About this file

This notice provides details for a Multiple Award Construction Contract (MACC) opportunity for general construction services at the National Institutes of Health. Up to 16 indefinite delivery/indefinite quantity contracts will be awarded for an eight year period with a total program value not to exceed $2 billion. Contractors will perform a variety of construction projects defined in task orders that will vary in size, scope, and complexity across NIH facilities. Small business set asides are reserved for 12 awards including three for small businesses, three for HUBZone, three for 8(a), and three for service disabled veteran owned small businesses. The anticipated release of the request for proposals is February 11, 2019 with a bid closing date of March 14, 2019. A pre-proposal site visit is required for a seed project. Task orders will be firm fixed price with all awardees receiving a minimum $1,000 task order.

Attachment 10-NIH/ORF Definitions and Acronyms

View the file

Other files

File Type Posted
MACC_Awardee_List.docx DOCX document
Amendment_0006.doc.pdf PDF
MACC_Questions-_Amendment_6.pdf PDF
IMG_2462.JPG JPG image
Bldg_4_Rm_115_LAN_Rm.pdf PDF
IMG_2481.JPG JPG image
Example_Door_Security_Detail_Dwg_E1-05_pg_2.JPG JPG image
Amendment_0005.pdf PDF
MACC_Technical_Questions.pdf PDF
IMG_2482.JPG JPG image
0322191318a.jpg JPG image
IMG_2467.JPG JPG image
Bldg_4_2010_Rm_115_LAN_Rm.pdf PDF
0322191310.jpg JPG image
0322191318.jpg JPG image
IMG_2463.JPG JPG image
IMG_2484.JPG JPG image
IMG_2465.JPG JPG image
IMG_2460.JPG JPG image
Bldg_4_1985_Elec.pdf PDF
IMG_2466.JPG JPG image
Bldg_4_2010_2nd_fl_LAN_Rm.pdf PDF
0322191316b.jpg JPG image
B4-1_Line_Dwg..pdf PDF
0322191309a.jpg JPG image
IMG_2464.JPG JPG image
0322191317b.jpg JPG image
IMG_2483.JPG JPG image
IMG_2461.JPG JPG image
0322191315c.jpg JPG image
Amendment_0004_MACC.pdf PDF
Amendment_0003_MACC.pdf PDF
MACC_Contracting_Questions_3-14-19.pdf PDF
NIH_Capital_Project_Forecast.pdf PDF
Amendment_0002_MACC.doc.pdf PDF
Amendment_0001.pdf PDF
MACC_Site_Visit_Signin_Sheets.pdf PDF
NIH_MACC-IDIQ_Site_Visit_Presentation_.pptx PPTX presentation
Attachment_9-Davis_Bacon_Wage_Determination.pdf PDF
Attachment_6-MACC_hhs_subk_plan_template.docx DOCX document
Attachment_2_Past_Performance_Information_Sheet-_11_18.pdf PDF
Attachment_5-NIH_Division_50_Construction_Cost_Template.xlsx XLSX spreadsheet
Attachment_8c_Seed_Project_Bldg_4_Exist_Generator_Tank_Photo.JPG JPG image
Attachment_4-RFI-QUESTION_ANSWER_Sheet.docx DOCX document
Attachment_8_Seed_Project_Bldg_4_Replace_Emergency_Generator.pdf PDF
Attachment_7_Social_Economic_Category_Selection_Sheet.pdf PDF
75N99019R00001.pdf PDF
Attachment_8a_Seed_Project_Bldg_4_Vivarium_Generator_final_Drawings.pdf PDF
Attachment_1_MACC_Construction_Experience_11_18.pdf PDF
Attachment_3_MACC_PAST_PERFORMANCE_QUESTIONNAIRE_for_Offeror.pdf PDF
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEFINITIONS and ACRONYMS

ATTACHMENT 10

Note: see the Design Requirements Manual (DRM) for additional definitions and acronyms.

Available at the following link:

https://www.orf.od.nih.gov/PoliciesAndGuidelines/BiomedicalandAnimalResearchFacilities

DesignPoliciesandGuidelines/Pages/DesignRequirementsManual2016.aspx

1. The acronym "A/E" shall be defined as the Architectural/Engineering Design Consultants not under contract with the Contractor.

