This notice is a draft request for proposal issued by NASA's Johnson Space Center seeking proposals for the Orion Main Engine project. Interested offerors are invited to submit written comments or questions by January 21, 2020 regarding the draft solicitation. The final solicitation and any associated documents will be made available on the Johnson Space Center's public website. This pre-solicitation notice provides an opportunity for industry to review and comment on the requirement prior to release of the formal solicitation in order to promote competition for the Orion Main Engine project.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment J-3
ATTACHMENT J-3
December 19, 2019
APPLICABLE,
MEET THE INTENT,
INFORMATIONAL &
TAILORED DOCUMENTS
LIST
TABLE OF CONTENTS
INTRODUCTION
1.0 APPLICABLE DOCUMENTS
1.1 APPLICABLE DOCUMENT CHILDREN
2.0 MEETS THE INTENT DOCUMENTS
3.0 INFORMATIONAL DOCUMENTS
4.0 TAILORED DOCUMENTS
INTRODUCTION
This attachment includes documents classified as Applicable, Meet the Intent, Informational, and Tailored to the Orion Main Engine (OME) Project, including the definitions of how these should be applied.
Items listed in the Applicable, Meet the Intent, Informational, and Tailored Documents will contain some items that have been determined as export controlled documents. These documents are so marked Export Controlled under the document ID and anyone with access to the documents must comply with the export control law. This includes both control and disclosure of any said documents. Other documents and data listed may not contain any restrictions, however before the release of any information or data the Contractor shall make a determination as to the applicability of U.S. export control laws and regulations.
1.0 APPLICABLE DOCUMENTS
In addition to the regulations and procedures identified elsewhere in this contract, the Contractor shall comply with the following regulations and procedures to the extent that they are employed in the Performance Work Statement (PWS) or Data Requirements Documents (DRDs). The Contractor is required to perform work in accordance with the documents listed below in their latest revision. The revisions listed below are the latest as of the request for proposal release.
An updated list of documents applicable per order may be included in each individual order. In the event there is a conflict between the revision in this list of documents and the documents list included with the order, the Contractor shall comply with the revision specified in the order. Any applicable and reference documents embedded in the applicable and meets the intent documents listed in this attachment shall not be applicable unless overtly specified as applicable in the PWS or DRDs.
For Applicable Documents, the use of alternate applicable documents in place of the ones specified in this list is not permitted.
ID Document Version/Date APPLICABLE DOCUMENT TITLE
REFERENCES
DRD/PTRS PWS
DoD 5220.22-M
Feb 28, 2006 Cng 2, May 18, National Industrial Security Program Operating Manual NOTE: Applicable only to the extent of preventing unauthorized disclosure of classified information
DD Form 254 N/A
JPR 2310.1 Rev B Oct 1, 2019
JSC Knowledge Management Strategy OME-S-001 N/A
MPCV 70146 Rev B Sep 18, 2019
Orion Multi-Purpose Crew Vehicle (MPCV) Program Acceptance Data Package (ADP) Requirements
OME-T-040 N/A
MPCV 72634
Export Controlled
Draft Nov 18, 2019
Orion Multi-Purpose Crew Vehicle (MPCV) Program Orion Main Engine (OME) Project Technical Requirements Specification (PTRS)
OME-M-001
OME-T-015
OME-T-027
OME-T-031
OME-T-093
PTRS 1.3
2.3.1, 2.3.2, 3.5, 3.6, 3.7, 5.3, 5.4, 8.1.1, 8.2.2, 8.2.3, 9.1, 9.2, 9.3, 9.5.1, 9.5.4, 11.1, 13.0
NPD 2810.1 Rev E Jul 14, 2015
NASA Information Security Policy OME-M-005 N/A
NPR 2810.1 Rev A Jan 31, 2021
Security of Information Technology OME-M-004
OME-M-005
4.6.2
SAE EIA-649-2 Apr 2016 Technical Report, Configuration Management Requirements for NASA Enterprises
OME-T-040 4.9
SO300-BT-PRO-010 Latest from www.gidep.org
Government-Industry Data Exchange Program (GIDEP) Operations Manual
OME-S-012 N/A
http://www.gidep.org/
1.1 APPLICABLE DOCUMENT CHILDREN
