80MSFC19R0010_Attachment_L-1__Excel_Pricing_Model_(EPM)_(PPC).xlsx

XLSX spreadsheet 168 KB Posted

Attached to
Consolidated Program Support Services (CPSS) Program, Planning, and Control (PP&C) Federal contract opportunity
Solicitation number
80MSFC19R0010
Issued by
National Aeronautics and Space Administration Marshall Space Flight Center

About this file

80MSFC19R0010 Attachment L-1 Excel Pricing Model (EPM) (PPC)

View the file

Other files for this federal contract opportunity

Other files attached to Consolidated Program Support Services (CPSS) Program, Planning, and Control (PP&C), newest first.
File Type Posted
80MSFC19R0010 Amendment P00005 SF30 - Summary of Changes.pdf PDF
80MSFC19R0010_CPSS_PP&C_Amendment_P00004.pdf PDF
Amendment_P00003_Attachment_A_and_B.pdf PDF
80MSFC19R0010_CPSS_PP&C_Amendment_P0003_SF30.pdf PDF
80MSFC19R0010_CPSS_PP&C_Final__RFP_-_Amendment_P00003.docx DOCX document
80MSFC19R0010_CPSS_PP&C_Final__RFP_-_Amendment_P00002.docx DOCX document
Amendment_P00002_Attachment_A_and_B.pdf PDF
80MSFC19R0010_Amendment_P00002_Attachment_L-1__Excel_Pricing_Model_(EPM)_(PPC).xlsx XLSX spreadsheet
80MSFC19R0010_CPSS_PP&C_Amendment_P0002_SF30.pdf PDF
80MSFC19R0010_Amendment_P00001_Attachment_L-1__Excel_Pricing_Model_(EPM)_(PPC).xlsx XLSX spreadsheet
80MSFC19R0010_CPSS_PP&C_Final__RFP_-_Amendment_P00001.docx DOCX document
80MSFC19R0010_CPSS_PP&C_Amendment_P0001_SF30.pdf PDF
Amendment_P00001_Attachment_A_and_B.pdf PDF
CPSS_PP&C_RFP_Cover_Letter.pdf PDF
80MSFC19R0010_Attachment_L-1__Excel_Pricing_Model_(EPM)_(PPC)_Final.xlsx XLSX spreadsheet
80MSFC19R0010_CPSS_PP&C_Final__RFP.docx DOCX document
80MSFC19P0020_CPSS_PP&C_SF1449.pdf PDF
ATOMS_Guide_10_2_19.pdf PDF
80MSFC19R0010_CPSS_PP&C_SF33.pdf PDF
CPSS_Interested_Parties_List.pdf PDF
80MSFC19R0010_CPSS_PP&C_Industry_Overview_Charts.pdf PDF
80MSFC19R0010_CPSS_PP&C_DRFP_Cover_Letter.pdf PDF
80MSFC19R0010_CPSS_PP&C_DRFP.docx DOCX document
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INDEX PPC

Company Name: Company XYZ, Inc. INDEX PPC

Attachment L-1

TabTitleSpecific Instruction
A-1Summary of Total PriceThis tab is designed to summarize the total price (mission and IDIQ) for the entire contract effort. Offerors shall input the applicable burden rate(s) to be applied to the IDIQ ODC (e.g travel, training). This tab is linked to other tabs within the workbook. Most of this tab will automatically fill in once the other tabs have been completed. The Government-provided IDIQ ODC (e.g. travel, training) values are pre-populated in this tab.
A-2Summary of Mission by Teammate/SubcontractorThis tab compiles each teammate's participation in mission labor. The top table is linked to each subsequent tab (Tab B-1 and Tab B-2) used to compute a total mission price for the company completing the EPM. The tables below are for the offeror to include each teammate/subcontractor's price for the work assigned to them. Each subcontractor that fills in the EPM will have a total price in the top table.
B-1 thru B-2Computation of Mission Price by Center (JSC or MSFC)This tab is used to calculate the fully burdened labor dollars using the proposed Work Year Equivalents (WYEs) multiplied by the proposed fully burden labor rates and the productive factor generated from the available hours for that contract period. The WYEs have been pre-populated by the Government in accordance with the RFP Attachment J-1A. The worksheet automatically calculates hours and dollars once other tabs are completed within this workbook.
********* PRIME ONLY PRIME ONLY PRIME ONLY PRIME ONLY *********
C-1 thru C-11Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by CenterThis tab calculates the IDIQ labor price by Center. The labor hours have been pre-populated by the Government for each labor category for each period of performance. These rates must include all anticipated subcontract rates as well as the offeror's handling and profit.

Note: The Government-provided pre-populated hours are provided only as a means of establishing a total proposed price for evaluation purposes. Offerors shall ensure that fully-burdened labor rates are provided for all labor categories, for all years of performance, for all Centers.

D Phase-In Form (PIF) This tab provides a complete estimate of phase-in, by the elements of price specified on the PIF and in accordance with the offeror’s normal estimating procedures. The price of the phase-in period, performed by a separate purchase order, shall not exceed $150,000.

NOTE: Offerors shall fill in the areas highlighted in yellow.

&"Times New Roman,Bold Italic"RFP# 80MSFC19R0010

&"Times New Roman,Bold"Page &P of &N &"Times New Roman,Bold"&F &A

Tab A - 1

Company XYZ, Inc.
Summary of Total Price
PP&C

ELEMENTS Base Yr. Option Yr. 1 Option Yr. 2 Option Yr. 3 Option Yr. 4 Totals

WYE - Mission
JSC26.526.526.526.515.5121.5
MSFC73.473.473.073.071.5364.1
Total WYE99.999.999.599.587.0485.6
Fully Burdened Labor - Mission
JSC$0$0$0$0$0$0
MSFC$0$0$0$0$0$0
Total Mission Labor Price$0$0$0$0$0$0Should Match Section B of the contract
IDIQ Labor by Center
AFRC$0$0$0$0$0$0
ARC$0$0$0$0$0$0
GRC$0$0$0$0$0$0
GSFC$0$0$0$0$0$0
HQ$0$0$0$0$0$0
JSC$0$0$0$0$0$0
KSC$0$0$0$0$0$0
LaRC$0$0$0$0$0$0
MSFC$0$0$0$0$0$0
MAF$0$0$0$0$0$0
SSC$0$0$0$0$0$0
Total IDIQ Labor$0$0$0$0$0$0
PP&C IDIQ ODC Value$500,000$500,000$500,000$500,000$500,000$2,500,000
SME IDIQ ODC Value$1,000,000$1,000,000$1,000,000$1,000,000$1,000,000$5,000,000
IDIQ ODC Burden (%)0%0%0%0%0%
Total IDIQ ODC Burden$0$0$0$0$0$0
Total IDIQ Labor and Burden$0$0$0$0$0$0

