CSFO_II_Cost_and_Pricing_Workbooks_(Amendment_1).xlsx
XLSX spreadsheet 362 KB Posted
- Attached to
- Center Safety and Fire Operations II (CSFO II) Federal contract opportunity
- Solicitation number
- 80JSC019R0034
About this file
CSFO II Cost and Pricing Workbooks (Amendment 1)
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Workbook Instructions
CSFO II EXCEL Pricng Model Instructions
GENERAL INSTRUCTIONS
Proposals shall be prepared using the Excel workbook provided in the RFP. The Government will be evaluating the proposals using Micosoft Excel. Each prime contractor and major subcontractor is required to submit their EPM and any other electronic cost data, in the format described in the RFP. The proposal shall be submitted to the Government using FedBizOpps. No other submission method will be acceptable. The deadline for submission of proposals are indicated in the RFP.
The Excel workbook shall be automated to the greatest extent possible. However, whereas linking among the spreadsheets within the workbook may be necessary, the use of external links (source data not provided to NASA) of any kind is prohibited. The workbook shall contain no macros or hidden cells, nor shall the workbook be locked, protected or secured by passwords.
When multiple versions of the same template are required, the multiple templates shall be included in the same worksheet stacked vertically.
NAMING CONVENTION:
Workbook shall be names as follows: The proposal shall include a single workbook with multiple worksheets. The workbook shall be named EPM followed by a hyphen then the three letter company name acronym. E.g. The company named Abacus Business Corporation shallname it's workbook "EPM-ABC". The names of worksheets within the workbook shall start with the worksheet name, followed by the hyphen, then the company's name acronym. E.g. The FBR worksheet for Abacus Business Corporation shall be named "FBR-ABC". included in the Offeror’s proposal shall begin with the appropriate workbook acronym, hyphen, followed by the first three letters of the Offeror’s company name.
Cost Templates Acronyms:
| TRST: | Technical Resources Summary Template |
| TRT TO: | Technical Resources Template Task Order |
| TOPT TO: | Task Order Pricing Template Task Order |
| FBR: | Fully Burdened Rate Pricing Template |
| IRAP: | Incumbency Retention and Pay |
| MSPT: | Minor Subcontracting Pricing Template |
| PIT: | Phase in Template |
| SAI: | Subcontract Arrangement Information |
| FBACP: | Fringe Benefit Analysis of Compensation Plan |
| SRA: | Seniority Right Assumptions |
| OHT: | Overhead Template |
| GAT: | General & Administrative Template |
| CFAOT: | Cognizant Field Audit Office Template |
NOTE: BECAUSE OF THE GOVERNMENT SHUTDOWN, YEAR ONE OF THE CONTRACT IS REDUCED TO 11 MONTHS. PLEASE ADJUST THE YEAR ONE COSTS TO REFLECT 11 MONTHS AND NOT 12 MONTHS.
PLEASE NOTE THAT THIS MODIFICATION WOULD HAVE NO EFFECT ON THE CALCULATION OF THE CONTRACTOR'S FISCAL YEAR INDIRECT RATES - (OHT and GAT TEMPLATES)
TRST
| TECHNICAL RESOURCES SUMMARY TEMPLATE - TRT |
| Prime Contractor's Name: |
Task Order
| Standard Labor Cat. | Year 1 (11 Mths) | Year 2 | Year 3 | Year 4 | Year 5 | Total |
| Program Manager | 0 | 0 | 0 | 0 | 0 | 0 |
| Business Support Specialist | 0 | 0 | 0 | 0 | 0 | 0 |
| Engineer Safety Specialist Level I | 0 | 0 | 0 | 0 | 0 | 0 |
| Engineer Safety Specialist Level II | 0 | 0 | 0 | 0 | 0 | 0 |
| Engineer Safety Specialist Level III | 0 | 0 | 0 | 0 | 0 | 0 |
| Fire Protection Engineer Level I | 0 | 0 | 0 | 0 | 0 | 0 |
| Fire Protection Engineer Level II | 0 | 0 | 0 | 0 | 0 | 0 |
| Test Safety Engineer | 0 | 0 | 0 | 0 | 0 | 0 |
| Data Analyst I | 0 | 0 | 0 | 0 | 0 | 0 |
| Data Analyst II | 0 | 0 | 0 | 0 | 0 | 0 |
| Safety Program Developer/Analyst | 0 | 0 | 0 | 0 | 0 | 0 |
| Secretary III | 0 | 0 | 0 | 0 | 0 | 0 |
| Other | 0 | 0 | 0 | 0 | 0 | 0 |
| Grand Total WYEs | 0 | 0 | 0 | 0 | 0 | 0 |
| Non-Labor Resources (NLR) $K | Year 1 (11 Mths) | Year 2 | Year 3 | Year 4 | Year 5 | Total |
| Material | 0 | |||||
| Training | 0 | |||||
| Travel | 0 | |||||
| Misc. | 0 | |||||
| 0 | ||||||
| Total NLRs | 0 | 0 | 0 | 0 | 0 | 0 |
INSTRUCTIONS FOR COMPLETING TEMPLATE TRST
This template is designed to summarize the Labor Resources and Non-Labor Resources (NLR) for this Task Order ONLY. The data shall be linked from the appropriate cells in Worksheet [TRT TO].
The note on worksheet [TRT TO] regarding the Offeror's responsibility for the proposed resources aspplies to this worksheet also.
