MECHANICAL INTEGRATED SERVICES AND TECHNOLOGIES (MIST II) Federal contract opportunity
Solicitation number
80GSFC20R0006
Issued by
National Aeronautics and Space Administration Goddard Space Center

About this file

This draft request for proposal (DRFP) is for the Mechanical Integrated Services and Technologies II (MIST II) contract to provide engineering services and related support to the National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC). Services include formulation, design, development, fabrication, integration, testing, verification, and operations of space flight and ground system hardware. Engineering focus areas include materials, structural analysis, mechanical design, electromechanical design, thermal, contamination and coatings, manufacturing, integration and test, optics, cryogenics, detector systems development, laser and electronic optics, and microwave instrument technologies. The final RFP is expected to release in January 2020. The contract value is estimated between $5 million minimum to $531 million maximum over five years. Responses are due as specified in individual task orders. The incumbent contractor may compete for award. Services will be performed at NASA GSFC and contractor facilities.

View the file

Other files for this federal contract opportunity

Other files attached to MECHANICAL INTEGRATED SERVICES AND TECHNOLOGIES (MIST II), newest first.
File Type Posted
MIST II FRFP QA Rev. 1.pdf PDF
MIST II Enclosure CC - GPM Amendment 2.pdf PDF
MIST II-Amendment-2 signed (002).pdf PDF
MIST II FRFP QA.pdf PDF
MIST II-Amendment-1.pdf PDF
Final MIST II Questions Rev.2.pdf PDF
Exhibit 12 - Past Performance Questionaire FRFP.pdf PDF
Enclosure EE IT Security Management Plan Template.pdf PDF
Exhibits 2-11 GPM FINAL MIST II RFP.pdf PDF
Attachment L.- IT Security M. Plan Cover Page FRFP.pdf PDF
Attachment I PIV Attachment FRFP.pdf PDF
Attachment C- Financial M. Reporting FRFP.pdf PDF
Exhibits 1A-1C GPM MIST II FINAL RFP.pdf PDF
Attachment A- Statement of Work FRFP.pdf PDF
MIST II FINAL RFP.pdf PDF
MIST II SF33-14a FINAL.pdf PDF
MIST II Cover Letter on Letterhead.pdf PDF
Attachment D - DD form 254 FRFP.pdf PDF
Attachment B-IDIQ Cost-Type Rate Matrix FRFP.pdf PDF
Exhibits 1A-1C Cover Page FRFP.pdf PDF
Enclosure DD - Contract Historical Data FRFP.pdf PDF
Exhibit 12 - Past Perfomance Cover Page FINAL.pdf PDF
ENCLOSURE CC - MIST II CC - GPM FRFP.pdf PDF
Enclosure AA MIST II QASP FRFP.pdf PDF
Attachment H- Contract Historical Data FRFP.pdf PDF
ENCLOSURE BB - Representative Task Orders Final 02-06-2020-.pdf PDF
Final MIST II Questions Rev.1.pdf PDF
Final MIST II Questions.pdf PDF
EXHIBIT 12 - Past Performance Questionaire FINAL.pdf PDF
MIST II DRFP GPM Exhibits 2-11 FINAL.pdf PDF
Attachment H- Contract Historical Data FINAL.pdf PDF
Attachment J - IT Security Applicable Docs List FINAL.pdf PDF
MIST II-DRFP GPM Exhibits 1A-1C FINAL.pdf PDF
EXHIBIT 12 Cover Page FINAL.pdf PDF
MIST II COVER LETTER FINAL.pdf PDF
Attachment I PIV Attachment FINAL.pdf PDF
Attachment F- Quality Assurance Plan Cover Page FINAL.pdf PDF
MIST II SF33 DRFP.pdf PDF
Exhibits 2-11 Cover Page FINAL.pdf PDF
Attachment E Safety and Health Plan Cover Page FINAL.pdf PDF
Attachment K Government Furnished Property FINAL.pdf PDF
Enclosure BB Combined RTOs FINAL.pdf PDF
Exhibits 1A-1C Cover Page FINAL.pdf PDF
Attachment A- Statement of Work FINAL.pdf PDF
Attachment B-IDIQ Cost-Type Rate Matrix FINAL.pdf PDF
Attachment L.- IT Security M. Plan Cover Page FINAL.pdf PDF
Attachment K- Government Furnished Property Cover Page FINAL.pdf PDF
ENCLOSURE CC - MIST II CC - GPM FINAL.pdf PDF
Attachment G-OCI Plan Cover Page FINAL.pdf PDF
Attachment C- Financial M. Reporting FINAL.pdf PDF
Show all 50

MECHANICAL INTEGRATED SERVICES AND TECHNOLOGIES (MIST II) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Mechanical Integrated Services and Technologies (MIST) II

DRAFT RFP 80GSFC20R006

Table Of Contents

SECTION B - SUPPLIES OR SERVICES AND COSTS

B.1 1852.216-74 ESTIMATED COST AND FIXED FEE (DEC 1991)

B.2 1852.232-81 GSFC MODIFICATION TO NFS 1852.232-81 CONTRACT

FUNDING (JUN 1990)

B.3 GSFC 52.211-90 SUPPLIES AND/OR SERVICES TO BE PROVIDED

(SEP 2017)

B.4 GSFC 52.216-90 MINIMUM/MAXIMUM AMOUNT OF SUPPLIES OR

SERVICES (COST REIMBURSEMENT) (APR 2008)

B.5 GSFC 52.216-91 SUPPLEMENTAL TASK ORDERING PROCEDURES

B.6 GSFC 52.232-94 ESTIMATED COST INCREASES (DEC 2005)

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 GSFC 52.211-91 SCOPE OF WORK. (FEB 2016)

C.2 GSFC 52.227-90 LIMITED RIGHTS DATA OR RESTRICTED COMPUTER

SOFTWARE (MAR 2008)

C.3 GSFC 52.235-90 REPORTS OF WORK (IDIQ). (AUG 2013)

SECTION D - PACKAGING AND MARKING

D.1 1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION

(SEP 2005)

D.2 CLAUSES INCORPORATED BY REFERENCE -- SECTION D

SECTION E - INSPECTION AND ACCEPTANCE

E.1 52.246-3 INSPECTION OF SUPPLIES—COST-REIMBURSEMENT

E.2 52.246-5 INSPECTION OF SERVICES – COST REIMBURSEMENT

E.3 52.246-8 INSPECTION OF RESEARCH AND DEVELOPMENT – COST-

REIMBURSEMENT (May 2001)

E.4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT

E.5 1852.246-72 MATERIAL INSPECTION AND RECEIVING REPORT

(APR 2015)

E.6 GSFC 52.246-93 ACCEPTANCE -- LOCATION(S) (SEP 2013)

E.7 GSFC 52.246-94 MATERIAL INSPECTION AND RECEIVING REPORT

NOT REQUIRED (APR 1989)

E.8 GSFC 52.246-102 INSPECTION SYSTEM RECORDS (APR 2013)

