Attachment_5-NIH_Division_50_Construction_Cost_Template.xlsx

XLSX spreadsheet 234 KB Posted

Attached to
MULTIPLE-AWARD-CONSTRUCTION-CONTRACT-(MACC) FOR GENERAL CONSTRUCTION SERVICES AT THE NATIONAL INSTITUTES OF HEALTH.
Solicitation number
75N99019R00001
Issued by

About this file

This document provides details for a Multiple Award Construction Contract solicitation from the Department of Health and Human Services National Institutes of Health Office of Research Facilities. Up to 16 indefinite delivery, indefinite quantity construction contracts for general construction services will be awarded, with up to 12 set aside for small businesses including three for small businesses, three for HUBZone small businesses, three for 8(a) small businesses, and three for Service Disabled Veteran Owned Small Businesses. Work may include maintenance, repair, alterations, and new construction. The total program value is not to exceed $2 billion over eight years. The solicitation is expected to be released on February 11, 2019 with proposals due on March 14, 2019. A pre-proposal site visit is scheduled for a seed project. Task orders will be on a firm fixed price basis. Successful awardees will receive a minimum $1,000 task order.

Attachment 5-NIH Division 50 Construction Cost Template

View the file

Other files

File Type Posted
MACC_Awardee_List.docx DOCX document
Amendment_0006.doc.pdf PDF
MACC_Questions-_Amendment_6.pdf PDF
IMG_2462.JPG JPG image
Bldg_4_Rm_115_LAN_Rm.pdf PDF
IMG_2481.JPG JPG image
Example_Door_Security_Detail_Dwg_E1-05_pg_2.JPG JPG image
Amendment_0005.pdf PDF
MACC_Technical_Questions.pdf PDF
IMG_2482.JPG JPG image
0322191318a.jpg JPG image
IMG_2467.JPG JPG image
Bldg_4_2010_Rm_115_LAN_Rm.pdf PDF
0322191310.jpg JPG image
0322191318.jpg JPG image
IMG_2463.JPG JPG image
IMG_2484.JPG JPG image
IMG_2465.JPG JPG image
IMG_2460.JPG JPG image
Bldg_4_1985_Elec.pdf PDF
IMG_2466.JPG JPG image
Bldg_4_2010_2nd_fl_LAN_Rm.pdf PDF
0322191316b.jpg JPG image
B4-1_Line_Dwg..pdf PDF
0322191309a.jpg JPG image
IMG_2464.JPG JPG image
0322191317b.jpg JPG image
IMG_2483.JPG JPG image
IMG_2461.JPG JPG image
0322191315c.jpg JPG image
Amendment_0004_MACC.pdf PDF
Amendment_0003_MACC.pdf PDF
MACC_Contracting_Questions_3-14-19.pdf PDF
NIH_Capital_Project_Forecast.pdf PDF
Amendment_0002_MACC.doc.pdf PDF
Amendment_0001.pdf PDF
MACC_Site_Visit_Signin_Sheets.pdf PDF
NIH_MACC-IDIQ_Site_Visit_Presentation_.pptx PPTX presentation
Attachment_9-Davis_Bacon_Wage_Determination.pdf PDF
Attachment_6-MACC_hhs_subk_plan_template.docx DOCX document
Attachment_2_Past_Performance_Information_Sheet-_11_18.pdf PDF
Attachment_8c_Seed_Project_Bldg_4_Exist_Generator_Tank_Photo.JPG JPG image
Attachment_4-RFI-QUESTION_ANSWER_Sheet.docx DOCX document
Attachment_8_Seed_Project_Bldg_4_Replace_Emergency_Generator.pdf PDF
Attachment_7_Social_Economic_Category_Selection_Sheet.pdf PDF
Attachment_10-Definitions_and_Acronyms.pdf PDF
75N99019R00001.pdf PDF
Attachment_8a_Seed_Project_Bldg_4_Vivarium_Generator_final_Drawings.pdf PDF
Attachment_1_MACC_Construction_Experience_11_18.pdf PDF
Attachment_3_MACC_PAST_PERFORMANCE_QUESTIONNAIRE_for_Offeror.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS

SECTION B - PRICING SHEETS INSTRUCTIONS:
CSI DIVISION WORKSHEETS:
1CSI DIVISION WORKSHEETS ARE LINKED TO THE SUMMARY PAGE. ENTER THE PROJECT C NUMBER ON THE SUMMARY PAGE AND IT WILL POPULATE ALL THE SHEETS.
2USE 50 DIVISIONS OF CONSTRUCTION AS DEFINED BY CSI MASTERFORMAT
3CREATE A CSI DIVISION WORKSHEET FOR EACH DIVISION OF WORK REQUIRED TO COMPLETE THE PROJECT
4LIST EACH WORK ITEM TO BE PERFORMED BY THE PRIME AND ITS ASSOCIATED MATERIAL AND LABOR COSTS. (ADD ADDITIONAL ROWS AS NECESSARY).
5IDENTIFY EACH SUBCONTRACTOR, ENTERING SUBCONTRACTOR'S TOTAL MATERIAL AND LABOR COSTS.

