SWiPS Questions and Responses 1-9-20.pdf
PDF 66 KB Posted
- Attached to
- Solar Wind Plasma Sensor (SWiPS) Space Weather Follow-On (SWFO-L1) Mission 80GSFC20R0010
- Solicitation number
- 80GSFC19R0048
About this file
This document contains questions and responses related to a request for proposal for a Solar Wind Plasma Sensor instrument. Key details include: the RFP is for the development of a Solar Wind Plasma Sensor that will be part of the Space Weather Follow-On L1 satellite mission, a joint undertaking of NASA and NOAA to provide continuity of solar wind and coronal mass ejection data as the highest priority for space weather observations. The questions and responses clarify that a list of references in the Mission Suitability Volume would count against the 45-page limit for that volume as specified in the RFP. No other salient information is included in this document beyond clarifying page limits for the proposal response.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL 80GSFC20R0010
SOLAR WIND PLASMA SENSOR (SWiPS) SPACE WEATHER FOLLOW-ON
Questions and Responses
Question 1:
RFP Reference:
RFP Section L.8(b)(1)
Comment or Question:
Does a list of references in the Mission Suitability Volume count against the Mission Suitability Volume page limit?
Response:
Yes. In accordance with provision L.8(b)(1), the Mission Suitability Volume page limitation is forty-five
(45) pages. Only items identified with specific page limitations, and, items identified as excluded from the page limitation (as stated in the table at L.8(b)(1)) are not included in the Mission Suitability Volume page limitation. See table from RFP Section L.8(b)(1) below:
Proposal Component Volume Reference Page Limitations
Offer Volume I L.12 None Mission Suitability Volume II L.14 45 Pages Cover Page, Table of Contents, Time- Phased Activity and Milestone Schedule, Master Equipment List (MEL), and Small Business Subcontracting Plan
Excluded
SPEC Compliance Matrix II.a 5 Pages Quality Assurance Plan (QAP) II.b Excluded Cost Volume III L.16 Mixed
(a) Cost Spreadsheets None
(b) Basis of Estimates 3 Pages per
WBS Level 2**
Past Performance Volume IV L.17 Mixed
(a) Information from the Offeror 25 Pages *
(b) Cover Page, Indices, Small Business Subcontracting Plan History, Customer Evaluations, Termination/Descope information, and List of Acronyms
Excluded
File details come from the government source that posted it. Updated .