Total Price - Mission and IDIQ $0 $0 $0 $0 $0 $0

Areas in Yellow Require Manual Input
It is the offeror's responsibility to provide an accurate proposal. The IDIQ travel dollars are not included in the total price.
Acronyms for NASA Centers
AFRC - Armstrong Flight Research Center, Edwards, CAKSC - Kennedy Space Center, Merritt Island, FL

ARC - Ames Research Center, Moffett Field, CA LaRC - Langley Research Center, Hampton, VA

GRC - Glenn Research Center, Cleveland, OH MSFC - Marshall Space Flight Center, Huntsville, AL

GSFC - Goddard Space Flight Center, Greenbelt, MD MAF - Michoud Assembly Facility, New Orleans, LA

HQ - NASA Headquarters Acquisition Division, Washington, DC SSC - Stennis Space Center, Bay St. Louis, MS

JSC - Johnson Space Center, Houston, TX

RFP# 80MSFC19R0010

&"Times New Roman,Bold"Page &P of &N &"Times New Roman,Bold"&F &A

Tab A -2

Company XYZ, Inc.
Summary of Mission Price by Teammate/Subcontractor
PP&C
ELEMENTSBase Yr.Option Yr. 1Option Yr. 2Option Yr. 3Option Yr. 4Totals
Prime (or offeror completing the EPM)
WYE - Mission
JSC26.526.526.526.515.5121.5This table is linked to the proceeding tabs. It will compute for the individual offeror who is filling in the EPM If this is a subcontractor then this could be given to the prime to compute the total proposed price.
MSFC73.473.473.073.071.5364.1
Total WYE99.999.999.599.587.0485.6
Fully Burdened Labor - Mission
JSC$0$0$0$0$0$0
MSFC$0$0$0$0$0$0
Mission Labor Price - Prime$0$0$0$0$0$0
Subcontractor Name #1
WYE - MissionBase Yr.Option Yr. 1Option Yr. 2Option Yr. 3Option Yr. 4Totals
JSC0.0
MSFC0.0
Total WYE0.00.00.00.00.00.0
Fully Burdened Labor - Mission
JSC$0.00
MSFC$0.00
Mission Labor Price - Sub 1$0$0$0$0$0$0
Subcontractor Name #2
WYE - MissionBase Yr.Option Yr. 1Option Yr. 2Option Yr. 3Option Yr. 4Totals
JSC0.0
MSFC0.0
Total WYE0.00.00.00.00.00.0
Fully Burdened Labor - Mission
JSC$0.00
MSFC$0.00
Mission Labor Price - Sub 2$0$0$0$0$0$0
Subcontractor Name #3
WYE - MissionBase Yr.Option Yr. 1Option Yr. 2Option Yr. 3Option Yr. 4Totals
JSC0.0
MSFC0.0
Total WYE0.00.00.00.00.00.0
Fully Burdened Labor - Mission
JSC$0.00
MSFC$0.00
Mission Labor Price - Sub 3$0$0$0$0$0$0
Subcontractor Name #4
WYE - MissionBase Yr.Option Yr. 1Option Yr. 2Option Yr. 3Option Yr. 4Totals
JSC0.0
MSFC0.0
Total WYE0.00.00.00.00.00.0
Fully Burdened Labor - Mission
JSC$0.00
MSFC$0.00
Mission Labor Price - Sub 4$0$0$0$0$0$0

Repeat the Above table for each subcontractor and add to totals

Total Team WYE and Labor for Mission
WYE - MissionBase Yr.Option Yr. 1Option Yr. 2Option Yr. 3Option Yr. 4Totals
JSC26.526.526.526.515.5121.5
MSFC73.473.473.073.071.5364.1
Total WYE99.999.999.599.587.0485.6
Fully Burdened Labor - Mission
JSC$0$0$0$0$0$0
MSFC$0$0$0$0$0$0
Mission Labor Price - Sub 5$0$0$0$0$0$0

Areas in Yellow Require Manual Input

RFP# 80MSFC19R0010

&"Times New Roman,Bold"Page &P of &N &"Times New Roman,Bold"&F &A

B-1 JSC

Company XYZ, Inc.B-1 JSC
NASA CenterJSC
Computation of Mission Price By Center (JSC)
WYE WYE WYE WYE
NASA Labor CategoryOfferor Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
JSC
Program Analyst I- 0
Program Analyst 2- 0
Program Analyst 32.002.002.002.00- 08.0
Program Analyst 412.5012.5012.5012.5010.5060.5
Scheduler 1- 0
Scheduler 2- 0
Scheduler 31.001.001.001.001.005.0
Scheduler 45.005.005.005.002.0022.0
Risk Management Analyst 1- 0
Risk Management Analyst 2- 0
Risk Management Analyst 3- 0
Risk Management Analyst 40.500.500.500.500.502.5
Cost Estimating Analyst 1- 0
Cost Estimating Analyst 2- 0
Cost Estimating Analyst 31.001.001.001.00- 04.0
Cost Estimating Analyst 44.504.504.504.501.5019.5
Cost Modeling Specialist 1- 0
Cost Modeling Specialist 2- 0
Cost Modeling Specialist 3- 0
Cost Modeling Specialist 4- 0
Cost Modeling Specialist 5- 0
Documentation Librarian- 0
Total WYE26.5026.5026.5026.5015.50121.50
Base Yr.Option 1Option 2Option 3Option 4
Total Productive Hours
HRS HRS HRS HRS HRS
NASA Labor CategoryOfferor Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
JSC
Program Analyst I- 0- 0- 0- 0- 0- 0
Program Analyst 2- 0- 0- 0- 0- 0- 0
Program Analyst 3- 0- 0- 0- 0- 0- 0
Program Analyst 4- 0- 0- 0- 0- 0- 0
Scheduler 1- 0- 0- 0- 0- 0- 0
Scheduler 2- 0- 0- 0- 0- 0- 0
Scheduler 3- 0- 0- 0- 0- 0- 0
Scheduler 4- 0- 0- 0- 0- 0- 0
Risk Management Analyst 1- 0- 0- 0- 0- 0- 0
Risk Management Analyst 2- 0- 0- 0- 0- 0- 0
Risk Management Analyst 3- 0- 0- 0- 0- 0- 0
Risk Management Analyst 4- 0- 0- 0- 0- 0- 0
Cost Estimating Analyst 1- 0- 0- 0- 0- 0- 0
Cost Estimating Analyst 2- 0- 0- 0- 0- 0- 0
Cost Estimating Analyst 3- 0- 0- 0- 0- 0- 0
Cost Estimating Analyst 4- 0- 0- 0- 0- 0- 0
Cost Modeling Specialist 1- 0- 0- 0- 0- 0- 0
Cost Modeling Specialist 2- 0- 0- 0- 0- 0- 0
Cost Modeling Specialist 3- 0- 0- 0- 0- 0- 0
Cost Modeling Specialist 4- 0- 0- 0- 0- 0- 0
Cost Modeling Specialist 5- 0- 0- 0- 0- 0- 0
Documentation Librarian- 0- 0- 0- 0- 0- 0
Total Hours------
FBLR FBLR FBLR FBLR
NASA Labor CategoryOfferor Labor CategoryBase Yr.Option 1Option 2Option 3Option 4
JSC
Program Analyst I
Program Analyst 2
Program Analyst 3
Program Analyst 4
Scheduler 1
Scheduler 2
Scheduler 3
Scheduler 4
Risk Management Analyst 1
Risk Management Analyst 2
Risk Management Analyst 3
Risk Management Analyst 4
Cost Estimating Analyst 1
Cost Estimating Analyst 2
Cost Estimating Analyst 3
Cost Estimating Analyst 4
Cost Modeling Specialist 1
Cost Modeling Specialist 2
Cost Modeling Specialist 3
Cost Modeling Specialist 4
Cost Modeling Specialist 5
Documentation Librarian
$$$ $$$ $$$ $$$ $$$
NASA Labor CategoryOfferor Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
JSC
Program Analyst I$ -$ -$ -$ -$ -$ -
Program Analyst 2$ -$ -$ -$ -$ -$ -
Program Analyst 3$ -$ -$ -$ -$ -$ -
Program Analyst 4$ -$ -$ -$ -$ -$ -
Scheduler 1$ -$ -$ -$ -$ -$ -
Scheduler 2$ -$ -$ -$ -$ -$ -
Scheduler 3$ -$ -$ -$ -$ -$ -
Scheduler 4$ -$ -$ -$ -$ -$ -
Risk Management Analyst 1$ -$ -$ -$ -$ -$ -
Risk Management Analyst 2$ -$ -$ -$ -$ -$ -
Risk Management Analyst 3$ -$ -$ -$ -$ -$ -
Risk Management Analyst 4$ -$ -$ -$ -$ -$ -
Cost Estimating Analyst 1$ -$ -$ -$ -$ -$ -
Cost Estimating Analyst 2$ -$ -$ -$ -$ -$ -
Cost Estimating Analyst 3$ -$ -$ -$ -$ -$ -
Cost Estimating Analyst 4$ -$ -$ -$ -$ -$ -
Cost Modeling Specialist 1$ -$ -$ -$ -$ -$ -
Cost Modeling Specialist 2$ -$ -$ -$ -$ -$ -
Cost Modeling Specialist 3$ -$ -$ -$ -$ -$ -
Cost Modeling Specialist 4$ -$ -$ -$ -$ -$ -
Cost Modeling Specialist 5$ -$ -$ -$ -$ -$ -
Documentation Librarian$ -$ -$ -$ -$ -$ -
Total Labor Dollars$0$0$0$0$0$0