For the following applicable documents, their embedded applicable children documents identified in the Approved Children Table are also applicable:
• MPCV 72634, Orion Multi-Purpose Crew Vehicle (MPCV) Program Orion Main Engine (OME) Project Technical Requirements Specification (PTRS) o MPCV 70156, Cross Program Fluid Procurement and Use Control Specification o MPCV 72623, Orion Multi-Purpose Crew Vehicle (MPCV) Propulsion System Bellows
Added Measures of Performance (AMOR)
Version/Date APPROVED CHILDREN DOCUMENT TITLE
REFERENCES
DRD/PTRS PWS
PARENT APPLICABLE DOCUMENT
MPCV 72634
Export Controlled
Draft Nov 18, 2019
Orion Multi-Purpose Crew Vehicle (MPCV) Program Orion Main Engine (OME) Project Technical Requirements Specification (PTRS)
OME-M-001
OME-T-015
OME-T-027
OME-T-031
OME-T-093
2.3.1, 2.3.2, 3.5, 3.6, 3.7, 5.3, 5.4, 8.1.1, 8.2.2, 8.2.3, 9.1, 9.2, 9.3, 9.5.1, 9.5.4, 11.1, 13.0
MPCV 72634 APPROVED CHILDREN
MPCV 70156 Rev F
Oct 24, 2018
Cross Program Fluid Procurement and Use Control Specification
OME.0001
OME.0003
OME.0058
R.OME.0001V
Appendix D 1.3 2.1 2.2 2.3 4.0
N/A
MPCV 72623
Export Controlled
Baseline Feb 21, 2018
Orion Multi-Purpose Crew Vehicle (MPCV) Propulsion System Bellows Added Measures of Performance (AMOR)
OME.0097
R.OME.0097V
N/A
2.0 MEETS THE INTENT DOCUMENTS
Meets the Intent documents are listed for two purposes.
1) To be used by the contractor as a level of standards that must meet the intent of the documents listed in this section if alternative standards are recommended by the contractor. The Contractor may request use of alternate documents instead of the ones specified in this list. The alternate document proposed must reflect a revision version and/or date so that the version is configuration managed. Once approved, the alternate item will be added to this list and shown as the approved alternate to the original meet the intent document.
2) To be used or tailored per direction within a DRD description. The resulting new or tailored document deliverable will take precedence over the associated document once the new or tailored document deliverable is approved by NASA. After the new or tailored document is approved by NASA, the item will be added to this list and shown as the approved alternate to the original document.
ID
Document Version/
Date
MEETS THE INTENT
DOCUMENT TITLE
REFERENCES
Alternate ID Document
Version/ Date
ALTERNATE DOCUMENT
TITLE
DRD/PTRS PWS
AIA NAS410 Rev 4 Dec 19, Certification and Qualification of NDE Test Personnel
OME-T-023 N/A
AIA NAS412 Rev 2 Apr 30, 2018
Foreign Object Damage (FOD) Prevention Guidance Document
OME-T-021 N/A
ANSI/AIAA S-080 Rev A
Space Systems - Metallic Pressure Vessels, Pressurized Structures, and Pressure Components
OME-T-071
OME.SDVR0065
R.OME.SDVR0065V
N/A
ANSI/AIAA S-081 Rev B
Space Systems – Composite Overwrapped Pressure Vessels (COPVs)
OME-T-071
OME.SDVR0066
R.OME.SDVR0066V
ANSI/NCSL
Z540.3
Revised
Requirements for the Calibration of Measuring and Test Equipment
OME.0089
R.OME.0089V
R.OME.0072V
R.OME.0091V
R.OME.0092V
ASME Y14.24 2012 Types and Applications of Engineering Drawings
OME-T-004 N/A
ASME Y14.34 Reaffirmed
Associated Lists OME-T-004 N/A
ASME Y14.35 2014 Engineering Drawings and Associated Documents
ID
Document Version/
Date
MEETS THE INTENT
DOCUMENT TITLE
REFERENCES
Alternate ID Document
Version/ Date
ALTERNATE DOCUMENT
TITLE
DRD/PTRS PWS
ASME Y14.100 2017 Engineering Drawing Practices
CEV-T-027000
Export Controlled
Rev G Feb 3, 2017
Electrical, Electronic, and Electromechanical Parts Management and Implementation Plan
OME.0061
R.OME.0061V
N/A
CPIA Publication
Jan 1997 Guidelines for Combustion Stability Specifications and Verification Procedures for Liquid Propellant Rocket Engines
OME.0025 5.7,
11.1
GSDO-RQMT-
Export Controlled
EAR99
Baseline May 1, 2013 with Errata Oct 1, 2019
Cross-Program Contamination Control Requirements Note: The only applicable sections are 3.2, 3.5, 3.6, 3.7, and Appendix C
OME-T-021
Appendix D 1.3
N/A
MIL-HDBK-6870 Rev B Feb 14, Inspection Program Requirements Nondestructive for Aircraft and Missile Materials and Parts
OME-T-023 N/A
MIL-STD-130 Rev N Chg 1 Nov 16, Identification Marking of U.S.