TRT TO
| TECHNICAL RESOURCES TEMPLATE - TRT |
| Prime Contractor's Name: |
| YEAR 1 (11 Mths) | |
| Combined Resources for the Entire Team -- | |
| Prime and ALL Major and Minor Subcontractors |
| Standard Labor Cat. | 2.0 Management | 2.1 Safety & Health | 2.2 Quality Management | 2.3 Environmental Management | 2.4 Professional Qualification,Licenses | 2.5 Applicable Document | 3.0 Engineering Analysis & Services | 3.1 Engineering Analysis | 3.2 Assess JSC Facility | 3.3 Assess Fire Protection | 3.4 Develop the S&MA Proj. | 3.5 Assess Crane Operations | 3.6 Asses Explosive Safety | 3.7 Provide Safety Guidance | 3.8 Provide JSC Specific Safety | 4.0 Institutional Safety | 4.1 Safety Awareness | 4.2 Safety Program | 4.3 Verification Audit | 4.4 Adm. Lockout | 4.5 Construction Safety | 4.6 Mishap Investigation | 7.0 Test Safety | 7.1 Assess Test Document | 7.2 Assess Test Readiness | 7.3 Monitor Test Operations | 7.4 Support the Institutional Rev. | 8.0 Safety Information | 8.1 Adm. & Maintain Safety | 8.2 Maintain Security | 8.3 Provide Reports | 8.4 Manage Safety, Health, & Env. | 8.5 Validate & Manage Safety Data | 9.0 Agency Safety Training | Total WYEs Year 1 |
| Program Manager | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Business Support Specialist | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Engineer Safety Specialist Level I | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Engineer Safety Specialist Level II | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Engineer Safety Specialist Level III | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Fire Protection Engineer Level I | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Fire Protection Engineer Level II | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Test Safety Engineer | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Data Analyst I | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Data Analyst II | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Safety Program Developer/Analyst | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Secretary III | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Other | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||||||||||||||||||||||||||||
| Grand Total WYEs | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Non-Labor Resources (NLR) $K | SOW 2 | SOW 3 | SOW 4 | SOW 7 | SOW 8 | SOW 9 | Total NLRs Year 1 | |||||||||||||||||||||||||||
| Material | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||
| Training | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||||||||
| Travel | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||||||||
| Misc. | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||
| Total NLRs Year 1 (11 Mths) | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| YEAR 2 | |
| Combined Resources for the Entire Team -- | |
| Prime and ALL Major and Minor Subcontractors |
| Standard Labor Cat. | 2.0 Management | 2.1 Safety & Health | 2.2 Quality Management | 2.3 Environmental Management | 2.4 Professional Qualification,Licenses | 2.5 Applicable Document | 3.0 Engineering Analysis & Services | 3.1 Engineering Analysis | 3.2 Assess JSC Facility | 3.3 Assess Fire Protection | 3.4 Develop the S&MA Proj. | 3.5 Assess Crane Operations | 3.6 Asses Explosive Safety | 3.7 Provide Safety Guidance | 3.8 Provide JSC Specific Safety | 4.0 Institutional Safety | 4.1 Safety Awareness | 4.2 Safety Program | 4.3 Verification Audit | 4.4 Adm. Lockout | 4.5 Construction Safety | 4.6 Mishap Investigation | 7.0 Test Safety | 7.1 Assess Test Document | 7.2 Assess Test Readiness | 7.3 Monitor Test Operations | 7.4 Support the Institutional Rev. | 8.0 Safety Information | 8.1 Adm. & Maintain Safety | 8.2 Maintain Security | 8.3 Provide Report | 8.4 Maintain Safety,Health,& Env. | 8.5 Develop & Maintain Safety Database | 9.0 Agency Safety Training | Total WYEs Year 2 |
| Program Manager | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Business Support Specialist | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Engineer Safety Specialist Level I | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Engineer Safety Specialist Level II | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Engineer Safety Specialist Level III | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Fire Protection Engineer Level I | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Fire Protection Engineer Level II | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Test Safety Engineer | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Data Analyst I | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Data Analyst II | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Safety Program Developer/Analyst | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Secretary III | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Other | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||||||||||||||||||||||||||||
| Grand Total WYEs | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Non-Labor Resources (NLR) $K | SOW 2 | SOW 3 | SOW 4 | SOW 7 | SOW 8 | SOW 9 | Total NLRs Year 2 | |||||||||||||||||||||||||||
| Material | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||
| Training | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||||||||
| Travel | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||||||||
| Misc. | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||
| Total NLRs Year 2 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| YEAR 3 | |
| Combined Resources for the Entire Team -- | |
| Prime and ALL Major and Minor Subcontractors |
| Standard Labor Cat. | 2.0 Management | 2.1 Safety & Health | 2.2 Quality Management | 2.3 Environmental Management | 2.4 Professional Qualification,Licenses | 2.5 Applicable Document | 3.0 Engineering Analysis & Services | 3.1 Engineering Analysis | 3.2 Assess JSC Facility | 3.3 Assess Fire Protection | 3.4 Develop the S&MA Proj. | 3.5 Assess Crane Operations | 3.6 Asses Explosive Safety | 3.7 Provide Safety Guidance | 3.8 Provide JSC Specific Safety | 4.0 Institutional Safety | 4.1 Safety Awareness | 4.2 Safety Program | 4.3 Verification Audit | 4.4 Adm. Lockout | 4.5 Construction Safety | 4.6 Mishap Investigation | 7.0 Test Safety | 7.1 Assess Test Document | 7.2 Assess Test Readiness | 7.3 Monitor Test Operations | 7.4 Support the Institutional Rev. | 8.0 Safety Information | 8.1 Adm. & Maintain Safety | 8.2 Maintain Security | 8.3 Provide Report | 8.4 Maintain Safety,Health,& Env. | 8.5 Develop & Maintain Safety Database | 9.0 Agency Safety Training | Total WYEs Year 3 |
| Program Manager | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Business Support Specialist | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Engineer Safety Specialist Level I | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Engineer Safety Specialist Level II | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Engineer Safety Specialist Level III | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Fire Protection Engineer Level I | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Fire Protection Engineer Level II | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Test Safety Engineer | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Data Analyst I | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Data Analyst II | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Safety Program Developer/Analyst | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Secretary III | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Other | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||||||||||||||||||||||||||||
| Grand Total WYEs | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Non-Labor Resources (NLR) $K | SOW 2 | SOW 3 | SOW 4 | SOW 7 | SOW 8 | SOW 9 | Total NLRs Year 3 | |||||||||||||||||||||||||||
| Material | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||