Areas in Yellow Require Manual Input

RFP 80MSFC19R0010 &F&A

B-2 MSFC

Company XYZ, Inc.B-2 MSFC
NASA CenterMSFC/KSC/HQ
Computation of Mission Price By Center
WYE WYE WYE WYE
NASA Labor CategoryOfferor Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Agency Wide Program Manager1.001.001.001.001.005.0
MSFC/KSC/HQ
Program Analyst I- 0
Program Analyst 27.006.006.006.006.0031.0
Program Analyst 2 (HQ)1.001.001.001.001.005.0
Program Analyst 310.6511.6511.2511.2510.2555.1
Program Analyst 410.0010.0010.0010.0010.0050.0
Program Analyst 4 (Kennedy)1.001.001.001.001.005.0
Scheduler 18.008.008.008.008.0040.0
Scheduler 29.009.009.009.009.0045.0
Scheduler 36.006.006.006.006.0030.0
Scheduler 49.509.509.509.509.0047.0
Risk Management Analyst 1- 0
Risk Management Analyst 2- 0
Risk Management Analyst 3- 0
Risk Management Analyst 45.005.005.005.005.0025.0
Cost Estimating Analyst 1- 0
Cost Estimating Analyst 2- 0
Cost Estimating Analyst 31.001.001.001.001.005.0
Cost Estimating Analyst 41.001.001.001.001.005.0
Cost Modeling Specialist 1- 0
Cost Modeling Specialist 20.500.500.500.500.502.5
Cost Modeling Specialist 3- 0
Cost Modeling Specialist 41.701.701.701.701.708.5
Cost Modeling Specialist 5- 0
Documentation Librarian1.001.001.001.001.005.0
Total WYE73.3573.3572.9572.9571.45364.05
Base Yr.Option 1Option 2Option 3Option 4
Total Productive Hours
HRS HRS HRS HRS
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Agency Wide Program Manager- 0- 0- 0- 0- 0- 0
MSFC/KSC/HQ
Program Analyst I- 0- 0- 0- 0- 0- 0
Program Analyst 2- 0- 0- 0- 0- 0- 0
Program Analyst 2 (HQ)- 0- 0- 0- 0- 0
Program Analyst 3- 0- 0- 0- 0- 0- 0
Program Analyst 4- 0- 0- 0- 0- 0- 0
Program Analyst 4 (Kennedy)- 0- 0- 0- 0- 0
Scheduler 1- 0- 0- 0- 0- 0- 0
Scheduler 2- 0- 0- 0- 0- 0- 0
Scheduler 3- 0- 0- 0- 0- 0- 0
Scheduler 4- 0- 0- 0- 0- 0- 0
Risk Management Analyst 1- 0- 0- 0- 0- 0- 0
Risk Management Analyst 2- 0- 0- 0- 0- 0- 0
Risk Management Analyst 3- 0- 0- 0- 0- 0- 0
Risk Management Analyst 4- 0- 0- 0- 0- 0- 0
Cost Estimating Analyst 1- 0- 0- 0- 0- 0- 0
Cost Estimating Analyst 2- 0- 0- 0- 0- 0- 0
Cost Estimating Analyst 3- 0- 0- 0- 0- 0- 0
Cost Estimating Analyst 4- 0- 0- 0- 0- 0- 0
Cost Modeling Specialist 1- 0- 0- 0- 0- 0- 0
Cost Modeling Specialist 2- 0- 0- 0- 0- 0- 0
Cost Modeling Specialist 3- 0- 0- 0- 0- 0- 0
Cost Modeling Specialist 4- 0- 0- 0- 0- 0- 0
Cost Modeling Specialist 5- 0- 0- 0- 0- 0- 0
Documentation Librarian- 0- 0- 0- 0- 0- 0
Total Hours------
FBLR FBLR FBLR FBLR
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4
Agency Wide Program Manager
MSFC/KSC/HQ
Program Analyst I
Program Analyst 2
Program Analyst 2 (HQ)
Program Analyst 3
Program Analyst 4
Program Analyst 4 (Kennedy)
Scheduler 1
Scheduler 2
Scheduler 3
Scheduler 4
Risk Management Analyst 1
Risk Management Analyst 2
Risk Management Analyst 3
Risk Management Analyst 4
Cost Estimating Analyst 1
Cost Estimating Analyst 2
Cost Estimating Analyst 3
Cost Estimating Analyst 4
Cost Modeling Specialist 1
Cost Modeling Specialist 2
Cost Modeling Specialist 3
Cost Modeling Specialist 4
Cost Modeling Specialist 5
Documentation Librarian
$$$ $$$ $$$ $$$ $$$
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Agency Wide Program Manager$ -$ -$ -$ -$ -$ -
MSFC/KSC/HQ
Program Analyst I$ -$ -$ -$ -$ -$ -
Program Analyst 2$ -$ -$ -$ -$ -$ -
Program Analyst 2 (HQ)$ -$ -$ -$ -$ -$ -
Program Analyst 3$ -$ -$ -$ -$ -$ -
Program Analyst 4$ -$ -$ -$ -$ -$ -
Program Analyst 4 (Kennedy)$ -$ -$ -$ -$ -$ -
Scheduler 1$ -$ -$ -$ -$ -$ -
Scheduler 2$ -$ -$ -$ -$ -$ -
Scheduler 3$ -$ -$ -$ -$ -$ -
Scheduler 4$ -$ -$ -$ -$ -$ -
Risk Management Analyst 1$ -$ -$ -$ -$ -$ -
Risk Management Analyst 2$ -$ -$ -$ -$ -$ -
Risk Management Analyst 3$ -$ -$ -$ -$ -$ -
Risk Management Analyst 4$ -$ -$ -$ -$ -$ -
Cost Estimating Analyst 1$ -$ -$ -$ -$ -$ -
Cost Estimating Analyst 2$ -$ -$ -$ -$ -$ -
Cost Estimating Analyst 3$ -$ -$ -$ -$ -$ -
Cost Estimating Analyst 4$ -$ -$ -$ -$ -$ -
Cost Modeling Specialist 1$ -$ -$ -$ -$ -$ -
Cost Modeling Specialist 2$ -$ -$ -$ -$ -$ -
Cost Modeling Specialist 3$ -$ -$ -$ -$ -$ -
Cost Modeling Specialist 4$ -$ -$ -$ -$ -$ -
Cost Modeling Specialist 5$ -$ -$ -$ -$ -$ -
Documentation Librarian$ -$ -$ -$ -$ -$ -
Total Labor Dollars$ -$ -$ -$ -$ -$ -

