About this file

These are architectural engineering drawings for the Calverton National Cemetery Columbarium Improvements project, specifically detailing existing conditions and restoration elevations for Columbarium H. The drawings, numbered CS108-CS110, show multiple wall elevations (Walls 5A-8A) with photographic and technical representations of the columbarium structures. The documents include restoration notes indicating requirements for cleaning, joint treatment, and preservation of existing infrastructure. The drawings are part of bid documents for the U.S. Department of Veterans Affairs, prepared by The LA Group, with a project issue date of March 25, 2025, and relate to project number 805CM3048 located in Suffolk County, New York. The technical drawings provide detailed visual and technical specifications for the restoration and improvement of the columbarium walls, including precise elevation views, material annotations, and preservation instructions.

View the file

Other files

File Type Posted
Virtual BID Opening New Date - 29 July 2025 - Calverton Natl Cem - FY-25.pdf PDF
A0004 - Calverton National Cemetery - 36C78625B0029 - FY-25.pdf PDF
805CM3048CNCColumBidSet_Bk_27.pdf PDF
Amandment A0003 - Claverton Natl Cem - 36C78625B0029 - FY-25.pdf PDF
805CM3048CNCColumBidSet_Bk_11.pdf PDF
Wage Determination - DB - Nassau - Suffolk Counties - Calverton Natl Cem.pdf PDF
A0003- Questions and Answers to RFIs - Calverton NC - 805CM3048 - FY-25.pdf PDF
SCHEDULE - Calverton Natl Cem - FY-25.pdf PDF
805CM3048CNCColumBidSet_Bk_33.pdf PDF
805CM3048CNCColumBidSet_Bk_14.pdf PDF
805CM3048CNCColumBidSet_Bk_19.pdf PDF
805CM3048CNCColumBidSet_Bk_35.pdf PDF
805CM3048CNCColumBidSet_Bk_30.pdf PDF
805CM3048CNCColumBidSet_Bk_29.pdf PDF
805CM3048CNCColumBidSet_Bk_32.pdf PDF
805CM3048CNCColumBidSet_Bk_21.pdf PDF
805CM3048CNCColumBidSet_Bk_28.pdf PDF
805CM3048CNCColumBidSet_Bk_23.pdf PDF
805CM3048CNCColumBidSet_Bk_18.pdf PDF
805CM3048CNCColumBidSet_Bk_16.pdf PDF
805CM3048CNCColumBidSet_Bk_12.pdf PDF
805CM3048CNCColumBidSet_Bk_13.pdf PDF
805CM3048CNCColumBidSet_Bk_31.pdf PDF
805CM3048CNCColumBidSet_Bk_34.pdf PDF
A0001 - Calverton National Cemetery - IFB No 36C78625B0029 - FY-25.pdf PDF
805CM3048CNCColumBidSet_Bk_24.pdf PDF
Attachment No 09 - DOL Payroll Form - FY-25.pdf PDF
Attachment No 01 - VIRTUAL BID OPENING -CALVERTON NATL CEM - IFB NO 36C78625B0029 - PROJECT NO 805CM3048.pdf PDF
805CM3048CNCColumBidSet_Bk_08.pdf PDF
805CM3048CNCColumBidSet_Bk_05.pdf PDF
805CM3048CNCColumBidSet_Bk_04.pdf PDF
805CM3048CNCColumBidSet_Bk_01.pdf PDF
805CM3048 Calverton NC Construction SOW.pdf PDF
36C78625B0029.docx DOCX document
805CM3048CNCColumBidSet_Bk_09.pdf PDF
805CM3048CNCColumBidSet_Bk_06.pdf PDF
805CM3048CNCColumBidSet_Bk_02.pdf PDF
Attachment No 08 - UEI for BID.pdf PDF
805CM3038 Calverton NC Col L-M Bk02.pdf PDF
Attachment No 10 - Davis-Bacon Act Poster.pdf PDF
Attachment No 07 - NCA Contractor Safety Checklist - FY-25.pdf PDF
Attachment No 05 - RFI Form - Calverton Natl Cem - PO No 805CM3048 - FY-25_01.pdf PDF
Attachment No 04 - Standard Form 1413 - FY-25.pdf PDF
Attachment 03 - LIMITATIONS ON SUBCONTRACTING_CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION - JAN 2023 - DEVIATION.pdf PDF
Attachment 02 - Cost Estimate Worksheet - Calverton Natl Cemtery - PO No 805CM3048 - FY-25_01.xlsx XLSX spreadsheet
805CM3048CNCColumBidSet_Bk_10.pdf PDF
805CM3048CNCColumBidSet_Bk_07.pdf PDF
805CM3038 Calverton NC Col L-M Bk01.pdf PDF
805CM3048 CNC Columb Specs.pdf PDF
Revised Specs - 805CM3048_CNC Columbarium Revised Specs Merge.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