Military Property
OME.0090
R.OME.0090V
N/A
MIL-STD-810 Rev H Jan 31, 2019
Department of Defense Test Method Standard
PTRS
5.3.2.4.1.e
ID
Document Version/
Date
MEETS THE INTENT
DOCUMENT TITLE
REFERENCES
Alternate ID Document
Version/ Date
ALTERNATE DOCUMENT
TITLE
DRD/PTRS PWS
MPCV 70038 Rev A Feb 13, Orion MPCV Hazard Analysis Requirements
OME-S-001
OME-S-003
OME-S-005
OME.0079
R.OME.0045V
3.7
MPCV 70043 Rev B Jun 10, 2015
Orion MPCV Hardware Failure Modes and Effects Analysis/Critical Items List (FMEA/CIL) Requirements Document
OME-S-009
R.OME.0096V
PTRS
5.3.2.9.2.2.1.b.3 5.3.2.9.2.2.2.c 5.3.2.10.2.2.1.b.3 5.3.2.10.2.2.2.c
MPCV 70059 Baseline Sep 6, 2012
Orion MPCV Safety and Mission Assurance Requirements
OME-S-001
OME-S-015
OME-T-019
3.6, 10.2, 10.4, 10.5
MPCV 70068 Baseline Jul 26, 2012
Orion MPCV Problem Reporting and Corrective Action (PRACA) Requirements
N/A 10.5
MPCV 70080 Rev A May 13, Cross Program Electromagnetic Environmental Effects (E3) Requirements Document
Note: Applicable sections are called out in the PTRS.
OME-T-025
OME.0062
OME.0105
R.OME.0105V
PTRS 5.3.2.10
ID
Document Version/
Date
MEETS THE INTENT
DOCUMENT TITLE
REFERENCES
Alternate ID Document
Version/ Date
ALTERNATE DOCUMENT
TITLE
DRD/PTRS PWS
MPCV 70152 Baseline May 5, 2016
Orion Multi-Purpose Crew Vehicle (MPCV) Program: Crew Interface Labeling Standard
OME.0091
R.OME.0091V
N/A
MPCV 72506
Export Controlled
Rev A Sep 6, 2018
Orion MPCV Standard for the Design and Fabrication of Ground Support Equipment
OME-O-008
OME-T-031
OME.0072
R.OME.0072V
13.0
MPCV 72620 Baseline Sep 13, Orion MPCV Program Electromagnetic Environmental Effect (E3) Requirements for Government Furnished Equipment (GFE)
OME.0062
OME.0105
R.OME.0062V
N/A
MSFC-SPEC-
20M02540
Rev E Dec 19, Assessment of Flexible Lines for Flow Induced Vibration
OME.SDVR0067
OME.0100
R.OME.0100V
MSFC-SPEC-626 Basic Feb 28, Test Control Document for Assessment of Flexible Lines for Flow Induced Vibration
OME.SDVR0067
NASA-STD-4003 Rev A Chg 1 Jan 19, 2016
Electrical Bonding for NASA Launch Vehicles, Spacecraft, Payloads, and Flight Equipment
OME-T-025
OME.0102
R.OME.0102V
NASA-STD-5009 Rev B May 8, 2019
Nondestructive Evaluation Requirements for Fracture Critical Metallic Components
OME-T-023 N/A
ID
Document Version/
Date
MEETS THE INTENT
DOCUMENT TITLE
REFERENCES
Alternate ID Document
Version/ Date
ALTERNATE DOCUMENT
TITLE
DRD/PTRS PWS
NASA-STD-5012 Rev B Jun 16, 2016