E.9 CLAUSES INCORPORATED BY REFERENCE -- SECTION E

SECTION F - DELIVERIES AND PERFORMANCE

F.1 52.242-15 STOP-WORK ORDER (AUG 1989) - ALTERNATE I (APR 1984) ... 26

F.2 GSFC 52.217-92 EFFECTIVE ORDERING PERIOD (JAN 2014)

F.3 GSFC 52.237-92 PLACE OF PERFORMANCE – SERVICES (NOV 2013)

F.4 GSFC 52.247-94 SHIPPING INSTRUCTIONS--CENTRAL RECEIVING

(FEB 2016)

F.5 CLAUSES INCORPORATED BY REFERENCE -- SECTION F

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 1852.216-75 PAYMENT OF FIXED FEE (DEC 1988)

G.2 1852.223-71 AUTHORIZATION FOR RADIO FREQUENCY USE. (APR 2015) 28

G.3 1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE

AND PATENT REPRESENTATIVE (APR 2015)

G.4 1852.227-86 COMMERCIAL COMPUTER SOFTWARE LICENSE

(APR 2015)

G.5 1852.242-71 TRAVEL OUTSIDE OF THE UNITED STATES (DEC 1988)

G.6 1852.242-73 NASA CONTRACTOR FINANCIAL MANAGEMENT

REPORTING (NOV 2004)

G.7 1852.232-80 SUBMISSION OF VOUCHERS FOR PAYMENT (APR 2018)

G.8 1852.245-70 CONTRACTOR REQUESTS FOR GOVERNMENT-FURNISHED

PROPERTY (AUG 2015)

G.9 1852.245-71 GSFC MODIFICATION TO NFS --INSTALLATION

ACCOUNTABLE GOVERNMENT PROPERTY (JUN 2018)

G.10 1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE

CUSTODY OF CONTRACTORS (JAN 2017)

G.11 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT

EQUIPMENT (JAN 2011)

G.12 1852.245-75 PROPERTY MANAGEMENT CHANGES (JAN 2011)

G.13 1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT

TO FAR 52.245–1 (JAN 2011)

G.14 1852.245-78 PHYSICAL INVENTORY OF CAPITAL PERSONAL PROPERTY

(AUG 2015)

G.15 1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS (SEP 2017)

G.16 GSFC 52.216-100 INDIVIDUALS AUTHORIZED TO ISSUE ORDERS.

(DEC 2014)

G.17 GSFC 52.242-90 FINANCIAL MANAGEMENT REPORTING (JUN 2014)

G.18 GSFC 52.245-93 REPORTS OF CONTRACTOR ACQUIRED GOVERNMENT

PROPERTY (MAR 2014)

G.19 GSFC 52.245-96 PROPERTY CLAUSE APPLICABILITY - ON-SITE AND

OFF-SITE (APR 2016)

G.20 GSFC 52.245-99 SUPPLEMENTAL FINANCIAL REPORTING OF NASA

PROPERTY IN THE CUSTODY OF CONTRACTORS (JUN 2019)

G.21 CLAUSES INCORPORATED BY REFERENCE -- SECTION G

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H.1 1852.208-81 RESTRICTIONS ON PRINTING AND DUPLICATING

(NOV 2004)

H.2 1852.223-70 SAFETY AND HEALTH MEASURES AND MISHAP REPORTING

(DEC 2015)

H.3 1852.223-75 MAJOR BREACH OF SAFETY OR SECURITY (FEB 2002)

H.4 1852.228-78 CROSS-WAIVER OF LIABILITY FOR SCIENCE OR SPACE

EXPLORATION ACTIVITIES UNREALATED TO THE INTERNATIONAL SPACE

STATION (OCT 2012)

H.5 1852.235-73 FINAL SCIENTIFIC AND TECHNICAL REPORTS (DEC 2006) .. 45

H.6 1852.242-72 DENIED ACCESS TO NASA FACILITIES (OCT 2015)

H.7 1852.244-70 GEOGRAPHIC PARTICIPATION IN THE AEROSPACE

PROGRAM. (APRIL 1985)………………………………………………………………….44

H.8 52.236-13 GSFC MODIFICATION TO FAR 52.236-13 ACCIDENT

PREVENTION. (NOV 1991) - ALTERNATE I (NOV 1991)

H.9 1852.209-71 LIMITATION OF FUTURE CONTRACTING (DEC 1988)

H.10 1852.225-70 EXPORT LICENSES (FEB 2000)

H.11 1852.235-74 ADDITONAL REPORTS OF WORK—RESEARCH AND

DEVELOPMENT (FEB 2003)

H.12 GSFC 52.204-99 CONTRACTOR PERSONNEL-IDENTIFICATION, ONSITE

REPORTING, AND CHECKOUT PROCEDURES (APR 2013)

H.13 GSFC 52.211-95 GOVERNMENT PREMISES—PHYSICAL ACCESS AND

COMPLIANCE WITH PROCEDURES (FEB 2016)

H.14 GSFC 52.223-91 SAFETY AND HEALTH ADDITIONAL REQUIREMENTS

(SEP 2017)

H.15 GSFC 52.223-92 GOVERNMENT PROPERTY – COMPLIANCE WITH

SAFETY STANDARDS. (FEB 2016)

H.16 GSFC 52.227-93 APPLICABILITY OF RIGHTS IN DATA - SPECIAL

WORKS. (MAR 2008)

H.17 GSFC 52.227-99 RIGHTS IN DATA (NOV 2018)

H.18 PROTEST FEE WITHHOLDING

H.19 CLAUSES INCORPORATED BY REFERENCE -- SECTION H

SECTION I - CONTRACT CLAUSES

I.1 52.202-1 DEFINITIONS (NOV 2013)

I.2 52.203-3 GRATUITIES (APR 1984)

I.3 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

I.4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE

GOVERNMENT (SEP 2006)

I.5 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)

I.6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS

FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

I.7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER

ACTIVITY (MAY 2014)

I.8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN

FEDERAL TRANSACTIONS (OCT 2010)

I.9 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT

(OCT 2015)

I.10 52.203-14 DISPLAY OF HOTLINE POSTER(S). (OCT 2015)

I.11 52.203-19 PROHIBITION ON REQUIRING CERTAIN INERNAL

CONFIDENTIALITY AGREEMENTS OR STATEMENTS. (JAN 2017)..…………….53

I.12 52.204-2 SECURITY REQUIREMENTS. (AUG 1996)

I.13 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POST-CONSUMER

FIBER CONTENT PAPER (MAY 2011)

I.14 52.204-9 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (JAN 2011)

I.15 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER

SUBCONTRACT AWARDS (OCT 2018)

I.16 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE

I.17 52.204-15 SERVICE CONTRACT REPORTING REQUIREMENTS FOR

INDEFINITE-DELIVERY CONTRACTS. (OCT 2016)

I.18 52.204-18 COMMERICAL AND GOVERNMENT ENTITY CODE

MAINTENANCE (JUL 2016)

I.19 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS

AND CERTIFICATIONS. (DEC 2014)