SUFFOLK COUNTY, NEW YORK

805CM3048

MARCH 25, 2025

U.S. Department of Veterans Affairs

STAMP

Revisions: Date:

Drawing Title

Approved:

Phase

Building Number

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

CALVERTON NATIONAL CEMETERY

COLUMBARIUM IMPROVEMENTS

ARCHITECT / ENGINEER OF RECORD: Office of Construction and Facilities Management

BID DOCUMENTS

INTEGRITY FEDERAL SERVICES /

THE LA GROUP JOINT VENTURE

Integrity Federal Services 148 S. Queen Street, Suite 350 Martinsburg

WV 25401

(304)-725-8456

The LA Group 40 Long Alley Saratoga Springs

NY 12866

(518)-587-8100

COLUMBARIUM H EXISTING CONDITIONS

/ RESTORATION ELEVATIONS - SHEET 7

CS108

9 of 99LTM BMD

COLUMBARIUM H - WALL 5A ELEVATION2 COLUMBARIUM H - WALL 5B ELEVATION3

COLUMBARIUM H - WALL 5C ELEVATION4 COLUMBARIUM H - WALL S5.1 ELEVATION5Scale: 1" = 5'

COLUMBARIUM H KEY1

CS108

CS108

CS108

CS108

2 / D

2 / D

WALL 6

W

ALL 7

W

ALL 4

W

ALL 5

W

ALL 8

WALL 6

WALL 5

2 / D

A. REMOVE AND RESET PRECAST PANELS. SEE DETAIL 10/CS500 AND

SPECIFICATIONS. INSPECT ANCHORAGE AT TIME OF REMOVAL. ALL

PANELS TO BE CLEANED. SEE SPECIFICATIONS.

B. REMOVE AND REPLACE JOINT SEALANT IF PANELS REMAINING IN

PLACE, NEW SEALANT IF PANELS TO BE REPLACED. SEE

SPECIFICATIONS.

C. REMOVE AND REPLACE WITH NEW PRECAST CONCRETE CAP. SEE

DETAIL 1/CS501

D. REMOVE AND REPLACE JOINT SEALANT AT CRACKED CAP JOINTS.

SEE SPECIFICATIONS.

E. CLEANING: ALL WALLS TO BE CLEANED OF MOLD AND RUST. POWER

WASHING IS PROHIBITED AND CLEANING IS WITH MILD DETERGENT

PER SPECIFICATIONS.

F. REMOVE AND RESET CAP. SEE DETAIL 1/CS501

G. REMOVE CRACKED PANEL AND REPLACE WITH NEW PANEL. SEE

DETAIL 10/CS500

H. REMOVE AND REPLACE CONCRETE PAVEMENT. SEE DETAIL 3/CS500

I. NOT APPLICABLE IN COLUMBARIUM H

RESTORATION NOTES:

1. FAILING PANEL JOINT SEALANT, TYP.

2. FAILING COPING JOINT SEALANT, TYP.

3. CRACKED PRECAST CONCRETE CAP, TYP.

4. STAINED PRECAST CONCRETE PANELS, TYP.

5. CRACKED PRECAST CONCRETE WALL PANELS, TYP.

6. ENTRY WALL PANELS NOT FIRMLY ATTACHED, TYP.

7. NOT APPLICABLE IN COLUMBARIUM H

8. PITTED AND SPALLING CONCRETE FLATWORK

EXISTING CONDITIONS NOTES:

3 / C

1 / B (ALL JOINTS

IN ELEVATION)

1 / B (ALL JOINTS

IN ELEVATION)

1 / B (ALL JOINTS

IN ELEVATION)

5 / G

5 / G

1 / B (ALL JOINTS

IN ELEVATION)

2 / D

REMOVE AND SALVAGE BENCH TO ALLOW FOR

RESTORATION WORK. BENCH TO BE STORED AND

PROTECTED IN A SECURE LOCATION DESIGNATED

BY THE CEMETERY UNTIL REINSTALLATION

NOTE: ALL WALLS ON THIS SHEET TO

RECEIVE CLEANING (E)

A

H

PROTECT EXISTING

PAVEMENT TO

REMAIN, TYP.