Strength and Life Assessment Requirements for Liquid-Fueled Space Propulsion System Engines
OME.0083
R.OME.0083V
R.OME.SDVR5V
5.7
NASA-STD-5017 Rev A Chg 1 May 31, Design and Development Requirements for Mechanisms
OME.0093
R.OME.0093V
PTRS 5.3.2.16.2.4
NASA-STD-5019 Rev A, Chg Mar 29, Fracture Control Requirements for Spaceflight Hardware
OME-S-016
OME-T-020
OME-T-023
OME.0098
R.OME.0098V
OME.SDVR57
NASA-STD-5020 Rev A Chg 1 Feb 11, Requirements for Threaded Fastening Systems in Spaceflight Hardware
OME.SDVR0010
OME.SDVR0011
R.OME.SDVR0011V
OME.SDVR00105
R.OME.SDVR00105V
Table 3.4.2-6
NASA-STD-6008 Baseline Chg 1 Jul 11, 2008
NASA Fastener Procurement, Receiving Inspection, and Storage Practices for Spaceflight Hardware
OME-S-016 N/A
ID
Document Version/
Date
MEETS THE INTENT
DOCUMENT TITLE
REFERENCES
Alternate ID Document
Version/ Date
ALTERNATE DOCUMENT
TITLE
DRD/PTRS PWS
NASA-STD-6016 Rev A Nov 30, Standard Materials and Processes Requirements for Spacecraft
OME-S-016
OME-T-019
OME-T-020
OME-T-021
OME-T-023
OME-T-094
OME.0094
R.OME.0094V
OME.SDVR50
R.OME.SDVR50V
OME.SDVR51
OME.SDVR95
R.OME.SDVR95V
OME.SDVR96
R.OME.SDVR96OO
ME.IF.0007
R.OME.IF.0007V
5.7, 9.5.3
NASA-STD-7009 Rev A, Chg Dec 7, 2016
Standard for Models and Simulations
OME-T-001 9.4
NASA-STD-7012 Baseline Mar 5, 2019
Leak Test Requirements R.OME.009V
R.OME.0010V
PTRS 5.3.2.3
NPR 6000.1 Rev H Nov 10, Requirements for Packaging, Handling, and Transportation for Aeronautical and Space Systems, Equipment, and Associated Components
OME.0092
R.OME.0092V
ID
Document Version/
Date
MEETS THE INTENT
DOCUMENT TITLE
REFERENCES
Alternate ID Document
Version/ Date
ALTERNATE DOCUMENT
TITLE
DRD/PTRS PWS
NPR 7150.2 Rev C Aug 2, 2019
NASA Software Engineering
OME-T-001 N/A
SAE AS9100 Rev D Sep 2016
Quality Management Systems - Requirements for Aviation, Space, and Defense Orgainzations
OME-S-001 N/A
SAE AS22759 Rev D May 2018
Wire, Electrical, Fluoropolymer- Insulated, Copper or Copper Alloy
OME.0088
R.OME.0088V
N/A
SMC-S-025 New Issue Jul 26, 2017
Evaluation and Test Requirements for Liquid Rocker Engines
OME-T-037
R.OME..0003V
R.OME..0004V
R.OME..0005V
R.OME..0006V
R.OME..00011V
R.OME..00014V
R.OME..00018V
R.OME..00022V
5.7, 11.2.2
3.0 INFORMATIONAL DOCUMENTS
Informational documents are listed for information purposes only. To obtain current versions of the Informational Documents, reference the NASA Windchill Library.
