About this file

This document is an Addendum #6 to a Request for Proposals (RFP) issued by the Port Authority of New York and New Jersey (PANYNJ) for Indefinite Quantity Contracts (IQCs) for electric vehicle infrastructure, energy efficiency, and renewable energy services. The RFP seeks expert professional design and construction services to be performed on an "as needed" basis from 2023 through 2027. The proposal receipt date has been changed to 2:00 P.M. on March 8, 2023, with a pre-proposal meeting rescheduled to February 16, 2023, at 2:00 P.M. Eastern Time, which will be conducted via Microsoft Teams.

The addendum includes responses to nine questions from potential proposers, clarifying various aspects of the RFP such as required forms (like the FHWA Standard Form LLL), proposer qualifications, team member inclusion, key individual roles, electronic signatures, and document formatting. Notable clarifications include that electronic signatures are acceptable, FAA Contract Provisions will be provided with specific task order requests, and proposers may use the same key individuals across different contract categories if they possess the requisite experience. Potential proposers are directed to contact Mr. Peter Penaflor, Contract Specialist, for any additional questions.

View the file

Other files

File Type Posted
2-RFPDOC 6000001276.pdf PDF
3-Addendum1 6000001276.pdf PDF
11-Addendum9 6000001276.pdf PDF
10-Addendum8 6000001276.pdf PDF
4-Addendum2 6000001276.pdf PDF
5-Addendum3 6000001276.pdf PDF
7-Addendum5 6000001276.pdf PDF
1-RFP 6000001276 AD.pdf PDF
6-Addendum4 6000001276.pdf PDF
9-Addendum7 6000001276.pdf PDF
12-Addendum10 6000001276.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

February 6, 2023

SUBJECT: REQUEST FOR PROPOSALS FOR INDEFINITE QUANTITY

CONTRACTS (IQCs) FOR PERFORMANCE OF EXPERT PROFESSIONAL DESIGN

AND/OR CONSTRUCTION OF ELECTRIC VEHICLE INFRASTRUCTURE, ENERGY

EFFICIENCY, AND RENEWABLE ENERGY SERVICES ON AN “AS NEEDED” BASIS

DURING 2023 THROUGH 2027 (RFP# 6000001276) – ADDENDUM # 6

Please note the date for receipt of proposals for the subject RFP has been changed to 2:00 P.M. on March 8, 2023.

The Pre-proposal Meeting is rescheduled to February 16, 2023, at 2:00 P.M. Eastern Time (ET). Please use the link below to access the meeting.

Microsoft Teams meeting Join on your computer, mobile app or room device Click here to join the meeting

Meeting ID: 271 945 007 24 Passcode: AWbiMH

Download Teams | Join on the web

Join with a video conferencing device panynj@m.webex.com Video Conference ID: 111 924 674 0 Alternate VTC instructions

The following questions were received from a Request for Proposals (RFP) recipients(s). The questions and the corresponding Authority answers are provided for your information and use, as appropriate.

Question 1: Section N, Federal Submission Requirements, Item c.4. (FHWA Submission Requirements – Standard Form LLL: Disclosure of Lobbying Activities) states, “If required, this certification must be submitted with the Proposals.” Can you please disclose whether this a required form, or not?

Answer 1: Yes, this is a required form.

Question 2: We have over 15 years and $1 Billion of ongoing complex Vehicle Fueling system planning, design, construction, renovation, modernization, operation, inspection, and maintenance at over 500 locations in the US and across the globe for the Department of Defense and associated clients. Can this relatable experience be used in lieu of current qualifications and experience requirements in our submittal?