Areas in Yellow Require Manual Input

RFP 80MSFC19R0010 &F&A

C-1 AFRC

Company XYZ, Inc.C-1 AFRC
NASA Center:AFRC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor RatesIDIQ HoursIDIQ Dollars
AFRCAFRCAFRC
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4TotalNASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Program Analyst IProgram Analyst I10,00010,00010,00010,00010,00050,000Program Analyst I$ -$ -$ -$ -$ -$ -
Program Analyst 2Program Analyst 210,00010,00010,00010,00010,00050,000Program Analyst 2$ -$ -$ -$ -$ -$ -
Program Analyst 3Program Analyst 310,00010,00010,00010,00010,00050,000Program Analyst 3$ -$ -$ -$ -$ -$ -
Program Analyst 4Program Analyst 410,00010,00010,00010,00010,00050,000Program Analyst 4$ -$ -$ -$ -$ -$ -
Scheduler 1Scheduler 110,00010,00010,00010,00010,00050,000Scheduler 1$ -$ -$ -$ -$ -$ -
Scheduler 2Scheduler 210,00010,00010,00010,00010,00050,000Scheduler 2$ -$ -$ -$ -$ -$ -
Scheduler 3Scheduler 310,00010,00010,00010,00010,00050,000Scheduler 3$ -$ -$ -$ -$ -$ -
Scheduler 4Scheduler 410,00010,00010,00010,00010,00050,000Scheduler 4$ -$ -$ -$ -$ -$ -
Risk Management Analyst 1Risk Management Analyst 110,00010,00010,00010,00010,00050,000Risk Management Analyst 1$ -$ -$ -$ -$ -$ -
Risk Management Analyst 2Risk Management Analyst 210,00010,00010,00010,00010,00050,000Risk Management Analyst 2$ -$ -$ -$ -$ -$ -
Risk Management Analyst 3Risk Management Analyst 310,00010,00010,00010,00010,00050,000Risk Management Analyst 3$ -$ -$ -$ -$ -$ -
Risk Management Analyst 4Risk Management Analyst 410,00010,00010,00010,00010,00050,000Risk Management Analyst 4$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 1Price Estimating Analyst 110,00010,00010,00010,00010,00050,000Price Estimating Analyst 1$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 2Price Estimating Analyst 210,00010,00010,00010,00010,00050,000Price Estimating Analyst 2$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 3Price Estimating Analyst 310,00010,00010,00010,00010,00050,000Price Estimating Analyst 3$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 4Price Estimating Analyst 410,00010,00010,00010,00010,00050,000Price Estimating Analyst 4$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 1Price Modeling Specialist 110,00010,00010,00010,00010,00050,000Price Modeling Specialist 1$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 2Price Modeling Specialist 210,00010,00010,00010,00010,00050,000Price Modeling Specialist 2$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 3Price Modeling Specialist 310,00010,00010,00010,00010,00050,000Price Modeling Specialist 3$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 4Price Modeling Specialist 410,00010,00010,00010,00010,00050,000Price Modeling Specialist 4$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 5Price Modeling Specialist 510,00010,00010,00010,00010,00050,000Price Modeling Specialist 5$ -$ -$ -$ -$ -$ -
Documentation LibrarianDocumentation Librarian10,00010,00010,00010,00010,00050,000Documentation Librarian$ -$ -$ -$ -$ -$ -
SME 1SME 110,00010,00010,00010,00010,00050,000SME 1$ -$ -$ -$ -$ -$ -
SME 2SME 210,00010,00010,00010,00010,00050,000SME 2$ -$ -$ -$ -$ -$ -
SME 3SME 310,00010,00010,00010,00010,00050,000SME 3$ -$ -$ -$ -$ -$ -
Total IDIQ Model250,000250,000250,000250,000250,0001,250,000Total IDIQ Model$ -$ -$ -$ -$ -$ -
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit.
Areas in Yellow Require Manual Input