LEGEND:

REMOVE AND REPLACE CONCRETE FLATWORK

REMOVE AND REPLACE PRECAST CONCRETE CAP

A

A

H

1 & 3

CS501

CS500

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

SUFFOLK COUNTY, NEW YORK

805CM3048

MARCH 25, 2025

U.S. Department of Veterans Affairs

STAMP

Revisions: Date:

Drawing Title

Approved:

Phase

Building Number

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

CALVERTON NATIONAL CEMETERY

COLUMBARIUM IMPROVEMENTS

ARCHITECT / ENGINEER OF RECORD: Office of Construction and Facilities Management

BID DOCUMENTS

INTEGRITY FEDERAL SERVICES /

THE LA GROUP JOINT VENTURE

Integrity Federal Services 148 S. Queen Street, Suite 350 Martinsburg

WV 25401

(304)-725-8456

The LA Group 40 Long Alley Saratoga Springs

NY 12866

(518)-587-8100

COLUMBARIUM H EXISTING CONDITIONS

/ RESTORATION ELEVATIONS - SHEET 8

CS109

10 of 99LTM BMD

COLUMBARIUM H - WALL 6A ELEVATION2 COLUMBARIUM H - WALL 6B ELEVATION3

COLUMBARIUM H - WALL S6 ELEVATION4 COLUMBARIUM H - WALL S7.1 ELEVATION5Scale: 1" = 5'

COLUMBARIUM H KEY1

CS109

COLUMBARIUM H - BACK OF WALL 7 ELEVATION6

CS109

CS109

CS109

2 / D

2 / D

5 / G

2 / D

WALL 6

W

ALL 7

W

ALL 4

W

ALL 5

W

ALL 8

WALL 6

WALL 5

2 / D

A. REMOVE AND RESET PRECAST PANELS. SEE DETAIL 10/CS500 AND

SPECIFICATIONS. INSPECT ANCHORAGE AT TIME OF REMOVAL. ALL

PANELS TO BE CLEANED. SEE SPECIFICATIONS.

B. REMOVE AND REPLACE JOINT SEALANT IF PANELS REMAINING IN

PLACE, NEW SEALANT IF PANELS TO BE REPLACED. SEE

SPECIFICATIONS.

C. REMOVE AND REPLACE WITH NEW PRECAST CONCRETE CAP. SEE

DETAIL 1/CS501

D. REMOVE AND REPLACE JOINT SEALANT AT CRACKED CAP JOINTS.

SEE SPECIFICATIONS.

E. CLEANING: ALL WALLS TO BE CLEANED OF MOLD AND RUST. POWER

WASHING IS PROHIBITED AND CLEANING IS WITH MILD DETERGENT

PER SPECIFICATIONS.

F. REMOVE AND RESET CAP. SEE DETAIL 1/CS501

G. REMOVE CRACKED PANEL AND REPLACE WITH NEW PANEL. SEE

DETAIL 10/CS500

H. REMOVE AND REPLACE CONCRETE PAVEMENT. SEE DETAIL 3/CS500

I. NOT APPLICABLE IN COLUMBARIUM H

RESTORATION NOTES:

1. FAILING PANEL JOINT SEALANT, TYP.

2. FAILING COPING JOINT SEALANT, TYP.

3. CRACKED PRECAST CONCRETE CAP, TYP.

4. STAINED PRECAST CONCRETE PANELS, TYP.

5. CRACKED PRECAST CONCRETE WALL PANELS, TYP.

6. ENTRY WALL PANELS NOT FIRMLY ATTACHED, TYP.

7. NOT APPLICABLE IN COLUMBARIUM H

8. PITTED AND SPALLING CONCRETE FLATWORK

EXISTING CONDITIONS NOTES:

1 / B (ALL JOINTS

IN ELEVATION)

1 / B (ALL JOINTS

IN ELEVATION)

A

1 / B (ALL JOINTS

IN ELEVATION)

1 / B (ALL JOINTS

IN ELEVATION)

NOTE: ALL WALLS ON THIS SHEET TO

RECEIVE CLEANING (E)

CS109

8 / H

PROTECT EXISTING

PAVEMENT TO

REMAIN, TYP.