I.20 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE,

SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB

AND OTHER COVERED ENTITIES (JULY 2018)

I.21 52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN

SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR

PROPOSED FOR DEBARMENT (OCT 2015)

I.22 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION

REGARDING RESPONSIBILITY MATTERS (OCT 2018)

I.23 52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED

DOMESTIC CORPORATIONS. (NOV 2015)

I.24 52.210-1 MARKET RESEARCH. (APR 2011)

I.25 52.211-5 MATERIAL REQUIREMENTS. (AUG 2000)

I.26 52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIRMENTS

(APR 2008)

I.27 52.215-2 AUDIT AND RECORDS - NEGOTIATION (OCT 2010)

I.28 52.215-8 ORDER OF PRECEDENCE - UNIFORM CONTRACT FORMAT

(OCT 1997)

I.29 52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR

PRICING DATA -- MODIFICATIONS (AUG 2011)

I.30 52.215-14 INTEGRITY OF UNIT PRICES. (OCT 2010)

I.31 52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS

(OCT 2010)

I.32 52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR

POSTRETIREMENT BENEFITS (PRB) OTHER THAN PENSIONS (JUL 2005)

I.33 52.215-19 NOTIFICATION OF OWNERSHIP CHANGES. (OCT 1997)

I.34 52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA

AND DATA OTHER THAN CERTIFIED COST OR PRICING DATA—

MODIFICATIONS. (OCT 2010)

I.35 52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES. (OCT 2009)

I.36 52.216-7 ALLOWABLE COST AND PAYMENT. (AUG 2018)

I.37 52.216-8 FIXED FEE. (JUN 2011)

I.38 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

I.39 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS. (OCT 2018)

I.40 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM

REREPRESENTATION. (JUL 2013)

I.41 52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES.

(FEB 1997)

I.42 52.222-2 PAYMENT FOR OVERTIME PREMIUMS. (JUL 1990)

I.43 52.222-3... CONVICT LABOR. (JUN 2003)…………………………………………56

I.44 52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS -

OVERTIME COMPENSATION (MAY 2018) ……………………………………………56

I.45 52.222-17 NONDISPLACEMNT OF QUALIFIED WORKERS (MAY2014)……56

I.46 52.222-19 CHILD LABOR—COOPERATION WITH AUTHORITIES AND

REMEDIES. (JAN 2018)

I.47 52.222-20 CONTRACTS FOR MATERIALS, SUPPLIES, ARTICLES, AND

EQUIPMENT EXCEEDING $15,000. (MAY 2014)

I.48 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

I.49 52.222-26 EQUAL OPPORTUNITY (SEP 2016)

I.50 52.222-29 NOTIFICATION OF VISA DENIAL (APR 2015)

I.51 52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)

I.52 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE

NATIONAL LABOR RELATIONS ACT. (DEC 2010)

I.53 52.222-50 COMBATING TRAFFICKING IN PERSONS (JAN 2019)

I.54 52.222-53 EXEMPTION FROM APPLICATION OF THE SERVICE

CONTRACT LABOR STANDARDS TO CONTRACTS FOR CERTAIN SERVICES—

REQUIREMENT (MAY 2014)

I.55 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)

I.56 52.223-3 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL

SAFETY DATA (JAN 1997) - ALTERNATE I (JUL 1995)………………………………56

I.57 52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW

INFORMATION. (MAY 2011) – ALTERNATE I (MAY 2011) –

ALTERNATE II (MAY 2011)

I.58 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)……………………………..56

I.59 52.223-10 WASTE REDUCTION PROGRAM. (MAY 2011)

I.60 52.223-15 ENERGY EFFICIENCY IN ENERY CONSUMING PRODUCTS

(DEC 2007)……..…………………………………………………………………………….56

I.61 52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS

IN SERVICE AND CONSTRUCTION CONTRACTS (AUG 2018)

I.62 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT

MESSAGING WHILE DRIVING (AUG 2011)

I.63 52.223-20 AEROSOLS (JUN 2016) …………………………………………..……..57

I.64 52.225-1 BUY AMERICAN —SUPPLIES. (MAY 2014)

I.65 52.225-8 DUTY-FREE ENTRY. (OCT 2010)

I.66 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES

(JUN 2008)

I.67 52.227-1 AUTHORIZATION AND CONSENT. (DEC 2007) ALT I

(APR 1984)

I.68 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND

COPYRIGHT INFRINGEMENT (DEC 2007)

I.69 52.227-3 PATENT INDEMNITY. (APR 1984) ALTERNATE I (Apr 1984)

I.70 52.227-11 PATENT RIGHTS—OWNERSHIP BY THE CONTRACTOR.

(MAY 2014) AS MODIFIED BY NFS 1852.227-11 (APR 2015)

I.71 52.227-16 ADDITIONAL DATA REQUIREMENTS. (JUN 1987)

I.72 52.227-23 RIGHTS TO PROPOSAL DATA (TECHNICAL). (JUN 1987)

I.73 52.228-7 INSURANCE—LIABILITY TO THIRD PERSONS. MAR 1996)

I.74 52.230-6 ADMINISTRATION OF COST ACCOUNTING STANDARDS

(JUNE 2010)

I.75 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

I.76 52.232-9 LIMITATION ON WITHHOLDING OF PAYMENTS (APR 1984)

I.77 52.232-17 INTEREST (MAY 2014)

I.78 52.232-22 LIMITATION OF FUNDS. (APR 1984)

I.79 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

I.80 52.232-25 PROMPT PAYMENT. (JAN 2017) - ALTERNATE I (FEB 2002)…

I.81 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER—SYSTEM

FOR AWARD MANAGEMENT (OCT 2018)

I.82 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS

(JUNE 2013) ……

I.83 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL

BUSINESS SUBCONTRACTORS. (DEC 2013)

I.84 52.233-1 DISPUTES (MAY 2014) - ALTERNATE I (DEC 1991)

I.85 52.233-3 PROTEST AFTER AWARD. (AUG 1996) - ALTERNATE I

(JUN 1985)

I.86 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM

(OCT 2004)

I.87 52.237-2 PROTECTION OF GOVERNMENT BUILDINGS, EQUIPMENT,

AND VEGETATION. (APR 1984)

I.88 52.237-3 CONTINUITY OF SERVICES. (JAN 1991)

I.89 52.239-1 PRIVACY OR SECURITY SAFEGUARDS. (AUG 1996)

I.90 52.242-1 NOTICE OF INTENT TO DISALLOW COSTS. (APR 1984)

I.91 52.242-4 CERTIFICATION OF FINAL INDIRECT COSTS. (JAN 1997)

I.92 52.242-5 PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS

(JAN 2017)

I.93 52.242-13 BANKRUPTCY (JUL 1995)

I.94 52.243-2 CHANGES—COST REIMBURSEMENT. (AUG 1987) -

ALTERNATE II ALTERNATE V (APR 1984)

I.95 52.243-6 CHANGE ORDER ACCOUNTING (APR 1984)