| Training | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||||||||
| Travel | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||||||||
| Misc. | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||
| Total NLRs Year 3 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| YEAR 4 | |
| Combined Resources for the Entire Team -- | |
| Prime and ALL Major and Minor Subcontractors |
| Standard Labor Cat. | 2.0 Management | 2.1 Safety & Health | 2.2 Quality Management | 2.3 Environmental Management | 2.4 Professional Qualification,Licenses | 2.5 Applicable Document | 3.0 Engineering Analysis & Services | 3.1 Engineering Analysis | 3.2 Assess JSC Facility | 3.3 Assess Fire Protection | 3.4 Develop the S&MA Proj. | 3.5 Assess Crane Operations | 3.6 Asses Explosive Safety | 3.7 Provide Safety Guidance | 3.8 Provide JSC Specific Safety | 4.0 Institutional Safety | 4.1 Safety Awareness | 4.2 Safety Program | 4.3 Verification Audit | 4.4 Adm. Lockout | 4.5 Construction Safety | 4.6 Mishap Investigation | 7.0 Test Safety | 7.1 Assess Test Document | 7.2 Assess Test Readiness | 7.3 Monitor Test Operations | 7.4 Support the Institutional Rev. | 8.0 Safety Information | 8.1 Adm. & Maintain Safety | 8.2 Maintain Security | 8.3 Provide Report | 8.4 Maintain Safety,Health,& Env. | 8.5 Develop & Maintain Safety Database | 9.0 Agency Safety Training | Total WYEs Year 4 |
| Program Manager | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Business Support Specialist | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Engineer Safety Specialist Level I | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Engineer Safety Specialist Level II | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Engineer Safety Specialist Level III | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Fire Protection Engineer Level I | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Fire Protection Engineer Level II | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Test Safety Engineer | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Data Analyst I | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Data Analyst II | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Safety Program Developer/Analyst | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Secretary III | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Other | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||||||||||||||||||||||||||||
| Grand Total WYEs | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Non-Labor Resources (NLR) $K | SOW 2 | SOW 3 | SOW 4 | SOW 7 | SOW 8 | SOW 9 | Total NLRs Year 4 | |||||||||||||||||||||||||||
| Material | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||
| Training | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||||||||
| Travel | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||||||||
| Misc. | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||
| Total NLRs Year 4 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| YEAR 5 | |
| Combined Resources for the Entire Team -- | |
| Prime and ALL Major and Minor Subcontractors |
| Standard Labor Cat. | 2.0 Management | 2.1 Safety & Health | 2.2 Quality Management | 2.3 Environmental Management | 2.4 Professional Qualification,Licenses | 2.5 Applicable Document | 3.0 Engineering Analysis & Services | 3.1 Engineering Analysis | 3.2 Assess JSC Facility | 3.3 Assess Fire Protection | 3.4 Develop the S&MA Proj. | 3.5 Assess Crane Operations | 3.6 Asses Explosive Safety | 3.7 Provide Safety Guidance | 3.8 Provide JSC Specific Safety | 4.0 Institutional Safety | 4.1 Safety Awareness | 4.2 Safety Program | 4.3 Verification Audit | 4.4 Adm. Lockout | 4.5 Construction Safety | 4.6 Mishap Investigation | 7.0 Test Safety | 7.1 Assess Test Document | 7.2 Assess Test Readiness | 7.3 Monitor Test Operations | 7.4 Support the Institutional Rev. | 8.0 Safety Information | 8.1 Adm. & Maintain Safety | 8.2 Maintain Security | 8.3 Provide Report | 8.4 Maintain Safety,Health,& Env. | 8.5 Develop & Maintain Safety Database | 9.0 Agency Safety Training | Total WYEs Year 5 |
| Program Manager | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Business Support Specialist | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Engineer Safety Specialist Level I | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Engineer Safety Specialist Level II | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Engineer Safety Specialist Level III | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Fire Protection Engineer Level I | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Fire Protection Engineer Level II | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Test Safety Engineer | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Data Analyst I | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Data Analyst II | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Safety Program Developer/Analyst | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Secretary III | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| Other | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | |||||||||||||||||||||||||||||
| - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | ||||||||||||||||||||||||||||||
| Grand Total WYEs | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Non-Labor Resources (NLR) $K | SOW 2 | SOW 3 | SOW 4 | SOW 7 | SOW 8 | SOW 9 | Total NLRs Year 5 | |||||||||||||||||||||||||||
| Material | 0 | 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||
| Training | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||||||||
| Travel | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||||||||
| Misc. | 0 | 0 | 0 | 0 | 0 | |||||||||||||||||||||||||||||
| 0 | 0 | 0 | 0 | 0 | ||||||||||||||||||||||||||||||
| Total NLRs Year 5 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Technical Resources Template - TRT - TO
This template is required by the prime Offeror only, and provides for labor resources and non-labor resources for the entire team inclusive of ALL major and minor subcontractors for each year of the contract.
Labor Resources:
This template shall provide resource data for all years. The template for each year shall be stacked vertically within this worksheet. Two years are depicted in this worksheet. Offerors shall add each of the other years at the bottom of the template. It is designed to provide the labor resources, by WYEs, for each SLC for the lowest level of the Statement of Work (SOW) required by the RFP. (The SOW breakdown structure and the name of the SOWs are shown in this worksheet.) Lower level SOWs are summarized into the higher level SOW. (For example: SOW 4.1 and SOW 4.2 are totalled into SOW 4.0. And SOWs 1.0, 2.0, 3.0 and 4.0 are totalled into the column labelled "Total WYEs CY1".)
Non-Labor Resources - NLR:
Non-labor resources for all years of the contract are also provided in this worksheet. THe NLRs for the five years of the contract shall be captured in the same manner as described above for labor resources. The NLR shall be provided in accordance with the RFP, which may require that the NLR information be provided at the lowest SOW level, as shown in the example here, or as one total number in the column labelled "Total NLRs CY1". This worksheet contains formula in the cells shaded blue. If the resources are provided as one amount instead of at the SOW level, then that amount shall be shown in the column labelled "Total NLRs Year 1", and the formulas in that column has to be removed.
NOTE:
NASA has provided formulae in this worksheet. The formulae were designed to assist Offerors in developing the worksheet.
HOWEVER, THE PROPOSAL IN THE PRODUCT OF THE OFFEROR, AND AS SUCH, IT IS THE OFFEROR'S RESPONSIBILITY TO REVIEW EACH FORMULA AND CORRECT ANY ERRORS AS NECESSARY. THE GOVERNMENT IS NOT RESPONSIBLE FOR ANY ERRORS IN THE FORMULAE THAT RESULTS IN ERRONEOUS RESOURCES IN THE PROPOSAL THAT WERE NOT INTENDED BY THE OFFEROR.