LEGEND:

REMOVE AND REPLACE CONCRETE FLATWORK 3

CS500

Project Title

Location

Issue Date Checked Drawn

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

SUFFOLK COUNTY, NEW YORK

805CM3048

MARCH 25, 2025

U.S. Department of Veterans Affairs

STAMP

Revisions: Date:

Drawing Title

Approved:

Phase

Building Number

VA FORM 08 - 6231

321 4 5 6 7 8 9 10

CALVERTON NATIONAL CEMETERY

COLUMBARIUM IMPROVEMENTS

ARCHITECT / ENGINEER OF RECORD: Office of Construction and Facilities Management

BID DOCUMENTS

INTEGRITY FEDERAL SERVICES /

THE LA GROUP JOINT VENTURE

Integrity Federal Services 148 S. Queen Street, Suite 350 Martinsburg

WV 25401

(304)-725-8456

The LA Group 40 Long Alley Saratoga Springs

NY 12866

(518)-587-8100

COLUMBARIUM H EXISTING CONDITIONS

/ RESTORATION ELEVATIONS - SHEET 9

CS110

11 of 99LTM BMD

COLUMBARIUM H - WALL 7A ELEVATION2 COLUMBARIUM H - WALL 7B ELEVATION3

COLUMBARIUM H - WALL S8 ELEVATION4 COLUMBARIUM H - WALL 8A ELEVATION5Scale: 1" = 5'

COLUMBARIUM H KEY1

CS110

CS110

CS110

CS110

2 / D 2 / D

5 / G

2 / D

WALL 6

W

ALL 7

W

ALL 8

WALL 6

WALL 8

WALL 8

W

ALL 8

W

ALL 9

WALL 9

W

ALL 9

A. REMOVE AND RESET PRECAST PANELS. SEE DETAIL 10/CS500 AND

SPECIFICATIONS. INSPECT ANCHORAGE AT TIME OF REMOVAL. ALL

PANELS TO BE CLEANED. SEE SPECIFICATIONS.

B. REMOVE AND REPLACE JOINT SEALANT IF PANELS REMAINING IN

PLACE, NEW SEALANT IF PANELS TO BE REPLACED. SEE

SPECIFICATIONS.

C. REMOVE AND REPLACE WITH NEW PRECAST CONCRETE CAP. SEE

DETAIL 1/CS501

D. REMOVE AND REPLACE JOINT SEALANT AT CRACKED CAP JOINTS.

SEE SPECIFICATIONS.

E. CLEANING: ALL WALLS TO BE CLEANED OF MOLD AND RUST. POWER

WASHING IS PROHIBITED AND CLEANING IS WITH MILD DETERGENT

PER SPECIFICATIONS.

F. REMOVE AND RESET CAP. SEE DETAIL 1/CS501

G. REMOVE CRACKED PANEL AND REPLACE WITH NEW PANEL. SEE

DETAIL 10/CS500

H. REMOVE AND REPLACE CONCRETE PAVEMENT. SEE DETAIL 3/CS500

I. NOT APPLICABLE IN COLUMBARIUM H

RESTORATION NOTES:

1. FAILING PANEL JOINT SEALANT, TYP.

2. FAILING COPING JOINT SEALANT, TYP.

3. CRACKED PRECAST CONCRETE CAP, TYP.

4. STAINED PRECAST CONCRETE PANELS, TYP.

5. CRACKED PRECAST CONCRETE WALL PANELS, TYP.

6. ENTRY WALL PANELS NOT FIRMLY ATTACHED, TYP.

7. NOT APPLICABLE IN COLUMBARIUM H

8. PITTED AND SPALLING CONCRETE FLATWORK

EXISTING CONDITIONS NOTES:

1 / B (ALL JOINTS

IN ELEVATION)

1 / B (ALL JOINTS

IN ELEVATION)

2 / D

1 / B (ALL JOINTS

IN ELEVATION)

1 / B (ALL JOINTS

IN ELEVATION)

NOTE: ALL WALLS ON THIS SHEET TO

RECEIVE CLEANING (E)

LEGEND:

REMOVE EX. VEGETATION & MULCH. NEW GRAVEL

& DECORATIVE STONE PER SPECIFICATIONS

CS501

09_CS108_COLUMBARIUM H RESTORATION-H-7
Sheets and Views
H-7
10_CS109_COLUMBARIUM H RESTORATION-H-8
Sheets and Views
H-8
11_CS110_COLUMBARIUM H RESTORATION-H-9
Sheets and Views
H-9

File details come from the government source that posted it. Updated .