15 NEPA emergency generators checklist signed.pdf
PDF 323 KB Posted
- Attached to
- NSBNL Emergency Generators Maintenance & Repair
- Solicitation number
- N4008525R2535
About this file
This document is a NEPA Environmental Checklist used to determine the environmental requirements associated with a proposed project to provide preventive maintenance and repairs to emergency generators at Naval Submarine Base New London. The project is scheduled to begin on 2/1/2025 and is classified as a maintenance and repair activity that does not require further NEPA analysis. However, the project must comply with various environmental requirements, including obtaining permits, consultations, and inspections related to coastal zone management, cultural resources, air quality, and waste management. The checklist identifies specific environmental requirements that the contractor must address during the design and operational phases of the project.
The related federal contract opportunity is for an Indefinite Delivery Indefinite Quantity (IDIQ) contract to provide emergency generator maintenance and repair services at the Naval Submarine Base New London. The contract will be a Commercial Services Firm-Fixed Price contract with a base period of 12 months and four 12-month option periods. The procurement is a 100% Small Business Set-Aside, with proposals due on 12/23/2024. The award will be made to the responsible offeror with the Lowest Price Technically Acceptable Proposal, based on price, corporate experience, and past performance.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NEPA ENVIRONMENTAL CHECKLIST – SUBASENLON
NEW FORM EFFECTIVE 07/10/2020. This NEPA Environmental Checklist (EC) is used to determine the environmental requirements associated with a proposed project. Complete the first 2 pages of the form, attach a site map and a SOW or 1391, and then submit to the PWD Environmental Division (EV). A complete EC with required attachments should be submitted a minimum of 15 days prior to project’s scheduled start date. If the project scope is modified or if project work has not been initiated within 1 year of the signature date, please contact EV for review/approval prior to initiating project activities.
GENERAL PROJECT INFORMATION
1 Activity Requesting: Naval Submarine Base New London
2 Activity POC / Phone / email: Joe Grimes, 860-694-1395 Grimes, joseph.r.grimes.civ@us.navy.mil
3 Name of Project: Emergency Generator Maintenance Contract
4 Project Number (if any): 1770949
5 Project Location: Submarine Base New London
6 Project Type: Maintenance and Repair
7 Description of the Project: Provide preventive Maintenance and repairs to emergency generators
8 Why is this project needed? Maintain working condition of emergency generators
9 When project scheduled to begin? 2/1/2025
PLANNING QUESTIONS
10a Total Project Area (sq. ft.) - (Include clear zones, soil disruption/disturbance area, lay down areas, etc) N/A
10b Percentage of Project Area - that is currently Impervious (asphalt, bldgs, etc.)
10c Percentage of Project Area - that will be Impervious once project completed
10d Percentage of Project Area - that will be disturbed (excavated, graded, etc)
11 How will Stormwater be managed in the long-term (post-construction)? N/A
12 How will Sanitary Sewage (wastewater) be managed in the long-term? N/A
13 Will there be actions conducted in the water (dredging, new pilings, removal etc.)? If so indicate state what action(s). N/A
14 Will there be actions conducted in an area under an Agriculture outlease? N/A
DESIGN RELATED QUESTIONS YES NO UNSURE
15 Will trees be removed?
16 Will emission-generating equipment (e.g. bull dozer, back hoe, etc.) be utilized during construction?
17 Will the project remove, install or utilize a petroleum storage tank, that is >=55-gallons?
18 Will the project remove or install an Oil Water Separator?
19 Will the project relocate excavated material at the Installation? If yes where is it going?
Will the construction / repair actions generate by-products (power washing water, haz. waste, state regulated waste such as asbestos, PCB items, transformers, capacitors, switches, light ballasts, lead paint chips, florescent bulbs, waste oil, solvents, etc)? If so indicate what type of waste(s) will be generated.
21 Will the construction / repair actions require de-watering from excavations, trenches or manholes? If yes, circle where de-watering will occur?
DESIGN RELATED QUESTIONS YES NO UNSURE
22 Will there be new hard pipe connections or modifications to existing hard pipe connections using water from Groton Utilities, the Thames, or wells?
