Attachment_8b_Seed_Project_Bldg_4_Vivarium_Generator_Specifications.pdf

PDF 2 MB Posted

Attached to
MULTIPLE-AWARD-CONSTRUCTION-CONTRACT-(MACC) FOR GENERAL CONSTRUCTION SERVICES AT THE NATIONAL INSTITUTES OF HEALTH.
Solicitation number
75N99019R00001
Issued by

About this file

This notice announces a multiple-award construction contract solicitation for general construction services at the National Institutes of Health. The National Institutes of Health Office of Research Facilities seeks to award up to 16 indefinite-delivery, indefinite-quantity contracts for ongoing facilities construction, alterations, and repair of buildings and structures. Work may include maintenance, repair, architectural, mechanical, electrical, plumbing, and other construction disciplines. The total contract value is not to exceed $2 billion over an eight-year ordering period. The solicitation is expected to be released on February 11, 2019, with proposals due on March 14, 2019. Awards will include up to 12 small business set-asides across various socioeconomic categories, with the remaining 4 awards to full and open contractors. All successful offerors will receive an initial task order for a minimum of $1,000.

Attachment 8b-Seed Project Bldg 4 Specifications

View the file

Other files

File Type Posted
MACC_Awardee_List.docx DOCX document
Amendment_0006.doc.pdf PDF
MACC_Questions-_Amendment_6.pdf PDF
IMG_2462.JPG JPG image
Bldg_4_Rm_115_LAN_Rm.pdf PDF
IMG_2481.JPG JPG image
Example_Door_Security_Detail_Dwg_E1-05_pg_2.JPG JPG image
Amendment_0005.pdf PDF
MACC_Technical_Questions.pdf PDF
IMG_2482.JPG JPG image
0322191318a.jpg JPG image
IMG_2467.JPG JPG image
Bldg_4_2010_Rm_115_LAN_Rm.pdf PDF
0322191310.jpg JPG image
0322191318.jpg JPG image
IMG_2463.JPG JPG image
IMG_2484.JPG JPG image
IMG_2465.JPG JPG image
IMG_2460.JPG JPG image
Bldg_4_1985_Elec.pdf PDF
IMG_2466.JPG JPG image
Bldg_4_2010_2nd_fl_LAN_Rm.pdf PDF
0322191316b.jpg JPG image
B4-1_Line_Dwg..pdf PDF
0322191309a.jpg JPG image
IMG_2464.JPG JPG image
0322191317b.jpg JPG image
IMG_2483.JPG JPG image
IMG_2461.JPG JPG image
0322191315c.jpg JPG image
Amendment_0004_MACC.pdf PDF
Amendment_0003_MACC.pdf PDF
MACC_Contracting_Questions_3-14-19.pdf PDF
NIH_Capital_Project_Forecast.pdf PDF
Amendment_0002_MACC.doc.pdf PDF
Amendment_0001.pdf PDF
MACC_Site_Visit_Signin_Sheets.pdf PDF
NIH_MACC-IDIQ_Site_Visit_Presentation_.pptx PPTX presentation
Attachment_9-Davis_Bacon_Wage_Determination.pdf PDF
Attachment_6-MACC_hhs_subk_plan_template.docx DOCX document
Attachment_2_Past_Performance_Information_Sheet-_11_18.pdf PDF
Attachment_5-NIH_Division_50_Construction_Cost_Template.xlsx XLSX spreadsheet
Attachment_8c_Seed_Project_Bldg_4_Exist_Generator_Tank_Photo.JPG JPG image
Attachment_4-RFI-QUESTION_ANSWER_Sheet.docx DOCX document
Attachment_8_Seed_Project_Bldg_4_Replace_Emergency_Generator.pdf PDF
Attachment_7_Social_Economic_Category_Selection_Sheet.pdf PDF
Attachment_10-Definitions_and_Acronyms.pdf PDF
75N99019R00001.pdf PDF
Attachment_8a_Seed_Project_Bldg_4_Vivarium_Generator_final_Drawings.pdf PDF
Attachment_1_MACC_Construction_Experience_11_18.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Prepared By:

CFR Engineering Consultants, Inc.

