This document contains questions and answers regarding the Environmental, Safety, Health, and Mission Assurance (ESHMA) Final Request for Proposal (RFP) 80GRC022R0017 from the National Aeronautics and Space Administration Glenn Research Center. The RFP seeks an ESHMA support services contractor to provide environmental, safety, health, and mission assurance support at NASA research facilities. Key details include that the contractor must submit a health and safety plan overview with its proposal and the full plan within 30 days of award, propose costs at the contract line item level both for proposal evaluation and contract performance reporting, and address potential organizational conflicts of interest in a separate attachment. The period of performance is from February 2024 to August 2029 including a six-month extension option.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Environmental, Safety, Health, and Mission Assurance (ESHMA)
Request for Proposal (RFP) 80GRC022R0017
Questions & Answers
RFP Section: Section L.19, L.24, and Attachment N Q1. L.19 requires that "The offeror shall submit a detailed safety and occupational health plan as part of its proposal." However, L.24 (UR3) requires only "an overview of the Health and Safety Plan," and Attachment N requires DRD 001 (Safety and Health Plan) be submitted 30 days after contract award. Recommend updating Section L.19 to reflect the correct timeline for delivery of the plan and eliminate the conflict between proposal submission requirements.
Answer: The Offeror shall provide an overview of the Health and Safety Plan as part of its proposal for evaluation purposes. This overview is in addition to the Health and Safety Plan required 30 days after contract award. Per UR3 of the RFP, “The overview shall include Practices, policies, and approaches to ensure a safe working environment for the Contractor’s employees as well as the approach to incorporating local, state, and federal (including NASA) regulations into operations and the approach to assess and mitigate risk as it relates to Safety and Health should be discussed and include Health and Safety Program Self-Evaluation.”. The site specific Health and Safety Plan required by section 2 of the Statement of Work and Attachment N will still need to be submitted 30 days after contract award.
RFP Section: Section B and Section L.25 PREPARATION OF VOLUME II – COST/PRICE FACTOR - Section 7 Q2. Does NASA intend Offerors to propose costs at the CLIN level for proposal purposes only but will not require the ESHMA contractor to manage and report costs incurred at the CLIN level during contract performance?
Answer: No. NASA requires the offeror/contractor to propose costs at the CLIN level and then the contractor with the winning proposal must manage and report costs at the CLIN level during contract performance via the 533-submission process.
RFP Section: Section L.17 1852.245-80 GOVERNMENT PROPERTY MANAGEMENT
INFORMATION (JAN 2011)
Q3. Will NASA please confirm that the initial submission of the requirements of the referenced instruction will be after the contract award?
Answer: The initial submission shall be provided with the proposal.
RFP Section: Section L.20 NOTICE OF POTENTIAL ORGANIZATIONAL CONFLICTS OF
INTEREST (OCT 2021)
Q4. Should offerors submit their OCI Plan as an attachment in Volume IV – Business Volume?
Answer: The OCI Plan shall be included as a separate proposal attachment.
RFP Section: Section L.24 PREPARATION OF VOLUME I – MISSION SUITABILITY, MP3 Recruitment, Retention, Staffing, and Compensation, Paragraph f Q5. Will NASA remove the TCP from the page allocation and have Offerors provide as an attachment to the Mission Suitability Volume?
Answer: Yes, the TCP will be excluded from the 80-page limitation in Volume I - Mission Suitability.
RFP Section: Attachment I - ESHMA PERSONNEL REQUIREMENTS Q6. What are the years of experience and minimum education requirements for Health Physicist category?
Answer: The Health Physicist experience and minimum education requirements are:
• Experience: 3-5 years supporting radiation safety program in a research or medical environment. Additional experience with non-ionizing radiation safety or laser safety is desirable.
• Education: BS or MS in health physics, or BS or MS in science/engineering/math AND formal training in health physics/radiation safety
RFP Section: Attachment I - ESHMA PERSONNEL REQUIREMENTS Q7. There is no specified years of experience requirement for the Medical Technologist Level IIIA and Fitness Specialist categories. Is the experience requirement 0 years for these two categories?