I.96 52.243-7 NOTIFICATION OF CHANGES. (JAN 2017)

I.97 52.244-2 SUBCONTRACTS. (OCT 2010)…………………………………………….58

I.98 52.244-5 COMPETITION IN SUBCONTRACTING. (DEC 1996)

I.99 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS. (AUG 2019)

I.100 52.245-1 GOVERNMENT PROPERTY. (JAN 2017)

I.101 52.245-9 USE AND CHARGES. (APR 2012)

I.102 52.246-25 LIMITATION OF LIABILITY—SERVICES. (FEB 1997)

I.103 52.247-1 COMMERCIAL BILL OF LADING NOTATIONS. (FEB 2006)

I.104 52.247-63 PREFERENCE FOR U.S. FLAG AIR CARRIERS (JUN 2003)

I.105 VALUE ENGINEERING (OCT 2010)…………………………………………….59

I.106 52.249-6 TERMINATION (COST-REIMBURSEMENT). (MAY 2004)

I.107 52.249-14 EXCUSABLE DELAYS. (APR 1984)

I.108 52.251-1 GOVERNMENT SUPPLY SOURCES. (APR 2012)

I.109 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

I.110 1852.203-70 DISPLAY OF INSPECTOR GENERAL HOTLINE POSTER

(JUN 2001)

I.111 1852.203-71 REQUIREMENT TO INFORM EMPLOYEES OF

WHISTLEBLOWER RIGHTS (AUG 2014)

I.112 1852.204-76 SECURITY REQUIREMENTS FOR UNCLASSIFIED

INFORMATION TECHNOLOGY RESOURCES. (JAN 2011)

I.113 1852.215-84 OMBUDSMAN. (NOV 2011) - ALTERNATE I (Jun 2000)

I.114 1852.216-89 ASSIGNMENT AND RELEASE FORMS. (AUG 2016) …………..59

I.115 1852.223-74 DRUG-AND ALCOHOL-FREE WORKFORCE (NOV 2015)

I.116 1852.227-11 PATENT RIGHTS--OWNERSHIP BY THE CONTRACTOR (APR

2015) ………………………………………………………………………………………..60

I.117 1852.227-14 RIGHTS IN DATA--GENERAL (APR 2015) ………………………..60

I.118 1852.228-75 MINIMUM INSURANCE COVERAGE. (OCT 1988)

I.119 1852.227-88 GOVERNMENT-FURNISHED COMPUTER SOFTWARE AND

RELATED TECHNICAL DATE (APR 2015)……………………………………………60

I.120 1852.235-70 CENTER FOR AEROSPACE INFORMATION (DEC 2006)

I.121 1852.237-70 EMERGENCY EVACUATION PROCEDURES. (DEC 1988)

I.122 1852.237-72 ACCESS TO SENSITIVE INFORMATION………………...……….60

I.123 1852.237-73 RELEASE OF SENSITIVE INFORMATION. (JUN 2005)…….…..60

I.124 1852.242-78 EMERGENCY MEDICAL SERVICES AND EVACUATION.

(APR 2001)………………………...………………………………………………………….60

I.125 52.204-1 APPROVAL OF CONTRACT. (DEC 1989)

I.126 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR

INFORMATION SYSTEMS (JUN 2016)

I.127 52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN

TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR

EQUIPMENT (AUG 2019)

I. 128 52.216-18 ORDERING (OCT 1995)

I.129 52.216-19 ORDER LIMITATIONS (OCT 1995)

I.130 52.219-14 LIMITATIONS ON SUBCONTRACTING (JUL 2019)

(DEVIATION 19-02)

I.131 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (DEVIAITON

19-02)…………………………………………………………………….……..……………..66

I.132 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)…………….67

I.133 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES

(JUL 2014)……………………………………………………………………………………67

I.134 52.223-7 NOTICE OF RADIO ACTIVE MATERIALS (JAN 1997) ……………..68

I.135 52.223-11 OZONE-DEPLETING SUBSTANCES AND HIGH GLOBAL

WARMING POTENTIAL HYDROFLUOROCARBONS. (JUN 2016)

I.136 52.242-3 PENALTIES FOR UNALLOWABLE COSTS. (MAY 2014)

(DEVIATION)

I.137 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

I.138 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)

I.139 1852.204-75 SECURITY CLASSIFICATION REQUIRMENTS (SEP 1989)……73

I.140 1852.216-80 TASK ORDERING PROCEDURES (OCT 1996)

I.141 1852.225-71 RESTRICTION ON FUNDING ACTIVITY WITH CHINA

I.142 GSFC 52.227-14 RIGHTS IN DATA-GENERAL (MAY 2014)--ALTERNATE II

(DEC 2007), ALTERNATE III (DEC 2007, AND ALTERNATE IV (DEC 2007) AS

MODIFIED BY NASA FAR SUPPLEMENT 1852.227-14 (APR 2015)………………….75

I.143 CLAUSES INCORPORATED BY REFERENCE -- SECTION I

SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

J.1 GSFC 52.211-101 LIST OF ATTACHMENTS (FEB 2016)

SECTION B - SUPPLIES OR SERVICES AND COSTS

B.1 1852.216-74 ESTIMATED COST AND FIXED FEE (DEC 1991)

The estimated cost of this contract is [the total of all task orders issued] exclusive of the fixed fee of [the total of all task orders issued]. The total estimated cost and fixed fee is [the total of all task orders issued].

(End of clause)

B.2 1852.232-81 GSFC MODIFICATION TO NFS 1852.232-81 CONTRACT

FUNDING (JUN 1990)

(a) For purposes of payment of cost, exclusive of fee, in accordance with the Limitation of Funds clause, the total amount allotted by the Government to this contract is $to be determined (TBD). This allotment is for TBD and covers the following estimated period of performance:

TBD.

(b) An additional amount of $TBD is obligated under this contract for payment of fee.

(c) The cumulative amount of funding obligated for payment of cost and fee under this contract is $TBD.

(End of clause)

B.3 GSFC 52.211-90 SUPPLIES AND/OR SERVICES TO BE PROVIDED

(SEP 2017)

The Contractor shall provide all resources (except as may be expressly stated in the Contract as furnished by the Government) necessary to deliver and/or perform the items below in accordance with Statement of Work (SOW), incorporated as Attachment A, and Task Orders issued hereunder.

