80KSC025R009 Amend 0007.pdf
PDF 162 KB Posted
- Attached to
- Vehicle Assembly Building (VAB) Power Phase I (Tower C), Project Control Number (PCN): 99300
- Solicitation number
- 80KSC025R0009
About this file
This document is an Amendment (Amendment 0007) to Solicitation 80KSC025R0009 for the VAB Power Phase I Tower C project at John F. Kennedy Space Center. The amendment provides government responses to 31 bidder inquiries covering various technical details, including drawing clarifications, specification interpretations, and site-specific questions. Key clarifications include:
Technical details involve electrical infrastructure modifications, with specific guidance on panel mounting (only panels 1CLA and 5CLA are recessed), surge protection requirements, and transportation logistics for equipment to the 10th and 32nd floors. The government specified that new panelboard and removed items will be transported via stairs, alternative delivery methods can be suggested, and a new set of drawings will be provided via SAM.gov. Additional notable responses addressed wage determination (FL20250196 modification 4 - Heavy), asbestos survey responsibilities, environmental sampling results, and equipment specification nuances such as acceptable construction methods and finish requirements.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
OP-CS
LaCorsha Whitmore Noel, Contracting Officer
The purpose of Amendment 0007 is to provide the Government responses to bidders' inquiries.
OP-CS
John F. Kennedy Space Center, NASA Procurement Office Code: OP-CS Kennedy Space Center, FL 32899
John F. Kennedy Space Center, NASA Procurement Office Code: OP-CS Bldg. M7-0301 (HQ) Rm: 5226H Attn: LaCorsha Whitmore Noel
TBD
80KSC025R0009
99300
1 4
09/04/2025
08/07/2025
LaCorsha Whitmore Noel Digitally signed by LaCorsha Whitmore Noel Date: 2025.09.04 14:27:58 -04'00'
9/4/2025
8/
/2
Se ct io n
L.
4(
c) (1 iii
R
FP
S ec tio n L.
4( c)
(1 iii ) s ta te s “ C om pl et io n of
S ec tio n
K re pr es en ta tio ns a nd ce rti fic at io ns o n-lin e at th e
Sy st em fo r A w ar d
M an ag em en t (
SA
M
) w eb si te a s r eq ui re d by F
A R
P ro vi si on
2.
4- 8, A nn ua l R ep re se nt at io ns a nd C er tif ic at io ns
, i nc or po ra te d in fu ll te xt in
S ec tio n
K o f t hi s s ol ic ita tio n.
Is th e of fe ro r r eq ui re d to p ro vi de a c op y of its
S A
M R ep re se nt at io ns a nd C er tif ic at io ns
, o r j us t a st at em en t t ha t t he y ar e co m pl et ed an ac cu ra te a s o f t he d at e of p ro po sa l s ub m itt al
C om pl et io n of S ec tio n K re pr es en ta tio n F4
:F an d ce rti fic at io ns is re qu ire d pe r t he so lic ita tio n.
P er
F A
R
2.
4- 8(
d) , i t s ta te s " th e of fe ro r h as c om pl et ed th e an nu al re pr es en ta tio ns a nd c er tif ic at io el ec tro ni ca lly in S
A M w eb si te a cc es se d th ro ug h w w w
.sa m
.g ov
A st at em en t c on fir m in g co m pl et io n an d ac cu ra cy w ith w w .sa m .g ov is a cc ep ta bl e.
8/
/2
N on
-P ric e V ol um e L.
.5 (b
W ou ld th e
G ov er nm en t c on si de r p ro je ct s o f " si m ila r c om pl ex ity " i n lie u of
5K
V /6
V or la rg er C la ss e le ct ric al su bs ta nt io n in a n op er at io na l f ac ili ty
N O
8/
/2
.4 .2
.1 W ou ld th e
G ov er nm en t v er ify if th e Q ua lit y Pr og ra m M an ag er is a fu ll tim e, o n-si te po si tio n?
Y es
, d ur in g on -s ite w or k.