20251 Century Blvd, Suite 120

Germantown, MD 20874

(877) 871‐4229

Building 4 – Vivarium Generator

National Institutes of Health

Specifications

Revised Final Submission

Work Order #: C101313 CFR Project Number: 14037

April 20, 2015

END OF TABLE OF CONTENTS

Division Section Title Pages

SPECIFICATIONS GROUP

DIVISION 01 - GENERAL

01100 SUMMARY 3

01140 WORK RESTRICTIONS 7

01310 PROJECT MANAGEMENT AND COORDINATION 13

01320 CONSTRUCTION PROGRESS DOCUMENTATION 8

01330 SUBMITTAL PROCEDURES 10

01400 QUALITY REQUIREMENTS 3

01420 REFERENCES 17

01450 CONSTRUCTION QUALITY CONTROL 17

01500 TEMPORARY FACILITIES AND CONTROLS 19

01595 SAFETY AND HEALTH 9

01600 PRODUCT REQUIREMENTS 4

01700 EXECUTION REQUIREMENTS 6

01731 CUTTING AND PATCHING 5

01732 SELECTIVE DEMOLITION 9

01770 CLOSEOUT PROCEDURES 10

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

078413 PENETRATION FIRESTOPPING 6

DIVISION 22 – MECHANICAL

220900 GENERATOR ENGINE EXHAUST 3

DIVISION 26 - ELECTRICAL

260500 COMMON WORK RESULTS FOR ELECTRICAL 4

260519 LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES 4

260526 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS 3

260529 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS 4

260533 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS 5

260553 IDENTIFICATION FOR ELECTRICAL SYSTEMS 5

260573 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY 6

262416 PANELBOARDS 7

262726 WIRING DEVICES 4

263213 ENGINE GENERATORS 14

263600 TRANSFER SWITCHES 9

265600 EXTERIOR LIGHTING 5

Work Request #: C101313 NIH Bldg 4 - Vivarium Generator

SECTION 01100 - SUMMARY

PART 1 - GENERAL

1.1 PROJECT IDENTIFICATION

A. Project Name and Location: Indicated on drawings.

B. Project Summary Description: The project includes but is not limited to the following work:

1. Installation of new generator and removal of existing generator.

2. Transfer of several loads from normal power to emergency power.

C. Engineer: The term Engineer refers to the various project engineering systems designers, unless noted otherwise on drawings, all working as sub-consultants to the Architect. The Engineers’ status relative to the construction will be delineated in writing by the Contracting Officer prior to the pre-construction conference. The project was designed by the companies indicated on the drawings.

1. All correspondence from the Contractor to the Engineer will be through the Project

Officer.

D. Project Officer: The Project Officer is identified on the drawings and has been assigned as the Project Officer for this Project to serve as the representative of the Owner and to provide assistance in administering the Contract for Construction between Government and Contractor.

E. Construction Manager: A Construction Manager may manage the project for NIH. If so, the Construction Manager’s status relative to the construction and identity will be delineated in writing by the Contracting Officer prior to the pre-construction conference. The Construction Manager is also referred to in some cases as the Construction Quality Manager or CQM.

1.2 WORK UNDER OTHER CONTRACTS

A. The Contractor shall cooperate with other contractors performing related work, including providing labor, materials and other costs necessary to satisfactorily coordinate the Contract work with work performed under other contracts.

B. Preceding Work: Separate contract work may be awarded by NIH for performance of certain construction operations that are expected to be substantially complete before the Work of this Contract begins. Follow-on activities under this Contract shall be satisfactorily conducted to protect and, if indicated on the drawings, to complete the related preceding separate Contract work.

C. Concurrent Work: Separate contract work may be awarded by NIH for performance of certain construction operations that will be conducted simultaneously with the work of this contract.

Interface work under this contract shall be satisfactorily conducted in compliance with the schedule requirements of the related concurrent separate contract work.

1. Unless otherwise noted on the drawings, a separate contract will be awarded for installation of telecommunication and data systems (IT Systems).

2. Unless otherwise noted on the drawings, a separate contract will be awarded for laboratory and/or vivarium monitoring systems if these systems are required for the project.

© 2014 CFR Engineering

SUMMARY

01100-1

3. Unless otherwise noted on the drawings, a separate contract for systems furnishings will be awarded if these systems are required for the project.

4. Other concurrent work is identified on the drawings.

1.3 SCHEDULE OF NIH-FURNISHED PROPERTY

A. If shown on the drawings, the project includes the following NIH furnished property to be installed by the Contractor: biosafety cabinets, ice machines, and other miscellaneous equipment indicated as Government Furnished, Contractor Installed on the Project drawings.

1. The Contractor shall notify the Project Officer in writing at least 14 calendar days in advance of the date on which the materials and equipment are required. Pick up the materials and equipment no later than 3 calendar days after the indicated required date.

2. The Contractor shall verify quantities of NIH-furnished property upon delivery and shall submit an acknowledging receipt thereof in writing to the Project Officer. Property found damaged or quantity short shall be reported to the Project Officer in writing within 24 hours.

3. The Contractor shall accept delivery at the time and location specified when delivery is made. The Contractor shall provide all handling and transportation necessary from the receiving location to the point of incorporation into the work.

4. If the materials and equipment are not picked up by the date as scheduled, the Contractor will be charged for storage at the rate of $100.00 per 45 Kg per month or fraction thereof.

5. The materials and equipment are located within 10 miles of the job site. The contractor shall provide all personnel required and means of safe transportation from the storage area to the job site.

B. The Contractor shall be responsible for disconnecting, loading, transporting, unloading, uncrating, assembly, installation, connection, and testing new materials and equipment.

Schedule a joint inspection with the Project Officer to inspect the materials and equipment to determine their existing condition. Uncrate the equipment in the presence of the Project Officer and inspect for possible damaged or missing parts. The Contractor shall be responsible for all damage sustained by the materials and equipment after this inspection.

1.4 MISCELLANEOUS PROVISIONS

A. Work in the extension of existing conditions shall correspond in all respects with the existing conditions to which it connects, or to similar existing conditions, in materials, workmanship and finish.

B. Alterations to Existing Conditions: Existing conditions shall be cut, drilled, removed, temporarily removed, or removed and replaced, as necessary for performance of work under the contract.

1. Replacements of existing conditions that are removed shall match similar existing conditions.

2. Unless otherwise indicated, existing structural members shall not be cut or altered without authorization by the Project Officer.

3. Conditions remaining in place, which are damaged or defaced during the work, shall be restored to the condition existing at time of award of contract.

4. Discolored or unfinished surfaces exposed by removal of existing conditions, that are indicated to be final exposed surfaces, shall be refinished or replaced as necessary to produce uniform and harmonious contiguous surfaces.

01100-2

C. Existing structures will remain in place unless otherwise indicated in project drawings.

D. Existing utility services shall be disconnected and removed to the extent indicated.

E. Removed items indicated to remain the property of NIH or the government and shall be stored on site where directed by the Project Officer.

1.5 SPECIFICATION FORMATS AND CONVENTIONS

A. Specification Intent: These Specifications are intended for use on multiple, separate projects.

Some material specifications contained therein may not be applicable to specific projects.

