Solicitation_KSC018R0016_SF1442_C.2__Change_Page.pdf

PDF 202 KB Posted

Attached to
Upgrade Liquid Hydrogen (LH2) System, Launch Complex 39B Federal contract opportunity
Solicitation number
80KSC018R0016
Issued by
National Aeronautics and Space Administration Kennedy Space Center

About this file

80KSC018R0016 SF1442 C,2 Change Pages

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Liquid Hydrogen (LH2) System, Launch Complex 39B, newest first.
File Type Posted
Sphere_Source_Selection_Statement_Final_Signed.pdf PDF
80KSC018R016_Amendment_9.pdf PDF
80KSC018R016_Amendment_8_SF30.pdf PDF
80KSC018R016_Amendment_7.pdf PDF
RESPONSE_TO_BIDDER_QUESTIONS_6-15-18.docx DOCX document
RESPONSE_TO_BIDDER_QUESTIONS_6-14-18.docx DOCX document
80KSC018R016_Amendment_6_Continuation.docx DOCX document
80KSC018R016_Amendment_6_SF30.pdf PDF
Solicitation_KSC018R0016_SF1442_J-B-26_Change_Page.pdf PDF
RESPONSE_TO_BIDDER_QUESTIONS_6-11-18.docx DOCX document
80KSC018R016_Amendment_5_SF30.pdf PDF
RESPONSE_TO_BIDDER_QUESTIONS_6-5-18.docx DOCX document
RESPONSE_TO_BIDDER_QUESTIONS_6-4-18.docx DOCX document
80KSC018R016_Amendment_4.pdf PDF
RESPONSE_TO_BIDDER_QUESTIONS_5-31-18.docx DOCX document
80KSC018R016_Amendment_3.pdf PDF
RESPONSE_TO_BIDDER_QUESTIONS_5-30-18.docx DOCX document
RESPONSE_TO_BIDDER_QUESTIONS_5-23-18.docx DOCX document
PCN_98985_Geotechnical_Report.pdf PDF
PCN_98985_Environmental_Report.pdf PDF
RESPONSE_TO_BIDDER_QUESTIONS_5-9-18.docx DOCX document
RESPONSE_TO_BIDDER_QUESTIONS_5-8-18.docx DOCX document
80KSC018R016_Amendment_2.pdf PDF
Pre-Bid_Attendee_List.docx DOCX document
80KSC018R016_Amendment_1.pdf PDF
Brand_Name_Justification_PLC.pdf PDF
80KSC018R0016_SF1442.pdf PDF
80KSC018R0016__Attachment_J1C_DOL_Area_Wage_Determination.pdf PDF
Solicitation_80KSC018R0016_SF1442_Continuation.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NASA/KSC SOLICITATION 80KSC018R0016

SECTION C – DESCRIPTION/SPECIFICATION/WORK STATEMENT

14. Specification 79K40362 Section 40 29 99 Subpart 3.7.3: The second sentence of this subpart is revised to read, “The inner line shall be pressurized to design pressure with

100 percent helium, or a mixture of 10% helium and 90% nitrogen with adjusted detection criteria, and the field welds tested for leakage.”

15. Drawing 79K40361 Volume 1, Sheet C-101: Flag Note J is revised to read, “REMOVE 60’ x 40’ CONCRETE SLAB AND PADS. FOR SLAB, ASSUME 12”

THICK CONCRETE SLAB WITH 6” x 6” 8-GAUGE REINFORCING MESH. FOR

PADS, ASSUME 24” THICK CONCRETE WITH 3/8”-DIAMETER REBAR.”

16. Drawing 79K40361 Volume 2, Sheet E-608: For Cable ID GSP-01, the TO

TERMINATION REFERENCE DESIGNATOR is revised from “UPS Panel TBD CB

TBD” to “Panel LH2-PB Circuit 3.” For Cable ID GSP-02, the TO TERMINATION

REFERENCE DESIGNATOR is revised from “FAC Panel TBD CB TBD” to “Panel

LH2-PA Circuit 1.” For Cable ID GSP-29, the TO TERMINATION REFERENCE

DESIGNATOR is revised from “UPS Panel TBD CB TBD” to “Panel LH2-PB Circuit 2.”