Item Description Reference Schedule Delivery Method/Addressee(s)

1 Services and Deliverables in accordance with Task Orders Issued and the

SOW

As Defined in the Individual Task Orders Issued

As Specified in Individual Task Orders Issued

As Specified in Individual Task Orders Issued

2 Task Plans Section B

GSFC 52.216-91

Section I NFS 1852.216-80

As Required in Clause NFS 1852.216.-80

NASA Task Orders Management System

(TOMS)

3 Reports of Work Section C

GSFC 52.235-90

Section H

NFS 1852.235-73

As Required in Clause GSFC 52.235-90

NASA Task Order Management System

(TOMS)

4 Contract Historical Data

Section C

GSFC 52.211-91

Attachment H

30 Days after Contracting Officer Request

Electronic Format/CO

5 NASA Financial Management Reports

Section G

GSFC 52.242-90

Section G

NFS 1852.242-73

Attachment C

Monthly and Quarterly in accordance with Attachment C

Electronic Format/ Contracting Officer (CO), Contracting Officer’s Representative (COR), Resource Analyst (RA) & Regional Office of Finance

6 Material Inspection and Receiving Reports (

MIRR)

Section E NFS 1852.246-72 Section E

GSFC 52.246-94

At Time of Delivery

Hard Copy/CO, COR and Receiving & Inspection

7 Foreign Travel Requests and Foreign Travel Reports

Section G NFS 1852.242-71

Foreign Travel Requests – 30 days in advance of travel; Foreign Travel Reports – Due within 10 business days of the completion of travel

As specified in Contracting Officer’s (CO) travel approval

8 Requests for Government Property

Section G

NFS 1852.245-70

30 Days Prior to Acquire Date

Electronic Format/CO

9 Financial Report of NASA Property in the Custody of the Contractors (NF 1018)

Section G

NFS 1852.245-73

Annual Report by October 15th and Final Report

NF 1018 Electronic Submission System (NESS)

10 Supplemental Financial Report of NASA Property in the Custody of Contractors

Section G

GSFC 52.245-99

Monthly By the 21st of each Month and the Final Report

Contractor –Held Asset Tracking System ( CHATS) at https://chats.nasa.gov

11 Physical Inventory of Capital Personal Property Reporting

Section G

NFS 1852.245-78

Within 10 days of Annual Physical Inventory

Property Administrator

12 Contractor Acquired Government Property Reporting

Section G

GSFC 52.245-93

Quarterly by Jan 30, Apr 30, July 30 and Oct 30

Electronic and Hard Copy Format/CO and SEMO, https://chats.nasa.gov/

Code 273

13 Reporting of Inventions Section G

NFS 1852.227-72

Section I

FAR 52.227-11

Interim Reports Every 12 Months (or sooner to preserve Patent Rights) and Final Report within 3 Months after Contract Completion

Electronic or Hard Copy Format/New Technology Representative or Patent Representative

14 Safety & Health Reporting

Section H1852.223-70, NFS 1852.223-75

GSFC 52.223-91

Monthly and Quarterly Reports and As Required

NASA Mishap Information System (NMIS)

15 Personal Identity Verification (PIV) Documentation and Reporting

Section H

GSFC 52.204-99

Attachment I

10th Day of the Month and As Required

Electronic Format and Hard Copy/COR; & Code 240

16 Equal Opportunity Reports

Section I

52.222-26

As Specified by 52.222-26

Electronic Format/ CO; & Code 120

17 Certificate of Insurance Section I

52.228-7

NFS 1852.228-75

As Specified by

FAR 52.228-7

Electronic Format/CO

18 Subcontract Notification

Section I

FAR 52.244-2

30 Days Prior to Subcontract Award Date

Electronic or Hard Copy/CO

19 IT Security Management Plan

Section I NFS 1852.204-76

Attachment L

30 Days After Contract Effective Date, & Annual Updates as Required

Electronic Format/CO

20 Service Contract Act Reporting

Section I

FAR 52.204-15

Annually by October 31 and Revisions, if https://www.sam.gov needed, by November 30

B.4 GSFC 52.216-90 MINIMUM/MAXIMUM AMOUNT OF SUPPLIES OR

SERVICES (COST REIMBURSEMENT) (APR 2008)

(a) The minimum amount of supplies or services that shall be ordered during the effective period of this contract is $5,000,000. The maximum amount of supplies or services that may be ordered during the effective period of this contract is $531,000,000. All orders placed under this contract will be applied to the minimum and maximum specified in this paragraph.

(b) The minimum amount is reached when the sum of the dollar amounts of all ordered supplies or services, except for any adjustments made pursuant to the Limitation of Cost or Limitation of Funds clause, equals or exceeds the minimum amount stated in paragraph (a).

(c) The maximum amount is reached when the sum of the dollar amounts of all ordered supplies or services, except for any adjustments made pursuant to the Limitation of Cost or Limitation of Funds clause, equals the maximum amount stated in paragraph (a).

(d) The maximum amount, if reached, precludes the issuance of further orders for supplies or services under this contract. However, reaching the maximum amount does not preclude adjustments to the dollar amounts of existing placed orders, for actions that are within the scope of the placed orders, and which are made pursuant to existing contract authority, such as the Changes clause.

(e) The maximum amount may be adjusted unilaterally by the Government on an as needed basis. Historic, current, and/or projected workload requirements will be used to determine the amount of upward adjustment. In no event will the adjusted maximum amount exceed 30% of the original maximum amount.

B.5 GSFC 52.216-91 SUPPLEMENTAL TASK ORDERING PROCEDURES

(COST REIMBURSEMENT) (APR 2010)

(a) When the Government issues a request for a “task plan” to the Contractor in accordance with the Clause entitled “Task Ordering Procedure” of this contract, the Contractor shall prepare its estimate of the labor hours, labor categories, indirect costs, and other direct costs required to perform the task order requirements. The Contractor shall use only those appropriate labor and indirect cost rates, which may be less than but shall not exceed the rates found in Attachment B, Direct Labor Rates, Indirect Rates, and Fixed Fee Matrices, to calculate the proposed estimated costs for all task orders issued in accordance with the “Task Ordering Procedure” clause of this contract.

(b) The Contractor’s proposed approach/pricing of the representative tasks set forth in its proposal for award of this contract shall be used as reference by the Contracting Officer in negotiating tasks with the Contractor which are issued under this contract, but only to the extent portions of a representative task are relevant to portions of a task actually issued.

(c) The Government and Contractor agree that the fixed fee percentage specified in Attachment B, Direct Labor Rates, Indirect Rates, and Fixed Fee Matrices shall be used to calculate the fixed fee dollars on all task orders issued in accordance with the “Task Ordering Procedure” clause of this contract.

B.6 GSFC 52.232-94 ESTIMATED COST INCREASES (DEC 2005)

(a) The Contractor shall notify the Contracting Officer in writing when the Contractor has reason to believe that the total cost for performance of this contract, or any individual task order, exclusive of any fee, will be either greater or substantially less than the total estimated cost stated in this contract or in the task order. Notification shall not be delayed pending preparation of a proposal.

(b) A proposal is required to support a request for an increase in the estimated cost of the contract or the task order. The proposal should be submitted as soon as possible after the above notification but no later than 115 days before the incurred costs are expected to exceed the estimated cost. This will allow adequate time for the Government to evaluate the proposal and to mutually establish any increase in estimated cost with the Contractor.

(c) (1)The proposal shall be submitted in the following format unless some other format is directed or approved by the Contracting Officer:

Incurred costs to date Projected cost to completion Total cost at completion Current negotiated estimated cost Requested increase in estimated cost

(d) (2) The “projected cost to completion” shall consist of the following “other than cost or pricing data” unless the Contracting Officer requests or approves the submittal of a greater or lesser amount of information:

(i) Elements of cost with supporting detail for estimated direct labor hours, direct and indirect rates, materials and subcontracts, and other elements.

