14 Limitations on Subcontracting.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
NSBNL Emergency Generators Maintenance & Repair
Solicitation number
N4008525R2535
Issued by

About this file

This document appears to be a Contractor's Limitations on Subcontracting Certification form related to a federal contract opportunity. The form requires the prime contractor to report labor costs and percentage of work performed by the prime and subcontractors for a 6-month reporting period, in accordance with FAR 52.219-14. The key details are:

The federal contract opportunity is for Emergency Generators Maintenance and Repair at Naval Submarine Base New London in Groton, CT. It is a Commercial Services Firm-Fixed Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) contract with a 12-month base period and four 12-month option periods. The procurement is a 100% Small Business Set-Aside, with NAICS code 811310 and a $12.5M size standard. Proposals are due by 23 December 2024, 10:00AM EST. The award will be made to the responsible offeror with the Lowest Price Technically Acceptable Proposal, based on price, corporate experience, and past performance.

View the file

Other files

File Type Posted
7.2 J-1502000-04 Map.pdf PDF
4.4 J-0200000-09 ELINS.xlsx XLSX spreadsheet
12 Corporate Experience.docx DOCX document
13 Past Performance Questionnaire (PPQ).docx DOCX document
9 Performance Assessment Plan.pdf PDF
6 1502000 F Facility Investment.pdf PDF
7.1 J-1502000-03 Generator Inventory.xlsx XLSX spreadsheet
7 1502000 J Facility Investment.pdf PDF
1 0100000 C General Information.pdf PDF
11 J-0200000-09 ELINS.xlsx XLSX spreadsheet
16 SUBASE General Requirements.pdf PDF
4 0200000 J Management and Administration.pdf PDF
5 1502000 C Facility Investment.pdf PDF
7.4 J-1502000-07 Maintenance Summary Report.xlsx XLSX spreadsheet
15 NEPA emergency generators checklist signed.pdf PDF
7.3 J-1502000-06 Service Order Summary Report.xlsx XLSX spreadsheet
3 0200000 F Management and Administration.pdf PDF
4.1 J-0200000-06 Quality Inspection and Surveillance report.xlsx XLSX spreadsheet
N4008525R2535.pdf PDF
7.6 J-1502000-09 Tank Inspection Form.pdf PDF
7.5 J-1502000-08 Monthly Meter Reads.xlsx XLSX spreadsheet
7.7 J-1502000-10 Monthly Gen Status Report.xlsx XLSX spreadsheet
4.2 J-0200000-07 On site Labor Summary Report.xlsx XLSX spreadsheet
10 Question Sheet (N4008525R2535).docx DOCX document
8 1502000 Facility Investment FAP.pdf PDF
2 0200000 C Management and Administration.pdf PDF
4.3 J-0200000-08 Equipment Summary Report.xlsx XLSX spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

POST-AWARD CONTRACTOR'S LIMITATIONS
ON SUBCONTRACTING CERTIFICATION
From:Contractor Name
To:Nicole Fellers, Contract Specialist
PWD New London
Naval Facilities Engineering Command, Mid-Atlantic
Subj:Contract No. N40085-xx-x-xxxx/Task Order xx-x-xxxx
1. Prime contractor is to complete and submit the following for each reporting period (6 months) for each performance period (Base Year and Options).
Block 1Block 2Block 3Block 4Block 5Block 6Block 7
Period of PerformanceFFP &
Task Order # (list TO#)Prime
Labor CostSub
Labor CostTotal FFP or Task Order Labor Cost% Cost Performed by Prime% Cost Performed by Sub
FFP$0.00$0.00$0.00
CLIN 0001$0.00$0.00
CLIN 0002$0.00
CLIN0003$0.00
TOTAL FOR CURRENT REPORTING PERIOD$0.00$0.00$0.00
TO XXXX$0.00
TO XXXX$0.00
Etc.$0.00
** add rows here$0.00
TOTAL FOR PREVIOUS REPORTING PERIOD$0.00$0.00$0.00
Total$0.00
Total$0.00
Total$0.00
Total$0.00
Total$0.00
CONTRACT TOTAL$0.00$0.00$0.00
2. Furthermore, in accordance with the provisions of FAR 52.219-14, Limitations on Subcontracting (Nov 2011), 13 CFR 124.510 and 13 CFR 125.6, in the performance of this contract,
In the case of a contract for services (except construction), Contractor has expended at least 50 percent of the cost of the contract performance incurred for personnel with its own (prime contractor) employees.
In the case of a contract for services (except construction), Contractor has expended at least 50 percent of the cost of the contract performance incurred for personnel with its own (prime contractor) employees.
In the case of a contract for supplies or products (other than procurement from a non-manufacturer in such supplies or products Contractor has performed at least 50 percent of the cost of manufacturing the supplies or products (not including the costs of materials).

In the case of a contract for general construction, Cambridge Marine Construction has performed at least 15 percent of the cost of the contract with its own employees (not including the costs of materials).

In the case of a contract for construction by special trade contractors, contractor has performed at least 25 percent of the cost of the contract with its own employees (not including the cost of materials).

I certify that to the best of its knowledge and belief, the information provided in this report is accurate, complete, and current as of the date of report.

CONTRACTOR:

SIGNATURE DATE

NAME AND TITLE

Page &P of &N

Sheet2

Sheet3

File details come from the government source that posted it. Updated .