TOPT TO
| TASK ORDER PRICING TEMPLATE (TOPT) - SAMPLE TASK ORDER - (TO) - CPFF |
| Prime Contractor Name: (Identify) |
| Year 1 (11 Mths) | Year 2 | Year 3 | Year 4 | Year 5 | ||||||||||||
| PRODUCTIVE HOURS CALCULATION | WYEs Proposed | Team Composite Conversion Factor | Total Annual Hours | WYEs Proposed | Team Composite Conversion Factor | Total Annual Hours | WYEs Proposed | Team Composite Conversion Factor | Total Annual Hours | WYEs Proposed | Team Composite Conversion Factor | Total Annual Hours | WYEs Proposed | Team Composite Conversion Factor | Total Annual Hours | Total Contract Hours |
| Example Engineer III | 1 | 1,860 | 1,860 | 1 | 1,860 | 1,860 | 2 | 1,860 | 3,720 | 1 | 1,860 | 1,860 | 3 | 1,860 | 5,580 | 14,880 |
| Program Manager | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Business Support Specialist | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Engineer Safety Specialist Level I | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Engineer Safety Specialist Level II | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Engineer Safety Specialist Level III | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Fire Protection Engineer Level I | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Fire Protection Engineer Level II | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Test Safety Engineer | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Data Analyst I | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Data Analyst II | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Safety Program Developer/Analyst | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Secretary III | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Other | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
Total Straight Time Hours 0 0 0 0 0 0 0 0 0 0 0
| PRODUCTIVE HOURS (Linked to the appropriate cells above) | Year 1 (11 Mths) | Year 2 | Year 3 | Year 4 | Year 5 | Total |
| Example Engineer III | 1,860 | 1,860 | 3,720 | 1,860 | 5,580 | 14,880 |
| Program Manager | 0 | 0 | 0 | 0 | 0 | 0 |
| Business Support Specialist | 0 | 0 | 0 | 0 | 0 | 0 |
| Engineer Safety Specialist Level I | 0 | 0 | 0 | 0 | 0 | 0 |
| Engineer Safety Specialist Level II | 0 | 0 | 0 | 0 | 0 | 0 |
| Engineer Safety Specialist Level III | 0 | 0 | 0 | 0 | 0 | 0 |
| Fire Protection Engineer Level I | 0 | 0 | 0 | 0 | 0 | 0 |
| Fire Protection Engineer Level II | 0 | 0 | 0 | 0 | 0 | 0 |
| Test Safety Engineer | 0 | 0 | 0 | 0 | 0 | 0 |
| Data Analyst I | 0 | 0 | 0 | 0 | 0 | 0 |
| Data Analyst II | 0 | 0 | 0 | 0 | 0 | 0 |
| Safety Program Developer/Analyst | 0 | 0 | 0 | 0 | 0 | 0 |
| Secretary III | 0 | 0 | 0 | 0 | 0 | 0 |
| Other | 0 | 0 | 0 | 0 | 0 | 0 |
Total Straight Time Hours 0 0 0 0 0 0
| FULLY-BURDENED LABOR RATES (From FBR Worksheet) | Year 1 (11 Mths) | Year 2 | Year 3 | Year 4 | Year 5 |
| Example Engineer III | 53.30 | ||||
| Program Manager | |||||
| Business Support Specialist | |||||
| Engineer Safety Specialist Level I | |||||
| Engineer Safety Specialist Level II | |||||
| Engineer Safety Specialist Level III | |||||
| Fire Protection Engineer Level I | |||||
| Fire Protection Engineer Level II | |||||
| Test Safety Engineer | |||||
| Data Analyst I | |||||
| Data Analyst II | |||||
| Safety Program Developer/Analyst | |||||
| Secretary III | |||||
| Other |
| FULLY-BURDENED LABOR COST | Year 1 (11 Mths) | Year 2 | Year 3 | Year 4 | Year 5 | TOTAL |
| Example Engineer III | 99,129 | - 0 | - 0 | - 0 | - 0 | 99,129 |
| Program Manager | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Business Support Specialist | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Engineer Safety Specialist Level I | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Engineer Safety Specialist Level II | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Engineer Safety Specialist Level III | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Fire Protection Engineer Level I | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Fire Protection Engineer Level II | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Test Safety Engineer | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Data Analyst I | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Data Analyst II | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Safety Program Developer/Analyst | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Secretary III | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Other | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
Total Fully Burdened Labor Cost - 0 - 0 - 0 - 0 - 0 - 0
| NON-LABOR RESOURCES | Year 1 (11 Mths) | Year 2 | Year 3 | Year 4 | Year 5 | TOTAL |
| Materials | - 0 | |||||
| Equipment | - 0 | |||||
| Travel | - 0 | |||||
| Other | - 0 | |||||
| Total Non-Labor Resources | $ - | $ - | $ - | $ - | $ - | $ - |
| Total Fully-Burdened Labor Cost & Non-Labor Resources | $ - | $ - | $ - | $ - | $ - | $ - |
| Not to Exceed (NTE) Fee Rate | ||||||
| Fee Dollars (Row 97 x Row 98) | - 0 | - 0 | - 0 | - 0 | - 0 | - 0 |
| Total Price | $ - | $ - | $ - | $ - | $ - | $ - |
| COLOR CODE: | |
| Example | White |
| Input required | Blue |
| Calculated | Grey |
| Linked from other cells | Pink |
| NOTE |
| REMOVE THE EXAMPLE ROWS FROM THE WORKSHEET BEFORE SUBMITTING THE PRICING WORKBOOK |
Instructions for TOPT Task Order 1:
This workbook contains links and formulae design to expedite the flow of information. The proposal is the product of the Offeror and as such, it is the Offeror's responsibility to review all links and formulae to determine that they are accurate and consistent with the Offeror's intent, and that the results are representative of the intended proposed cost and fee. Errors caused by inaccurate links or formulae made by the Government are not the responsibility of the Government, since it is the contractor's responsibility to change or correct any erroneous links or formulae. The Offeror shall review all links and formulae for accuracy and logic.
This template is used for pricing the Cost Reimbursement Task Order 1, and is required of the Prime Contractor only.
The template consists of 5 labor sections, (1) productive hours calculation, (2) productive hours, (3) fully-burdened labor rates, and (4) fully-burdened labor cost, and (5) Non-Labor Resources.
1. Productive Hours Calculation This first section addresses the development of the Productive Hours by Standard Labor Category (SLC) by year. The section includes the Prime Offeror's proposed WYEs per SLC by year, and the Team Composite Conversion Factor, which is developed by the Prime Offeror. This Team Composite Conversion Factor is not necessarily the same for each SLC, nor is it necessarily the same for each SLC for each year. (See below for additional information on the conversion factor.) The WYEs are multiplied by the Team Composite Conversion Factor to determine the Productive Hours by SLC by year.
2. Productive Hours In this section, the productive hours calculated in section 1 above are simply transferred (by linking) to this section. This step facilitates the easy and "orderly" calculation of the fully-burdened labor costs in section 4. The links and formulae are already established in this worksheet to expedite the flow of information. However, it should be noted that this worksheet is provided to facilitate the Offeror's proposal development process, and to achieve consistency in all proposals for comparison purposes.
3. Fully-Burdened Labor Rates The fully-burdened labor rates in this section are linked from the [FBR-CPFF] Worksheets. Note: The FBRs used for pricing the CPFF Task Order (Task Order 1) do not include fee. The fee is calculated separately at the bottom of this template. The FBR for years 2 through 5 shall be obtained from the appropriate year's FBR in worksheet [FBR].
4. Fully-Burdened Labor Cost This section calculates the fully-burdened labor cost by multiplying the productive hours by the Fully-Burdened Labor Rates (FBR).
5. Non-Labor Resources (NLR) Offerors are to propose NLRs by category, e.g. Material, Travel, etc. Please identify each "other" category.
Conversion Factor The conversion factor is the number of productive hours for each WYE. It represents the 2,080 hours (40 hours per week X 52 weeks per year) available annually less non-productive hours. Non-productive hours include annual leave, holiday leave, sick leave, and all other leave available to an employee during the year. The conversion factor may be the same for each SLC and each year, or they may all be different.
Additionally, the bottom of the template provides for the total cost, the Prime Offeror’s fee rate, the Prime Offeror fee, and the total proposed price. If there are any fee-sharing arrangements with subcontractors, provide the details in the proposal cost narrative. If there are fee-sharing arrangements, then the fully-burdened labor rates of subcontractors shall not contain any fee.
We have provided an example of a calculation of a single SLC labor cost. (See the cells in bright green.) Offerors are required to remove all the examples before submitting their proposals.