(ii) Supporting explanation for the increases and projections, sufficient for the Government to understand the reasons for the increased estimated cost.

[END OF SECTION B]

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 GSFC 52.211-91 SCOPE OF WORK. (FEB 2016)

The Contractor shall provide the personnel, materials, and facilities, except as otherwise specified in this Contract, necessary to perform the work and to furnish the items specified in the Supplies and/or Services To Be Provided clause of this Contract in accordance with the Statement of Work, Attachment A; Safety and Health Plan, Attachment E;; and task orders issued hereunder.

C.2 GSFC 52.227-90 LIMITED RIGHTS DATA OR RESTRICTED COMPUTER

SOFTWARE (MAR 2008)

In accordance with the delivery requirements of this contract, all software data rights shall be delivered in accordance with the Rights in Data – General clause, specified elsewhere in this contract, except for the following: NONE

C.3 GSFC 52.235-90 REPORTS OF WORK (IDIQ). (AUG 2013)

(a) Monthly progress reports. The Contractor shall submit monthly progress reports of all work accomplished covering all Task Orders active during each month of contract performance.

Reports shall address the accomplishments and progress of all work performed under each Task Order for the month being reported. Each Task Order shall be a separate report. The report shall be in narrative form and brief in content. The report shall include a description of overall Task Order progress to include technical accomplishments and status of deliverables. Also the report shall provide a quantitative description of overall progress and identify any risks or problems, which may impede performance and proposed corrective actions. Also the report shall have a discussion of the projected work activities to be performed during the next monthly reporting period.

(b) Final Task Order Report. The Contractor shall submit a Final Task Order Report for each completed Task Order that summarizes the results of the entire Task Order, including recom-mendations and conclusions based on the experience and results obtained. The Final Task Order Report should include, as appropriate, tables, graphs, diagrams, curves, sketches, photo-graphs, and drawings in sufficient detail to comprehensively explain the results achieved under the Task Order. The final report shall also include the final incurred cost for the Task Order.

(c) Submission. The Contractor shall submit the reports required by this clause as follows:

Copies Report Type Addressee Mail Code

1 M,F Contracting Officer (CO) 210.M 1 M,F Contracting Officer's Representative (COR) 540 1 M,F Task Monitor See Task Order

[M=Monthly Report, F=Final Report]

(d) Submission dates. Monthly reports shall be submitted by the 15th day of the month following the month being reported. If the Task Order is awarded beyond the middle of a month, the first monthly report shall cover the period from award until the end of the following month. The final report for each Task Order shall be submitted within 30 days after completion of the Task Order.

[END OF SECTION C]

SECTION D - PACKAGING AND MARKING

D.1 1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION

(SEP 2005)

D.2 CLAUSES INCORPORATED BY REFERENCE -- SECTION D

Clause D.1 at the beginning of this Section is incorporated by reference, with the same force and effect as if it was were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, Clauses Incorporated by Reference, of this contract.

(End of text)

[END OF SECTION D]

SECTION E - INSPECTION AND ACCEPTANCE

E.1 52.246-3 INSPECTION OF SUPPLIES—COST-REIMBURSEMENT

(MAY 2001)

Clause E.1 applies only to Task Orders issued that include Supplies

E.2 52.246-5 INSPECTION OF SERVICES – COST REIMBURSEMENT

(APR 1984)

Clause E.2 applies only to Task Orders issued for Services

E.3 52.246-8 INSPECTION OF RESEARCH AND DEVELOPMENT – COST-

REIMBURSEMENT (May 2001)

Clause E.3 applies only to Task Orders issued for Research and Development

E.4 52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT

(DEC 2014)

(a) The Contractor shall comply with the higher-level quality standard(s) listed below.

-ISO 9001-2015, Quality Management Systems-Requirements

-AS9100 Rev. D, Quality Management Systems - Requirements for Aviation, Space and Defense Organizations

(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph (a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in—

(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or

(2) When the technical requirements of a subcontract require—

(i) Control of such things as design, work operations, in-process control, testing, and inspection; or

(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.

(End of clause)

E.5 1852.246-72 MATERIAL INSPECTION AND RECEIVING REPORT

(APR 2015)

(a) At the time of each delivery to the Government under this contract, the Contractor shall prepare and furnish a Material Inspection and Receiving Report (DD Form 250 series). The form(s) shall be prepared and distributed as follows:

(1) Via mail and marked "Advance Copy", one copy each to the Contracting Officer, the Contracting Officer's Representative (if designated in the contract), and to the cognizant Administrative Contracting Officer, if any.

(2) Via mail, the original and 1 copy (unfolded) to the shipment address (delivery point) specified in Section F of this contract. Mark the exterior of the envelope "CONTAINS DD FORM 250". This must arrive prior to the shipment.

(3) With shipment in waterproof envelope (one copy) for the consignee.

(4) If the shipment address is not directly to the Goddard Space Flight Center (Greenbelt) central receiving areas, then one copy of the DD Form 250 must be provided (via mail) to one on the following addresses depending upon whether this contract is with GSFC Greenbelt:

Receiving and Inspection (Code 279), Goddard Space Flight Center, Greenbelt, MD 20771.

(b) The Contractor shall prepare the DD Form 250 in accordance with NASA FAR Supplement

1846.6. The Contractor shall enclose the copies of the DD Form 250 in the package or seal them in a waterproof envelope, which shall be securely attached to the exterior of the package in the most protected location.

(c) When more than one package is involved in a shipment, the Contractor shall list on the DD Form 250, as additional information, the quantity of packages and the package numbers. The Contractor shall forward the DD Form 250 with the lowest numbered package of the shipment and print the words “CONTAINS DD FORM 250” on the package.

E.6 GSFC 52.246-93 ACCEPTANCE -- LOCATION(S) (SEP 2013)

The Contracting Officer or authorized representative will accomplish acceptance at the following location(s):

Deliverable Item No. Location Authorized Representative 2 TBD by task orders COR 3 – 20 See Section B Clause B.3 CO/ COR

The Contracting Officer reserves the right to designate other Government agents as authorized representatives. The Contractor will be notified by a written notice or by a copy of the delegation letter if other agents are authorized.

E.7 GSFC 52.246-94 MATERIAL INSPECTION AND RECEIVING REPORT

NOT REQUIRED (APR 1989)

NASA FAR Supplement clause 18-52.246-72 of this contract requires the furnishing of a Material Inspection and Receiving Report (MIRR) (DD Form 250 series) at the time of each delivery under this contract. However, a MIRR is not required for the following paper/electronic deliverables:

1) Services rendered

2) Reports/documentation

E.8 GSFC 52.246-102 INSPECTION SYSTEM RECORDS (APR 2013)

The Contractor shall maintain records evidencing inspections in accordance with the Inspection clause of this contract for six (6) years after delivery of all items and/or completion of all services called for by the contract.

