Scheduler 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 2Scheduler 2100010001000100010005000Scheduler 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 3Scheduler 3100010001000100010005000Scheduler 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 4Scheduler 4100010001000100010005000Scheduler 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 1Risk Management Analyst 1100010001000100010005000Risk Management Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 2Risk Management Analyst 2100010001000100010005000Risk Management Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 3Risk Management Analyst 3100010001000100010005000Risk Management Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 4Risk Management Analyst 4100010001000100010005000Risk Management Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 1Cost Estimating Analyst 1100010001000100010005000Cost Estimating Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 2Cost Estimating Analyst 2100010001000100010005000Cost Estimating Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 3Cost Estimating Analyst 3100010001000100010005000Cost Estimating Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 4Cost Estimating Analyst 4100010001000100010005000Cost Estimating Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 1Cost Modeling Specialist 1100010001000100010005000Cost Modeling Specialist 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 2Cost Modeling Specialist 2100010001000100010005000Cost Modeling Specialist 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 3Cost Modeling Specialist 3100010001000100010005000Cost Modeling Specialist 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 4Cost Modeling Specialist 4100010001000100010005000Cost Modeling Specialist 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 5Cost Modeling Specialist 5100010001000100010005000Cost Modeling Specialist 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal2100021000210002100021000105000Subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Base Yr.Option 1Option 2Option 3Option 4TotalBase Yr.Option 1Option 2Option 3Option 4Total
SME 1SME 1100010001000100010005000SME 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SME 2SME 2100010001000100010005000SME 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SME 3SME 3100010001000100010005000SME 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal SME3000300030003000300015000Subtotal SME$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total IDIQ Model hours2400024000240002400024000120000Total IDIQ Model Dollars$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit.
Areas in Yellow Require Manual Input

&"Times New Roman,Bold Italic"&K00B0F0RFP#80MSFC19R0010

C-6 JSC

Company XYZ, Inc.C-6 JSC
NASA Center:JSC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor RatesIDIQ HoursIDIQ Dollars
JSCJSCJSC
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4TotalNASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Program Analyst 1Program Analyst 1100010001000100010005000Program Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 2Program Analyst 2100010001000100010005000Program Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 3Program Analyst 3100010001000100010005000Program Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 4Program Analyst 4100010001000100010005000Program Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 1Scheduler 1100010001000100010005000Scheduler 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 2Scheduler 2100010001000100010005000Scheduler 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 3Scheduler 3100010001000100010005000Scheduler 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 4Scheduler 4100010001000100010005000Scheduler 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 1Risk Management Analyst 1100010001000100010005000Risk Management Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 2Risk Management Analyst 2100010001000100010005000Risk Management Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 3Risk Management Analyst 3100010001000100010005000Risk Management Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 4Risk Management Analyst 4100010001000100010005000Risk Management Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 1Cost Estimating Analyst 1100010001000100010005000Cost Estimating Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 2Cost Estimating Analyst 2100010001000100010005000Cost Estimating Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 3Cost Estimating Analyst 3100010001000100010005000Cost Estimating Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 4Cost Estimating Analyst 4100010001000100010005000Cost Estimating Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 1Cost Modeling Specialist 1100010001000100010005000Cost Modeling Specialist 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 2Cost Modeling Specialist 2100010001000100010005000Cost Modeling Specialist 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 3Cost Modeling Specialist 3100010001000100010005000Cost Modeling Specialist 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 4Cost Modeling Specialist 4100010001000100010005000Cost Modeling Specialist 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 5Cost Modeling Specialist 5100010001000100010005000Cost Modeling Specialist 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal2100021000210002100021000105000Subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Base Yr.Option 1Option 2Option 3Option 4TotalBase Yr.Option 1Option 2Option 3Option 4Total
SME 1SME 1100010001000100010005000SME 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SME 2SME 2100010001000100010005000SME 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SME 3SME 3100010001000100010005000SME 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal SME3000300030003000300015000Subtotal SME$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total IDIQ Model hours2400024000240002400024000120000Total IDIQ Model Dollars$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit.
Areas in Yellow Require Manual Input

&"Times New Roman,Bold Italic"&K00B0F0RFP#80MSFC19R0010

C-7 KSC

Company XYZ, Inc.C-7 KSC
NASA Center:KSC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor RatesIDIQ HoursIDIQ Dollars
KSCKSCKSC
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4TotalNASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Program Analyst 1Program Analyst 1100010001000100010005000Program Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 2Program Analyst 2100010001000100010005000Program Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 3Program Analyst 3100010001000100010005000Program Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 4Program Analyst 4100010001000100010005000Program Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 1Scheduler 1100010001000100010005000Scheduler 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 2Scheduler 2100010001000100010005000Scheduler 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 3Scheduler 3100010001000100010005000Scheduler 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Scheduler 4Scheduler 4100010001000100010005000Scheduler 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 1Risk Management Analyst 1100010001000100010005000Risk Management Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 2Risk Management Analyst 2100010001000100010005000Risk Management Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 3Risk Management Analyst 3100010001000100010005000Risk Management Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Risk Management Analyst 4Risk Management Analyst 4100010001000100010005000Risk Management Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 1Cost Estimating Analyst 1100010001000100010005000Cost Estimating Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 2Cost Estimating Analyst 2100010001000100010005000Cost Estimating Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 3Cost Estimating Analyst 3100010001000100010005000Cost Estimating Analyst 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Estimating Analyst 4Cost Estimating Analyst 4100010001000100010005000Cost Estimating Analyst 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 1Cost Modeling Specialist 1100010001000100010005000Cost Modeling Specialist 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 2Cost Modeling Specialist 2100010001000100010005000Cost Modeling Specialist 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 3Cost Modeling Specialist 3100010001000100010005000Cost Modeling Specialist 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 4Cost Modeling Specialist 4100010001000100010005000Cost Modeling Specialist 4$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Cost Modeling Specialist 5Cost Modeling Specialist 5100010001000100010005000Cost Modeling Specialist 5$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal2100021000210002100021000105000Subtotal$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Base Yr.Option 1Option 2Option 3Option 4TotalBase Yr.Option 1Option 2Option 3Option 4Total
SME 1SME 1100010001000100010005000SME 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SME 2SME 2100010001000100010005000SME 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SME 3SME 3100010001000100010005000SME 3$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Subtotal SME3000300030003000300015000Subtotal SME$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Total IDIQ Model hours2400024000240002400024000120000Total IDIQ Model Dollars$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit.
Areas in Yellow Require Manual Input

&"Times New Roman,Bold Italic"&K00B0F0RFP#80MSFC19R0010

C-8 LaRC

Company XYZ, Inc.C-8 LaRC
NASA Center:LARC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor RatesIDIQ HoursIDIQ Dollars
LARCLARCLARC
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4TotalNASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Program Analyst 1Program Analyst 1100010001000100010005000Program Analyst 1$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Program Analyst 2Program Analyst 2100010001000100010005000Program Analyst 2$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.