Version/Date INFORMATION DOCUMENT TITLE
REFERENCES
DRD/PTRS PWS
ASTM E1548 Reapproved
Standard Practice for Preparation of Aeroasace Contamination Control Plans
OME-T-021 N/A
ESD 10003 Rev F May 3, 2017
Exploration Systems Development Risk Management Plan N/A 8.2.2
ISO 9001 5th Ed.
Sep 15, 2015
ISO 9001:2015 - Certification for Quality OME-S-001 N/A
ISO 14300-1 2nd Ed.
Jul 15, 2011
Space Systems - Project Management - Part 1: Structuring of a Project
N/A 4.1
ITS-HBK-2810.06-2B May 2019 NASA Information Technology Security Handbook, IT Security Awareness Training
OME-M-004 4.6.2.4
OMB Circular A-130 No Date Managing Information as a Strategic Resource OME-M-004 4.8
ID Document Version/Date INFORMATION DOCUMENT TITLE
REFERENCES
DRD/PTRS PWS
MPCV 70135 Rev B Aug 17, 2017
Orion Multi-Purpose Crew Vehicle (MPCV) Program: Structural Design and Verification Requirements (SDVR)
OME.0083
OME.SDVR7
R.OME.SDVR7V
OME.SDVR50
OME.SDVR51
OME.SDVR56
OME.SDVR57
R.OME.SDVR57V
OME.SDVR95
OME.SDVR96
R.OME.SDVR59V
R.OME.SDVR67V
R.OME.SDVR88V
5.3.1.3.2 Table 3.4.2-6 Table 5.3.2-1(5)
N/A
MPCV 72008 Rev D Aug 28, 2018
Orion Multi-Purpose Crew Vehicle (MPCV) Program Plan
OME-M-001 4.1
MPCV 72091 Rev C Oct 18, 2017
Orion Multi-Purpose Crew Vehicle (MPCV) Program Integrated Risk Management Plan
N/A 4.11
MPCV 72223 Rev B May 21, 2019
Orion Multi-Purpose Crew Vehicle (MPCV) Program Mishap Preparedness and Contingency Plan
OME-S-001
MPCV 72523 Rev B Jun 1, 2015
Orion Multi-Purpose Crew Vehicle (MPCV) Program Configuration and Data Management (C&DM) Plan
N/A 2.3.1, 4.10
MPCV-RIBRE-SPE-0011
Export Controlled
Issue 9 Jun 18, 2019
MPCV-ESM Mechanical System Support Spec
OME.0028 N/A
ID Document Version/Date INFORMATION DOCUMENT TITLE
REFERENCES
DRD/PTRS PWS
MPCV-RIBRE-SPE-0012
Export Controlled
Issue 9 Sep 30, 2016
MPCV-ESM External Thermal Environment System Support Specification
N/A N/A
NASA-ESM-PROP-2016-
Export Controlled
Apr 29, 2016 ESM Propulsion Memo, Subject: TVC Actuator Test Load
OME.0041 N/A
NASA-HDBK-5010 Chg 1 Revalidated Oct 19, 2017
Fracture Control Implementation Handbook for Spaceflight Hardware
NASA-HDBK-7005 Baseline Mar 13, 2001
Dynamic Environmental Criteria
OME-T-015
OME.SDVR0088
N/A
NASA-STD-5001 Rev B Chg 2 Oct 5, 2016
Structural Design and Test Factors of Safety for Spaceflight Hardware
N/A N/A
NASA-STD-8739.4 Rev A Jun 30, 2016
Workmanship Standard for Crimping, Intercoonecting Cables, Harnesses, and Wiring
OME-S-001
OME.0087
R.OME.0087V
NIST SP811 2008 Edition Guide for the use of the International System of Units
PTRS 1.6.1 N/A
NPD 8730.5 Rev B Oct 27, 2005
NASA Quality Assurance Program Policy
NPR 1600.1 Rev A Aug 12, 2013
NASA Security Project Procedural Requirements
OME-M-004 4.8
NPR 7120.5 Rev E Aug 14, 2012
NASA Space Flight Program and Project Management
OME-M-002 N/A
NPR 7120.8 Rev A Sep 14, 2018
NASA Research and Technology Program and Project Management Requirements
ID Document Version/Date INFORMATION DOCUMENT TITLE
