This document is an Amendment (Amendment 0004) to Solicitation No. 80KSC025R0009 for the VAB Power Phase I Tower C project at John F. Kennedy Space Center, NASA. The amendment serves three primary purposes: (1) incorporate changes to the solicitation, (2) provide government responses to bidder questions, and (3) provide an attachment of Environmental Results. Key changes include clarifying crane access limitations to the 32nd floor, confirming that equipment will need to be transported via stairwell, and addressing various technical specifications related to electrical systems, panel mounting, and construction requirements.
The amendment includes a comprehensive Q&A section addressing 31 detailed questions from potential contractors, covering topics such as wage determinations, drawing clarity, electrical panel specifications, equipment transportation, asbestos surveys, and site access. Notable responses include confirming the Quality Program Manager is a full-time on-site position, clarifying surge protection requirements for panelboards, specifying that only panels 1CLA and 5CLA are recessed, and providing guidance on transporting equipment between floors in Tower C. The amendment is dated 09/02/2025, with responses primarily addressing technical clarifications to ensure bidders have accurate and complete information for preparing their proposals.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
OP-CS
LaCorsha Whitmore Noel, Contracting Officer
The purpose of Amendment 0004 is to:
(a) Incorporate changes to solicitation, see attached Addendum Changes.
(b) Provide Government responses to bidders questions.
(c) Provide attachment Environmental Results - 99300.pdf via www.sam.gov.
OP-CS
John F. Kennedy Space Center, NASA Procurement Office Code: OP-CS Kennedy Space Center, FL 32899
John F. Kennedy Space Center, NASA Procurement Office Code: OP-CS Bldg. M7-0301 (HQ) Rm: 5226H Attn: LaCorsha Whitmore Noel
TBD
80KSC025R0009
99300
1 5
09/02/2025
08/07/2025
LaCorsha Whitmore Noel Digitally signed by LaCorsha Whitmore Noel Date: 2025.09.02 11:38:29 -04'00'
9/2/2025
INCORPORATE CHANGES INTO SOLICITATION
A) Add the following to Section C. 2 (b) Addenda to Drawings, Maps, Specification, and/or Statements of Work:
1. Replace comment #1 on sheet E-060, phase 2 of Attachment J-F 79K50591 VAB_Refresh Tower C Drawing, with the following:
CRANE ACCESS IS NOT AVAILABLE TO THE 32ND FLOOR. EXISTING ELEVATORS
IN TOWER B CAN BE USED TO REACH THE 16TH FLOOR, WHERE A WALKWAY
CAN BE USED TO REACH TOWER C. TRANSPORT OF EQUIPMENT AND
COMPONENTS BETWEEN THE 16TH AND 32ND FLOORS IN TOWER C WILL NEED
TO BE ACCOMPLISHED VIA THE EXISTING STAIRWELL.
1 8/21/2025 Section L.4(c)(1)(iii) RFP Section L.4(c)(1)(iii) states “Completion of Section K representations and certifications on-line at the System for Award Management (SAM) website as required by FAR Provision 52.204-8, Annual Representations and Certifications, incorporated in full text in Section K of this solicitation.”. Is the offeror required to provide a copy of its SAM Representations and Certifications, or just a statement that they are completed and accurate as of the date of proposal submittal
Completion of Section K representation F4:F34and certifications is required per the solicitation. Per FAR 52.204-8(d), it states "the offeror has completed the annual representations and certifications electronically in SAM website accessed through www.sam.gov..."
A statement confirming completion and accuracy within www.sam.gov is acceptable.
2 8/26/2025 Non-Price Volume L..5(b) Would the Government consider projects of "similar complexity" in lieu of 15KV/600V or larger Class electrical substantion in an operational facility?
NO 0003
3 8/26/2025 01 45 00 00 40 1.4.2.1 Would the Government verify if the Quality Program Manager is a full time, on-site, position?
Yes, during on-site work. 0003
4 8/26/2025 01 45 00 00 40 1.4.1 Would the Government please verify that the Quality Representative, not the Quality program Manager, is the only person that can "be assigned to more than one contract provided that the assigned contracts are located at the same site."
