Attachment B-IDIQ Cost-Type Rate Matrix FRFP.pdf
PDF 32 KB Posted
- Attached to
- MECHANICAL INTEGRATED SERVICES AND TECHNOLOGIES (MIST II) Federal contract opportunity
- Solicitation number
- 80GSFC20R0006
About this file
This document contains an attachment to a request for proposal for the Mechanical Integrated Services and Technologies II contract. The attachment provides rate matrices for prime contractor and subcontractor direct labor rates, cost estimating relationships, indirect cost rates, and fixed fees to be used for pricing all task orders under the contract. Position qualifications are to be proposed for all direct labor categories. The related federal contract opportunity notice indicates the solicitation is for engineering services and related support to the Mechanical Systems Division and Instrument Systems and Technology Division at NASA's Goddard Space Flight Center. Services include formulation, design, development, fabrication, integration, testing, verification, and operations of space flight and ground system hardware as well as technology development and validation to enable future space and science missions. The final RFP will be released in January 2020, and the electronic library for documents can be accessed online. Questions must be submitted by email by the specified date.
View the file
Other files for this federal contract opportunity
Show all 50
MECHANICAL INTEGRATED SERVICES AND TECHNOLOGIES (MIST II) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 80GSFC20R0006
SEPTEMBER 2019
ATTACHMENT B
INDEFINITE DELIVERY INDEFINITE QUANTITY
(IDIQ)
DIRECT LABOR RATES, INDIRECT RATES AND
FEE MATRICES
RFP
Contract TBD Attachment B
(03/2015)
IDIQ DIRECT LABOR RATES, INDIRECT RATES
AND FEE MATRICES
Task Plan proposals must utilize the not-to-exceed rates and factors delineated below for pricing all task orders contemplated or issued in accordance with the “Task Ordering Procedure” and “Supplemental Task Ordering Procedures” clauses of the contract. All Task Orders issued will be applied to the guaranteed minimum quantity and maximum quantity as provided in “Minimum/Maximum Amount of Supplies or Services” clause.
1. PRIME DIRECT LABOR RATE MATRIX (For All Task Orders):
The Prime Contractor shall not exceed the direct labor rates as specified below for pricing all task orders:
**Labor Categories
*CY 1
^HR Rate
CY 2
HR Rate
CY 3
HR Rate
CY 4
HR Rate
CY 5
HR Rate
CY 6
HR Rate
**Labor Categories - The Offeror shall provide Prime direct labor categories, in accordance with the Position Qualifications in Section 6 of this attachment.
*CY = Contract Year
^HR = Hourly Rate: These are not-to-exceed rates to be used for task order pricing purposes only for the Prime Contractor direct labor hours. The Contractor may propose lower rates when pricing task orders.
(03/2015)
2. PRIME COST ESTIMATING RELATIONSHIPS (For All Task Orders):
The Prime Contractor shall not exceed the cost estimating relationships (CERs) rates or factors as specified below for deriving/pricing Other Direct Costs (ODCs), if applicable, on all task orders:
****CERs Base of Application CY 1 CY 2 CY 3 CY 4 CY 5 CY 6
****CERs – If applicable, the Offeror shall complete all Prime ODC categories and rates/factors that are proposed using a CER, such as management percentages or computer/IT fees. Clearly delineate the base of application. If not applicable, insert “NONE”. Clearly delineate onsite and offsite rates.
3. PRIME INDIRECT COST RATE MATRIX (For All Task Orders):
The Prime Contractor shall not exceed the indirect rates as specified below for pricing all task orders:
***Indirect Rate
Categories
Base of Application CY 1 CY 2 CY 3 CY 4 CY 5 CY 6
***Indirect Rate Categories - The Offeror shall complete all Prime indirect rate categories and rates that may be applied against direct and indirect costs under a task order in accordance with the contractor’s accounting and estimating procedures. Clearly delineate the base of application and onsite versus offsite rates.
(03/2015)
4. PRIME FIXED FEE RATE MATRIX (For All Task Orders):
The Prime Contractor shall not exceed the fixed fee rate specified below for pricing all Cost-Plus-Fixed-Fee (CPFF) task orders:
*****Fixed Fee
Rate
Base of Application
CY 1 CY 2 CY 3 CY4 CY 5 CY 6
*****The Offeror shall complete the Prime’s fixed fee rate that shall be used to calculate the fixed fee dollars for all task orders issued under the resultant contract. Clearly delineate the base of application.
5. SUBCONTRACTOR (Name-TBP) FULLY-LOADED LABOR RATE MATRIX (For All Task Orders):
The Prime Contractor shall not exceed the fully-loaded direct labor rates as specified below for pricing the subcontractor direct labor hours on all task orders:
++Labor Categories
*CY 1
^HR Rate
CY 2
HR Rate
CY 3
HR Rate
CY 4
HR Rate
CY 5
HR Rate
CY 6
HR Rate
++Labor Categories - The Offeror shall provide fully-loaded subcontractor direct labor categories, in accordance with the Position Qualifications in Section 6 of this attachment.
Clearly delineate onsite versus offsite rates.
*CY = Contract Year
^HR = Hourly Rate: These are not-to-exceed fully-load rates to be used for pricing purposes only for the Subcontractor direct labor hours. The Contractor may propose lower rates when pricing task orders.
(03/2015)
6. POSITION QUALIFICATIONS (For All Prime and Subcontractor Direct Labor Categories):
NOTE: TO BE PROPOSED (TBP) – A Position Qualification shall be proposed for each individual Prime Direct Labor Category included in Section 1 and each individual Subcontractor Direct Labor Category included in Section 5.
| ATTACHMENT B |
| 1. PRIME DIRECT LABOR RATE MATRIX (For All Task Orders): |
| 2. PRIME COST ESTIMATING RELATIONSHIPS (For All Task Orders): |
| 3. PRIME INDIRECT COST RATE MATRIX (For All Task Orders): |
| 4. PRIME FIXED FEE RATE MATRIX (For All Task Orders): |
File details come from the government source that posted it. Updated .