REFERENCES
DRD/PTRS PWS
NPR 8705.2 Rev C Jul 10, 2017
Human Rating Requirements for Space Systems
OME.0079 N/A
NPR 8735.1 Rev D Jul 29, 2018
Exchange of Problem Data Using NASA Advisories and the Government-Industry Data Exchange Program (GIDEP)
NPR 9090.1 Rev A Feb 25, 2013
Reimbursable Agreements
NSTS 08123 Rev C Apr 12, 1994
Certification of Flex Hoses and Bellows for Flow Induced Vibration
OME.SDVR0067 N/A
OME Memorandum Export Controlled
Draft Dec 19, 2019
CSM Orion Main Engine Project Memorandum Subject: Orion Main Engine Project Environmental Definition
OME-M-001
OME-T-015
OME-T-027
OME-T-031
OME-T-093
PTRS 1.3
2.3.1, 2.3.2, 3.5, 3.6, 3.7, 5.3, 5.4, 8.1.1, 8.2.2, 8.2.3, 9.1, 9.2, 9.3, 9.5.1, 9.5.4, 11.1, 13.0
SMC-S-005 Feb 28, 2015 AFSC Space And Missile Systems Center Standard: Space Systems - Flight Pressurized Systems
OME.SDVR0068 N/A
SAE AS9003 Rev A Jul 2010
Inspection and Test Quality Systems Requirements for Aviation, Space, and Defense Organizations
OME-S-001 N/A
SAE AS9120 Rev B Nov 2016
Quality Management Systems - Requirements for Aviation, Space and Defense Distributors
SAE EIA649 Rev C Feb 2019
System Management Standard, (R) Configuration Management Standard
OME-T-040 N/A
SAE GEIA859 Rev A Apr 2012
Technical Report, Data Management
N/A 4.10
ID Document Version/Date INFORMATION DOCUMENT TITLE
REFERENCES
DRD/PTRS PWS
SLS-PLAN-062
Export Controlled
Rev A Nov 14, 2018
Cross-Program Integrated Vehicle Loads Control Plan (LCP) OME.SDVR0057
OME.SDVR0065
OME.SDVR0066
SP-2010-3403 Jan 2010 NASA Schedule Management Handbook
4.0 TAILORED DOCUMENTS
Version/Date
TAILORED DOCUMENT TITLE
TAILORED LANGUAGE
REFERENCES
DRD/PTRS PWS
NASA-STD-5019 Rev A, Chg 2 Mar 29, 2018
Fracture Control Requirements for Spaceflight Hardware
Current requirement language
4.2.1 Responsible Fracture Control Board
[FCR 2] The NASA Center responsible for the human-rated spaceflight hardware shall establish and designate a NASA RFCB to ensure compliance with the technical requirements of this document.
*Proposed tailored language
4.2.1 Responsible Fracture Control Board
[FCR 2] The OME Contractor shall establish and designate a RFCB to ensure compliance with the technical requirements of this document or the NASA approved alternate standard.
Current requirement language
4.2.2 Responsible Program
Human-rated spaceflight programs shall impose fracture control on their projects to meet the requirements of this NASA Technical Standard.
*Proposed tailored language
4.2.2 Responsible Program
Human-rated spaceflight programs shall impose fracture control on their projects to meet the requirements of this NASA Technical Standard or the NASA approved alternative standard.
*General proposed tailored language Anywhere in this standard that refers to meeting the requirements of this NASA Technical Standard should be understood to mean meeting the requirements of this NASA Technical Standard or the NASA approved alternate standard.