&"Times New Roman,Bold Italic"&K00B0F0RFP#80MSFC19R0010

&F &A

C-2 ARC

Company XYZ, Inc.C-2 ARC
NASA Center:ARC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor RatesIDIQ HoursIDIQ Dollars
ARCARCARC
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4TotalNASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Program Analyst IProgram Analyst I10,00010,00010,00010,00010,00050,000Program Analyst I$ -$ -$ -$ -$ -$ -
Program Analyst 2Program Analyst 210,00010,00010,00010,00010,00050,000Program Analyst 2$ -$ -$ -$ -$ -$ -
Program Analyst 3Program Analyst 310,00010,00010,00010,00010,00050,000Program Analyst 3$ -$ -$ -$ -$ -$ -
Program Analyst 4Program Analyst 410,00010,00010,00010,00010,00050,000Program Analyst 4$ -$ -$ -$ -$ -$ -
Scheduler 1Scheduler 110,00010,00010,00010,00010,00050,000Scheduler 1$ -$ -$ -$ -$ -$ -
Scheduler 2Scheduler 210,00010,00010,00010,00010,00050,000Scheduler 2$ -$ -$ -$ -$ -$ -
Scheduler 3Scheduler 310,00010,00010,00010,00010,00050,000Scheduler 3$ -$ -$ -$ -$ -$ -
Scheduler 4Scheduler 410,00010,00010,00010,00010,00050,000Scheduler 4$ -$ -$ -$ -$ -$ -
Risk Management Analyst 1Risk Management Analyst 110,00010,00010,00010,00010,00050,000Risk Management Analyst 1$ -$ -$ -$ -$ -$ -
Risk Management Analyst 2Risk Management Analyst 210,00010,00010,00010,00010,00050,000Risk Management Analyst 2$ -$ -$ -$ -$ -$ -
Risk Management Analyst 3Risk Management Analyst 310,00010,00010,00010,00010,00050,000Risk Management Analyst 3$ -$ -$ -$ -$ -$ -
Risk Management Analyst 4Risk Management Analyst 410,00010,00010,00010,00010,00050,000Risk Management Analyst 4$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 1Price Estimating Analyst 110,00010,00010,00010,00010,00050,000Price Estimating Analyst 1$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 2Price Estimating Analyst 210,00010,00010,00010,00010,00050,000Price Estimating Analyst 2$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 3Price Estimating Analyst 310,00010,00010,00010,00010,00050,000Price Estimating Analyst 3$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 4Price Estimating Analyst 410,00010,00010,00010,00010,00050,000Price Estimating Analyst 4$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 1Price Modeling Specialist 110,00010,00010,00010,00010,00050,000Price Modeling Specialist 1$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 2Price Modeling Specialist 210,00010,00010,00010,00010,00050,000Price Modeling Specialist 2$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 3Price Modeling Specialist 310,00010,00010,00010,00010,00050,000Price Modeling Specialist 3$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 4Price Modeling Specialist 410,00010,00010,00010,00010,00050,000Price Modeling Specialist 4$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 5Price Modeling Specialist 510,00010,00010,00010,00010,00050,000Price Modeling Specialist 5$ -$ -$ -$ -$ -$ -
Documentation LibrarianDocumentation Librarian10,00010,00010,00010,00010,00050,000Documentation Librarian$ -$ -$ -$ -$ -$ -
SME 1SME 110,00010,00010,00010,00010,00050,000SME 1$ -$ -$ -$ -$ -$ -
SME 2SME 210,00010,00010,00010,00010,00050,000SME 2$ -$ -$ -$ -$ -$ -
SME 3SME 310,00010,00010,00010,00010,00050,000SME 3$ -$ -$ -$ -$ -$ -
Total IDIQ Model250,000250,000250,000250,000250,0001,250,000Total IDIQ Model$ -$ -$ -$ -$ -$ -
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit.
Areas in Yellow Require Manual Input

&"Times New Roman,Bold Italic"&K00B0F0RFP#80MSFC19R0010

C-3 GRC

Company XYZ, Inc.C-3 GRC
NASA Center:GRC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor RatesIDIQ HoursIDIQ Dollars
GRCGRCGRC
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4TotalNASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Program Analyst IProgram Analyst I10,00010,00010,00010,00010,00050,000Program Analyst I$ -$ -$ -$ -$ -$ -
Program Analyst 2Program Analyst 210,00010,00010,00010,00010,00050,000Program Analyst 2$ -$ -$ -$ -$ -$ -
Program Analyst 3Program Analyst 310,00010,00010,00010,00010,00050,000Program Analyst 3$ -$ -$ -$ -$ -$ -
Program Analyst 4Program Analyst 410,00010,00010,00010,00010,00050,000Program Analyst 4$ -$ -$ -$ -$ -$ -
Scheduler 1Scheduler 110,00010,00010,00010,00010,00050,000Scheduler 1$ -$ -$ -$ -$ -$ -
Scheduler 2Scheduler 210,00010,00010,00010,00010,00050,000Scheduler 2$ -$ -$ -$ -$ -$ -
Scheduler 3Scheduler 310,00010,00010,00010,00010,00050,000Scheduler 3$ -$ -$ -$ -$ -$ -
Scheduler 4Scheduler 410,00010,00010,00010,00010,00050,000Scheduler 4$ -$ -$ -$ -$ -$ -
Risk Management Analyst 1Risk Management Analyst 110,00010,00010,00010,00010,00050,000Risk Management Analyst 1$ -$ -$ -$ -$ -$ -
Risk Management Analyst 2Risk Management Analyst 210,00010,00010,00010,00010,00050,000Risk Management Analyst 2$ -$ -$ -$ -$ -$ -
Risk Management Analyst 3Risk Management Analyst 310,00010,00010,00010,00010,00050,000Risk Management Analyst 3$ -$ -$ -$ -$ -$ -
Risk Management Analyst 4Risk Management Analyst 410,00010,00010,00010,00010,00050,000Risk Management Analyst 4$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 1Price Estimating Analyst 110,00010,00010,00010,00010,00050,000Price Estimating Analyst 1$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 2Price Estimating Analyst 210,00010,00010,00010,00010,00050,000Price Estimating Analyst 2$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 3Price Estimating Analyst 310,00010,00010,00010,00010,00050,000Price Estimating Analyst 3$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 4Price Estimating Analyst 410,00010,00010,00010,00010,00050,000Price Estimating Analyst 4$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 1Price Modeling Specialist 110,00010,00010,00010,00010,00050,000Price Modeling Specialist 1$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 2Price Modeling Specialist 210,00010,00010,00010,00010,00050,000Price Modeling Specialist 2$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 3Price Modeling Specialist 310,00010,00010,00010,00010,00050,000Price Modeling Specialist 3$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 4Price Modeling Specialist 410,00010,00010,00010,00010,00050,000Price Modeling Specialist 4$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 5Price Modeling Specialist 510,00010,00010,00010,00010,00050,000Price Modeling Specialist 5$ -$ -$ -$ -$ -$ -
Documentation LibrarianDocumentation Librarian10,00010,00010,00010,00010,00050,000Documentation Librarian$ -$ -$ -$ -$ -$ -
SME 1SME 110,00010,00010,00010,00010,00050,000SME 1$ -$ -$ -$ -$ -$ -
SME 2SME 210,00010,00010,00010,00010,00050,000SME 2$ -$ -$ -$ -$ -$ -
SME 3SME 310,00010,00010,00010,00010,00050,000SME 3$ -$ -$ -$ -$ -$ -
Total IDIQ Model250,000250,000250,000250,000250,0001,250,000Total IDIQ Model$ -$ -$ -$ -$ -$ -
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit.
Areas in Yellow Require Manual Input