Review the color code chart at the bottom of the worksheet.
FBR Instructions
INSTRUCTIONS FOR COMPLETING THE FBR TEMPLATE
THIS WORKSHEET SHALL BE COMPLETED BY THE PRIME CONTRACTOR AND ALL MAJOR SUBCONTRACTORS
A separate fully-burdened rates (FBR) calculation is required for each contract year of the effort from the Prime Contractor and from each major subcontractor. Major subcontractors are defined as those subcontractors proposing at least $500,000 per year of estimated costs. The FBR development for each year shall be shown in this worksheet stacked vertically. (The worksheet shows two years as an example of how the years shall be stacked.) The template is used to provide insight into the development of the FBR, exclusive of fee, (except for subcontractors) for each SLC for each contract year. The FBR calculated by subcontractors shall include fee, unless there is a fee-sharing agreement with the Prime Contractor. Notes on the worksheet indicate what columns have to be completed by the Prime Contractor and what columns have to be completed by subcontractors.
The template starts with the FBR for the first contract year for each SLC which shall be linked from the IRAP template. To this base rate is added indirect cost. The indirect rates in this worksheet shall reflect, (and preferably linked to), the indirect rates in the OHT, the GAT worksheet, (and any other indirect rate worksheet) included in this workbook. If the contractor's (and subcontractor's) accounting system comprises additional indirect rates than those shown in the template, additional columns shall be added to the template to accomodate the contractor's (subcontractor's) additional indirect rates. For subcontractors, fee is added to the FBR, unless there is a fee-sharing arrangement with the Prime contractor.
The facilities capital cost of money column is provided should this cost be proposed. However, note that it is NASA's policy to offset CAS 414 costs dollar for dollar from fee in accordance with NASA FAR Supplement 1815.404-471-5.
The next columns, under the brown highlighted row, are used to accomodate the FBR for all subcontractors to be included in the development of the Prime Contractor's composite FBRs. Columns shall be added to accomodate more than the three subcontractors included in the worksheet. If the Prime Contractor's accounting system includes the addition of a burden rate to its subcontractors cost, the burdened rate is added here. The Percentage Usage Columns are provided so that the Prime Contractor may weight the proposed direct labor per SLC for the Prime Contractor and all subcontractors. A weighted average is then calculated for each SLC. (See the formula in the example provided in the worksheet, highlighted in green.) NOTE: The total usage percentage of the Prime Contractor and all subcontractors shall total 100%.
The Composite Prime and Subcontractor FBR per Hour column is used to calculate the final composite FBR for each SLC. These FBRs shall match the FBRs in Section B of the contract.
The last column to the right of this template addresses the Composite Overtime Prime and Subcontractor FBR per Hour. In the pricing narrative in Volume III of the proposal, the Prime Contractor shall include a discussion on the rationale for developing the overtime FBR.
Formulae and links shall be included in the worksheet as much as is possible to accomodate changes in any cell to facilitate easy recalculation of any FBR.
YEARS 2 THROUGH 5:
The worksheet shall be stacked as shown in the worksheet for Year 2 to accomodate years 2 through 5. Escalation may be added to years 2 through 5. Formulae shall be used to facilitate the escalation of the FBR as shown in the worksheet for year 2. Indirect rates shall be linked to the OHT, GAT and any other indirect rate worksheets included in this workbook.
Note: Refer to FAR Clause 52.222-43, Fair Labor Standards & Service Contract Act – Price adjustment, with respect to escalation for non-exempt personnel.
The FBRs calculated in this worksheet shall be linked to the FRBs used in worksheet [TOPT TO 1] to calculate the final proposed price for Task Order 1.
Review the example, highlighted in green, to gain a better understanding of how the worksheet is completed. The example is that of a Prime Contractor with no fee added to the FBR.
After adding any fee, a subcontractor shall stop at this point and submit the FBRs to the Prime Contractor for inclusion into the Prime Contractor's FBR calculations. The details of the subcontractor's FBR development is not required to be submitted to the Prime Contractor.
FBR
| FULLY BURDENED RATES TEMPLATE (FBR) YEAR 1 | |||
| { x } Contract year 1 (11 Mths) (Base) | |||
| [ ] Prime Contractor: | { } Contract year 2 (Base) | NOTE: | Check the appropriate box on the left for Prime Contractor or Subcontractor |
| { } Contract year 3 (Base) | Check the appropriate box on the left for the contract year | ||
| [ ] Major Subcontractor: | { } Contract year 4 (Base) | ||
| { } Contract year 5 (Base) |
NOTE: BEFORE SUBMITTING THE WORTKBOOK, DELETE THE ROWS WITH THE EXAMPLE SHOWN IN THE GREEN HIGHLIGHTED CELLS
| The area below this brown row is the subcontract price input area to be completed by the Prime Contractor with FBR data provided by all subcontractors | |||||||||||||||||||||||
| NASA | Direct Labor Base Rate (From IRAP Template) | Overhead Rate (From FPRA, FPRR, or OHT) | Overhead Cost | G&A Rate (From FPRA, FPRR or GAT) | G&A Cost | Percent Usage | Composite | USAGE SUMMARY | |||||||||||||||
| Standard Labor Category (SLC) | FCCOM | Other | Fee (Subcontractor only) | Fully-Burdened Labor Rates | @ | Subcontractor "A" FBR/hr* | Subcontractor "B" FBR/hr* | Subcontractor "C" FBR/hr* | Prime Burdens Rate /hr** | Subcontractor "A" FBR + Prime Burdened Rate/hr | Subcontractor "B" FBR + Prime Burdened Rate/hr | Subcontractor "C" FBR + Prime Burdened Rate/hr | % Usage Prime | % Usage Subcontractor "A" | % Usage Subcontractor "B" | % Usage Subcontractor "C" | Prime & Sub FBR /hr*** | Total Usage (Used as a check. S/B 100%) | |||||
| Engineer III (Example) | $ 27.17 | 75% | 20.37 | 6% | 2.85 | - 0 | - 0 | 50.39 | 56.00 | 58.00 | 60.00 | 6% | $ 59.36 | $ 61.48 | $ 63.60 | 70% | 20% | 10% | 0% | $ 53.30 | 100% |
| Program Manager | 0% |
| Business Support Specialist | 0% |
| Engineer Safety Specialist Level I | 0% |
| Engineer Safety Specialist Level II | 0% |
| Engineer Safety Specialist Level III | 0% |
| Fire Protection Engineer Level I | 0% |
| Fire Protection Engineer Level II | 0% |
| Test Safety Engineer | 0% |