OME-S-016
OME-T-020
OME-T-023
OME.0098
R.OME.0098V
OME.SDVR57
ID Document Version/Date
TAILORED DOCUMENT TITLE
TAILORED LANGUAGE
REFERENCES
DRD/PTRS PWS
CEV-T-027000
Export Controlled
Rev G Feb 3, 2017
Electrical, Electronic, and Electromechanical Parts Management and Implementation Plan
Current requirement language
4.1.2 Orion Parts Control Board
The Orion Parts Control Board (PCB) shall be implemented by this plan, manage, and coordinate at the project level, the selection, application, and procurement requirements of all EEE parts. LM and NASA shall co-chair the PCB. All subcontractors shall support the PCB as applicable (e.g. NSPAR approval of subcontractor’s items, unique issues to subcontractors, etc…) and shall implement the findings and decisions of the PCB to the extent that they are covered in their contractual effort.
*Proposed tailored language
4.1.2 Orion Parts Control Board
The OME Contractor Parts Control Board (PCB) shall be implemented by this plan (or NASA approved alternate plan), manage, and coordinate at the project level, the selection, application, and procurement requirements of all EEE parts. The OME Contractor shall chair the PCB. All subcontractors shall support the PCB as applicable (e.g. NSPAR approval of subcontractor’s items, unique issues to subcontractors, etc…) and shall implement the findings and decisions of the PCB to the extent that they are covered in their contractual effort.
ID Document Version/Date
TAILORED DOCUMENT TITLE
TAILORED LANGUAGE
REFERENCES
DRD/PTRS PWS
CEV-T-027000
Export Controlled
Rev G Feb 3, 2017
Electrical, Electronic, and Electromechanical Parts Management and Implementation Plan
Current requirement language
4.1.2.1 Board Membership—The PCB membership shall include
at least one member from LM as well as the appropriate subcontractors. LM shall Co-chair the meeting with NASA. NASA, as Co-chair on the PCB, shall retain the right of disapproval of PCB decisions. All members shall be capable of supporting the PCB in technical matters as required. Each member shall have the authority to commit his organization or company to PCB decisions which are within the scope of their contract and consistent with the parts, materials, and processes control program processes.
*Proposed tailored language
4.1.2.1 Board Membership—The PCB membership shall include
at least one voting member from NASA as well as the appropriate subcontractors. Although the NASA board member has a vote, board consensus is not required. All members shall be capable of supporting the PCB in technical matters as required. Each member shall have the authority to commit his organization or company to PCB decisions which are within the scope of their contract and consistent with the parts, materials, and processes control program processes.
ID Document Version/Date
TAILORED DOCUMENT TITLE
TAILORED LANGUAGE
REFERENCES
DRD/PTRS PWS
CEV-T-027000
Export Controlled
Rev G Feb 3, 2017
Electrical, Electronic, and Electromechanical Parts Management and Implementation Plan
Current requirement language
4.1.2.3 PCB Responsibilities
1. The PCB shall establish PCB operating procedures in accordance with this standard.
2. LM, as chair of the PCB, shall establish and maintain a PAPL.
Each member shall coordinate the identification and applicable data for proposed EEE parts. When required, each member shall request approval of items using the NSPAR process with the supporting data, as applicable. The PCB shall recommend approval or disapproval for each part. These approved parts and lists will be periodically submitted to Lockheed Martin.
3. The PCB shall ensure compliance with the requirements of this standard to the extent they are invoked on contract. The responsible contractor or subcontractor shall evaluate and recommend approval/disapproval to the PCB for deviations or waivers on the requirements of this standard.
4. The PCB shall review and approve use of any nonstandard parts.
*Proposed tailored language
4.1.2.3 PCB Responsibilities
1. The PCB shall establish PCB operating procedures in accordance with this standard.
2. The OME Contractor, as chair of the PCB, shall establish and maintain a PAPL. Each member shall coordinate the identification and applicable data for proposed EEE parts. When required, each member shall request approval of items using the NSPAR process with the supporting data, as applicable. The PCB shall recommend approval or disapproval for each part. These approved parts and lists will be periodically submitted to NASA.