&"Times New Roman,Bold Italic"&K00B0F0RFP#80MSFC19R0010

C-4 GSFC

Company XYZ, Inc.C-4 GSFC
NASA Center:GSFC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor RatesIDIQ HoursIDIQ Dollars
GSFCGSFCGSFC
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4TotalNASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Program Analyst IProgram Analyst I10,00010,00010,00010,00010,00050,000Program Analyst I$ -$ -$ -$ -$ -$ -
Program Analyst 2Program Analyst 210,00010,00010,00010,00010,00050,000Program Analyst 2$ -$ -$ -$ -$ -$ -
Program Analyst 3Program Analyst 310,00010,00010,00010,00010,00050,000Program Analyst 3$ -$ -$ -$ -$ -$ -
Program Analyst 4Program Analyst 410,00010,00010,00010,00010,00050,000Program Analyst 4$ -$ -$ -$ -$ -$ -
Scheduler 1Scheduler 110,00010,00010,00010,00010,00050,000Scheduler 1$ -$ -$ -$ -$ -$ -
Scheduler 2Scheduler 210,00010,00010,00010,00010,00050,000Scheduler 2$ -$ -$ -$ -$ -$ -
Scheduler 3Scheduler 310,00010,00010,00010,00010,00050,000Scheduler 3$ -$ -$ -$ -$ -$ -
Scheduler 4Scheduler 410,00010,00010,00010,00010,00050,000Scheduler 4$ -$ -$ -$ -$ -$ -
Risk Management Analyst 1Risk Management Analyst 110,00010,00010,00010,00010,00050,000Risk Management Analyst 1$ -$ -$ -$ -$ -$ -
Risk Management Analyst 2Risk Management Analyst 210,00010,00010,00010,00010,00050,000Risk Management Analyst 2$ -$ -$ -$ -$ -$ -
Risk Management Analyst 3Risk Management Analyst 310,00010,00010,00010,00010,00050,000Risk Management Analyst 3$ -$ -$ -$ -$ -$ -
Risk Management Analyst 4Risk Management Analyst 410,00010,00010,00010,00010,00050,000Risk Management Analyst 4$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 1Price Estimating Analyst 110,00010,00010,00010,00010,00050,000Price Estimating Analyst 1$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 2Price Estimating Analyst 210,00010,00010,00010,00010,00050,000Price Estimating Analyst 2$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 3Price Estimating Analyst 310,00010,00010,00010,00010,00050,000Price Estimating Analyst 3$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 4Price Estimating Analyst 410,00010,00010,00010,00010,00050,000Price Estimating Analyst 4$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 1Price Modeling Specialist 110,00010,00010,00010,00010,00050,000Price Modeling Specialist 1$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 2Price Modeling Specialist 210,00010,00010,00010,00010,00050,000Price Modeling Specialist 2$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 3Price Modeling Specialist 310,00010,00010,00010,00010,00050,000Price Modeling Specialist 3$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 4Price Modeling Specialist 410,00010,00010,00010,00010,00050,000Price Modeling Specialist 4$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 5Price Modeling Specialist 510,00010,00010,00010,00010,00050,000Price Modeling Specialist 5$ -$ -$ -$ -$ -$ -
Documentation LibrarianDocumentation Librarian10,00010,00010,00010,00010,00050,000Documentation Librarian$ -$ -$ -$ -$ -$ -
SME 1SME 110,00010,00010,00010,00010,00050,000SME 1$ -$ -$ -$ -$ -$ -
SME 2SME 210,00010,00010,00010,00010,00050,000SME 2$ -$ -$ -$ -$ -$ -
SME 3SME 310,00010,00010,00010,00010,00050,000SME 3$ -$ -$ -$ -$ -$ -
Total IDIQ Model250,000250,000250,000250,000250,0001,250,000Total IDIQ Model$ -$ -$ -$ -$ -$ -
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit.
Areas in Yellow Require Manual Input

&"Times New Roman,Bold Italic"&K00B0F0RFP#80MSFC19R0010

C-5 HQ

Company XYZ, Inc.C-5 HQ
NASA Center:HQ

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor RatesIDIQ HoursIDIQ Dollars
HQHQHQ
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4TotalNASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Program Analyst IProgram Analyst I10,00010,00010,00010,00010,00050,000Program Analyst I$ -$ -$ -$ -$ -$ -
Program Analyst 2Program Analyst 210,00010,00010,00010,00010,00050,000Program Analyst 2$ -$ -$ -$ -$ -$ -
Program Analyst 3Program Analyst 310,00010,00010,00010,00010,00050,000Program Analyst 3$ -$ -$ -$ -$ -$ -
Program Analyst 4Program Analyst 410,00010,00010,00010,00010,00050,000Program Analyst 4$ -$ -$ -$ -$ -$ -
Scheduler 1Scheduler 110,00010,00010,00010,00010,00050,000Scheduler 1$ -$ -$ -$ -$ -$ -
Scheduler 2Scheduler 210,00010,00010,00010,00010,00050,000Scheduler 2$ -$ -$ -$ -$ -$ -
Scheduler 3Scheduler 310,00010,00010,00010,00010,00050,000Scheduler 3$ -$ -$ -$ -$ -$ -
Scheduler 4Scheduler 410,00010,00010,00010,00010,00050,000Scheduler 4$ -$ -$ -$ -$ -$ -
Risk Management Analyst 1Risk Management Analyst 110,00010,00010,00010,00010,00050,000Risk Management Analyst 1$ -$ -$ -$ -$ -$ -
Risk Management Analyst 2Risk Management Analyst 210,00010,00010,00010,00010,00050,000Risk Management Analyst 2$ -$ -$ -$ -$ -$ -
Risk Management Analyst 3Risk Management Analyst 310,00010,00010,00010,00010,00050,000Risk Management Analyst 3$ -$ -$ -$ -$ -$ -
Risk Management Analyst 4Risk Management Analyst 410,00010,00010,00010,00010,00050,000Risk Management Analyst 4$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 1Price Estimating Analyst 110,00010,00010,00010,00010,00050,000Price Estimating Analyst 1$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 2Price Estimating Analyst 210,00010,00010,00010,00010,00050,000Price Estimating Analyst 2$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 3Price Estimating Analyst 310,00010,00010,00010,00010,00050,000Price Estimating Analyst 3$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 4Price Estimating Analyst 410,00010,00010,00010,00010,00050,000Price Estimating Analyst 4$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 1Price Modeling Specialist 110,00010,00010,00010,00010,00050,000Price Modeling Specialist 1$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 2Price Modeling Specialist 210,00010,00010,00010,00010,00050,000Price Modeling Specialist 2$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 3Price Modeling Specialist 310,00010,00010,00010,00010,00050,000Price Modeling Specialist 3$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 4Price Modeling Specialist 410,00010,00010,00010,00010,00050,000Price Modeling Specialist 4$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 5Price Modeling Specialist 510,00010,00010,00010,00010,00050,000Price Modeling Specialist 5$ -$ -$ -$ -$ -$ -
Documentation LibrarianDocumentation Librarian10,00010,00010,00010,00010,00050,000Documentation Librarian$ -$ -$ -$ -$ -$ -
SME 1SME 110,00010,00010,00010,00010,00050,000SME 1$ -$ -$ -$ -$ -$ -
SME 2SME 210,00010,00010,00010,00010,00050,000SME 2$ -$ -$ -$ -$ -$ -
SME 3SME 310,00010,00010,00010,00010,00050,000SME 3$ -$ -$ -$ -$ -$ -
Total IDIQ Model250,000250,000250,000250,000250,0001,250,000Total IDIQ Model$ -$ -$ -$ -$ -$ -
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit.
Areas in Yellow Require Manual Input