Answer: NASA has determined there is no specified years’ experience requirement for the Medical Technologist Level IIIA- and Fitness Specialist as the qualification requirements are based on competency, which is more accurately measured with actual experience(s) and performance as stated in the corresponding Position Qualifications and Requirements column.
RFP Section: Section L.21 (Page 75 of 111) Q8. Will the government change the font size restriction to text in graphics as to facilitate more flexibility in graphics layout? Being able to produce high quality graphics with 12-point font takes up more proposal space and disincentivizes offerors to include effective process-oriented graphics.
Answer: No, the font size restriction will not change.
RFP Section: Section L.25 (Page 91 of 111) Q9. Can the government please confirm the end date of the Period of Performance (PoP) for pricing purposes?
Answer: For pricing purposes, the Offeror shall use the period of performance from February 26, 2024, to August 27, 2029, including the six-month extension. The government is requesting pricing for base performance (2 years), Option 1 (2 years), Option 2 (1 year), and a possible 6-month extension. This brings the total potential period of performance to 5.5 years.
RFP Section: Section L.25, Section 5: ESCALATION (Page 94 of 111) Q10. The RFP states that "Offeror should provide the most recent three years of historical labor escalation for similar projects, if available." Will the government confirm whether this is still needed if the offeror has a DCAA recommended escalation rate for forward pricing rates?
Answer: If the Offeror has an established Forward Pricing Rate Recommendation/Agreement that includes escalation the required information is not needed.
RFP Section: Section L.25, Section 7: COST WORKBOOKS (Page 95 of 111) Q11. The RFP states that "Rounding: Monetary amounts other than Direct Labor Rates, may be expressed to the closest whole dollar amount, with cents omitted." Will the government clarify whether they would like this to be expressed visually (i.e., hide the cents) or actually written at the whole dollar value?
Answer: Either way is ok.
RFP Section: Section L.25; Section 7: COST WORKBOOKS; Attachment H-3: Tabs 12a, 12b, 12c (Page 97 of 111) Q12. Will the government accept an Offeror's Forward Pricing Rate Recommendation (FPRR) in lieu of submitting tab(s) 12 - Indirect Rate?
Answer: Yes.
RFP Section: Section L.25; Section 7: COST WORKBOOKS; Template 13: Total Staffing (Page 98 of 111) Q13. With regards to the Service Contract Labor Standards, what is the applicable Wage Determination from the Dept of Labor?
Answer: Template 13 is a standard NASA template, the applicable Wage Determination is Service Contract Act WD # 2015-4727 rev. 21 for Cuyahoga County, WD #: 2015-4751 rev. 24 for Erie County, and WD #: 2015-4281 rev. 27 for Washington DC.
RFP Section: Attachment I - PERSONAL REQUIREMENTS – Waste Management Positions Q14. Waste Management Lead and Waste Management Technician have the same job description and requirements. How do they differ?
Answer: The waste management lead has in depth knowledge of all waste management functions, environmental regulations, DOT regulations and NASA Safety best practices. They have the ability to coordinate with NASA, NASA sub-contractors for services. The waste management lead compiles compliance reports, establishes cost estimates for base work, work orders and IDIQ tasks. They coordinate staff schedules and help fill vacancies.
The waste management technician must be experienced and trained to safely and legally carry out many environmental and waste duties including spill response, site inspections and waste collection. They must be familiar with RCRA and DOT regulations, waste manifests and waste profiles.
RFP Section: Section 7.4 Q15. Section 7.4 is referenced multiple times in the Reports and Deliverables Table and at the start of Section 9.4. However, there does no Section 7.4 in the SOW.
Answer: The section 7.4 references have been corrected, see Attachment A - Environmental, Safety, Health, & Mission Assurance (ESHMA) Support Services SOW.
RFP Section: Section L.22(b) Q16. Section L.22(b) requires a cover letter "as part of Volume I." Is the cover letter and associated content included in page count?
Answer: The cover letter is not included in page count.
RFP Section: Section L.22(b) Q17. Section L.22(b) requires a matrix identifying where requirements are addressed in Volume I. Is this matrix included in the page count?
Answer: Section L.24 requires a matrix to be submitted which is excluded from the 80-page limitation for Mission Suitability.