Attachment F - Rates and Fee Matrices.pdf
PDF 145 KB Posted
- Attached to
- NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal Federal contract opportunity
- Solicitation number
- 80GSFC21R0037
About this file
This document contains rate matrices and labor hour estimates to support the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) / Wallops Flight Facility (WFF) request for proposal for the NASA Sounding Rocket Operations Contract (NSROC) IV. The contractor will be responsible for operating and maintaining government-owned facilities located at NASA's Wallops Flight Facility in Wallops Island, Virginia and White Sands Missile Range in White Sands, New Mexico, including conducting sounding rocket operations from multiple launch sites and remote launch campaigns. The attachment provides rate matrices for prime and subcontractor direct labor rates by category and location for the base period and each option year, indirect cost rates by category and location, cost estimating relationships if applicable, and award fee rates. Also included are estimates of direct labor hours by labor category and phase for each mission complexity level.
View the file
Other files for this federal contract opportunity
Show all 50
NASA Sounding Rocket Operations Contract (NSROC) IV - FINAL Request for Proposal has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NUMBER 80GSFC21R0037
NASA SOUNDING ROCKET OPERATIONS CONTRACT IV
(NSROC IV)
Attachment F
Direct Labor Rates, Indirect Rates, Award Fees, and
Mission Direct Labor Hour Matrices
July 2021
NSROC IV ATTACHMENT F RFP# 80GSFC21R0037
1. PRIME DIRECT LABOR RATE MATRIX (For All Task Orders):
The Contractor shall not exceed the rates as specified below for pricing all task orders (Mission and/or Performance) contemplated or issued in accordance with Clause H.15, Task Ordering
Procedure. Any task orders issued in accordance with Clause H.15 will be applied to the guaranteed minimum amount and maximum amount as provided in Clause B.6.
PRIME DIRECT LABOR RATES
**Labor
Categories
Location *CY 1
^HR Rate
CY 2
HR Rate
CY 3
HR Rate
CY 4
HR Rate
CY 5
HR Rate
CY6
HR Rate
*CY = Contract Year
**Labor Categories – The Offeror shall provide direct labor rates by Offeror direct labor category, in accordance with the Position Descriptions in Section 8 of this attachment.
^HR = Hourly Rate: These are not-to-exceed rates for pricing all Prime contractor task orders
(Mission and/or Performance). The Contractor may propose lower rates when pricing task orders.
2. PRIME INDIRECT COST RATE MATRIX (For All Task Orders):
The Contractor shall not exceed the rates as specified below for pricing all task orders (Mission and/or Performance) contemplated or issued in accordance with Clause H.15, Task Ordering
Procedure. Any task orders issued in accordance with Clause H.15 will be applied to the guaranteed minimum amount and maximum amount as provided in Clause B.6.
PRIME INDIRECT COST RATE MATRIX
***Indirect
Rate
Categories
Location Base of
Application
*CY 1 CY 2 CY 3 CY 4 CY 5 CY 6
***Indirect Rate Categories - The Offeror shall complete all Prime indirect categories, which apply to the SOW, Mission Task Orders and Performance Task Orders. The Offeror shall complete all
Prime indirect rate categories and rates that may be applied against direct and indirect costs in accordance with the contractor’s accounting and estimating procedures. Clearly delineate the base of application, period of performance location including onsite versus offsite rates.
3. PRIME COST ESTIMATING RELATIONSHIPS (For All Task Orders):
The Prime Contractor shall not exceed the cost estimating relationships (CERs) rates or factors as specified below for deriving/pricing Other Direct Costs (ODCs), if applicable, on all task orders:
****CERs
Location
Base of
CY 1 CY 2 CY 3 CY 4 CY 5 CY 6
****CERs – If applicable, the Offeror shall complete all Prime ODC categories and rates/factors that are proposed using a CER, such as management percentages or computer/IT fees. Clearly delineate the base of application and location, if applicable. If not applicable, insert “NONE”.