Where project drawings indicate a type of material or work, all specification content reasonably inferable as applicable to said material or work is applicable to the project.

B. Specification Format: The Specifications are organized into Divisions and Sections using the 26-division format and CSI/CSC's "Master Format" numbering system.

C. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations.

These conventions are as follows:

1. Abbreviated Language: Language used in the Specifications and other Contract

Documents is abbreviated. Words and meanings shall be interpreted as appropriate.

Words implied, but not stated, shall be inferred as the sense requires. Singular words shall be interpreted as plural, and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates.

2. Imperative mood and streamlined language are generally used in the Specifications.

Requirements expressed in the imperative mood are to be performed by Contractor.

Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted.

a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

END OF SECTION 01100

01100-3

SECTION 01140 - WORK RESTRICTIONS

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions apply to this Section.

1.2 SUMMARY

A. This Section documents conditions and procedures on the NIH campus that may impact the performance of work by the contractor including the following:

1. Contractor use of premises

2. NIH occupancy of adjacent premises

3. NIH occupancy prior to substantial completion

4. Working hours

5. Use of existing elevators

6. Construction Risk Assessment (CRA) and Interim Life Safety Measures (ISLM) restrictions for projects in Building 10/CRC Complex (Building 10, ACRF Wing and

CRC).

B. Related Sections: This specification section is related to any and all specification sections with explicit or implicit reference to work restriction documentation including but not limited to the following Division 1 specification sections:

1. Division 1 Section "Summary"

2. Division 1 Section "Project Management and Coordination"

3. Division 1 Section "Construction Progress Documentation"

4. Division 1 Section "Submittal Requirements"

5. Division 1 Section "Quality Requirements"

6. Division 1 Section "Construction Quality Control"

7. Division 1 Section "Temporary Facilities and Controls"

8. Division 1 Section "Safety and Health"

9. Division 1 Section "Execution Requirements"

10. Division 1 Section "Cutting and Patching"

11. Division 1 Section "Selective Demolition"

12. Division 1 Section "Closeout Procedures"

1.3 CONTRACTOR USE OF PREMISES

A. The Project Officer will conduct a pre-construction survey with the Contractor to review and document the existing conditions surrounding the project premises prior to the beginning of any construction activity.

B. All contractor personnel shall abide by the NIH no smoking policy within buildings, near building entrances and near air intake louvers.

C. All corridors and stairs required for emergency egress shall remain clear and unobstructed at all times.

WORK RESTRICTIONS

01140-1

D. Access to emergency services and for fire, police, and other emergency forces shall remain free and unobstructed at all times.

E. When exit access or exit components need to be changed or modified in any way, this action shall be done only with prior written approval by the authority having jurisdiction (AHJ). The AHJ will keep the NIH Fire Department and relevant occupants notified of all route changes.

F. Existing fire alarm, detection, and suppression systems shall remain in good working order. All modifications or planned shutdowns of the fire protection systems must be scheduled and approved by Maintenance Engineering. It is the responsibility of Maintenance Engineering to notify the AHJ and the NIH Fire Department of all modifications in these systems. Contractor shall ensure that temporary, but equivalent, fire safety measures are in place when the operation of any fire system is impaired. Temporary and equivalent systems must be approved by the AHJ and tested monthly.

G. Restrict combustible storage on the jobsite to the minimum level acceptable to the AHJ for daily operations.

H. Penetrations in fire and smoke walls contiguous with occupied areas will be properly sealed at the end of each work shift.

I. Remove wastes from the worksite at the end of each work shift or more frequently if directed by Project Officer.

J. The Contractor shall limit use of the site and premises to the work in areas indicated in the contract documents, to allow for NIH occupancy and public use of areas surrounding project site.

K. The Contractor shall schedule his work so as to cause the least amount of interference with NIH building and campus operations. All work schedules shall be approved by the Project Officer.

L. Permission to interrupt any building services and/or utility services shall be requested in writing a minimum of fifteen (15) working days prior to the desired date of interruption. NIH reserves the right to refuse any request and to schedule such interruption on a later or earlier date and time which is mutually agreeable to NIH and the Contractor.

M. Temporary closing of streets, sidewalks, and/or parking areas must be coordinated with the Project Officer. The Contractor shall submit a "Request for Temporary Use of NIH Paved Area" to the Project Officer at least fifteen (15) calendar days prior to closing of any facility.

Closing or restricting traffic on NIH paved areas will not be permitted except in emergencies without the approved form. Approvals shall be obtained from the following offices prior to any closure:

1. Project Officer

2. NIH Fire Department

3. NIH Police

4. NIH Parking and Traffic Control Specialist

N. The Contractor, his employees and all subcontractors shall become familiar with and comply with all NIH regulations, including fire, traffic, safety, and security regulations.

01140-2

O. All personnel employed by the Contractor or subcontractors and working on the NIH campus shall keep within the limits of the work and avenues of ingress and egress. Entry to any restricted area is forbidden unless entry is required and is approved in writing by the Project Officer.

P. The Contractor's equipment shall be conspicuously marked for identification purposes.

Q. Confine operations at the site to areas indicated. Do not disturb portions of the site beyond the areas in which work is indicated.

R. Keep driveways and entrances serving the premises clear and available at all times to NIH employees and visitors. Do not use these areas for parking or storage of materials.

S. Lock automotive type vehicles, such as trucks or other mechanized or motorized construction equipment, when parked and unattended so as to prevent unauthorized use. Do not leave such vehicles or equipment unattended with the motor running or the ignition key in place.