| Data Analyst I | 0% |
| Data Analyst II | 0% |
| Safety Program Developer/Analyst | 0% |
| Secretary III | 0% |
| Other | 0% |
| ADDITIONAL NOTES TO THE FBR WORKSHEET: |
| @ "Major subcontractors shall stop here in their individual FBR worksheet, and provide their FBRs to the Prime Contractor" |
| * These columns shall include the fully-burdened labor rates for major subcontractors by SLC. |
| ** Based on the Prime Contractor's Accounting System, the Prime contractor may apply a burden rate to the major subcontractors' FBRs, if applicable. |
| *** This column shows the calculated Prime Contractor's and major subcontractors' composite fully burdened labor rates by SLC; these rates shall match the FBRs in Section B of the Model Contract. |
FULLY BURDENED RATES TEMPLATE (FBR) YEAR 2
| Direct Labor Rate Escalation Factor for Year 2 | Input into this cell the escalation factor proposed contract year 2 | |||
| { } Contract year 1 (Base) | ||||
| [ ] Prime Contractor: | { x } Contract year 2 (Base) | NOTE: | Check the appropriate box on the left for Prime Contractor or Subcontractor | |
| { } Contract year 3 (Base) | Check the appropriate box on the left for the contract year | |||
| [ ] Major Subcontractor: | { } Contract year 4 (Base) | |||
| { } Contract year 5 (Base) |
NOTE: BEFORE SUBMITTING THE WORTKBOOK, DELETE THE ROWS WITH THE EXAMPLE SHOWN IN THE GREEN HIGHLIGHTED CELLS
| The area below this brown row is the subcontract price input area to be completed by the Prime Contractor with FBR data provided by all subcontractors | |||||||||||||||||||||||
| NASA | Direct Labor Base Rate (Escalated from the Previous Year) | Overhead Rate (From FPRA, FPRR, or OHT) | Overhead Cost | G&A Rate (From FPRA, FPRR or GAT) | G&A Cost | FCCOM | Other | Fee (Subcontractor only) | FBR | Percent Usage | Composite | USAGE SUMMARY | |||||||||||
| Standard Labor Category (SLC) | @ | Subcontractor "A" FBR/hr* | Subcontractor "B" FBR/hr* | Subcontractor "C" FBR/hr* | Prime Burdens Rate /hr** | Subcontractor "A" FBR + Prime Burdened Rate/hr | Subcontractor "B" FBR + Prime Burdened Rate/hr | Subcontractor "C" FBR + Prime Burdened Rate/hr | % Usage Prime | % Usage Subcontractor "A" | % Usage Subcontractor "B" | % Usage Subcontractor "C" | Prime & Sub FBR /hr*** | Total Usage (Used as a check. S/B 100%) |
| Program Manager | - 0 | 0% |
| Business Support Specialist | - 0 | 0% |
| Engineer Safety Specialist Level I | - 0 | 0% |
| Engineer Safety Specialist Level II | - 0 | 0% |
| Engineer Safety Specialist Level III | - 0 | 0% |
| Fire Protection Engineer Level I | - 0 | 0% |
| Fire Protection Engineer Level II | - 0 | 0% |
| Test Safety Engineer | - 0 | 0% |
| Data Analyst I | - 0 | 0% |
| Data Analyst II | - 0 | 0% |
| Safety Program Developer/Analyst | - 0 | 0% |
| Secretary III | - 0 | 0% |
| Other | - 0 | 0% |
| ADDITIONAL NOTES TO THE FBR WORKSHEET: |
| @ "Major subcontractors shall stop here in their individual FBR worksheet, and provide their FBRs to the Prime Contractor" |
| * These columns shall include the fully-burdened labor rates for major subcontractors by SLC. |
| ** Based on the Prime Contractor's Accounting System, the Prime contractor may apply a burden rate to the major subcontractors' FBRs, if applicable. |
| *** This column shows the calculated Prime Contractor's and major subcontractors' composite fully burdened labor rates by SLC; these rates shall match the FBRs in Section B of the Model Contract. |
FULLY BURDENED RATES TEMPLATE (FBR) YEAR 3
| Direct Labor Rate Escalation Factor for Year 3 | Input into this cell the escalation factor proposed contract year 3 | |||
| { } Contract year 1 (Base) | ||||
| [ ] Prime Contractor: | { } Contract year 2 (Base) | NOTE: | Check the appropriate box on the left for Prime Contractor or Subcontractor | |
| { x } Contract year 3 (Base) | Check the appropriate box on the left for the contract year | |||
| [ ] Major Subcontractor: | { } Contract year 4 (Base) | |||
| { } Contract year 5 (Base) |
NOTE: BEFORE SUBMITTING THE WORTKBOOK, DELETE THE ROWS WITH THE EXAMPLE SHOWN IN THE GREEN HIGHLIGHTED CELLS
| The area below this brown row is the subcontract price input area to be completed by the Prime Contractor with FBR data provided by all subcontractors | |||||||||||||||||||||||
| NASA | Direct Labor Base Rate (Escalated from the Previous Year) | Overhead Rate (From FPRA, FPRR, or OHT) | Overhead Cost | G&A Rate (From FPRA, FPRR or GAT) | G&A Cost | FCCOM | Other | Fee (Subcontractor only) | FBR | Percent Usage | Composite | USAGE SUMMARY | |||||||||||
| Standard Labor Category (SLC) | @ | Subcontractor "A" FBR/hr* | Subcontractor "B" FBR/hr* | Subcontractor "C" FBR/hr* | Prime Burdens Rate /hr** | Subcontractor "A" FBR + Prime Burdened Rate/hr | Subcontractor "B" FBR + Prime Burdened Rate/hr | Subcontractor "C" FBR + Prime Burdened Rate/hr | % Usage Prime | % Usage Subcontractor "A" | % Usage Subcontractor "B" | % Usage Subcontractor "C" | Prime & Sub FBR /hr*** | Total Usage (Used as a check. S/B 100%) |
| Program Manager | - 0 | 0% |
| Business Support Specialist | - 0 | 0% |
| Engineer Safety Specialist Level I | - 0 | 0% |
| Engineer Safety Specialist Level II | - 0 | 0% |
| Engineer Safety Specialist Level III | - 0 | 0% |
| Fire Protection Engineer Level I | - 0 | 0% |
| Fire Protection Engineer Level II | - 0 | 0% |
| Test Safety Engineer | - 0 | 0% |
| Data Analyst I | - 0 | 0% |
| Data Analyst II | - 0 | 0% |
| Safety Program Developer/Analyst | - 0 | 0% |
| Secretary III | - 0 | 0% |
| Other | - 0 | 0% |
| ADDITIONAL NOTES TO THE FBR WORKSHEET: |
| @ "Major subcontractors shall stop here in their individual FBR worksheet, and provide their FBRs to the Prime Contractor" |
| * These columns shall include the fully-burdened labor rates for major subcontractors by SLC. |
| ** Based on the Prime Contractor's Accounting System, the Prime contractor may apply a burden rate to the major subcontractors' FBRs, if applicable. |
| *** This column shows the calculated Prime Contractor's and major subcontractors' composite fully burdened labor rates by SLC; these rates shall match the FBRs in Section B of the Model Contract. |
FULLY BURDENED RATES TEMPLATE (FBR) YEAR 4
| Direct Labor Rate Escalation Factor for Year 4 | Input into this cell the escalation factor proposed contract year 4 | |||
| { } Contract year 1 (Base) | ||||
| [ ] Prime Contractor: | { } Contract year 2 (Base) | NOTE: | Check the appropriate box on the left for Prime Contractor or Subcontractor | |
| { } Contract year 3 (Base) | Check the appropriate box on the left for the contract year | |||