8/
/2
.4 .1
W ou ld th e G ov er nm en t p le as e ve rif y th at th e Q ua lit y R ep re se nt at iv e, n ot th e Q ua lit y pr og ra m M an ag er , i s t he o nl y pe rs on th at c an
"b e as si gn ed to m or e th an o ne c on tra ct pr ov id ed th at th e as si gn ed c on tra ct s a re lo ca te d at th e sa m e si te
Y es
, Q ua lit y
R ep c an b e as si gn ed to m ul tip le p ro je ct s.
8/
/2
.1
Sp ec ifi ca tio n st at es th at th e re co rd d ra w in gs a re to b e pr od uc ed b y th e co nt ra ct or . I s t he
G er nm en t a bl e to p ro vi de th e pr oj ec t d ra w in gs a nd a ll ne ce ss ar y su pp or tin g fil es ut oC A
D R el ea se
3?
N O
8/
/2
.1
.6 .1
.1 .7 th ro ug h
3.
1.
7.
D oe s t he
G ov er nm en t r eq ui re a ll sp ec ifi ed m at er ia ls to b e sa lv ag ed
If so
, w ill th e
G ov er nm en t d es ig na te a st or ag e ar ea o n th e jo bs ite fo r t he sa lv ag ed m at er ia ls
O nl y if th er e's n o co nt am in an ts
. Y es
, a d es ig na te d ar ea w ill b e pr ov id ed
8/
/2
D ra w in g E-
1, N ot e
W ill a n ar ea w ith in th e V
A B b e m ad e av ai la bl e fo r e qu ip m en t s ta gi ng a nd la yd ow n?
If no t, pl ea se id en tif y an a pp ro xi m at e lo ca tio n so th at w e m ay e va lu at e th e ad di tio na l ef fo rt re qu ire d to p er fo rm th e w or k.
Y
ES
8/
/2
Is th er e a de di ca te d
F/ A c on tra ct or fo r t he
V A
B
Si em en s?
Y
ES
, S im pl ex
8/
/2
D ur in g th e co ns tru ct io n pr oc es s h ow m an y ot he r p ro je ct s/ co nt ra ct s w ill b e ex pe ct to be o n go in g co nc ur re nt ly
O th er p ro je ct s a re e xp ec te d to b e on g oi ng c on cu rr en tly . T he e xa ct am ou nt is u nk no w n at th is ti m e.
8/
/2
W ha t s te ps n ee d to b e ta ke n in o rd er to g et n on e sc or te d ac ce ss to th e si te fo r w or ki ng pe rs on ne l?
W ha t a re th e co st s f or c er ta in re qu ire d tra in in g?
In fo rm at io n w ill b e pr ov id ed , p os t c on tra ct a w ar d.
8/
/2
W ha t p at hw ay s w ill th e w or ki ng p er so nn el b e ab le to u se to a cc es s w or k ar ea s?
Pa th w ay s t o w or ki ng a re as w ill b e co or di na te d af te r c on tra ct a w ar d.
8/
/2
W ill th e sc he du le b e bi nd in g?
W ill th e aw ar de d co nt ra ct or b e ab le to st ar t a n ew po rti on o f w or k be fo re it is o rig in al ly sc he du le d st ar t?
N o.
T he sc he du le is a d yn am ic d oc um en t.
C on tra ct or c an w or k st ep s ou t o f s eq ue nc e as lo ng a s i t d oe sn
't im pa ct o ve ra ll sc he du le
8/
/2
A re th er e an y co m po ne nt s/ eq ui pm en t t ha t w ill b e re m ov ed /d em ol is he d fr om th e w or k si te s t ha t w ill b e re qu ire d fo r t he c on tra ct or to tu rn o ve r t o th e go ve rn m en t?
N
O
A m en d
N o.
So lic ita tio n N o.
0K
SC
5R
P ro je ct T itl e:
V A
B P ow er
P ha se I
T ow er C
N o.