BACKUP SHALL BE PROVIDED FOR EACH SUBCONTRACTOR. (PRIME CONTRACTOR MAY ELECT TO MODIFY THIS SPREADHSHEET TO PROIVDE SUBCONTRACTOR BACK-UP DETAIL SIMILAR TO PRIME CONTRACTOR'S DETAIL.)

6INSERT A PERCENTAGE (i.e. 5 FOR 5%) FOR OVERHEAD APPLIED TO SUBCONTRACTOR(S)
7INSERT A PERCENTAGE (i.e. 5 FOR 5%) FOR PROFIT APPLIED TO SUBCONTRACTOR(S)
8A TOTAL DIVISION COST WILL CALCULATE AS COST DATA IS ENTERED FOR PRIME COSTS, SUBCONTRACTOR(S) COSTS AND PERCENTAGE VAULES.
SUMMARY PAGE:.
9THE SUMMARY PAGE WORK ITEMS ARE LINKED TO A CORRESPONDING CSI DIVISION WORKSHEET.
10INSERT A PERCENTAGE (i.e. 10 FOR 10%) FOR OVERHEAD APPLIED TO PRIME WORK
11INSERT A PERCENTAGE (i.e. 10 FOR 10%) FOR PROFIT APPLIED TO PRIME WORK
12INSERT PRICE OF PREFORMANCE / PAYMENT BOND
13A TOTAL CONTRACT PRICE WILL CALCUALTE AS COST DATA IS POPULATED FROM LINKED CSI DIVISION WORKSHEETS.

SUMMARY

Work Request Number C101313 - Building 4 Replace Emergency Generator

TABLE B-1 -- PROPOSAL SUMMARY OF COSTS *USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT

DIV. #:ITEM DESCRIPTION
(Use CSI Division Worksheet to back-up all pricing information for each Division listed in Table)(A)
MATERIALS(B)
LABOR(C) = (A) + (B)
SUBTOTAL COST(D)
SUBCONTRACTOR COSTS(E) = (C) + (D)

TOTAL COST

01GENERAL REQUIREMENTS$ - 0$ - 0$ - 0$ - 0$ - 0
2Existing Conditions$ - 0$ - 0$ - 0$ - 0$ - 0
3Concrete$ - 0$ - 0$ - 0$ - 0$ - 0
4Masonry$ - 0$ - 0$ - 0$ - 0$ - 0
5Metals$ - 0$ - 0$ - 0$ - 0$ - 0
6Wood, Plastics, and Composites$ - 0$ - 0$ - 0$ - 0$ - 0
7Thermal and Moisture Protection$ - 0$ - 0$ - 0$ - 0$ - 0
8Openings$ - 0$ - 0$ - 0$ - 0$ - 0
9Finishes$ - 0$ - 0$ - 0$ - 0$ - 0
10Specialties$ - 0$ - 0$ - 0$ - 0$ - 0
11Equipment$ - 0$ - 0$ - 0$ - 0$ - 0
13Special Construction$ - 0$ - 0$ - 0$ - 0$ - 0
14Conveying Systems$ - 0$ - 0$ - 0$ - 0$ - 0
21Fire Suppression$ - 0$ - 0$ - 0$ - 0$ - 0
22Plumbing$ - 0$ - 0$ - 0$ - 0$ - 0
23HVAC$ - 0$ - 0$ - 0$ - 0$ - 0
25Integrated Automation$ - 0$ - 0$ - 0$ - 0$ - 0
26ELECTRICAL$ - 0$ - 0$ - 0$ - 0$ - 0
27Communications$ - 0$ - 0$ - 0$ - 0$ - 0
28Electrical Safety and Security$ - 0$ - 0$ - 0$ - 0$ - 0
31Earthwork$ - 0$ - 0$ - 0$ - 0$ - 0
32Exterior Improvements$ - 0$ - 0$ - 0$ - 0$ - 0
33Utilities$ - 0$ - 0$ - 0$ - 0$ - 0
34Transportation$ - 0$ - 0$ - 0$ - 0$ - 0