| [ ] Major Subcontractor: | { x } Contract year 4 (Base) | |||
| { } Contract year 5 (Base) |
NOTE: BEFORE SUBMITTING THE WORTKBOOK, DELETE THE ROWS WITH THE EXAMPLE SHOWN IN THE GREEN HIGHLIGHTED CELLS
| The area below this brown row is the subcontract price input area to be completed by the Prime Contractor with FBR data provided by all subcontractors | |||||||||||||||||||||||
| NASA | Direct Labor Base Rate (Escalated from the Previous Year) | Overhead Rate (From FPRA, FPRR, or OHT) | Overhead Cost | G&A Rate (From FPRA, FPRR or GAT) | G&A Cost | FCCOM | Other | Fee (Subcontractor only) | FBR | Percent Usage | Composite | USAGE SUMMARY | |||||||||||
| Standard Labor Category (SLC) | @ | Subcontractor "A" FBR/hr* | Subcontractor "B" FBR/hr* | Subcontractor "C" FBR/hr* | Prime Burdens Rate /hr** | Subcontractor "A" FBR + Prime Burdened Rate/hr | Subcontractor "B" FBR + Prime Burdened Rate/hr | Subcontractor "C" FBR + Prime Burdened Rate/hr | % Usage Prime | % Usage Subcontractor "A" | % Usage Subcontractor "B" | % Usage Subcontractor "C" | Prime & Sub FBR /hr*** | Total Usage (Used as a check. S/B 100%) |
| Program Manager | - 0 | 0% |
| Business Support Specialist | - 0 | 0% |
| Engineer Safety Specialist Level I | - 0 | 0% |
| Engineer Safety Specialist Level II | - 0 | 0% |
| Engineer Safety Specialist Level III | - 0 | 0% |
| Fire Protection Engineer Level I | - 0 | 0% |
| Fire Protection Engineer Level II | - 0 | 0% |
| Test Safety Engineer | - 0 | 0% |
| Data Analyst I | - 0 | 0% |
| Data Analyst II | - 0 | 0% |
| Safety Program Developer/Analyst | - 0 | 0% |
| Secretary III | - 0 | 0% |
| Other | - 0 | 0% |
| ADDITIONAL NOTES TO THE FBR WORKSHEET: |
| @ "Major subcontractors shall stop here in their individual FBR worksheet, and provide their FBRs to the Prime Contractor" |
| * These columns shall include the fully-burdened labor rates for major subcontractors by SLC. |
| ** Based on the Prime Contractor's Accounting System, the Prime contractor may apply a burden rate to the major subcontractors' FBRs, if applicable. |
| *** This column shows the calculated Prime Contractor's and major subcontractors' composite fully burdened labor rates by SLC; these rates shall match the FBRs in Section B of the Model Contract. |
FULLY BURDENED RATES TEMPLATE (FBR) YEAR 5
| Direct Labor Rate Escalation Factor for Year 5 | Input into this cell the escalation factor proposed contract year 5 | |||
| { } Contract year 1 (Base) | ||||
| [ ] Prime Contractor: | { } Contract year 2 (Base) | NOTE: | Check the appropriate box on the left for Prime Contractor or Subcontractor | |
| { } Contract year 3 (Base) | Check the appropriate box on the left for the contract year | |||
| [ ] Major Subcontractor: | { } Contract year 4 (Base) | |||
| { x } Contract year 5 (Base) |
NOTE: BEFORE SUBMITTING THE WORTKBOOK, DELETE THE ROWS WITH THE EXAMPLE SHOWN IN THE GREEN HIGHLIGHTED CELLS
| The area below this brown row is the subcontract price input area to be completed by the Prime Contractor with FBR data provided by all subcontractors | |||||||||||||||||||||||
| NASA | Direct Labor Base Rate (Escalated from the Previous Year) | Overhead Rate (From FPRA, FPRR, or OHT) | Overhead Cost | G&A Rate (From FPRA, FPRR or GAT) | G&A Cost | FCCOM | Other | Fee (Subcontractor only) | FBR | Percent Usage | Composite | USAGE SUMMARY | |||||||||||
| Standard Labor Category (SLC) | @ | Subcontractor "A" FBR/hr* | Subcontractor "B" FBR/hr* | Subcontractor "C" FBR/hr* | Prime Burdens Rate /hr** | Subcontractor "A" FBR + Prime Burdened Rate/hr | Subcontractor "B" FBR + Prime Burdened Rate/hr | Subcontractor "C" FBR + Prime Burdened Rate/hr | % Usage Prime | % Usage Subcontractor "A" | % Usage Subcontractor "B" | % Usage Subcontractor "C" | Prime & Sub FBR /hr*** | Total Usage (Used as a check. S/B 100%) |
| Program Manager | - 0 | 0% |
| Business Support Specialist | - 0 | 0% |
| Engineer Safety Specialist Level I | - 0 | 0% |
| Engineer Safety Specialist Level II | - 0 | 0% |
| Engineer Safety Specialist Level III | - 0 | 0% |
| Fire Protection Engineer Level I | - 0 | 0% |
| Fire Protection Engineer Level II | - 0 | 0% |
| Test Safety Engineer | - 0 | 0% |
| Data Analyst I | - 0 | 0% |
| Data Analyst II | - 0 | 0% |
| Safety Program Developer/Analyst | - 0 | 0% |
| Secretary III | - 0 | 0% |
| Other | - 0 | 0% |
| ADDITIONAL NOTES TO THE FBR WORKSHEET: |
| @ "Major subcontractors shall stop here in their individual FBR worksheet, and provide their FBRs to the Prime Contractor" |
| * These columns shall include the fully-burdened labor rates for major subcontractors by SLC. |
| ** Based on the Prime Contractor's Accounting System, the Prime contractor may apply a burden rate to the major subcontractors' FBRs, if applicable. |
| *** This column shows the calculated Prime Contractor's and major subcontractors' composite fully burdened labor rates by SLC; these rates shall match the FBRs in Section B of the Model Contract. |
IRAP
Incumbency Retention and Pay Template (IRAP)
| Prime Contractor Name: | . |
| Major Subcontractor Name: | |
| Minor Subcontractor Name: |
| Data Source Used By Offeror | Offeror's Labor Category | Category per DOL WD or CBA | Exempt (EX) or Non-Exempt (NE) | NASA Standard Labor Category (SLC) | Proposed WYEs by SLC | Incumbent Retention % (Column 1) | Retention % of Incumbents at Current Direct Labor Rates (Column 2) | "Net" Incumbents Paid at Current Direct Labor Rates (Column 1 times Column 2) | % Usage | Unadjusted Base Direct Labor Rate (Pre-Contract Year 1 Direct Labor Rate) | Escalation or Other Adjustment Applied to Pre-Contract Year 1 Direct Labor Rate | Direct Labor Rate (Contract Year 1) | Basis of Direct Labor Rate (Offeror's Labor Category) |
| Example: Engineer III | |||||||||||||
| Historical Incumbent Rate | EX | EXAMPLE: Engineer III | 5.7 | 63.75% | $ 29.36 | ex: NASA Technical Library Rate at Contract Start | |||||||
| Contractor Incumbent Rate | EXAMPLE: Engineer III | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | ex: Contractor Incumbent Data, escalated to contract start | ||||||
| WD Rate | EXAMPLE: Engineer III | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | ex: WD No. 15 - 5233, Revision 17 (August 8, 2017) | ||||||
| CBA Rate | EXAMPLE: Engineer III | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | ex: CBA dated June 6, 2017 | ||||||
| Third Party Rate Data | EX | EXAMPLE: Engineer III | 0.9 | 10.00% | $ 21.80 | 2.10% | $ 22.26 | ex: ERI (Data as of Aug 2017, escalated to Sep 2018) | |||||