&"Times New Roman,Bold Italic"&K00B0F0RFP#80MSFC19R0010

C-6 JSC

Company XYZ, Inc.C-6 JSC
NASA Center:JSC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor RatesIDIQ HoursIDIQ Dollars
JSCJSCJSC
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4TotalNASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Program Analyst IProgram Analyst I10,00010,00010,00010,00010,00050,000Program Analyst I$ -$ -$ -$ -$ -$ -
Program Analyst 2Program Analyst 210,00010,00010,00010,00010,00050,000Program Analyst 2$ -$ -$ -$ -$ -$ -
Program Analyst 3Program Analyst 310,00010,00010,00010,00010,00050,000Program Analyst 3$ -$ -$ -$ -$ -$ -
Program Analyst 4Program Analyst 410,00010,00010,00010,00010,00050,000Program Analyst 4$ -$ -$ -$ -$ -$ -
Scheduler 1Scheduler 110,00010,00010,00010,00010,00050,000Scheduler 1$ -$ -$ -$ -$ -$ -
Scheduler 2Scheduler 210,00010,00010,00010,00010,00050,000Scheduler 2$ -$ -$ -$ -$ -$ -
Scheduler 3Scheduler 310,00010,00010,00010,00010,00050,000Scheduler 3$ -$ -$ -$ -$ -$ -
Scheduler 4Scheduler 410,00010,00010,00010,00010,00050,000Scheduler 4$ -$ -$ -$ -$ -$ -
Risk Management Analyst 1Risk Management Analyst 110,00010,00010,00010,00010,00050,000Risk Management Analyst 1$ -$ -$ -$ -$ -$ -
Risk Management Analyst 2Risk Management Analyst 210,00010,00010,00010,00010,00050,000Risk Management Analyst 2$ -$ -$ -$ -$ -$ -
Risk Management Analyst 3Risk Management Analyst 310,00010,00010,00010,00010,00050,000Risk Management Analyst 3$ -$ -$ -$ -$ -$ -
Risk Management Analyst 4Risk Management Analyst 410,00010,00010,00010,00010,00050,000Risk Management Analyst 4$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 1Price Estimating Analyst 110,00010,00010,00010,00010,00050,000Price Estimating Analyst 1$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 2Price Estimating Analyst 210,00010,00010,00010,00010,00050,000Price Estimating Analyst 2$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 3Price Estimating Analyst 310,00010,00010,00010,00010,00050,000Price Estimating Analyst 3$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 4Price Estimating Analyst 410,00010,00010,00010,00010,00050,000Price Estimating Analyst 4$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 1Price Modeling Specialist 110,00010,00010,00010,00010,00050,000Price Modeling Specialist 1$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 2Price Modeling Specialist 210,00010,00010,00010,00010,00050,000Price Modeling Specialist 2$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 3Price Modeling Specialist 310,00010,00010,00010,00010,00050,000Price Modeling Specialist 3$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 4Price Modeling Specialist 410,00010,00010,00010,00010,00050,000Price Modeling Specialist 4$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 5Price Modeling Specialist 510,00010,00010,00010,00010,00050,000Price Modeling Specialist 5$ -$ -$ -$ -$ -$ -
Documentation LibrarianDocumentation Librarian10,00010,00010,00010,00010,00050,000Documentation Librarian$ -$ -$ -$ -$ -$ -
SME 1SME 110,00010,00010,00010,00010,00050,000SME 1$ -$ -$ -$ -$ -$ -
SME 2SME 210,00010,00010,00010,00010,00050,000SME 2$ -$ -$ -$ -$ -$ -
SME 3SME 310,00010,00010,00010,00010,00050,000SME 3$ -$ -$ -$ -$ -$ -
Total IDIQ Model250,000250,000250,000250,000250,0001,250,000Total IDIQ Model$ -$ -$ -$ -$ -$ -
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit.
Areas in Yellow Require Manual Input

&"Times New Roman,Bold Italic"&K00B0F0RFP#80MSFC19R0010

C-7 KSC

Company XYZ, Inc.C-7 KSC
NASA Center:KSC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor RatesIDIQ HoursIDIQ Dollars
KSCKSCKSC
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4TotalNASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Program Analyst IProgram Analyst I10,00010,00010,00010,00010,00050,000Program Analyst I$ -$ -$ -$ -$ -$ -
Program Analyst 2Program Analyst 210,00010,00010,00010,00010,00050,000Program Analyst 2$ -$ -$ -$ -$ -$ -
Program Analyst 3Program Analyst 310,00010,00010,00010,00010,00050,000Program Analyst 3$ -$ -$ -$ -$ -$ -
Program Analyst 4Program Analyst 410,00010,00010,00010,00010,00050,000Program Analyst 4$ -$ -$ -$ -$ -$ -
Scheduler 1Scheduler 110,00010,00010,00010,00010,00050,000Scheduler 1$ -$ -$ -$ -$ -$ -
Scheduler 2Scheduler 210,00010,00010,00010,00010,00050,000Scheduler 2$ -$ -$ -$ -$ -$ -
Scheduler 3Scheduler 310,00010,00010,00010,00010,00050,000Scheduler 3$ -$ -$ -$ -$ -$ -
Scheduler 4Scheduler 410,00010,00010,00010,00010,00050,000Scheduler 4$ -$ -$ -$ -$ -$ -
Risk Management Analyst 1Risk Management Analyst 110,00010,00010,00010,00010,00050,000Risk Management Analyst 1$ -$ -$ -$ -$ -$ -
Risk Management Analyst 2Risk Management Analyst 210,00010,00010,00010,00010,00050,000Risk Management Analyst 2$ -$ -$ -$ -$ -$ -
Risk Management Analyst 3Risk Management Analyst 310,00010,00010,00010,00010,00050,000Risk Management Analyst 3$ -$ -$ -$ -$ -$ -
Risk Management Analyst 4Risk Management Analyst 410,00010,00010,00010,00010,00050,000Risk Management Analyst 4$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 1Price Estimating Analyst 110,00010,00010,00010,00010,00050,000Price Estimating Analyst 1$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 2Price Estimating Analyst 210,00010,00010,00010,00010,00050,000Price Estimating Analyst 2$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 3Price Estimating Analyst 310,00010,00010,00010,00010,00050,000Price Estimating Analyst 3$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 4Price Estimating Analyst 410,00010,00010,00010,00010,00050,000Price Estimating Analyst 4$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 1Price Modeling Specialist 110,00010,00010,00010,00010,00050,000Price Modeling Specialist 1$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 2Price Modeling Specialist 210,00010,00010,00010,00010,00050,000Price Modeling Specialist 2$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 3Price Modeling Specialist 310,00010,00010,00010,00010,00050,000Price Modeling Specialist 3$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 4Price Modeling Specialist 410,00010,00010,00010,00010,00050,000Price Modeling Specialist 4$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 5Price Modeling Specialist 510,00010,00010,00010,00010,00050,000Price Modeling Specialist 5$ -$ -$ -$ -$ -$ -
Documentation LibrarianDocumentation Librarian10,00010,00010,00010,00010,00050,000Documentation Librarian$ -$ -$ -$ -$ -$ -
SME 1SME 110,00010,00010,00010,00010,00050,000SME 1$ -$ -$ -$ -$ -$ -
SME 2SME 210,00010,00010,00010,00010,00050,000SME 2$ -$ -$ -$ -$ -$ -
SME 3SME 310,00010,00010,00010,00010,00050,000SME 3$ -$ -$ -$ -$ -$ -
Total IDIQ Model250,000250,000250,000250,000250,0001,250,000Total IDIQ Model$ -$ -$ -$ -$ -$ -
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit.
Areas in Yellow Require Manual Input