Yes, Quality Rep can be assigned to multiple projects. 0003
5 8/26/2025 01 78 00 2.1 Specification states that the record drawings are to be produced by the contractor. Is the Government able to provide the project drawings and all necessary supporting files in AutoCAD Release 2023?
NO 0003
6 8/26/2025 02 41 00 3.1.6.1 & 3.1.7 through 3.1.7.4 Does the Government require all specified materials to be salvaged? If so, will the Government designate a storage area on the jobsite for the salvaged materials?
Only if there's no contaminants. Yes, a designated area will be provided.
7 8/26/2025 Drawing E-001, Note 33 Will an area within the VAB be made available for equipment staging and laydown? If not, please identify an approximate location so that we may evaluate the additional effort required to perform the work.
YES 0003
8 8/27/2025 Is there a dedicated F/A contractor for the VAB? Siemens? YES, Simplex 0003
9 8/27/2025 During the construction process how many other projects/contracts will be expected to be on going concurrently?
Other projects are expected to be on going concurrently. The exact amount is unknown at this time.
10 8/27/2025 What steps need to be taken in order to get non escorted access to the site for working personnel? What are the costs for certain required training?
Information will be provided, post contract award. 0003
11 8/27/2025 What pathways will the working personnel be able to use to access work areas? Pathways to working areas will be coordinated after contract award. 0003
12 8/27/2025 Will the schedule be binding? Will the awarded contractor be able to start a new portion of work before it is originally scheduled start?
No. The schedule is a dynamic document. Contractor can work steps out of sequence as long as it doesn't impact overall schedule.
13 8/27/2025 Are there any components/equipment that will be removed/demolished from the work sites that will be required for the contractor to turn over to the government?
NO 0003
Amend No.
Solicitation No. 80KSC025R0009 Project Title: VAB Power Phase I Tower C
No. Date Received
Reference (Section Paragraph/Page, Drawing Sheet/Page)
QUESTION
GOVERNMENT RESPONSE
8/27/2025
E-001 general note 37 states : CRANE ACCESS IS NOT AVAILABLE TO 32ND
FLOOR. EQUIPMENT WILL NEED TO BE TRANSPORTED THROUGH
STAIRWELL. REFER TO SHEET E-060 FOR ADDITIONAL INFORMATION, but E 60 in phase 2 step 1 states to “CONTACT COR TO COORDINATE CONTRACTOR
PROVIDED CRANE FOR LIFTING OF DISTRIBUTION PANEL AND OTHER
EQUIPMENT AND CABLE TO THE 32ND FLOOR AND OF BRINGING DOWN
DEMOLISHED EQUIPMENT. ERECT RIGGING, AS REQUIRED, TO
ACCOMMODATE LATERAL TRANSITION FROM CRANE TO 32ND FLOOR.” –
which is correct? Please advise.
Disregard note on sheet E-060. Crane access to 32nd floor is limited and preferred path via stairway is shown on drawing. Contractor can suggest alternate method for transportation of new and removed items. New panelboard and existing removed items (32nd floor) would be transported using stairs. See Amendment 0004.
15 8/27/2025 Admendment 01 - Wage Determination The FL20250106 wage determination provided with the solicitation seems to not have the correct wage rates for the SOW construction type. Past projects with similar scope utilized a DBA FL20250001 with Electrician code ELEC0222-001 and ELEC0756-001.
What wage determination should be utilized?
The accurate Davis Bacon Act wage determination to be utilized is FL20250196 modification 4 - Heavy.
16 8/27/2025 Attachment J-F - Drawing Set 79K50591 Several drawing sheets have characters that are not legible and there is random characters on several sheets. Will there be a set of drawings issued that are not corrupted?
A drawing new set will be provided via www.sam.gov, attachment titled "79K50591 VAB_Refresh Tower C Drawing_Sign and Seal.pdf".
8/27/2025 Drawings A number of drawings in the package are corrupt and not legible. Its very apparent within the notes and cable schedules. S-131; S-132; S-502; E-020; E-131; E-132; E- 141; E-142 are some examples. Please provide a complete set of drawings that are not corrupt.