4. PRIME AWARD FEE RATE MATRIX
The Prime Contractor shall not exceed the award fee rate specified below for pricing all Cost-Plus-
Award-Fee (CPAF) task orders:
*****Award Fee
Rate
Base of
CY1 CY2 CY3 CY4 CY5 CY6
*****The Offeror shall complete the Prime’s award fee rate that shall not be exceeded when calculating the maximum available award fee dollars for all task orders issued under the resultant contract. Clearly delineate the base of application
5. SUBCONTRACTOR (Name-TBP) LOADED LABOR RATE MATRIX (For All Task Orders):
The Contractor shall not exceed the rates as specified below for pricing the subcontractor labor hours on all task orders (Mission and/or Performance) contemplated or issued in accordance with
Clause H.15, Task Ordering Procedure. Any task orders issued in accordance with Clause H.15 will be applied to the guaranteed minimum quantity and maximum quantity as provided in Clause
B.6.
SUBCONTRACTOR (Name-TBP) LOADED LABOR RATE MATRIX
++Labor
Categories
Location *CY 1
^HR Rate
CY 2
HR Rate
CY 3
HR Rate
CY 4
HR Rate
CY 5
HR Rate
CY 6
HR Rate
++Labor Categories - The Offeror shall provide fully-loaded Subcontractor direct labor rates by
Subcontractor direct labor category in accordance with the Position Descriptions in Section 8 of this attachment.
^HR = Hourly Rate: These are not-to-exceed rates for pricing subcontractor labor hours. The
Contractor may propose lower rates when pricing task orders.
6. MISSION DIRECT/OVERTIME LABOR HOUR MATRIX – BY MISSION COMPLEXITY
LEVEL:
This section shall include all proposed technical, direct-productive Labor Categories (in accordance with Section 8 of this attachment) and Labor Hours (Regular and Overtime), including subcontractor(s), required for each of the following Mission Complexity Levels (MCL) (no
Management or Administrative labor).
MISSION DIRECT LABOR HOUR MATRIX – MCL 4
Categories
Design Phase
(SOW 3.1.2)
Fabrication, I&T and Qual
Phase
(SOW 3.1.3)
Pre-Launch, ATP, Launch, and Post
Launch Phase
(SOW 3.1.4)
Post-Flight
(SOW 3.1.5)
TOTAL
LABOR
HOURS
Prime:
Subcontractor:
MISSION DIRECT LABOR HOUR MATRIX – MCL 3
Categories and Post
MISSION DIRECT LABOR HOUR MATRIX – MCL 2
Categories and Post
MISSION DIRECT LABOR HOUR MATRIX – MCL 1
Categories Design Phase
(SOW 3.1.2)
Fabrication, I&T and Qual and Post
**Labor Categories – The Offeror shall provide direct labor categories by Prime and
Subcontractor in accordance with the Position Descriptions in Section 8 of this attachment. The
Mission Direct Labor Hour Matrices above shall not include in Management and Administrative direct labor categories—only technical direct-productive Direct Labor Categories.
7. Variance Factors
The Variance Factor in the table below will be used to adjust the target hours of a Mission Task
Order to capture mission specific characteristics or requirements outside the baseline Mission
Complexity Level definitions given in Table 4 in Section 3.1.1 of the SOW. This factor will be applied to the target hours listed in the Mission Direct Labor Hour Matrix above, when pricing all
Mission Task Orders contemplated or issued in accordance with Clause H.15, Task Ordering
Procedure. Examples of events when the Variance Factors are applicable are given in SOW section
3.1.1.
Variance Factor
(Percentage of
Total Labor
Hours)
MCL 1 MCL 2 MCL 3 MCL 4
Enhanced 1
Enhanced 2
Remote
Second Attempt
Quality
8. POSITION DESCRIPTIONS (For All Offeror and Subcontractor Direct Labor Categories):
NOTE: TO BE PROPOSED (TBP) – A Position Qualification shall be proposed for each individual Prime Direct Labor Category included in Section 1 and each individual Subcontractor
Direct Labor Category included in Section 5.