About this file

This document contains questions and answers regarding a draft request for proposal for the Orion Main Engine opportunity. NASA is seeking proposals for the development and production of the Orion Main Engine to be used on the European Service Module for the Orion spacecraft. Interested offerors are invited to submit comments or questions on the draft RFP by January 21, 2020. The final RFP will be updated with additional information such as required insurance amounts and reference 3D models of engine interfaces. NASA will provide contact information for the European Service Module Integration Facility and maintain the NASA Project Manager as the point of contact for agency boards. Historical data on current engine preparation, testing and integration will also be made available to help bidders in developing their proposals.

View the file

Other files for this federal contract opportunity

Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

80JSC020OME

DRAFT RFP

Question and Answers

Question Answers

43 With respect to insurance coverage, we recommend the language in the recent HLS Appendix H Procurement be used:

"Insurance shall be an amount up to $XX million, or the maximum amount available in the market at reasonable cost, subject to approval by the contracting officer."

The final Request For Proposal (RFP) has been updated to contain the amount of insurance required.

The Final RFP Section I has been updated to include NASA FAR 1852.228-75, Minimum Insurance Coverage which details the required insurance coverage for the acquisition.

44 Figure 3.7-8 Interface Requirements highlights the Fuel and Oxidizer Interface Panel Geometry, ESM Side.

To facilitate design clarity we recommend NASA provide access to a CAD model of the full interface geometry.

The original Orbital Maneuvering System engine was not built with Computer Aided Design (CAD) models.

The CAD models of the full interface geometry are proprietary models. However, the final RFP technical library now includes 3-Dimensional (3-D) models of the current OMS-E outer mold line and the Heat Shield under file name “EngineScan_Export Controlled.zip” and “Heat Shield STL Files Export.zip”, respectively. The models contain information on the engine side of the interfaces, which mate with the European Service Module. The models were generated via a point cloud method, which may contain some inaccuracies and/or discontinuities. The 3-D models in the technical library is for reference only and should any conflict arise between this model and the Orion Multi-Purpose Crew Vehicle (MPCV) 72634, Program Orion Main Engine Project Technical Requirements Specification (PTRS), the PTRS shall take precedence.

45 Will NASA provide specific information on current operations, relationships and contacts of current engine preparation and integration to help bidders plan and prepare an OME bid? The specific information includes international relationships and contacts for delivery, integration and support; internal NASA boards and interfaces to the program;

and experience to date with current engines relative to the preparation, test, delivery, integration, and support of the engines.

NASA has provided the European Service Module Integration Facility Point of Contact (POC) in the final RFP, Attachment J-12, LIST OF GOVERNMENT FACILITIES. The NASA Project Manager will remain the POC for all NASA boards during the contract performance. The Pre-Proposal Conference Charts show the Organizational structure, international relationships and integration flow. In the technical library, there is a document titled “OMS-E GSE, Ground, and Flight Installation Hardware List” with the filename “OMS-E_GSEandFlt_HW_List Feb 28.pdf” which details the Ground Support Equipment currently utilized.

Accessibility Report

Filename:

80JSC020OME Draft RFP Q&A Part 2 r1.pdf

Report created by:

Organization:

[Enter personal and organization information through the Preferences > Identity dialog.]

Summary

The checker found no problems in this document.

Needs manual check: 0

Passed manually: 2

Failed manually: 0

Skipped: 3

Passed: 27

Failed: 0

Detailed Report

Document

Rule Name Status Description

Accessibility permission flag Passed Accessibility permission flag must be set

Image-only PDF Passed Document is not image-only PDF

Tagged PDF Passed Document is tagged PDF

Logical Reading Order Passed manually Document structure provides a logical reading order

Primary language Passed Text language is specified

Title Passed Document title is showing in title bar

Bookmarks Passed Bookmarks are present in large documents

Color contrast Passed manually Document has appropriate color contrast

Page Content

Rule Name Status Description

Tagged content Passed All page content is tagged

Tagged annotations Passed All annotations are tagged

Tab order Passed Tab order is consistent with structure order

Character encoding Passed Reliable character encoding is provided

Tagged multimedia Passed All multimedia objects are tagged

Screen flicker Passed Page will not cause screen flicker

Scripts Passed No inaccessible scripts

Timed responses Passed Page does not require timed responses

Navigation links Passed Navigation links are not repetitive

Forms

Rule Name Status Description

Tagged form fields Passed All form fields are tagged

Field descriptions Passed All form fields have description

Alternate Text

Rule Name Status Description

Figures alternate text Passed Figures require alternate text

Nested alternate text Passed Alternate text that will never be read

Associated with content Passed Alternate text must be associated with some content

Hides annotation Passed Alternate text should not hide annotation

Other elements alternate text Skipped Other elements that require alternate text

Tables

Rule Name Status Description

Rows Passed TR must be a child of Table, THead, TBody, or TFoot

TH and TD Skipped TH and TD must be children of TR

Headers Passed Tables should have headers

Regularity Passed Tables must contain the same number of columns in each row and rows in each column

Summary Skipped Tables must have a summary

Lists

Rule Name Status Description

List items Passed LI must be a child of L

Lbl and LBody Passed Lbl and LBody must be children of LI

Headings

Rule Name Status Description

Appropriate nesting Passed Appropriate nesting

Back to Top

File details come from the government source that posted it. Updated .