Will new hard pipe connections or modifications to existing hard pipe connections discharge wastewater to the sanitary sewer, storm sewer or the Thames River? If so circle discharge type.
24 Will there be UST or AST installation, modification, or removal? If so indicate which type of tank and which action.
25 Will there be installation, repair, modification or removal of any system containing refrigerants
(e. g. freon, halon)?
26 Will there be modifications, destruction, or disturbance of the shoreline, streams, groundwater tables, surface water bodies, or wetlands? If so, explain.
Will there be any excavation and/or dewatering with the potential to impact the designated CT Coastal Zone (i.e., 1,000 feet inland from the MHW line)? If so, what type of activity will occur that can potentially impact the coastal zone area?
28 New proposed use and/or application of pesticides, rodenticides and herbicides? If so, indicate which type.
29 Will the project require pile driving?
OPERATIONAL RELATED QUESTIONS YES NO UNSURE
30 Will emission-generating equipment be installed (ex. paint booth, emergency generators)? If so, what type of equipment will be installed?
31 Will there be any new processes or maintenance activities conducted? If so, describe what they are.
ADDITIONAL COMMENTS
Type here:
Checklist Preparer, phone number and e-mail Craig Schuller 860-694-2715 craig.schuller.civ@us.navy.mil Date 8/7/2024
NEPA ENVIRONMENTAL CHECKLIST – SUBASENLON
SUMMARY OF ENVIRONMENTAL REQUIREMENTS
(To Be Completed by Environmental Division Only) PLEASE NOTE: The Environmental review provided is only valid for 1 year. If the project scope has been modified or checklist has expired, please contact the SUBASENLON PW Environmental Division to re-evaluate the project.
Name of Project: Emergency Generator Maintenance Contract Project Number: 1770949
PLANNING REQUIREMENTS (Issues That Can Effect the Project’s Timeline, Cost, or Site Location) Environmental Aspect YES NO Environmental Requirement Project Impacts
National Env Policy Act (NEPA) CATEX CATEX = 1 week; EA = 12 months; EIS = 24 months Can’t award till NEPA complete
Threatened or Endangered Species Consultation with USFWS and/or NMFS required. Process may take 6 months
Marine Mammal Protection Act IHA or LOA Consultation with NMFS May take 4 to 18 months
Wetland Impacts Permits and possibly mitigation required. May take 7 months after
NEPA
Navigable Water Impacts Permits required. Takes 2-7 months after
NEPA
Agriculture Outlease Consultations with NAVFAC Real Estate required. Process may take 1 to 3 months.
Tree Mitigation Compensation for tree loss or mitigation is required. This may add costs to project.
Coastal Zone Mgmt Act Coastal Consistency Determination (CCD) is required.
See Comment 2 Process takes 90 days.
Cultural Resources Consultations with SHPO required See Requir 8 Process may take 1 to 6 months
Major Air Emission Source Permit is required. Process takes 6 months
Construction Emissions Air Conformity Record of Non-Applicability is required. This process takes a week.
Installation Restoration Land-use controls exist or Consultation w/ EPA required See Requir 2 Process may take 4 months
Petroleum Contamination Follow guidance in CNRMA POL SOP. This may add costs to project.
DESIGN REQUIREMENTS (Issues To Be Addressed In Design Phase) Storm Water Best Mgmt
Practices, Erosion & Sediment Control
Required for projects that include excavation or other land disturbance. See Requir 3 Incorporate into the design.
CT Storm Water Mgmt Permit Required for projects that will disturb ≥ 1 acre of land. Obtain before construction.
De-watering, Wastewater Mgmt Protective measures required for managing excess waters. Incorporate into the design.
Beach & Dune Management Protective measures required for impact beaches & dunes Incorporate into the design.
Spill Preventative Measures Secondary containment required for tanks ≥ 55 gal Incorporate into the design.
OPERATIONAL REQUIREMENTS (Issues To Be Addressed Prior To Use)
New Industrial Process Environmental Department Site Inspection required. Required before operation.
New Waste Generating Activity Environmental Department Site Inspection required. Required before operation.