T. Schedule deliveries to minimize space and time requirements for storage of material and equipment on site.

U. Maintain existing building in a safe and weather tight condition throughout the construction period. Provide temporary heating and cooling as required to keep indoor temperatures between 65 degrees F and 80 degrees F. A heating and cooling plan shall be submitted to the Project Officer within 14 calendar days of the Notice to Proceed for approval.

V. Repair damage caused by construction operations. Take precautions to protect the building, its occupants and the public during the construction period.

W. Keep public areas, such as hallways, stairs, lobbies and toilet rooms, free from accumulation of waste material, rubbish, construction debris, and construction materials and remove such daily.

X. Prior to bid, become familiar with all work restrictions applicable to the building in which work is to be performed and develop work plan and project cost accordingly. Such work restrictions include but are not limited to:

1. Restricted use of loading zones, spaces, docks and other delivery facilities,

2. Restricted use of elevators and stairs,

3. Restrictions regarding removal of exterior windows,

4. Restrictions regarding use of VOC or other volatile chemicals.

Y. The Contractor will not be allowed any storage area, other than within the limits of construction. Coordinate the storage of materials to maintain safe passage and emergency egress through the site at all times. If additional storage is necessary, obtain and pay for such storage off site. Payment for stored materials will not be permitted.

Z. For all work within Building 10, no exterior window can be opened without the prior written consent of the Project Officer. The building complex is under negative pressure and incoming air will affect the operation of the HVAC system.

AA. Use of the existing loading dock facilities will be shared with NIH activities on a first-come-first-served, wait-your-turn basis, unless otherwise directed.

01140-3

BB. Existing materials and equipment that are removed as part of the construction operations, and that are not reused or designated to be salvaged as NIH or other's property, shall be removed from the site. Storage or sale of excess salvageable materials and equipment is not permitted on site.

CC. Pollution producing equipment shall not be located near air intakes where airborne smoke or fumes could be drawn into the building.

DD. For parking restrictions in effect under this contract see Contract for Construction and applicable Office of Research Facilities contractor parking policy.

EE. Electric arc welding equipment shall not be connected to the building power supply system.

FF. Where available, the contractor will be allowed limited use of existing toilet facilities.

GG. Existing Stair Usage: Use of existing stairs will be permitted, as long as stairs are cleaned and maintained in a condition acceptable to the NIH. Prior to Substantial Completion, restore stairs to condition existing before initial use and maintain in their original condition until Substantial Completion.

1. Provide protective coverings, barriers, devices, signs, or other procedures to protect stairs and to maintain means of egress. If, despite such protection, stairs become damaged, restore damaged areas so no evidence remains of correction work.

1.4 NIH OCCUPANCY OF ADJACENT PREMISES

A. NIH will occupy the site and the existing building areas immediately adjacent to, above and below the construction site during the entire period of construction, unless otherwise indicated on project drawings.

1. Cooperate with NIH representatives during construction operations to minimize conflicts and facilitate NIH usage. Perform the work in a manner that does not interfere with NIH operations. Delays may be incurred. If the Project Officer determines that the safety and health of building occupants is in jeopardy, the Contractor must modify his construction plan and procedures to avoid the potential hazard before continuing with construction.

2. The Contractor shall take particular care in the execution of work in and near Patient and Hospital areas, Animal Holding Facilities, and Research Laboratory Areas.

Uninterrupted operation shall be maintained in these areas.

3. Some areas within the limits of the contract may be occupied during performance of work under this Contract. In addition, NIH reserves the right to complete the work not specifically in this contract, but within the physical limits of the contract, by NIH or NIH contract personnel.

1.5 NIH OCCUPANCY PRIOR TO SUBSTANTIAL COMPLETION

A. NIH reserves the right to occupy and to place and install equipment in completed areas of the building prior to Substantial Completion, provided such occupancy does not interfere with completion of the work. NIH installation of equipment and partial occupancy shall not constitute acceptance of the total work.

1. Prior to partial NIH occupancy, mechanical and electrical systems for the space shall be fully operational, and required inspections and tests shall be successfully completed.

01140-4

Upon occupancy, NIH will operate and maintain mechanical and electrical systems serving the occupied portions of the building.

2. Upon occupancy, NIH will assume responsibility for maintenance and custodial service for the occupied portions of the building.

3. The warranty period for the occupied portion of the building only will commence on the date of occupancy by NIH.

1.6 Unscheduled Operations

A. NIH may restrict work in or around hospital, laboratory, or animal holding areas on an unscheduled basis. NIH will provide not less than 24 hour notification each time work restrictions due to unscheduled NIH operations are invoked, except for emergencies.

1.7 WORKING HOURS

A. Contractor's General Working Hours: The normal work day is between the hours of 6:30am to 4:30pm Monday through Friday, except for the holidays and other times as listed in the Contract for Construction.

B. The Contractor shall not encumber peak traffic flows during morning rush hour (6:30 am to 8:30 am) and evening rush hour (4:00pm to 5:30pm).

C. Unless otherwise indicated on project drawings, Noise Hours shall be between the hours of 7:30am and 9:00pm.

D. Work shall not be performed during other than General Working Hours except when such timeliness of performance is required to safeguard life or property. Other deviations may be authorized by the Project Officer.

E. Requests for deviations from General Working Hours, including work on holidays, shall be submitted in writing to the Project Officer not less than fifteen (15) calendar days in advance of the proposed work period. Once approved, the schedule must be delivered to the NIH Police prior to the start of work.

F. NIH Unoccupied Hours will be defined, if applicable during the Preconstruction Meeting or on the project drawings. The Contractor shall submit a proposed schedule and gain the Project Officer's approval at least 72 hours before proceeding with any work during NIH Unoccupied Hours.

