Enclosure 2 - Phase-in SOW - 04-20-22.pdf

PDF 170 KB Posted

Attached to
NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal Federal contract opportunity
Solicitation number
80GSFC21R0037
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This document contains a Statement of Work (SOW) and related solicitation for the NASA Sounding Rocket Operations Contract IV (NSROC IV). The SOW outlines phase-in activities for the incumbent contractor to transition management, operations, engineering and administrative functions to the new contractor over a 60-day period. Key deliverables include quality management, configuration management, training and security plans due within 60 days of contract award. The solicitation seeks proposals to operate and maintain government-owned facilities at Wallops Flight Facility, Virginia and White Sands Missile Range, New Mexico, conducting sounding rocket launch operations from multiple sites including Alaska, Norway, Kwajalein Atoll and Australia. Comments on the draft RFP are due within 14 days. The selected contractor will assume full responsibility for launch operations and facility management to support the NASA Sounding Rocket Program.

View the file

Other files for this federal contract opportunity

Other files attached to NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal, newest first.
File Type Posted
Attachment F - Direct Labor Rates Indirect Rates Fee Matrices 04-20-22.pdf PDF
Enclosure 8b - RTO Cost Exhibits (4-20-22).pdf PDF
NSROC IV FRFP Questions 04-20-2022.pdf PDF
Attachment B Part 3 - Ordnance and Vehicle Hardware.pdf PDF
Attachment C4 - NM WD2015-5461 Grant-Hidalgo-Luna-Sierra Counties 12-27-21.pdf PDF
Attahcment M - Contract Historical Data.pdf PDF
NSROC IV Security Classification DD254.pdf PDF
Attachment T - Contractor Proposed Enhancements.pdf PDF
Enclosure 11 (DRAFT Performance Evaluation Plan).pdf PDF
Request for Proposal - 80GSFC21R0037 DRFP to RFP Changes.pdf PDF
Attachment B Part 1 - Equipment Inventory.pdf PDF
Attachment B Part 2 - Stock Inventory March 2022.pdf PDF
Attachment C1 - VA WD2015-4327 Accomack-Northampton Counties 12-27-21.pdf PDF
Attachment C2 - NM WD2015-5455 Chaves-Eddy-Lincoln-Otero Counties 12-27-21.pdf PDF
Attachment E - Financial Management Reporting Requirements.pdf PDF
Attachment P - Applicable Standards and Policies.pdf PDF
Enclosure 2 (Phase-in SOW).pdf PDF
Enclosure 7 (Quality Assurance Surveillance Plan).pdf PDF
Enclosure 8a (CORE Cost Exhibits).pdf PDF
Enclosure 8b - (RTO Cost Exhibits).pdf PDF
NSROC IV DRFP Questions and Government Responses (FINAL).pdf PDF
Attachment C.5 - NM 2015-5461 Grant_Hidalgo_Luna_Sierra.txt TXT text file
Attachment C.6 - TX 2015-5805 Culberson.txt TXT text file
Enclosure 2 (Phase-in SOW).pdf PDF
Enclosure 3 (Supplemental Safety Health and Environmental Information).pdf PDF
Enclosure 11 (DRAFT Performance Evaluation Plan).pdf PDF
Exhibit 1 - Past Perfromance Questionnaire NSROC IV.pdf PDF
Attachment T - Contractor Proposed Enhancements.pdf PDF
Draft Request for Proposal - 80GSFC21R0037 (UPDATE).pdf PDF
Attachment B Part 1 - Equipment Inventory May 2021.pdf PDF
Attachment C.2 - VA 2015-4327 Accomack_Northampton.txt TXT text file
Attachment C.3 - NM 2015-5455 Chaves_Eddy_Lincoln_Otero.txt TXT text file
Attachment C.7 - TX 2015-5229 El Paso_Hudspeth.txt TXT text file
Attachment E - Financial Management Reporting Requirements - DRFP Final.pdf PDF
Attachment F - Direct Labor Rates Indirect Rates Fee Matrices.pdf PDF
Attachment K - NSROC IV WBS and WBS Dictionary - DRFP Final.pdf PDF
Attahcment M - Contract Historical Data.pdf PDF
Attachment O - NSROC IV Security Classification DD254.pdf PDF
Attachment P - Applicable Standards and Policies - DRFP Final 07072021.pdf PDF
Enclosure 4 (SRPO Technology Roadmap June 2021).pdf PDF
Enclosure 7 (Quality Assurance Surveillance Plan).pdf PDF
Enclosure 8a (CORE Cost Exhibits).pdf PDF
Enclosure 9 (IT Security Management Plan Template).pdf PDF
Enclosure 10 (NSROC Historical Data October 2021).pdf PDF
Attachment B Part 3 - Ordnance and Vehicle Hardware Inventory May 2021.pdf PDF
Attachment C.1 - DE_ MD 2015-4271 Sussex_Somerset_Wicomico_Worcester.txt TXT text file
Attachment C.4 - NM 2015-5447 Dona Ana.txt TXT text file
Attachment S - IT Security Applicable Documents List - DRFP Final.pdf PDF
Enclosure 5 (RTO 1).pdf PDF
Enclosure 6 (RTO 2).pdf PDF
Show all 50

NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NUMBER 80GSFC21R0037

NASA SOUNDING ROCKET OPERATIONS CONTRACT IV

(NSROC IV)