ADDITIONAL REQUIREMENTS or COMMENTS Comment 1 The proposed action is within the scope of CATEX #8: Routine repair and maintenance of buildings, facilities, vessels, aircraft, ranges, and equipment associated with existing operations and activities.
None of the exclusions from reliance on a CATEX applies in this case; therefore, the proposed action does not require further NEPA analysis. The applicability of this CATEX determination requires full implementation of all environmental requirements identified below.
Comment 2 Work at B77 occurs in the coastal zone; however, a Coastal Consistency Determination is not required because the project scope does not include activities identified on CT DEEP's list of federal activities subject to consistency review, as established in the CT Coastal Management Plan. In addition, the project does not have the potential to significantly affect state coastal resources and/or uses.
Requir 1 Work shall comply with all Federal, State, and local environmental regulations as well as with all applicable Navy requirements. SUBASENLON PWD EV shall be the point of contact for all questions related to environmental rules or regulations.
Requir 2 Work may occur in areas located in or near an IR zone/site. However, no ground-disturbing activities are included in the scope of work. If ground-disturbing activities are planned, a dig permit shall be obtained prior to the initiation of such activity and soil management procedures detailed in the dig permit and the SUBASE Soil Management SOP shall be followed.
Requir 3 Use of exterior storage and laydown areas in support of this project shall be done in compliance with SUBASENLON instructions and policies. Site must be evident of good housekeeping practices consistent with proper storm water management and control.
Requir 4 The SUBASENLON Fire Department (860-694-3333) shall be notified immediately of any spill to the environment.
Spills shall also be reported in accordance with federal, state, and Navy spill reporting requirements and with the latest procedures enforced by SUBASENLON and the PW NLON EV Division. Clean-up actions are the responsibility of the contractor. If reporting to the State or the NRC is required, the contractor is responsible for completing verbal and written notifications. Copies of any CT DEEP- or NRC-required spill reports shall be submitted to the PW NLON EV Division within 24 hours of any spill.
Requir 5 SDSs for new products used and installed under the project shall be forwarded to the PW NLON EV Division in support of EPCRA Programs.
Requir 6 A list of HAZMAT scheduled for use or installation on the project and the approximate quantities/volumes of these materials shall be submitted to the PW NLON EV Division EPCRA Manager (x5140) prior to initiating project activities.
Requir 7 All storage tanks holding petroleum products, >55 gallons, must meet the requirements of 40 CFR 112, NFPA 20, 30, 30A, and 31. Tank specifications shall be provided to the PW NLON EV Division Tank Program Manager (x5133) prior to installation.
Requir 8 Any work activities impacting buildings eligible for listing on the National Register of Historic Places shall be subject to consultation with the State Historic Preservation Office (SHPO), which shall be coordinated through the PW NLON EV Division Cultural Resource Manager (x5649). Advance notice is required for projects in the following buildings/areas: B83, B84, B86, B141, B164, B168, B169, B439, and Dealey Plaza.
Requir 9 Contractor is required to pack and take with any incidental regulated waste generated while servicing (oily rags, paint brushes, parts change-out, etc). This does NOT get disposed of on base.
Requir 10 The manufacturer’s VOC data sheet(s) and SDS sheet(s) for any adhesives or coatings shall be provided to the PW NLON EV Division Air Program Manager (860-694-5192) for verification that the VOC content is within established CT Architectural, Industrial and Maintenance (AIM) limits and to the PW NLON EV Division EPCRA Manager (860-694- 5140).
Requir 11 Requirements associated with the PW NLON EV Division Air and Tank Programs were written into the original contract. The renewal contract shall be submitted to the PW NLON EV Division for review to ensure that existing requirements remain and that new requirements are added.
Christopher Koproski, Installation Environmental Program Director; x3976; christopher.r.koproski.civ@us.navy.mil
Environmental POC; phone number and email Signature and Date mailto:christopher.r.koproski.civ@us.navy.mil
| DESIGN RELATED QUESTIONS |
| DESIGN RELATED QUESTIONS |
| 2024-09-27T13:12:21-0400 | |
| KOPROSKI.CHRISTOPHER.R.1013633343 |