D at e R ec ei ve d
R ef er en ce
(S ec tio n
Pa ra gr ap h/ Pa ge , D ra w in g
Sh ee t/P ag e)
Q U
E
ST
IO
N
G O
V E
R N
M E
N T
R E
SP
O
SE
/2
E -0 g en er al n ot e st at es
C
R A
N E
A C
C
ES
S
IS
N O
T A
V A
IL
A
B
LE
T O
2N
D
FL
O R
. E Q
U
IP
M
EN
T W
IL
L
N
EE
D T
O B
E
TR
A N
SP
O
R
TE
D T
H R
O U
G H
ST
IR
W
EL
L.
R
EF
ER
T O
S H
EE
T
E-
FO
R A
D D
IT
IO
N A
L
IN
FO
R
M A
TI
O
N , b ut E in p ha se st ep st at es to
C O
N
TA
C T
C O
R T
O C
O O
R D
IN
A
TE
C
O N
TR
A
C
TO
R
PR
V
ID
ED
C
R A
N E
FO
R
L
IF
TI
N
G O
F D
IS
TR
IB
U
TI
O
N P
A N
EL
A
N D
O
TH
ER
EQ
U
IP
M
EN
T
A N
D C
A B
LE
T
O T
H E
N
D F
LO
O
R A
N D
O F
B R
IN
G
IN
G
D O
W
D
EM
O
LI
SH
ED
E
Q U
IP
M
EN
T.
E R
EC
T
R
IG
G
IN
G , A
S R
EQ
U
IR
ED
, T
C C
O M
M O
D A
TE
L
A
TE
R A
L
TR
A N
SI
TI
O N
F R
O M
C R
A N
E
TO
2N
D F
LO
O
R hi ch is c or re ct
Pl ea se a dv is e.
D is re ga rd n ot e on sh ee t E
-0
. C ra ne a cc es s t o nd fl oo r i s l im ite d an d pr ef er re d pa th v ia st ai rw ay is sh ow n on d ra w in g.
C on tra ct or c su gg es t a lte rn at e m et ho d fo r t ra ns po rta tio n of n ew a nd re m ite m s.
N ew p an el bo ar d an d ex is tin g re m ov ed it em s ( nd fl oo r) ou ld b e tra ns po rte d us in g st ai rs
Se e A m en dm en t 0
4.
8/
/2
A dm en dm en t 0
- W ag e
D et er m in at io n
Th e
FL
w ag e de te rm in at io n pr ov id ed w ith th e so lic ita tio n se em s t o no t h av e th e co rr ec t w ag e ra te s f or th e
SO
W c on st ru ct io n ty pe . P as t p ro je ct s w ith si m ila r s co pe ut ili ze d a D
B A
F L2 w ith
E le ct ric ia n co de
E
LE
C
-0 a nd E
LE
C
-0
W ha t w ag e de te rm in at io n sh ou ld b e ut ili ze d?
Th e ac cu ra te
D av is B ac on
A ct w ag e de te rm in at io n to b e ut ili ze
FL
m od ifi ca tio n
- H ea vy
8/
/2
A tta ch m en t J
-F
D ra w in g Se t 7 9K
Se ve ra l d ra w in g sh ee ts h av e ch ar ac te rs th at a re n ot le gi bl e an d th er e is ra om ch ar ac te rs o n se ve ra l s he et s.
W ill th er e be a se t o f d ra w in gs is su ed th at a re ot rr up te d?
A d ra w in g ne w se t w ill b e pr ov id ed v ia w w w
.sa m
.g ov
, a tta ch m en t tit le d "7
9K
V A
B _R ef re sh T ow er
C D ra w in g_
Si gn
Se al .p df
8/
/2
D ra w in gs
A n um be r o f d ra w in gs in th e pa ck ag e ar e co rr up t a nd n ot le gi bl e.
It s v er y ap pa nt in th e no te s a nd c ab le sc he du le s.
S-
1;
S
-1
; S -5
; E
-0
; E -1
; E
-1
; E
1;
E -1 a re so m e ex am pl es
. P le as e pr ov id e a co m pl et e se t o f d ra w in gs th at a re rr up t.