SUBTOTAL - 1: $ - 0 $ - 0 $ - 0

OVERHEAD (% * subtotal 1 (C)) : (INSERT %) 0% $ - 0

SUBTOTAL- 2 (subtotal 1 (C ) + overhead): $ - 0

PROFIT (% * subtotal 2): (INSERT %) 0% $ - 0

SUBTOTAL - 3 (subtotal 2 + profit): $ - 0

TOTAL SUBCONTRACTOR COSTS (subtotal 1 (D)): $ - 0

SUBTOTAL - 4 (subtotal 3 + total subcontractor costs): $ - 0

PERFORMANCE / PAYMENT BOND: $ - 0

TOTAL CONTRACT PRICE (subtotal 4 + bond): $ - 0

Attachment #5, NIH Division 50 Construction Cost Template FOR OFFICIAL USE ONLY

SOURCE SELECTION SENSITIVE INFORMATION-SEE FAR 2.101 & 3.104

Multiple Award Construction Contract (MACC) Seed Project Building 4 November 2018

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 1

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

01GENERAL REQUIREMENTS(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

FOR OFFICIAL USE ONLY

SOURCE SELECTION SENSITIVE INFORMATION-SEE FAR 2.101 & 3.104

Multiple Award Construction Contract (MACC) Seed Project November 19, 2018

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 2

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

2Existing Conditions(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 3

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

3Concrete(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 4

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

4Masonry(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 5

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

5Metals(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 6

Work Request Number C101313 - Building 4 Replace Emergency Generator

FOR OFFICIAL USE ONLY

Source Selection Sensitive Information—See FAR 2.101 & 3.104

Multiple Award Construction Contract (MACC)*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

6Wood, Plastics, and Composites(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

FOR OFFICIAL USE ONLY

SOURCE SELECTION SENSITIVE INFORMATION-SEE FAR 2.101 & 3.104

Multiple Award Construction Contract (MACC) Seed Project November 19, 2018

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 7

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

7Thermal and Moisture Protection(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 8

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

8Openings(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 9

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

9Finishes(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 10

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

10Specialties(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 11

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

11Equipment(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 13

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

13Special Construction(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 14

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #:* DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

14Conveying Systems(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 21

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

21Fire Suppression(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 22

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

22Plumbing(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P&P of &N

Division 23

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #:* DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

23HVAC(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 25

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

25Integrated Automation(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 26

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

26ELECTRICAL(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 27

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #:* DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

27Communications(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 28

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #:* DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

28Electrical Safety and Security(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 31

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

31Earthwork(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 32

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

32Exterior Improvements(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 33

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

33Utilities(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N

Division 34

Work Request Number C101313 - Building 4 Replace Emergency Generator

*USE 50 DIVISIONS AS DEFINED CSI's MASTERFORMAT
TABLE B-2 -- PRICING WORKSHEET BACKUPRepeat worksheet for each CSI Division of Construction as required

DIV. #: DIVISION DESCRIPTION: QUANTITY MATERIALS LABOR (G) = (D) + (F)

TOTAL ITEM COST

34Transportation(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

ITEM #PRIME WORK ITEMS
1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
1 - PRIME SUBTOTAL:$ - 0$ - 0$ - 0
SUBCONTRACTOR(S) WORK ITEMS*
(Provide separate back-up for each subcontractor listed)QUANTITYMATERIALSLABOR(G) = (D) + (F)

TOTAL ITEM COST

(A)
No. Units(B)
Unit Meas.(C)
$ Per Unit(D) = (A) *(C)
Subtotal(E)
$ Per Unit(F) = (A) * (E)

Subtotal

1$ - 0$ - 0$ - 0
2$ - 0$ - 0$ - 0
3$ - 0$ - 0$ - 0
4$ - 0$ - 0$ - 0
5$ - 0$ - 0$ - 0
6$ - 0$ - 0$ - 0
7$ - 0$ - 0$ - 0
8$ - 0$ - 0$ - 0
9$ - 0$ - 0$ - 0
10$ - 0$ - 0$ - 0
11$ - 0$ - 0$ - 0
12$ - 0$ - 0$ - 0
13$ - 0$ - 0$ - 0
14$ - 0$ - 0$ - 0
15$ - 0$ - 0$ - 0
2 - SUBCONTRACTOR SUBTOTAL:$ - 0$ - 0$ - 0

3 - PRIME OVERHEAD ON SUBCONTRACTOR (% * Subcontractor (G)): (INSERT)% 5% $ - 0

4 - SUBTOTAL (SUM 2 + 3): $ - 0

5 - PRIME PROFIT ON SUBCONTRACTOR (% * Subtotal 4): (INSERT)% 5% $ - 0

6 - TOTAL SUBCONTRACTOR (SUM 4 +5): $ - 0

TOTAL DIVISION (SUM 1 + 6): $ - 0

&"Arial,Regular"&12&F &"Arial,Regular"&12Page &P of &N image1.png image2.png

File details come from the government source that posted it. Updated .