G. Contractor's Required Working Hours: Work required to be performed during NIH Unoccupied Hours will be delineated during the Preconstruction Meeting or on the project drawings.

1.8 USE OF EXISTING ELEVATORS

A. For work in existing NIH buildings, the Contractor will be permitted to use an existing freight elevator for freight service and transportation of construction personnel during the construction period.

B. Elevators will be used by both contractor and NIH and must be available to NIH at all times.

Coordinate usage with the Project Officer. Use of any elevator is on a first come first use basis.

Delays may be incurred.

01140-5

C. Protection of existing elevators: Provide protective pads for the cab and other appropriate protective measures for the car and entrance doors and frames. The Contractor shall not load the elevator to more than 75% of the rated capacity or the capacity indicated by the elevator operator, which ever is less. The Contractor is responsible for making repairs to any damage to the elevators during his use. If the Contractor fails to promptly repair any damage to the elevator or if the elevator is required to discontinue service, NIH may make any necessary repairs it deems required and deduct all associated costs directly from this construction contract.

At the end of construction, restore the elevator to its original condition, replace worn cables, guide shoes and similar items of limited life.

1.9 CONSTRUCTION RISK ASSESSMENT (CRA) RESTRICTIONS FOR PROJECTS IN

BUILDING 10/CRC COMPLEX

A. The Contractor shall comply with Construction Risk Measures identified in the Construction Risk Assessment (CRA) or stipulated by the Project Officer that address activities that could potentially compromise patient care, treatment, and services in occupied areas of the Building 10/CRC complex (i.e., Buildings 10, 10B (ACRF), CRC, and NMR imaging center). Work restrictions include those required to limit activities adversely affecting air quality requirements, infection control measures, utility requirements, noise, vibration and emergency procedures.

1. Construction Risk Measures must be implemented prior to the project execution phase and be maintained through demolition, construction or renovation till the completion of the project.

2. Construction risk measures included scheduled times and thresholds for vibration and noise; barriers to contain particulates including sticky carpet mats, smoke-tight wall boards, air pressure differentials, and filtration devices; redundant or comparable safeguards to maintain effective odor removal, air conditioning, humidification, heating, critical air quality and clinical parameters required for patient care and the safety of all occupants, and emergency procedures.

1.10 INTERIM LIFE SAFETY MEASURES (ISLM) RESTRICTIONS FOR PROJECTS IN

BUILDING 10/CRC COMPLEX

A. The Contractor shall comply with the ILSM established by the NIH Division of the Fire Marshal or the Clinical Center. These measures shall be implemented for all construction, renovation and alteration work and periods when the work compromises the fire protection systems such that the facility does not meet applicable provisions of the Life Safety Code®.

Work restrictions include but are not limited to the following:

1. Separate work areas from the remaining portion of the building with smoke- tight, dust containing partitions constructed with noncombustible or fire-retardant materials. All barriers shall have clean, smooth surfaces and provide a contiguous seal to minimize the migration of construction dust as well as smoke

2. Because the building's air pressure is negative relative to the outdoors, work that involves a break in an exterior wall shall be protected with two parallel noncombustible or fire-retardant partitions to minimize energy loss, property damage, and occupants' discomfort or exposure to chemical vapors and bioaerosois.

3. Prior to use, the Project Officer, with the CC safety officer and CC Office of Facility Management will assess the risks associated with the flammables, oxidizers, irritants, and other potentially hazardous chemicals proposed for use in the work area.

a. The contractor will provide the Material Safety Data Sheets for chemicals used on the site in accordance with provisions of the OSHA Hazard Communication Act.

01140-6

The contractor must keep a binder containing all MSDS for chemicals approved for use at the worksite---where it is readily available for employees and emergency responders at NIH.

b. Flammable and oxidizing chemicals on the jobsite shall be limited to a 1-day supply. Additional supplies shall not be stored in a building unless an approved storage area is designated by the AHJ.

c. Flammable compressed gas cylinder shall be securely stored in an approved cart.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

END OF SECTION 01140

01140-7

SECTION 01310 - PROJECT MANAGEMENT AND COORDINATION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS.

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section includes administrative provisions for managing and coordinating construction operations including, but not limited to, the following:

1. General project coordination.

2. Utility service interruptions.

3. Coordination drawings.

4. Conservation.

5. Administrative and supervisory personnel.

6. Conferences and meetings.

7. Cleaning and protection.

8. Construction Risk Assessment (CRA) and Interim Life Safety Measures

(ISLM) management for projects in Building 10/CRC Complex (Building 10, ACRF Wing and CRC).

B. Related Sections: This specification section is related to any and all specification sections with explicit or implicit reference to project management and coordination. Specific submittal requirements of these related specification sections are not included in this section. Related sections include but are not limited to the following specification sections:

1. Division 1 Section "Summary"

2. Division 1 Section "Work Restrictions"

3. Division 1 Section "Construction Progress Documentation"

4. Division 1 Section "Submittal Procedures"

5. Division 1 Section "Quality Requirements"

6. Division 1 Section "Construction Quality Control"

7. Division 1 Section "Temporary Facilities and Controls"

8. Division 1 Section "Safety and Health"

9. Division 1 Section "Product Requirements"

10. Division 1 Section "Execution Requirements"

11. Division 1 Section "Cutting and Patching"

12. Division 1 Section "Closeout Procedures"

1.3 GENERAL PROJECT COORDINATION

A. Coordination of Trades: Coordinate construction operations included in the various sections of the Specifications to provide an efficient and orderly installation of each part of the Work.

Coordinate construction operations included under different sections of the Specifications that depend on each other for proper installation, connection or operation.