A d ra w in g ne w se t w ill b e pr ov id ed v ia w w w
.sa m
.g ov
, a tta ch m en t tit le d "7
9K
V A
B _R ef re sh T ow er
C D ra w in g_
Si gn
.p df
8/
/2
D ra w in gs
Pa th
A
B
0t h flo or fr am in g pl an s a re re ve rs ed o n st ru ct ur al d ra w in gs v s e le ct ric dr aw in gs . P le as e co nf irm w hi ch d ra w in gs a re c or re ct
El ec tri ca l d ra w in gs sh ow s t he c or re ct in fo rm at io n.
8/
/2
D ra w in gs
S pe ci fic at io n
Se ct io n
.0
Sp ec ifi ca tio n se ct io n
.0
2.
2.
st at es to p ro vi de su rg e pr ot ec tiv e de vi ce a t pa ne lb oa rd s.
Pa ne l s ch ed ul es d o no t i nd ic at e su rg e pr ot ec tio n is re qu ire d no r i s t he br ea ke r c al le d ou t f or su rg e.
P le as e co nf irm if su rg e pr ot ec tio n is re qu ire pa ne lb oa rd s.
Y es
, s ur ge p ro te ct io n is re qu ire d.
A ls o, se e ge ne ra l n ot e #3 on sh ee t E
-0
8/
/2
D ra w in gs
Th er e is a c on fli ct b et w ee n re ce ss ed a nd su rf ac e m ou nt ed p an el s o n th e dr aw in gs v s ac tu al fi el d co nd iti on s.
Pe r t he si te v is it th er e ar e on ly tw o pa ne ls th at a re re qu ire d to b e re ce ss ed in a w al l, Pa ne l 1 C
LA
a nd
C
LA
. T he fo llo w in g pa ne ls sh ou ld b e su rf ac e m ou nt b ut a re la be le d as re ce ss ed in th e pa ne l s ch ed ul es : 3
C
LA
, 6 C
LA
, 7
C
LA
, 1 0C
LA
C
LA
, 1
9C
LA
0C
LA
. P le as e co nc ur
C on cu r.
O nl y pa ne ls
C
LA
a nd
C
LA
a re re ce ss ed
8/
/2
D ra w in gs
Th er e is a c on fli ct b et w ee n th e m ai n br ea ke r s iz in g on th e fo llo w in g pa ne ls : P
1C
LA
C
LA
b ot h sh ow am p on th e on e lin e an d
0a m p on th e pa ne l s ch ed ul e.
Pl ea se c on fir m w hi ch is c or re ct
B ot h 1C
LA
a nd
C
LA
a re
A a s s ho w n pa ne l s ch ed ul e.
8/
/2
D ra w in g
S-
1, S
-1
, S -1
S-ge ne ra l s tru ct ur al n ot es C
.9 st at es to p ro vi de st an da rd re si no us fl oo rin g pe r sp ec ifi ca tio n se ct io n
.1 on a ll su rf ac es w ith in c on cr et e cu rb ed a re as
. P le as e co nf irm if th is is o nl y th e ne w c on cr et e cu rb ed a re a ar ou nd th e tra ns fo rm er s o r i s t hi s th e en tir e cu rb ed a re a on
0t h le ve l b et w ee n co lu m n lin es
S a nd O
D oe s t he
2t h le ve l ne ed th is re si no us fl oo rin g as w l?
Th is o nl y fo r n ew c on cr et e ar ea
8/
/2
Sp ec ifi ca tio ns
Pa ra gr ap h K re fe re nc es th e co nt ra ct or to e ng ag e th e se rv ic es o f a F lo rid a Li ce sb es to s C on su lta nt (F
LA
C
) t o pe rf or m a c om pr eh en si ve a sb es to s s ur ve y, c ov er in g al l su sp ec t A C
M w ith in th e lim its o f t he p ro je ct a re a.