For Cable ID GSP-30, the TO TERMINATION REFERENCE DESIGNATOR is revised from “FAC Panel TBD CB TBD” to “Panel LH2-PA Circuit 2.”

17. Specification 79K40362 Section 26 05 00.00 40 Subpart 3.2.1.8: The third sentence of this subpart is revised to read, “Maximum support spacing is 10 feet.”

18. Specification 79K40362 Section 27 05 28.36 40 Subpart 2.4.1: The first sentence of the second paragraph of this subpart is revised to read, “Support cable trays at not more than 10-foot intervals.”

19. Drawing 79K40361 Volume 2, Sheet T-002: General Note 23 is revised to add, “D. CABLES INSTALLED IN VERTICAL OR HORIZONTAL CABLE TRAY AT 10-

FOOT INTERVALS.”

20. 79K40361 Volume 2, Sheet T-102: Flag Note C is considered deleted from this sheet. The 14 conduits in Zone F4 referred to by Flag Note C are not required and are considered deleted from this sheet.

21. Specification 79K40362 Section 43 42 41.99 Subpart 2.1.2.1h): The first sentence is revised to read, “Cycles - The inner sphere shall be designed to withstand 7000-pressure and thermal cycles without damage to vessel structure.” The wording “or insulation package” is considered deleted from this sentence.

22. Specification 79K40362 Section 43 42 41.99 Subpart 2.1.3.1e): The first sentence is revised to read, “Cycles - The outer sphere shall be designed to withstand 7000-pressure thermal cycles without damage to vessel structure.” The wording “or insulation package” is considered deleted from this sentence.

NASA/KSC SOLICITATION 80KSC018R0016

SECTION C – DESCRIPTION/SPECIFICATION/WORK STATEMENT

23. Specification 79K40362 Section 43 42 41.99 Subpart 2.2.5: A sentence is added at the end of the subpart stating, “Identify the number of pressure and thermal cycles the perlite insulation can withstand without significant damage or performance degradation in the required submittal.”

24. Specification 79K40362 Section 43 42 41.99 Subpart 2.2.5.1: A sentence is added stating, “Identify the number of pressure and thermal cycles the hollow glass microsphere insulation can withstand without significant damage or performance degradation in the associated submittal.”

25. Specification 79K40362 Section 43 42 41.99 Subpart 1.3: In SD-02 Shop

Drawings, Materials and Equipment is considered as having a “; G” added after it. This submittal requires review and approval by the government.

26. Specification 79K40362 Section 43 42 41.99 Subpart 1.3: In SD-03 Product Data, Data Sheets for Materials and Equipment is considered as having a “; G” added after it.

This submittal requires review and approval by the government.

(c) "Or Equal" Items”

Throughout the technical specifications and drawings of this contract, where certain manufacturers’ trade names and model numbers are specified and followed by the term "or equal," the manufacturer's name and data as specified shall represent the minimum standard type, quality, and capacity acceptable for incorporation into the work covered by this contract.

The products of other manufacturers will be considered as being acceptable, provided that such products fully meet or exceed all minimum structural or use and operational features of the particular manufacturers’ items as specified, and provided that the other manufacturers’ items are easily interchangeable and can be adequately incorporated within the allocated space in the building or structure. In all cases, the acceptability of "or equal" items shall be at the

Contracting Officer's discretion, based upon data submitted by the Contractor in accordance with the requirements under the Shop Drawings Clause.

(d) Omissions from the drawings or specifications, or the omission or misdescription of details of work which are manifestly necessary to carry out the intent of the drawings and specifications, or which are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work but they shall be performed as if fully and correctly set forth and described in the drawings and specifications.

(e) The Contractor shall check all drawings furnished him immediately upon their receipt and shall promptly notify the Contracting Officer of any discrepancies. Figures marked on drawings shall in general be followed in preference to scale measurements. Large scale drawings shall in general govern small scale drawings. The Contractor shall compare all drawings and verify the figures before laying out the work and will be responsible for any errors which might have been avoided thereby.