1. Schedule construction operations in the sequence required to obtain the best results where the installation of one part of the work depends on installation of other components before or after that part.

© 2014 CFR Engineering

PROJECT MANAGEMENT AND COORDINATION

01310-1

2. Coordinate installation of different components to provide maximum accessibility for required maintenance, service, removal/installation of component parts, testing and repair.

3. Accommodate items scheduled for later installation.

4. Provide for coordinated incorporation of Contractor's accepted Value Engineering proposals and Change Orders.

5. Locate pipes, conduits, ducts, equipment, and their related supports so that they do not interfere with the intended use of lifting devices for adjacent equipment and components.

B. Notification: Where required by this section and others, prepare and distribute memoranda to each party performing work at the project site, outlining special procedures required for coordination, including required notices, reports, attendance at meetings and meeting minutes as part of the memoranda.

C. Administrative Procedures: Coordinate scheduling and timing of administrative procedures with other construction activities to avoid conflicts and promote orderly progress of the work.

Administrative procedures include but are not limited to the following:

1. Preparation of schedules.

2. Installation and removal of temporary facilities and controls.

3. Delivery and processing of submittals.

4. Progress meetings.

5. Pre-installation conferences

6. Project closeout activities.

D. Utility Service Interruption Plan

1. Contractor shall submit a Utility Service Interruption Plan for the project. Plan shall include proposed dates and times of each scheduled interruption based on the construction schedule, with estimated period of outage, list of existing equipment that will be affected by the interruption, proposed sequence of equipment shut-down and start-up, and responsible personnel. The plan should incorporate the following guidance:

a. Frequency and duration of interruption should be minimized.

b. Interruptions should be scheduled during times when the facility is unoccupied.

c. Requirements contained in the NIH ORF Manual “Policy and Procedure Utility

Shutdown”, latest edition, available on the NIH Website.

2. Plan must be approved in writing by the Contracting Officer and the Project Officer. If not approved, consult with the Project Officer, and revise and resubmit the plan until approved.

3. Requests for Utility Outages and Connections shall be made in writing to the Project Officer at least 15 calendar days in advance of the date and time required. Each request shall state the system involved, area involved, approximate duration of outage, and the nature of work involved.

4. Utility outages and connections required during the performance of the work that affect existing systems and are deemed by the Project Officer to jeopardize normal NIH operations shall be made during other than normal duty hours.

5. Coordination and notification to NIH tenants and activities will be accomplished by the Contracting Officer following notification by the contractor.

6. Prior to each interruption, the Contractor will confirm with the Contracting Officer that any necessary NIH personnel are prepared to execute the shut-down and start-up of affected existing equipment.

© 2014 CFR Engineering

01310-2

Due to the nature and complexity of NIH facilities, the following article is typically COORDINATION

DRAWINGS

A. Prepare coordination drawings when specified, where careful coordination is needed for installation of products and materials fabricated by separate entities, or where limited space availability necessitates maximum utilization of the space for efficient installation of different components.

1. Show the relationship of components shown on separate shop drawings.

2. Indicate required installation sequences.

3. Provide vertical and horizontal dimensions necessary to locate each component and avoid conflicts within the space.

4. Comply with shop drawing requirements for sheet size and submittal methods specified in Division 1 Section "Submittals."

5. Refer to Division 2-16 technical specification sections for specific Coordination Drawing requirements.

B. Provide coordination drawings for equipment and system installations in mechanical and electrical rooms and spaces where two or more entities will provide the work and separate shop drawings are insufficient to show coordination.

1.5 SUSTAINABLE CONSTRUCTION AND CONSERVATION

A. Consider conservation of energy, water and materials in the conduct of construction operation.

Salvage materials and equipment involved in the performance of, but not incorporated into, the work.

B. Sustainable Construction Plan

1. Establish and document a program to maximize sustainability goals identified in

Technical Sections of specifications. Program shall minimally include the following written information:

a. Designation of a Sustainable Construction coordinator. Based on the workload required this may be a part-time function.

b. Matrix of products or construction activities with sustainability requirements or goals. A sample matrix is attached at the end of this Specification Section and includes:

1) Row for each product or activity ordered by CSI specification format.

2) Column for each LEED Credit requirement or goal.

3) Column of each LEED Credit identifying plan for meeting requirement and identifying expected attainment level.

4) Project schedule of values relating to documentation of LEED Credits.

C. Recycled Waste Management Plan

1. Establish and document a program to maximize recycling of waste materials. Program shall minimally include the following written information:

a. Designation of a waste management coordinator. Based on the workload required this may be a part-time function.

b. Identification of recyclable materials.

c. Identification of available local recycling firms and agencies to receive recyclable materials.

d. Establishment of quantity goals for collection of each recyclable material.

© 2014 CFR Engineering

01310-3

e. Designation of one or more locations on the project site for collection, sorting and temporary storage of recyclable materials.

f. Means and schedule for transporting and delivery of recyclable materials to recycling firms and agencies.

2. Contractor's waste management coordinator shall provide on-site instruction of workers in the identification, separation and handling of recyclable materials, and shall manage the process for the duration of the Contract.

a. Contractor shall lay out and define specific areas to facilitate separation of materials for recycling, and shall maintain collection bins clearly marked to avoid contamination of the recyclable materials.

b. The waste management coordinator shall report monthly, in writing, the quantity of each recyclable material collected during the previous month and cumulatively to date, compared to the quantity goal, and other points of interest. Copies of each report shall be distributed to each significant party of the project, including the Contracting Officer.

D. Hazardous Materials Waste Management Plan

1. Contractor shall establish and submit for approval a Hazardous Materials Waste

Management Plan within 14 calendar days of the Notice to Proceed or at least 14 calendar days prior to introducing hazardous materials on the site.