E.9 CLAUSES INCORPORATED BY REFERENCE -- SECTION E

Clause(s) E.1 thru E.3 at the beginning of this Section is incorporated by reference, with the same force and effect as if they were given in full text. Clauses incorporated by reference which require a fill-in by the Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses

[END OF SECTION E]

SECTION F - DELIVERIES AND PERFORMANCE

F.1 52.242-15 STOP-WORK ORDER (AUG 1989) - ALTERNATE I

(APR 1984)

F.2 GSFC 52.217-92 EFFECTIVE ORDERING PERIOD (JAN 2014)

The effective ordering period of this contract shall be for a period of five (5) years from the contract effective date of TBD. (End of Clause)

F.3 GSFC 52.237-92 PLACE OF PERFORMANCE – SERVICES (NOV 2013)

The services to be performed under this contact shall be performed at the following location(s):

NASA Goddard Space Flight Center and the Contractor’s off-site facilities. Alternate places of performance maybe specified in task orders.

F.4 GSFC 52.247-94 SHIPPING INSTRUCTIONS--CENTRAL RECEIVING

(FEB 2016)

Shipments of the items required under this contract shall be to:

Receiving Officer Goddard Space Flight Center Building 35, Code 279Greenbelt, Maryland 20771

Marked for:

Technical Officer (Name):________*______ Code: __________*___________

Building: ____________*_______________ Room: ________*_____________

Contract No.:________________________

Item(s) No.__________________________

*To be determined by task order

Compliance with this clause is necessary to assure verification of delivery and acceptance and prompt payment.

F.5 CLAUSES INCORPORATED BY REFERENCE -- SECTION F

Clause F.1 at the beginning of this Section is incorporated by reference, with the same force and effect as if it was given in full text. Clauses incorporated by reference which require a fill-in by the by Reference, of this Government include the text of the affected paragraph(s) only. This does not limit the clause to the affected paragraph(s). The Contractor is responsible for understanding and complying with the entire clause. The full text of the clause is available at the addresses contained in clause 52.252-2, Clauses Incorporated contract.

[END OF SECTION F]

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 1852.216-75 PAYMENT OF FIXED FEE (DEC 1988)

G.2 1852.223-71 AUTHORIZATION FOR RADIO FREQUENCY USE. (APR 2015)

G.3 1852.227-72 DESIGNATION OF NEW TECHNOLOGY REPRESENTATIVE

AND PATENT REPRESENTATIVE (APR 2015)

G.4 1852.227-86 COMMERCIAL COMPUTER SOFTWARE LICENSE (APR 2015)

G.5 1852.242-71 TRAVEL OUTSIDE OF THE UNITED STATES (DEC 1988)

G.6 1852.242-73 NASA CONTRACTOR FINANCIAL MANAGEMENT

REPORTING (NOV 2004)

G.7 1852.232-80 SUBMISSION OF VOUCHERS FOR PAYMENT (APR 2018)

(a) The designated payment office is the NASA Shared Services Center (NSSC) located at FMD Accounts Payable, Bldg. 1111, Jerry Hlass Road, Stennis Space Center, MS 39529.

(b) Except for classified vouchers, the Contractor shall submit all vouchers and invoices using the steps described at NSSC's Vendor Payment information Web site at:

https://www.nssc.nasa.gov/vendorpayment. Please contact the NSSC Customer Contact Center at 1-877-NSSC123 (1-877-677-2123) with any additional questions or comments.

(c) Payment requests.

(1) The payment periods are stipulated in the payment clause(s) contained in this contract.

(2) Vouchers submitted under cost type contracts and invoices submitted under fixed-price contracts shall include the items delineated in FAR 32.905(b) supported by relevant back-up documentation. Back-up documentation shall include at a minimum, the following information:

(i) Vouchers.

(A) Breakdown of billed labor costs and associated contractor generated supporting documentation for billed direct labor costs to include rates used and number of hours incurred.

(B) Breakdown of billed other direct costs (ODCs) and associated contractor generated supporting documentation for billed ODCs.

(C) Indirect rate(s) used to calculate the amount of billed indirect expenses.

(D) Progress reports, as required.

(ii) Invoices.

(A) Description of goods and services delivered as part of the contract's terms and conditions, including the dates of delivery/performance.

(B) Progress reports, as required.

(C) Date goods and services were performed.

(iii) Fee vouchers.

(A) Listing of all provisionally-billed fee by period or date earned since contract award.

(B) A reconciliation of all billed and earned fee.

(C) A clear explanation of the fee calculations.

(d) Non-electronic payment requests. The Contractor may submit a non-electronic voucher/invoice using the steps for non-electronic payment requests described at https://www.nssc.nasa.gov/vendorpayment, when any of the following conditions are met:

(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor.

(2) The contract includes provisions allowing the contractor to submit vouchers or invoices using the steps for non-electronic payment. In such instances the Contractor agrees to submit non-electronic payment requests using the method or methods specified in Section G of the contract.

(e) Improper vouchers/invoices. The NSSC Payment Office will notify the contractor of any apparent error, defect, or impropriety in a voucher/invoice within seven calendar days of receipt by the NSSC Payment Office. Inquiries regarding requests for payment should be directed to the NSSC as specified in paragraph (b) of this section.

(f) Other payment clauses. In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.

(g) In the event that amounts are withheld from payment in accordance with provisions of this contract, a separate payment request for the amount withheld will be required before payment for that amount may be made.

(End of clause)

G.8 1852.245-70 CONTRACTOR REQUESTS FOR GOVERNMENT-FURNISHED

PROPERTY (AUG 2015)

(a) The Contractor shall provide all property required for the performance of this contract. The Contractor shall not acquire or construct items of property to which the Government will have title under the provisions of this contract without the Contracting Officer's written authorization.

Property which will be acquired as a deliverable end item as material or as a component for incorporation into a deliverable end item is exempt from this requirement. Property approved as part of the contract award or specifically required within the statement of work is exempt from this requirement.

(b)(1) In the event the Contractor is unable to provide the property necessary for performance, and the Contractor requests provision of property by the Government, the Contractor's request shall—

(i) Justify the need for the property;

(ii) Provide the reasons why contractor-owned property cannot be used;

(iii) Describe the property in sufficient detail to enable the Government to screen its inventories for available property or to otherwise acquire property, including applicable manufacturer, model, part, catalog, National Stock Number or other pertinent identifiers;

(iv) Combine requests for quantities of items with identical descriptions and estimated values when the estimated values do not exceed $500,000 per unit; and

(v) Include only a single unit when the acquisition or construction value equals or exceeds $500,000.

(2) Contracting Officer authorization is required for items the Contractor intends to manufacture as well as those it intends to purchase.

(3) The Contractor shall submit requests to the Contracting Officer no less than 30 days in advance of the date the Contractor would, should it receive authorization, acquire or begin fabrication of the item.

(c) The Contractor shall maintain copies of Contracting Officer authorizations, appropriately cross-referenced to the individual property record, within its property management system.