3. The PCB shall ensure compliance with the requirements of this standard to the extent they are invoked on contract. The responsible contractor or subcontractor shall evaluate and recommend approval/disapproval to the PCB for deviations or waivers on the requirements of this standard.
4. The PCB shall review and approve use of any nonstandard parts.
ID Document Version/Date
TAILORED DOCUMENT TITLE
TAILORED LANGUAGE
REFERENCES
DRD/PTRS PWS
CEV-T-027000
Export Controlled
Rev G Feb 3, 2017
Electrical, Electronic, and Electromechanical Parts Management and Implementation Plan
Current requirement language
4.1.2.4 PCB Delegation—Disposition of parts and/or actions not involving NSPARs, waivers or deviations is delegated to the prime contractor. The PCB, when providing technical review and recommendation of waivers or deviations to the contract to the Orion Project, shall be co-chaired and conducted by LM, and NASA. Part exceptions shall be dispositioned by the PCB.
*Proposed tailored language
4.1.2.4 PCB Delegation—Disposition of parts and/or actions not involving NSPARs, waivers or deviations is delegated to the OME contractor. The PCB, when providing technical review and recommendation of waivers or deviations to the contract to the OME Project, shall be chaired and conducted by the OME Contractor. Part exceptions shall be dispositioned by the PCB.
*Note: Proposed tailored language for NASA Standards is pending approval by the responsible Technical Authority in accordance with NPR 7120.5.
Proposed tailoring language for Program documents is pending approval by the Orion Program and the responsible Technical Authority.
| INTRODUCTION |
| 1.0 APPLICABLE DOCUMENTS |
| 1.1 APPLICABLE DOCUMENT CHILDREN |
| 2.0 MEETS THE INTENT DOCUMENTS |
| 3.0 INFORMATIONAL DOCUMENTS |
Accessibility Report
Filename:
J-3 DRFP Documents List.pdf
Report created by:
Organization:
[Enter personal and organization information through the Preferences > Identity dialog.]
Summary
The checker found problems which may prevent the document from being fully accessible.
Needs manual check: 2
Passed manually: 0
Failed manually: 0
Skipped: 1
Passed: 27
Failed: 2
Detailed Report
Document
Rule Name Status Description
Accessibility permission flag Passed Accessibility permission flag must be set
Image-only PDF Passed Document is not image-only PDF
Tagged PDF Passed Document is tagged PDF
Logical Reading Order Needs manual check Document structure provides a logical reading order
Primary language Passed Text language is specified
Title Passed Document title is showing in title bar
Bookmarks Passed Bookmarks are present in large documents
Color contrast Needs manual check Document has appropriate color contrast
Page Content
Rule Name Status Description
Tagged content Passed All page content is tagged
Tagged annotations Passed All annotations are tagged
Tab order Passed Tab order is consistent with structure order
Character encoding Passed Reliable character encoding is provided
Tagged multimedia Passed All multimedia objects are tagged
Screen flicker Passed Page will not cause screen flicker
Scripts Passed No inaccessible scripts
Timed responses Passed Page does not require timed responses
Navigation links Passed Navigation links are not repetitive
Forms
Rule Name Status Description
Tagged form fields Passed All form fields are tagged
Field descriptions Passed All form fields have description
Alternate Text
Rule Name Status Description
Figures alternate text Passed Figures require alternate text
Nested alternate text Passed Alternate text that will never be read
Associated with content Passed Alternate text must be associated with some content
Hides annotation Passed Alternate text should not hide annotation
Other elements alternate text Passed Other elements that require alternate text
Tables
Rule Name Status Description
Rows Passed TR must be a child of Table, THead, TBody, or TFoot
TH and TD Passed TH and TD must be children of TR
Headers Passed Tables should have headers
Regularity Failed Tables must contain the same number of columns in each row and rows in each column
Summary Failed Tables must have a summary
Lists
Rule Name Status Description
List items Passed LI must be a child of L
Lbl and LBody Passed Lbl and LBody must be children of LI
Headings
Rule Name Status Description
Appropriate nesting Skipped Appropriate nesting
Back to Top
File details come from the government source that posted it. Updated .