ENCLOSURE 2

PHASE-IN STATEMENT OF WORK

APRIL 2022

STATEMENT OF WORK

FOR

PHASE-IN ACTIVITIES

NASA SOUNDING ROCKET OPERATIONS CONTRACT IV

1. BACKGROUND INFORMATION

A complete description of the NASA Sounding Rocket Operations Contract IV (NSROC IV) is contained in solicitation number 80GSFC21R0037. The purpose of this Statement of Work (SOW) is to conduct phase-in activities associated with NSROC IV. Phase-in will be conducted under this contract at the following locations: NASA’s Wallops Flight Facility, Wallops Island, Virginia (WFF) and at White Sands Missile Range, White Sands, New Mexico (WSMR). The contractor shall also be responsible for conducting sounding rocket operations from multiple launch sites, including remote launch campaigns. NASA sounding rocket launch sites include Poker Flat Research Range in Fairbanks, Alaska (PFRR) and Andoya Space in Andenes, Norway which includes Svalbard. Mobile launch sites include Reagan Test Site in Kwajalein Atoll and Equatorial Launch Australia (ELA) in Australia. Additional mobile launch sites could be established and utilized during the duration of the NSROC IV contract.

The contractor shall perform phase-in activities leading to readiness to assume full performance of NSROC IV 60 calendar days after phase-in start. During the phase-in period, the contractor shall not be responsible for performance of the effort described in the NSROC IV SOW, Attachment A, of solicitation number 80GSFC21R0037. The Government anticipates awarding a stand-alone firm-fixed price contract to accomplish this goal.

2. PURPOSE AND OBJECTIVES

During the phase-in period, the contractor shall review and become familiar with applicable NASA regulations, policies, and procedures. The contractor shall take necessary action to submit deliverables and ensure staff has obtained all required licenses and certifications to begin full contract performance 60 calendar days after phase-in start, under the contract awarded pursuant to solicitation number 80GSFC21R0037. The contractor shall use the phase-in period to begin integrating the requirements and deliverables of the contract while obtaining knowledge of the facilities, grounds, and operations required to support the NASA Sounding Rocket Program.

During this period of time the incoming contractor shall work with the Government and the incumbent contractor to ensure a smooth and effective transition.

Upon completion of the phase-in period, the contractor shall be completely responsible for all services and operations required under NSROC.

3. REQUIREMENTS

The contractor shall develop and implement a phase-in plan to be approved by NASA that defines the contractor’s approach too fully and optimally transition management, operations, engineering, technical, and administrative functions from the incumbent contractor. The contractor shall assume full responsibility for all contractual obligations beginning with the effective date of the contract. The contractor shall coordinate and lead the transition team. The phase-in process shall not adversely affect work performed by the incumbent. The contractor is responsible for ensuring continuity of operations, technology development, program planning support, management and administrative support, pending procurements, and fulfillment of all contract deliverables pending from previous contract as well as those on the next contract in order to meet all of NASA’s mission schedules, requirements, and planned costs. A written weekly status report shall be submitted that identifies and summarizes new and ongoing major and critical activities, schedule, progress, risk, and contingency operations. Informal communications, including teleconferences, as needed, shall be conducted by the contractor with the Contracting Officer’s Representative (COR).

During the phase-in period the contractor is expected to begin and/or continue work on meeting contract deliverables required in the contract awarded pursuant to solicitation number 80GSFC21R0037. Table 1 identifies major contract deliverables that shall be submitted after contract effective date.

Deliverable Name Periodic Date or Specific Due Date Comments Contract

Ref.

Delivery method

Quality Manual 60 calendar days after contract Effective Date

Implementation of quality processes for all critical elements

2.1.3.7 Electronic

Copies to COR

Configuration Management Plan

60 calendar days after contract Effective Date

Define the process for identification, control, and verification of the development, reconfiguration, and refurbishment of all mission and safety critical systems and processes

2.1.3.8 Electronic

Copies to COR

Training Plan 60 calendar days after contract Effective Date

How the contractor will identify, maintain, schedule, conduct, and document training, licensing, and certification for personnel and equipment

2.1.3.5 Electronic

Copies to COR

Information Technology (IT) Security Plan

60 calendar days after contract Effective Date

The security measures and program safeguards planned

2.1.3.4 Electronic

Copies to COR

Risk Management Plan

60 calendar days after contract Effective Date

How the Contractor will collect, track, and mitigate significant programmatic and technical risks to the Sounding Rockets Program

2.1.3.9 Electronic

Copies to COR

Systems Engineering Plan

60 calendar days after contract Effective

How the Contractor will ensure the complex subsystems

2.1.3.10 Electronic

Copies to COR

Deliverable Name Periodic Date or Specific Due Date Comments Contract

Ref.

Delivery method

Date integrated into sounding rocket vehicles and payloads function together to satisfy the objectives of the overall mission

Diversity, Equity, Inclusion and Accessibility (DEIA) Plan

60 calendar days after contract Effective Date

The DEIA plan demonstrates the contractor’s commitment to fairness regarding diversity, equity, inclusion, and accessibility. This plan will provide NASA with an understanding of how the contractor plans to recruit, retain, and develop a diverse high performing workforce from underserved communities. The plan shall include measurable performance metrics and objectives. The DEIA plan will be utilized as an assessment tool by the contracting officer to monitor the contractor’s progression in its commitment to diversifying its workforce.

2.1.2.3 Electronic

Copies to COR

4. PERIOD OF PERFORMANCE

The phase-in period for the NSROC will last 60 days beginning on the date the Phase-In purchase order is signed.

End of SOW