2. The Hazardous Materials Waste Management Plan shall be included (in draft form if approved copy is not available) with the submission of the Contractor's Safety and Health Program.

3. Requirements for the Hazardous Material Waste Management Plan are located in Division 1 Section "Use, Handling, Storage, Transporting, Accumulation and Disposal of NIH Controlled Material."

E. Heating and Cooling Plan

1. Contractor shall submit a Heating and Cooling Plan for the project when the work will impact the conditioned spaces of existing NIH facilities. Plan shall include written description of how the contractor intends to maintain the interior temperature between 65 degrees F and 80 degrees F or at other environmental conditions specified in the project documents. Include in the plan the heating and cooling of temporary facilities which enclose existing NIH spaces.

F. Sediment and Erosion Control and Storm Water Management Plans

1. Project drawings may contain Sediment and Erosion Control and Storm Water

Management Plans. If the drawing set includes such plans, NIH will obtain the approval of the plans by the State of Maryland.

2. If the project drawings do not contain Sediment and Erosion Control and Storm Water Management Plans, and the project requires work that mandates submittal of such plans to the State of Maryland for approval, the contractor shall:

a. Prepare Sediment and Erosion Control and Storm Water Management Plans meeting requirements of the State of Maryland, and sealed by an Engineer licensed in the State of Maryland.

b. Submit plans to the NIH Project Officer for review and submission to the State of Maryland.

c. Provide services of third party reviewer, approved by the State of Maryland for review of submitted plans.

© 2014 CFR Engineering

01310-4

1.6 SUBMITTALS

A. Utility Service Interruption Plans

1. Develop and submit a Utility Service Interruption Plan to the Contracting Officer for approval within 14 calendar days after the Notice to Proceed and at least 15 calendar days in advance of the first requested interruption to coincide with the request for utility outage.

2. Update the plan and re-submit when conditions change at least 15 calendar days in advance of the first requested change to a utility interruption.

3. Include a copy as an appendix to the Quality Control Plan.

B. Coordination Drawings: Submit Coordination Drawings prepared as specified in this section.

C. Sustainable Construction Plan

1. Submit a copy of the program to the Contracting Officer for information within 14 calendar days after Notice to Proceed.

2. Update the plan and re-submit for information when conditions change.

3. Include a copy as an appendix to the Quality Control Plan.

D. Recycled Waste Management Plan

1. Submit a copy of the program to the Contracting Officer for information within 14 calendar days after Notice to Proceed.

2. Update the plan and re-submit for information when conditions change.

3. Include a copy as an appendix to the Quality Control Plan.

E. Hazardous Waste/Waste Management Plan

1. Develop and submit to the Contracting Officer for approval within 14 calendar days after

Notice to Proceed a Hazardous Waste/Waste Management Plan that conforms to the requirements contained in Division 1 Section "Use, Handling, Storage, Transporting, Accumulation and Disposal of NIH Controlled Materials."

2. Update the plan and re-submit for information when conditions change.

3. Include a copy as an appendix to the Quality Control Plan.

F. Heating and Cooling Plan

1. Develop and submit to the Contracting Officer for approval within 14 calendar days after

Notice to Proceed a Heating and Cooling Plan for occupied NIH spaces effected by the project work.

2. Update the plan and re-submit for approval when conditions change.

3. Include a copy as an appendix to the Quality Control Plan.

G. Integrated Pest Management Service Plan

1. Develop and submit to the Contracting Officer for approval within 14 calendar days after

Notice to Proceed a Integrated Pest Management Service Plan conforming to the requirements identified in Division 1 Section "Tempoary Facilities and Controls."

2. Update the plan and re-submit for approval when conditions change.

3. Include a copy as an appendix to the Quality Control Plan.

H. Severe Storm Plan

1. Develop and submit to the Contracting Officer for approval within 14 calendar days after

Notice to Proceed a Severe Storm Plan conforming to the requirements identified in Division 1 Section "Safety and Health."

© 2014 CFR Engineering

01310-5

2. Update the plan and re-submit for approval when conditions change.

3. Include a copy as an appendix to the Quality Control Plan.

I. Demolition Plan

1. Develop and submit to the Contracting Officer for review within 14 calendar days after

Notice to Proceed and at least 14 calendar days prior to the planned commencement of demolition activities a Demolition Plan conforming to the requirements identified in Division 1 Section "Selective Demolition" or other demolition related sections.

2. Update program and re-submit for approval when conditions change.

3. Include a copy as an appendix to the Quality Control Plan.

J. Quality Control Plan

1. Develop and submit to the Contracting Officer for approval within 30 calendar days after

Notice to Proceed a Quality Control Plan conforming to the requirements identified in Division 1 Section "Construction Quality Control."

2. Update program and re-submit for approval when conditions change.

K. Safety and Health Program

1. Develop and submit to the Contracting Officer for review within 14 calendar days after

Notice to Proceed the Contractor's Safety and Health Program as required by Division 1 Section "Safety and Health."

2. Update program and re-submit for approval when conditions change.

L. Cutting and Patching Plan

1. Develop and submit to the Contracting Officer for approval a cutting and patching plan for approval at least 21 calendar days in advance of the time cutting and patching will initially be performed as required by Division 1 Section "Cutting and Patching."

2. Update program and re-submit for approval when conditions change.

3. Include a copy as an appendix to the Quality Control Plan.

M. Project Closeout and Work Plan

1. Develop and submit to the Contracting Officer for approval a project closeout and work plan for approval at least 15 calendar days prior to the Substantial Completion Inspection as required by Division 1 Section "Closeout Procedures."