&"Times New Roman,Bold Italic"&K00B0F0RFP#80MSFC19R0010

C-8 LaRC

Company XYZ, Inc.C-8 LaRC
NASA Center:LARC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor RatesIDIQ HoursIDIQ Dollars
LARCLARCLARC
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4TotalNASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Program Analyst IProgram Analyst I10,00010,00010,00010,00010,00050,000Program Analyst I$ -$ -$ -$ -$ -$ -
Program Analyst 2Program Analyst 210,00010,00010,00010,00010,00050,000Program Analyst 2$ -$ -$ -$ -$ -$ -
Program Analyst 3Program Analyst 310,00010,00010,00010,00010,00050,000Program Analyst 3$ -$ -$ -$ -$ -$ -
Program Analyst 4Program Analyst 410,00010,00010,00010,00010,00050,000Program Analyst 4$ -$ -$ -$ -$ -$ -
Scheduler 1Scheduler 110,00010,00010,00010,00010,00050,000Scheduler 1$ -$ -$ -$ -$ -$ -
Scheduler 2Scheduler 210,00010,00010,00010,00010,00050,000Scheduler 2$ -$ -$ -$ -$ -$ -
Scheduler 3Scheduler 310,00010,00010,00010,00010,00050,000Scheduler 3$ -$ -$ -$ -$ -$ -
Scheduler 4Scheduler 410,00010,00010,00010,00010,00050,000Scheduler 4$ -$ -$ -$ -$ -$ -
Risk Management Analyst 1Risk Management Analyst 110,00010,00010,00010,00010,00050,000Risk Management Analyst 1$ -$ -$ -$ -$ -$ -
Risk Management Analyst 2Risk Management Analyst 210,00010,00010,00010,00010,00050,000Risk Management Analyst 2$ -$ -$ -$ -$ -$ -
Risk Management Analyst 3Risk Management Analyst 310,00010,00010,00010,00010,00050,000Risk Management Analyst 3$ -$ -$ -$ -$ -$ -
Risk Management Analyst 4Risk Management Analyst 410,00010,00010,00010,00010,00050,000Risk Management Analyst 4$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 1Price Estimating Analyst 110,00010,00010,00010,00010,00050,000Price Estimating Analyst 1$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 2Price Estimating Analyst 210,00010,00010,00010,00010,00050,000Price Estimating Analyst 2$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 3Price Estimating Analyst 310,00010,00010,00010,00010,00050,000Price Estimating Analyst 3$ -$ -$ -$ -$ -$ -
Price Estimating Analyst 4Price Estimating Analyst 410,00010,00010,00010,00010,00050,000Price Estimating Analyst 4$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 1Price Modeling Specialist 110,00010,00010,00010,00010,00050,000Price Modeling Specialist 1$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 2Price Modeling Specialist 210,00010,00010,00010,00010,00050,000Price Modeling Specialist 2$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 3Price Modeling Specialist 310,00010,00010,00010,00010,00050,000Price Modeling Specialist 3$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 4Price Modeling Specialist 410,00010,00010,00010,00010,00050,000Price Modeling Specialist 4$ -$ -$ -$ -$ -$ -
Price Modeling Specialist 5Price Modeling Specialist 510,00010,00010,00010,00010,00050,000Price Modeling Specialist 5$ -$ -$ -$ -$ -$ -
Documentation LibrarianDocumentation Librarian10,00010,00010,00010,00010,00050,000Documentation Librarian$ -$ -$ -$ -$ -$ -
SME 1SME 110,00010,00010,00010,00010,00050,000SME 1$ -$ -$ -$ -$ -$ -
SME 2SME 210,00010,00010,00010,00010,00050,000SME 2$ -$ -$ -$ -$ -$ -
SME 3SME 310,00010,00010,00010,00010,00050,000SME 3$ -$ -$ -$ -$ -$ -
Total IDIQ Model250,000250,000250,000250,000250,0001,250,000Total IDIQ Model$ -$ -$ -$ -$ -$ -
Please note that these rates must include all anticipated subcontract or vendor rates as well as the Prime Offeror's handling and profit.
Areas in Yellow Require Manual Input

&"Times New Roman,Bold Italic"&K00B0F0RFP#80MSFC19R0010

C-9 MSFC

Company XYZ, Inc.C-9 MSFC
NASA Center:MSFC

Summary of Proposed IDIQ Fully Burdened Labor Rates by Contract Period by Center

Composite IDIQ Fully Burdened Labor RatesIDIQ HoursIDIQ Dollars
MSFCMSFCMSFC
NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4NASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4TotalNASA Labor CategoryBase Yr.Option 1Option 2Option 3Option 4Total
Program Analyst IProgram Analyst I10,00010,00010,00010,00010,00050,000Program Analyst I$ -$ -$ -$ -$ -$ -
Program Analyst 2Program Analyst 210,00010,00010,00010,00010,00050,000Program Analyst 2$ -$ -$ -$ -$ -$ -
Program Analyst 3Program Analyst 310,00010,00010,00010,00010,00050,000Program Analyst 3$ -$ -$ -$ -$ -$ -
Program Analyst 4Program Analyst 410,00010,00010,00010,00010,00050,000Program Analyst 4$ -$ -$ -$ -$ -$ -

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.