(d) Property furnished from Government excess sources is provided as-is, where-is. The Government makes no warranty regarding its applicability for performance of the contract or its ability to operate. Failure of property obtained from Government excess sources under this clause is insufficient reason for submission of requests for equitable adjustments discussed in the clause at FAR 52.245-1, Government Property, as incorporated in this contract.

G.9 1852.245-71 GSFC MODIFICATION TO NFS --INSTALLATION-

ACCOUNTABLE GOVERNMENT PROPERTY (JUN 2018)

(a) The Government property described in paragraph (c) of this clause may be made available to the Contractor on a no-charge basis for use in performance of this contract. This property shall be utilized only within the physical confines of the NASA installation that provided the property unless authorized by the Contracting Officer under (b)(1)(iv). Under this clause, the Government retains accountability for, and title to, the property, and the Contractor shall comply with the following:

(1) NASA Procedural Requirements (NPR) 4100.1, NASA Materials Inventory Management Manual;

(2) NASA Procedural Requirements (NPR) 4200.1, NASA Equipment Management Procedural Requirements;

(3) NASA Procedural Requirement (NPR) 4300.1, NASA Personal Property Disposal Procedural Requirements;

(4) Notify the cognizant property custodian, Contracting Officer’s Representative (COR), and the Installation Security Officer immediately if theft of Government property is suspected or property cannot be located

(5) Identify Government property equipment that is no longer considered necessary for performance of the contract.

(6) Ensure that equipment is turned in to the Property Disposal Officer through the cognizant property custodian when no longer needed. This is the only acceptable procedure for disposal of Government property.

(7) Do not relocate Government property within Government premises or remove Government property from Government premises without written approval.

(8) Ensure that Government property, including property leased to the Government, is used only for the purposes of performing the contract.

(9) Ensure that Government property is protected and conserved.

Property not recorded in NASA property systems must be managed in accordance with the requirements of the clause at FAR 52.245-1, as incorporated in this contract.

The Contractor shall establish and adhere to a system of written procedures to assure continued, effective management control and compliance with these user responsibilities. In accordance with FAR 52.245-1(h)(1) the contractor shall be liable for property lost, damaged, destroyed or stolen by the contractor or their employees when determined responsible by a NASA Property Survey Board, in accordance with the NASA guidance in this clause.

(b)(1) The official accountable recordkeeping, financial control, and reporting of the property subject to this clause shall be retained by the Government and accomplished within NASA management information systems prescribed by the installation Supply and Equipment Management Officer (SEMO) and Financial Management Officer. If this contract provides for the Contractor to acquire property, title to which will vest in the Government, the following additional procedures apply:

(i) The Contractor's purchase order shall require the vendor to deliver the property to the installation central receiving area.

(ii) The Contractor shall furnish a copy of each purchase order, prior to delivery by the vendor, to the installation central receiving area.

(iii) The Contractor shall establish a record for Government titled property as required by FAR 52.245-1, as incorporated in this contract, and shall maintain that record until accountability is accepted by the Government.

(iv) Contractor use of Government property at an off-site location and off-site subcontractor use requires advance approval of the Contracting Officer and notification of the Industrial Property Officer. The property shall be considered Government furnished and the Contractor shall assume accountability and financial reporting responsibility. The Contractor shall establish records and property control procedures and maintain the property in accordance with the requirements of FAR 52.245-1, Government Property (as incorporated in this contract), until its return to the installation. NASA

Procedural Requirements related to property loans shall not apply to offsite use of property by contractors.

(2) After transfer of accountability to the Government, the Contractor shall continue to maintain such internal records as are necessary to execute the user responsibilities identified in paragraph (a) of this clause and document the acquisition, billing, and disposition of the property. These records and supporting documentation shall be made available, upon request, to the SEMO and any other authorized representatives of the Contracting Officer.

(c) The following property and services are provided if checked:

__x__ (1) Office space, work area space, and utilities. Government telephones are available for official purposes only.

__x_ (2) Office furniture.

__x__ (3) Property listed in List of IAGP Attachment M and applicable Task Orders

(i) If the Contractor acquires property, title to which vests in the Government pursuant to other provisions of this contract, this property also shall become accountable to the Government upon its entry into Government records.

(ii) The Contractor shall not bring to the installation for use under this contract any property owned or leased by the Contractor, or other property that the Contractor is accountable for under any other Government contract, without the Contracting Officer's prior written approval.

____ (4) Supplies from stores stock.

____ (5) Publications and blank forms stocked by the installation.

____ (6) Safety and fire protection for Contractor personnel and facilities.

__x__ (7) Installation service facilities: IT Services through the Agency Consolidated End-user Services (ACES) contract

__x__ (8) Medical treatment of a first-aid nature for Contractor personnel injuries or illnesses sustained during on-site duty.

__x__ (9) Cafeteria privileges for Contractor employees during normal operating hours.

__x__ (10) Building maintenance for facilities occupied by Contractor personnel.

____ (11) Moving and hauling for office moves, movement of large equipment, and delivery of supplies. Moving services may be provided on-site, as approved by the Contracting Officer.

(End of clause)

G.10 1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE

CUSTODY OF CONTRACTORS (JAN 2017)

(a) The Contractor shall submit annually a NASA Form (NF) 1018, NASA Property in the Custody of Contractors, in accordance with this clause, the instructions on the form and NFS subpart 1845.71, and any supplemental instructions for the current reporting period issued by

NASA.

(b)(1) Subcontractor use of NF 1018 is not required by this clause; however, the Contractor shall include data on property in the possession of subcontractors in the annual NF 1018.

(2) The Contractor shall mail the original signed NF 1018 directly to the Goddard Space Flight Center, Supply and Equipment Management Branch, Code 273, Greenbelt, MD 20771 and a copy to the Goddard Space Flight Center (GSFC), General Accounting Department, General Ledger Section, Code 157, Greenbelt, MD 20771, unless the Contractor uses the NF 1018 Electronic Submission System (NESS) for report preparation and submission.

(3) One copy shall be submitted (through the Department of Defense (DOD) Property Administrator if contract administration has been delegated to DOD) to the following address:

Goddard Space Flight Center, Supply and Equipment Management Branch, Code 273, Greenbelt, MD 20771, unless the Contractor uses the NF 1018 Electronic Submission System (NESS) for report preparation and submission.

(c)(1) The annual reporting period shall be from October 1 of each year through September 30 of the following year. The report shall be submitted in time to be received by October 31st.

The information contained in these reports is entered into the NASA accounting system to reflect current asset values for agency financial statement purposes. Therefore, it is essential that required reports be received no later than October 31st.

(2) Some activity may be estimated for the month in which the report is submitted, if necessary, to ensure the NF 1018 is received when due. However, contractors’ procedures must document the process for developing these estimates based on planned activity such as planned purchases or NASA Form 533 (NF 533) Contractor Financial Management Report) cost estimates. It should be supported and documented by historical experience or other corroborating evidence, and be retained in accordance with FAR Subpart 4.7, Contractor Records Retention.