https://gcc02.safelinks.protection.outlook.com/ap/t-59584e83/?url=https%3A%2F%2Fteams.microsoft.com%2Fl%2Fmeetup-join%2F19%253ameeting_N2FmMTY5MDYtNzE3Ni00ZjkzLThmMDktYWMwYmFlMTg2Mjdj%2540thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%2522c4484a25-d0d8-4ad0-916a-a889b6aa7a02%2522%252c%2522Oid%2522%253a%25226ad59f35-a474-4072-b79a-09d444aec461%2522%257d&data=05%7C01%7Cppenaflor%40panynj.gov%7C4da6405ae73942f88c4f08db087d5475%7Cc4484a25d0d84ad0916aa889b6aa7a02%7C0%7C0%7C638113106616737538%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=Ta2MUvhufJA8gH%2B73AFq4znsxks29ZSre3F6nzTczm8%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.microsoft.com%2Fen-us%2Fmicrosoft-teams%2Fdownload-app&data=05%7C01%7Cppenaflor%40panynj.gov%7C4da6405ae73942f88c4f08db087d5475%7Cc4484a25d0d84ad0916aa889b6aa7a02%7C0%7C0%7C638113106616737538%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=N%2Fq1n03YV%2B%2BdJuu%2F8rh9VJFB%2BeDxwLHN86%2FMz046bU4%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.microsoft.com%2Fmicrosoft-teams%2Fjoin-a-meeting&data=05%7C01%7Cppenaflor%40panynj.gov%7C4da6405ae73942f88c4f08db087d5475%7Cc4484a25d0d84ad0916aa889b6aa7a02%7C0%7C0%7C638113106616737538%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=gUgF7JZtGIrHzboXzggAjiqvlw7bGd5%2FBbtRMN91SWk%3D&reserved=0 mailto:panynj@m.webex.com https://www.webex.com/msteams?confid=1119246740&tenantkey=panynj&domain=m.webex.com

- 2 -

Answer 2: Proposers are required to meet the Proposer Requirements identified in Section I. of the RFP letter.

Question 3: Because we represent multiple hardware and software producers, and utilize the services of regional and local engineering and construction entities for cost efficiencies, and to meet small and disadvantaged business requirements, can we include formal Team Members (with binding Teaming Agreements and participation requirements) and their qualifications and experience as part of the respondents/offerors submittal?

Answer 3: Refer to Section D. of the RFP letter.

Question 4: For Section H, if we are not proposing any subconsultants, will we lose points or be disqualified here if we just provide an explanation of how we will meet requirements on a task order? I can provide a statement on the diversity of our internal team.

Answer 4: Proposers will be evaluated based on their response to Section H in accordance with the specified evaluation criteria.

Question 5: On page 5 of the RFP Item E as it relates to the “Summary of Types of Work Performed”, we anticipate submitting a table within the 30-page max proposal. Wanted to see if we can include with the proposal, in an appendix section, project description pages along with our 30-page max submittal.

Answer 5: Section E is included in the 30 page-max.

Question 6: Page 6 of the RFP states that key individuals include but are not limited to – i.

Project Manager, ii. Design Lead, and iii. Construction/Installation Lead. Do we need these three particular roles for each category (i.e. a different Design Lead for Category A, B, C, and D?) or are you requesting these three roles to lead the overall contract?

Answer 6: Each Category stands on its own. You may propose the same key individuals for each category if they possess the requisite experience.

Question 7: In reference to the Federal Aviation Administration (FAA) Contract Provisions (Exhibit IB), it appears that it was not included within the RFP documents. Looking to see if we can obtain a copy.

Answer 7: FAA Contract Provisions are scope specific and will be provided if a Task Order Proposal Request is issued.

Question 8: To facilitate processing and execution of RFP specified forms, and align with the electronic submission format, can you please clarify whether electronic signatures acceptable?

Answer 8: Yes, electronic signatures are acceptable.

Question 9: Due to the space limitation on the PDF for Attachment G Proposer Requirements, can we convert the PDF to a Word file?

Answer 9: Yes

If you have any questions, please contact Mr. Peter Penaflor, Contract Specialist, at ppenaflor@panynj.gov.

mailto:ppenaflor@panynj.gov

February 6, 2023

File details come from the government source that posted it. Updated .