This document is a Functional Assessment Plan (FAP) that outlines the performance objectives, standards, and assessment methods for a Facility Investment contract. The key details are:

The contract covers emergency, urgent, and routine service orders as well as a preventive maintenance program for facilities, ground structures, equipment, and systems at Naval Submarine Base New London in Groton, CT. The performance standards include responding to emergency service orders within 2 hours, completing urgent orders within 5 days, and routine orders within 30 days. Preventive maintenance must be performed per the contractor's program and manufacturers' recommendations. Performance is assessed through periodic sampling, validated customer complaints, and unscheduled visits, with different assessment levels based on contractor performance. The contract is a Commercial Services Firm-Fixed Price Indefinite Delivery Indefinite Quantity with a 12-month base period and four 12-month option periods.

View the file

Other files

File Type Posted
7.2 J-1502000-04 Map.pdf PDF
4.4 J-0200000-09 ELINS.xlsx XLSX spreadsheet
12 Corporate Experience.docx DOCX document
13 Past Performance Questionnaire (PPQ).docx DOCX document
9 Performance Assessment Plan.pdf PDF
6 1502000 F Facility Investment.pdf PDF
7.1 J-1502000-03 Generator Inventory.xlsx XLSX spreadsheet
14 Limitations on Subcontracting.xlsx XLSX spreadsheet
7 1502000 J Facility Investment.pdf PDF
1 0100000 C General Information.pdf PDF
11 J-0200000-09 ELINS.xlsx XLSX spreadsheet
16 SUBASE General Requirements.pdf PDF
4 0200000 J Management and Administration.pdf PDF
5 1502000 C Facility Investment.pdf PDF
7.4 J-1502000-07 Maintenance Summary Report.xlsx XLSX spreadsheet
15 NEPA emergency generators checklist signed.pdf PDF
7.3 J-1502000-06 Service Order Summary Report.xlsx XLSX spreadsheet
3 0200000 F Management and Administration.pdf PDF
4.1 J-0200000-06 Quality Inspection and Surveillance report.xlsx XLSX spreadsheet
N4008525R2535.pdf PDF
7.6 J-1502000-09 Tank Inspection Form.pdf PDF
7.5 J-1502000-08 Monthly Meter Reads.xlsx XLSX spreadsheet
7.7 J-1502000-10 Monthly Gen Status Report.xlsx XLSX spreadsheet
4.2 J-0200000-07 On site Labor Summary Report.xlsx XLSX spreadsheet
10 Question Sheet (N4008525R2535).docx DOCX document
2 0200000 C Management and Administration.pdf PDF
4.3 J-0200000-08 Equipment Summary Report.xlsx XLSX spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FUNCTIONAL ASSESSMENT PLAN (FAP)

FACILITY INVESTMENT

1502000

FACILITY INVESTMENT FAP

Assessment Levels (AL) Assessment Frequency (Freq)

A – Annually

Q – Quarterly

M – Once per month

BW – Once every 13-16 days

W – Once per week

R – As required

Method of Assessment (MOA)

PS – Periodic Sampling

VCC – Validated Customer Complaints

UV – Unscheduled Visits

CE – Customer’s Evaluation

AL1

Start assessment at this Level

AL2

Add this Level if Contractor performance for AL1 is Unsatisfactory

AL3

Add this Level if Contractor performance at AL1 or AL2 is Unsatisfactory

Note: Return to appropriate Assessment Level when performance improves.

Note: The first method listed in the MOA column below is the primary assessment method.

Spec Item

Performance Objective Performance Standard MOA

Assessment Level Sample Size

Freq

AL1 AL2 AL3

UOM

(total)

Normal Reduced

3.1 Service Orders

The Contractor shall perform service order work in a timely manner and ensure facilities, ground structures, personal property equipment and installed equipment and systems are restored to a safe, normal working condition and function properly.

Service order work is responded to and completed within the specified time.

Facilities, ground structures, personal property equipment and installed equipment and systems are restored to normal working condition, including recertification if applicable.

When repair is complete the facility, ground structure, personal property equipment or installed equipment and system does not present danger to personnel or equipment.

PS

VCC

N/A

10%

5%

M

3.1.1 Emergency Service Orders

The Contractor shall respond to emergency service orders and arrest emergent conditions to minimize and

Emergency service orders responded to within two hours of receipt of call.

Item

Performance Objective Performance Standard MOA

Assessment Level Sample Size

Freq

AL1 AL2 AL3

UOM

(total)

Normal Reduced mitigate damage facilities, ground structures, personal property equipment, and installed equipment and systems and danger to personnel.

Emergency service orders are arrested within 24 hours of receipt of call.

Work is continued without interruption until emergent condition is arrested.

3.1.2 Urgent Service Orders

The Contractor shall complete urgent service orders in a timely manner and facilities, ground structures, personal property equipment, and installed equipment and systems are restored to a safe, normal working condition and function properly.

Urgent service orders are completed within five working days.

3.1.3 Routine Service Orders

The Contractor shall complete routine service orders in a timely manner and ensure facilities, ground structures, personal property equipment, and installed equipment and systems are restored to a safe, normal working condition and function properly.

Routine service orders are completed within

30 calendar days.

3.2 Preventive Maintenance (PM)

Program The Contractor shall develop and implement a PM program for facilities, ground structures, personal property equipment, and installed equipment and systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.

Maintenance is accomplished in accordance with the Contractor’s PM program and work schedule.

PM is performed in accordance with manufacturers’ recommended procedures and OEM standards.

5%

3.2.1 Emergency Generators

The Contractor shall perform maintenance on emergency generators to ensure safe, reliable, uninterrupted service.

Maintenance is performed in accordance with Contractor's PM program and work schedule.

Item

Performance Objective Performance Standard MOA

Assessment Level Sample Size

Freq

AL1 AL2 AL3

UOM

(total)

Normal Reduced

Emergency generators provide electrical power to meet the load demand for the duration of a power outage.

Emergency generators activated to restore electrical power within five minutes following loss of power.

Adequate fuel additive to prevent freezing for size fuel tank is added.

3.2.1.1 Meter Readings

The Contractor shall perform monthly and annual meter readings as required.

All meter readings are performed on time and reported to the Environmental Division at the required time.

4 Non-Recurring Work Non-Recurring work may be ordered utilizing DoD EMALL in accordance with Section H or on a task order in accordance with the PROCEDURES FOR ISSUING ORDERS clause in Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.

As

Require d

R

MONTHLY PERFORMANCE ASSESSMENT SUMMARY

Contract #: ___________________ Installation/Site:

Annex/sub-annex: 1502000 Facility Investment Month/Year:

Title

AL1 AL2/AL3 VCC Safety QMS review

Item E M N E M N Pos Neg Issues # Samples A U

3.1 Service Orders

3.1.1 Emergency Service Orders

3.1.2 Urgent Service Orders

3.1.3 Routine Service Orders

3.2 Preventive Maintenance

(PM) Program

4 Non-Recurring Work

Comments:

Recommended Actions:

Technical Ratings (mark using "X")

E VG S M U

Overall Technical Rating for Recurring Work

Overall Technical Rating for Non-Recurring Work

COR Signature: Date:

E = Standards Exceeded; M = Standards Met; N = Standards Not Met