| Contractor Rate Data | Labor Category 8 | EX | EXAMPLE: Engineer III | 1.8 | 20.00% | $ 22.78 | 2.10% | $ 23.26 | ex: Ave Rate Data as of 8/15/17, esc to contract start | ||||
| Contractor Rate Data | Labor Category 9 | EX | EXAMPLE: Engineer III | 0.6 | 6.25% | $ 24.63 | 2.10% | $ 25.15 | ex: Ave Rate Data as of 8/15/17, esc to contract start | ||||
| Other (Contractor to Identify) | EXAMPLE: Engineer III | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||||||
| EXAMPLE: Engineer III Composite | 9.0 | 75.00% | 85.00% | 63.75% | 100.00% | $ 27.17 |
| Historical Incumbent Rate | Program Manager | 0.0 | Incumbent Data Is Not Provided | |||||||
| Contractor Incumbent Rate | Program Manager | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | ||||
| WD Rate | Program Manager | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | ||||
| CBA Rate | Program Manager | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | ||||
| Third Party Rate Data | Program Manager | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | ||||
| Contractor Rate Data | Program Manager | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | ||||
| Other (Contractor to Identify) | Program Manager | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | ||||
| Program Manager Composite | 0.0 | 100.00% | 87.00% | 87.00% | 0.00% | $ - 0 |
| Historical Incumbent Rate | Business Support Specialist | 0.0 | Incumbent Data Is Not Provided | |||||||
| Contractor Incumbent Rate | Business Support Specialist | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | ||||
| WD Rate | Business Support Specialist | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | ||||
| CBA Rate | Business Support Specialist | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | ||||
| Third Party Rate Data | Business Support Specialist | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | ||||
| Contractor Rate Data | Business Support Specialist | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | ||||
| Other (Contractor to Identify) | Business Support Specialist | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | ||||
| Business Support Specialist Composite | 0.0 | 100.00% | 87.00% | 87.00% | 0.00% | $ - 0 |
| Historical Incumbent Rate | Engineer Safety Specialist Level I | 0.0 | |||||||
| Contractor Incumbent Rate | Engineer Safety Specialist Level I | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| WD Rate | Engineer Safety Specialist Level I | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| CBA Rate | Engineer Safety Specialist Level I | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| Third Party Rate Data | Engineer Safety Specialist Level I | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| Contractor Rate Data | Engineer Safety Specialist Level I | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| Other (Contractor to Identify) | Engineer Safety Specialist Level I | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| Engineer Safety Specialist Level I Composite | 0.0 | 0.00% | 0.00% | 0.00% | 0.00% | $ - 0 |
| Historical Incumbent Rate | Engineer Safety Specialist Level II | 0.0 | 0.00% | $ - 0 | |||||
| Contractor Incumbent Rate | Engineer Safety Specialist Level II | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| WD Rate | Engineer Safety Specialist Level II | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| CBA Rate | Engineer Safety Specialist Level II | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| Third Party Rate Data | Engineer Safety Specialist Level II | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| Contractor Rate Data | Engineer Safety Specialist Level II | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| Other (Contractor to Identify) | Engineer Safety Specialist Level II | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| Engineer Safety Specialist Level II Composite | 0.0 | 0.00% | 0.00% | 0.000% | 0.00% | $ - 0 |
| Historical Incumbent Rate | Engineer Safety Specialist Level III | 0.0 | 0.00% | $ - 0 | |||||
| Contractor Incumbent Rate | Engineer Safety Specialist Level III | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| WD Rate | Engineer Safety Specialist Level III | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| CBA Rate | Engineer Safety Specialist Level III | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| Third Party Rate Data | Engineer Safety Specialist Level III | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| Contractor Rate Data | Engineer Safety Specialist Level III | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| Other (Contractor to Identify) | Engineer Safety Specialist Level III | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| Engineer Safety Specialist Level III Composite | 0.0 | 0.00% | 0.00% | 0.00% | 0.00% | $ - 0 |
| Historical Incumbent Rate | Fire Protection Engineer Level I | 0.0 | 0.00% | $ - 0 | |||||
| Contractor Incumbent Rate | Fire Protection Engineer Level I | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| WD Rate | Fire Protection Engineer Level I | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| CBA Rate | Fire Protection Engineer Level I | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| Third Party Rate Data | Fire Protection Engineer Level I | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| Contractor Rate Data | Fire Protection Engineer Level I | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| Other (Contractor to Identify) | Fire Protection Engineer Level I | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| Fire Protection Engineer Level I Composite | 0.0 | 0.00% | 0.00% | 0.00% | 0.00% | $ - 0 |
| Historical Incumbent Rate | Fire Protection Engineer Level II | 0.0 | 0.00% | $ - 0 | |||||
| Contractor Incumbent Rate | Fire Protection Engineer Level II | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| WD Rate | Fire Protection Engineer Level II | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| CBA Rate | Fire Protection Engineer Level II | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| Third Party Rate Data | Fire Protection Engineer Level II | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| Contractor Rate Data | Fire Protection Engineer Level II | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| Other (Contractor to Identify) | Fire Protection Engineer Level II | 0.0 | 0.00% | $ - 0 | 0.00% | $ - 0 | |||
| Fire Protection Engineer Level II Composite | 0.0 | 0.00% | 0.00% | 0.00% | 0.00% | $ - 0 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.