RESPONSE_TO_BIDDER_QUESTIONS_5-8-18.docx
DOCX document 19 KB Posted
- Attached to
- Upgrade Liquid Hydrogen (LH2) System, Launch Complex 39B Federal contract opportunity
- Solicitation number
- 80KSC018R0016
About this file
80KSC018R0016 Bidder Questions and Answers 5/8/18
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
80KSC018R0016
QUESTION & ANSWERS 5/8/18
RESPONSE TO BIDDER QUESTIONS:
1. REFERENCE: RFP General QUESTION: Since the contractor is carrying the design for the Liquid Hydrogen Sphere we would like to request a 5-week extension in order to complete a partial design and price the work aggressively.
ANSWER: As of this date, the proposal due date remains unchanged.
2. REFERENCE: RFP General
QUESTION: Will the craft be able to park within the jobsite or need to be bused in?
ANSWER: Assuming “craft” is referred to as “craft labor”; Refer to 80KSC018R0016 SF1442 Continuation Clause J-B-84. Associated coordination is the responsibility of the contractor.
3. REFERENCE: RFP General QUESTION: How many days of training/screening will be required to get badged for the site?
ANSWER: Refer to 80KSC018R0016 SF1442 Continuation Clauses H.6, I.14, J-B-72, and J-B-76. These clauses reference badging and training required. SATERN courses available online typically take 1-hour. Course quizzes must be completed related to certain courses to verify retention of content. ELSA Training typically takes 1-hour in person on KSC and must be scheduled by coordination with the Contracting Officer.
4. REFERENCE: RFP General
QUESTION: Will all work be on straight-time or will night work be required?
ANSWER: Refer to 80KSC018R0016 SF1442 Continuation Clause F.2.
5. REFERENCE: RFP General QUESTION: What is the protocol for downtime when a launch is scheduled on-site?
ANSWER: For a launch from LC 39B, refer to 80KSC018R0016 SF1442 Continuation Clause J-B-79 for downtime requirements. For a launch from other than LC 39B, refer to 80KSC018R0016 SF1442 Continuation Clause F.4 for downtime requirements.
6. REFERENCE: RFP General
QUESTION: Is there a concrete batch plant on-site?
ANSWER: No, there is not a concrete batch plant on KSC.
7. REFERENCE: RFP Section L / Appendix 2.
QUESTION: Will all pre-proposal questions and responses be shared with all offerors?
ANSWER: Yes, and any changes or clarifications resulting from bidder questions will be addressed in a solicitation amendment. If the questions are general and do not amend the solicitation, a Question & Answer sheet will be posted.
File details come from the government source that posted it.