A drawing new set will be provided via www.sam.gov, attachment titled "79K50591 VAB_Refresh Tower C Drawing_Sign and Seal.pdf".
8/27/2025 Drawings Path A & B 10th floor framing plans are reversed on structural drawings vs electrical drawings. Please confirm which drawings are correct.
Electrical drawings shows the correct information. 0004
8/27/2025 Drawings & Specification Section 26 24 16.00 40 Specification section 26 24 16.00 2.2.5 states to provide surge protective device at panelboards. Panel schedules do not indicate surge protection is required nor is there a breaker called out for surge. Please confirm if surge protection is required in panelboards.
Yes, surge protection is required. Also, see general note #34 on sheet E-001.
8/27/2025 Drawings There is a conflict between recessed and surface mounted panels on the drawings vs actual field conditions. Per the site visit there are only two panels that are required to be recessed in a wall, Panel 1CLA and 5CLA. The following panels should be surface mount but are labeled as recessed in the panel schedules: 3CLA, 6CLA, 7CLA, 10CLA, 16CLA, 19CLA, & 20CLA. Please concur.
Concur. Only panels 1CLA and 5CLA are recessed. 0004
8/27/2025 Drawings There is a conflict between the main breaker sizing on the following panels: Panel 1CLA & 5CLA both show 125amp on the one line and 200amp on the panel schedule.
Please confirm which is correct.
Both 1CLA and 5CLA are 200A as shown panel schedule. 0004
8/27/2025 Drawing S-001, S-132, S-142 S-001 general structural notes C.9 states to provide standard resinous flooring per specification section 09 67 23.13 on all surfaces within concrete curbed areas. Please confirm if this is only the new concrete curbed area around the transformers or is this the entire curbed area on 10th level between column lines S and O? Does the 32th level need this resinous flooring as well?
This is only for new concrete area. 0004
8/27/2025 Specifications 01 11 00 Paragraph K references the contractor to engage the services of a Florida Licensed Asbestos Consultant (FLAC) to perform a comprehensive asbestos survey, covering all suspect ACM within the limits of the project area. Please confirm the contractor is required to complete this survey.
Contractor is responsible to complete this survey. 0004
8/27/2025 Drawing H-006 Note C refers to a 2024 environmental sampling result that can be found in section 7 of the project data manual. We cannot locate this manual in the bid package. Please provide.
Environmental results will be provided via attachment titled "Environmental Results - 99300.pdf".
8/27/2025 Specification Section 26 23 00.00 98 Section 2.1 references NEMA 12 construction. NEMA 12 is not available since the switchgear needs ventilation for proper operation. Please advise if a separate enclosure is required. If a separate enclosure is required, please provide specification.
Government response is in progress.
8/27/2025 Specification Section 26 23 00.00 98 Section 2.1.2.1 Our manufacturer does not use welded construction for the compartments. Is bolted construction acceptable?
Yes, bolted construction is acceptable. 0004
27 8/27/2025 Specification Section 26 23 00.00 98 Section 2.1.2.3 references all buses to be insulated. Our manufacturers phase buses will be air insulated in the bus compartment. Bus runs back for cabling to be heat shrink insulated. Is this acceptable?
Government response is in progress.
28 8/27/2025 Specification Section 26 23 00.00 98 Section 2.3 References finish for galvanized and stainless steel, which are not applicable to standard steel. Our manufacturer will use it’s standard powder coat process.
Government response is in progress.
29 8/27/2025 How to get/remove equipment to floor #32 Tower C, due to no elevator on this area. New panelboard and existing removed items (32nd floor) would be transported using stairs. See drawing sheet E-060 for details.
Contractor can suggest alternate method for delivery of material.
30 8/27/2025 How to get/remove equipment to floor #10 Tower C, due to no elevator on this area. See drawing sheet E-060 for details. There are two paths shown on the drawing. Contractor can suggest alternate method for delivery of material.
31 8/27/2025 Do we need to design and build a structure to delivery material and equipment to these floors 32nd and 10th?
No structure is needed. Contractor can suggest alternate method for delivery of material.