2. Update program and re-submit for approval when conditions change.

3. Coordinate contents of this plan with Division 1 Section "Construction Quality Control" and the contents of the Quality Control Plan.

N. Staff Names: Within 14 calendar days of the start of site operations, submit a list of principal staff assignments, including superintendent and other personnel in attendance at Project site.

Identify individuals and their duties and responsibilities; list addresses and telephone numbers, including home and office telephone numbers. Provide names, addresses, and telephone numbers of individuals assigned as standbys in the absence of individuals assigned to Project.

1. Post copies of list in Project meeting room, in temporary field office, and by each temporary telephone.

2. Provide updated lists when individuals assigned to positions change or positions are added to the contractor's staff team.

© 2014 CFR Engineering

01310-6

O. Meeting minutes: The contractor shall provide meeting minutes from the following meeting as required by this section. Additional meeting minute requirements may be located in other sections.

1. Preconstruction Conference.

2. Pre-installation Conferences.

3. Progress meetings.

4. Coordination Meetings

1.7 ADMINISTRATIVE AND SUPERVISORY PERSONNEL

A. In addition to the Project Superintendent, the Contractor shall provide other administrative and supervisory personnel as required for proper performance of the work.

B. Waste Management Coordinator: Provide a waste management coordinator whose duties shall consist of developing and implementing a program for maximizing recycling of waste.

C. Integrated Pest Management Quality Control Supervisor: Provide an Integrated Pest Management Quality Control Supervisor with duties as indicated in Division 1 Section "Temporary Facilities and Controls."

1.8 CONFERENCES AND MEETINGS

A. Pre-construction Conference:

1. The Contractor shall attend a pre-construction conference scheduled by the Project

Officer at a time and place convenient to both parties. Work shall not commence prior to the conference. Conference shall review responsibilities and personnel assignments.

2. Attendees: Participants at the conference shall be familiar with the project, shall be authorized to conclude matters relating to the Work, and at a minimum include representatives of the following parties or their designated representatives:

a. Contracting Officer.

b. NIH Project Officer

c. Architect.

d. Major design consultants.

e. Contractor

f. Major subcontractors

g. Major Suppliers

h. NIH Police

i. NIH Division of Safety, including representatives from the Pest Management

Section and the Occupational Safety and Health Branch

j. Other concerned parties.

3. Agenda: Subjects for discussion shall include items of significance that could effect progress, including but not limited to the following:

a. Tentative construction schedule.

b. Critical work sequencing.

c. Designation of responsible personnel.

d. Procedures for processing field decisions and Change Orders.

e. Procedures for processing Applications for Payment.

f. Distribution of Contract Documents.

g. Submittal of Shop Drawings, Product Data, and Samples.

© 2014 CFR Engineering

01310-7

h. Preparation of Record Documents.

i. Use of the premises.

j. Parking availability.

k. Office, work, and storage areas.

l. Equipment deliveries and priorities.

m. Safety and Health procedures

n. First Aid

o. Security

p. Housekeeping and progress cleaning

q. Working hours

r. Permits

s. Integrated Pest Management procedures.

4. Reporting: No later than 3 calendar days after the conference, the Contractor shall distribute minutes of the conference to each party present and to other concerned parties, including the Contracting Officer.

5. This meeting may satisfy the requirement for a Pre-construction Safety Meeting in Division 1 Section "Safety and Health."

B. Pre-installation Conferences: The Contractor shall conduct a pre-installation conference at the Project Site before each construction activity that requires coordination with other construction.

Pre-installation conferences may be combined with Preparatory Phase meetings described in Division 1 Section "Construction Quality Control."

1. Attendees: In addition to the Contractor's representative, the installer and representatives of manufacturers and fabricators involved in or affected by the installation, and its coordination or integration with other materials and installations that have preceded or will follow, shall attend. Prior to conferences, advise the Contracting Officer of scheduled conference dates.

2. Agenda: Review the progress of other construction activities and preparations for the particular activity under consideration at each pre-installation conference, including requirements for the following.

a. Contract Documents

b. Options

c. Related Change Orders, including accepted Value Engineering proposals

d. Purchases

e. Deliveries

f. Submittals

g. Review of mockups

h. Possible conflicts

i. Compatibility problems

j. Time schedules

k. Weather limitations

l. Manufacturer's recommendations

m. Warranty requirements

n. Compatibility of materials

o. Acceptability of substrates

p. Quality requirements

q. Temporary facilities and controls

r. Space and access limitations

© 2014 CFR Engineering

01310-8

s. Governing regulations

t. Safety

u. Testing and inspection requirements

v. Required performance results

w. Protection.

3. Reporting: Record significant discussions and agreements and disagreements of each conference. No later than 3 calendar days after each conference, the Contractor shall distribute minutes of the conference to each party present and to other concerned parties, including the Contracting Officer.

4. Do not proceed with the installation if the conference cannot be successfully concluded.

Initiate whatever actions are necessary to resolve impediments to the performance of the work, and reconvene the conference at the earliest feasible date.

C. Pre-Demolition Conference: The Contractor shall conduct conference at project site. Review methods and procedures related to selective demolition including, but not limited to, the following:

1. Inspect and discuss condition of construction to be selectively demolished.

2. Review structural load limitations of existing structure.

3. Review and finalize demolition schedule and verify availability of materials, demolition personnel, equipment, and facilities needed to make progress and avoid delays.

4. Review requirements of work performed by other trades that rely on substrates exposed by demolition operations.

5. Discussion of any outstanding issues from NIH review of Contractor's Demolition Plan.

D. Progress Meetings: The Project Officer shall conduct progress…