MIST II Amend 2 Summary C.._.pdf

PDF 71 KB Posted

Attached to
MECHANICAL INTEGRATED SERVICES AND TECHNOLOGIES (MIST II)
Solicitation number
80GSFC20R0006
Issued by

About this file

This document provides an amendment to the solicitation for the Mechanical Integrated Services and Technologies II contract. The National Aeronautics and Space Administration Goddard Space Center is seeking engineering services and related support for the formulation, design, development, fabrication, integration, testing, verification, and operations of space flight and ground system hardware. The scope of work includes multidisciplinary mechanical engineering areas such as materials, structural analysis, mechanical design, electromechanical design, thermal engineering, contamination control, coatings, manufacturing, integration, testing, optics, cryogenics, detector systems, laser technology, electro-optics, and microwave instrumentation. This amendment updates the labor categories and qualification requirements for senior contamination engineer, senior electro-optical engineer, and optical analyst positions. All other terms and conditions of the solicitation remain the same. Offerors should monitor the electronic library for solicitation documents and submit any questions in writing to the email address provided.

View the file

Other files

File Type Posted
MIST II Amendment 3.pdf PDF
MIST II FRFP QA Rev. 1.pdf PDF
MIST II Enclosure CC - GPM Amendment 2.pdf PDF
MIST II-Amendment-2 signed (002).pdf PDF
MIST II Amend 1 Summary Changes.pdf PDF
MIST II FRFP QA.pdf PDF
MIST II-Amendment-1.pdf PDF
Final MIST II Questions Rev.2.pdf PDF
Attachment H- Contract Historical Data FRFP.pdf PDF
ENCLOSURE BB - Representative Task Orders Final 02-06-2020-.pdf PDF
Attachment C- Financial M. Reporting FRFP.pdf PDF
Attachment A- Statement of Work FRFP.pdf PDF
Enclosure DD - Contract Historical Data FRFP.pdf PDF
Exhibit 12 - Past Performance Questionaire FRFP.pdf PDF
Attachment L.- IT Security M. Plan Cover Page FRFP.pdf PDF
Attachment G-OCI Plan Cover Page FRFP.pdf PDF
Exhibits 2-11 Cover Page FRFP.pdf PDF
ENCLOSURE EE- Cover pg IT Security Management Plan.pdf PDF
Attachment K Government Furnished Property FRFP.pdf PDF
MIST II FINAL RFP.pdf PDF
Attachment B-IDIQ Cost-Type Rate Matrix FRFP.pdf PDF
MIST II Cover Letter on Letterhead.pdf PDF
Attachment D - DD form 254 FRFP.pdf PDF
MIST II SF33-14a FINAL.pdf PDF
Enclosure EE IT Security Management Plan Template.pdf PDF
Attachment I PIV Attachment FRFP.pdf PDF
Exhibits 2-11 GPM FINAL MIST II RFP.pdf PDF
Exhibits 1A-1C Cover Page FRFP.pdf PDF
Exhibits 1A-1C GPM MIST II FINAL RFP.pdf PDF
Enclosure AA MIST II QASP FRFP.pdf PDF
ENCLOSURE CC - MIST II CC - GPM FRFP.pdf PDF
Exhibit 12 - Past Perfomance Cover Page FINAL.pdf PDF
Final MIST II Questions Rev.1.pdf PDF
Final MIST II Questions.pdf PDF
Exhibits 2-11 Cover Page FINAL.pdf PDF
Attachment K- Government Furnished Property Cover Page FINAL.pdf PDF
Attachment H- Contract Historical Data FINAL.pdf PDF
Enclosure AA MIST II QASP FINAL.pdf PDF
MIST II DRFP 12-16-2019.pdf PDF
MIST II-DRFP GPM Exhibits 1A-1C FINAL.pdf PDF
Attachment F- Quality Assurance Plan Cover Page FINAL.pdf PDF
MIST II SF33 DRFP.pdf PDF
Attachment C- Financial M. Reporting FINAL.pdf PDF
Enclosure DD - Contract Historical Data FINAL.pdf PDF
Attachment D - DD form 254 FINAL.pdf PDF
EXHIBIT 12 Cover Page FINAL.pdf PDF
MIST II COVER LETTER FINAL.pdf PDF
Attachment I PIV Attachment FINAL.pdf PDF
Attachment J - IT Security Applicable Docs List FINAL.pdf PDF
EXHIBIT 12 - Past Performance Questionaire FINAL.pdf PDF
Show 40 more

Latest 50 of 60 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mechanical Integrated Services and Technologies (MIST) II

FINAL RFP 80GSFC20R0006

AMENDMENT 2

Enclosure CC is being replaced with Amendment 2

1. Page 18 of Enclosure CC is updated to add BS or equivalent to the Senior Contamination Engineer Labor Category.

2. Page 21 of Enclosure CC is updated to add BS or equivalent to the Senior Electro-Optical Engineer Labor Category.

3. Page 21 of Enclosure CC is updated to add BS or equivalent to the Optical Analyst Labor Category.

4. All other terms and conditions remain unchanged and in full force and effect.

-END OF AMENDMENT-

File details come from the government source that posted it. Updated .