P le as e co nf irm th e co nt ra ct or qu ire d to c om pl et e th is su rv ey
C on tra ct or is re sp on si bl e to c om pl et e th is su rv ey
/2
D ra w in g
H -0
N ot e
C re fe rs to a en vi ro nm en ta l s am pl in g re su lt th at c an b e fo un d in se ct io n th e pr oj ec t d at a m an ua l.
W e ca nn ot lo ca te th is m an ua l i n th e bi d pa ck ag e.
P le as e pr ov id e.
En vi ro nm en ta l r es ul ts w ill b e pr ov id ed v ia a tta ch m en t t itl
"E nv iro nm en ta l R es ul ts
0.
pd f"
8/
/2
Sp ec ifi ca tio n Se ct io n
.0
Se ct io n
2.
re fe re nc es N
EM
A co ns tru ct io n.
N
EM
A is n ot a va ila bl e si nc e th e sw itc hg ea r n ee ds v en til at io n fo r p ro pe r o pe ra tio n.
P le as e ad vi se if a se pa ra te e nc lo su qu ire d.
If a se pa ra te e nc lo su re is re qu ire d, p le as e pr ov id e sp ec ifi ca tio n.
N
EM
A is a cc ep ta bl e.
up da te d
8/
/2
Sp ec ifi ca tio n Se ct io n
.0
Se ct io n
2.
1.
2.
O ur m an uf ac tu re r d oe s n ot u se w el de d co ns tru ct io n fo r t he pa rtm en ts
. I s b ol te d co ns tru ct io n ac ce pt ab le
Y es , b ol te d co ns tru ct io n is a cc ep ta bl e.
8/
/2
Sp ec ifi ca tio n
Se ct io n
.0
Se ct io n 2.
1.
2.
re fe re nc es a ll bu se s t o be in su la te d.
O ur m an uf ac tu re rs p ha se b us es ill be ir in su la te d in th e bu s c om pa rtm en t.
B us ru ns b ac k fo r c ab lin g to b e he at sh rin k in su la te d.
Is th is a cc ep ta bl e?
A ll bu ss es a re to b e in su la te d pe r t he sp ec ifi ca tio ns
A ir in su la te no t a cc ep ta bl e.
8/
/2
Sp ec ifi ca tio n
Se ct io n
.0
Se ct io n 2.
R ef er en ce s f in is h fo r g al va ni ze d an d st ai nl es s s te el
, w hi ch a re ap pl ic ab le to st an da rd st ee l.
O ur m an uf ac tu re r w ill u se it
’s st an da rd p ow de r c oa t pr oc es s.
Th e m an uf ac tu re
's st an da rd p ow de r c oa t p ro ce ss is n ot a pp ro ve d.
Th sp ec ifi ca tio ns fo r t he e qu ip m en t f in is h ne ed to b e fo llo w ed
8/
/2
H ow to g et /re m ov e eq ui pm en t t o flo or
T ow er
C , d ue to n o el ev at or o n th is a a.
ew p an el bo ar d an d ex is tin g re m ov ed it em s ( nd fl oo r) w ou ld b e tra ns po rte d us in g st ai rs
. S ee d ra w in g sh ee t E
-0 fo r d et ai ls
C on tra ct or c an su gg es t a lte rn at e m et ho d fo r d el iv er y of m at er ia l.
8/
/2
H ow to g et /re m ov e eq ui pm en t t o flo or
T ow er
C , d ue to n o el ev at or o n th is a a.
dr aw in g sh ee t E -0 fo r d et ai ls
. T he re a re tw o pa th s s ho w on dr aw in g.
C on tra ct or c an su gg es t a lte rn at e m et ho d fo r d el iv er y at er ia l.
8/
/2
D o w e ne ed to d es ig n an d bu ild a st ru ct ur e to d el iv er y m at er ia l a nd e qu ip m en t t o th es e flo or s 3
2n d an d o st ru ct ur e is n ee de d.
C on tra ct or c an su gg es t a lte rn at e m et ho d fo r de liv er y of m at er ia l.
File details come from the government source that posted it. Updated .