2. The acronym "Contractor A/E" shall be defined as the Architect/Engineer Design Consultant under contract to the Contractor.

3. The acronym 'BIM" shall be defined as Building Information Modeling; the process of generating and managing building data during its life cycle.

4. The term "Building 10" shall be defined as the facility complex composed of the Warren Grant Magnuson Clinical Center, Ambulatory Care Research Facility (ACRF), and all additions including the Mark O. Hatfield Clinical Research Center. Building 10 is also referred to as the Clinical Center Complex (CCC).

5. The acronym "CRA" shall mean Construction Risk Assessment – used to identify, develop and implement control measures required for the TYPE, GROUP and CLASS of area in which work will be performed and for adjacent areas that may be affected by the work.

6. The acronym “CQM” shall mean Construction Quality Manager, the entity with whom the Government has executed a separate contract to perform construction quality management services.

7. The acronym "Contractor" refers to both the General Contractor and any subcontractors, consultants, etc. working under this contract. The General Contractor shall ensure that subcontractors, consultants, etc. comply with all provisions of this contract.

8. The acronym "CO" shall be defined as the NIH Contracting Officer.

9. The acronym “COR” shall be defined as the Contracting Officer’s Representative. See Section C.4. GENERAL CONDITIONS OF THE MACC for a description of duties and responsibilities.

10. The acronym “CxA” shall mean Commissioning Agent, the entity with whom the Government has executed a separate contract to perform commissioning services.

11. The acronym "DDCM" shall be defined as the ORF’s Division of Design and Construction Management.

https://www.orf.od.nih.gov/PoliciesAndGuidelines/BiomedicalandAnimalResearchFacilitiesDesignPoliciesandGuidelines/Pages/DesignRequirementsManual2016.aspx https://www.orf.od.nih.gov/PoliciesAndGuidelines/BiomedicalandAnimalResearchFacilitiesDesignPoliciesandGuidelines/Pages/DesignRequirementsManual2016.aspx

12. The acronym “DEP” shall be defined as the ORF’s Division of Environmental Protection.

13. The acronym "DFOM" shall be defined as ORF’s Division of Facilities, Operations, and Maintenance.

14. The acronym “DFM’ shall mean ORS Division of the Fire Marshal.

15. The acronym "DTR" shall be defined as ORF's Division of Technical Resources.

16. The acronym “DOHS” shall mean ORS Division of Health and occupational Safety.

17. The acronym 'EV" shall be defined as Earned Value.

18. The acronym "ILSM" shall be defined as the Interim Life Safety Measures for the Building 10 Clinical Center Complex.

19. Quality Assurance “QA” shall be defined as the means by which the Government assures that the Construction Contractor's quality control is working effectively, and that the end product complies with the quality required by the terms of the contract.

20. The acronym 'QC" shall be the method used by the contractor to control the quality of the materials and workmanship.

21. The acronym 'LEED" shall be defined as Leadership in Energy and Environmental Design; a rating system devised by the United States Green Building Council.

22. The acronym "NIH" shall be defined as the National Institutes of Health.

23. The acronym "ORS" shall be defined as NIH's Office of Research Services.

24. The acronym "ORF" shall be defined as NIH's Office of Research Facilities Development and Operations.

25. The term "ORF Safety Officer "shall be an employee of the NIH, or designated representative who is responsible for the day-to-day management of the ORF Safety Program.

26. The acronym "PO" shall be defined as the NIH Project Officer also known as the Contracting Officer's Technical Representative (COTR). The PO is the authorized ‘technical’ representative for administrating the contract on behalf of the CO, exclusive of contractual matters.

27. The term "Government Project Team" shall be defined as the CO, COR, PO, A/E, CQM, CxA (If applicable).

28. The term "Substantial Completion" shall mean the project (or a specified portion) is complete to the extent it can be occupied or used for its intended purpose in accordance with contract and/or regulatory requirements with only minor punch list items to be completed.

29. The term "Task Order" or "TO" is a document prepared by the Contracting Officer that is issued to the Contractor for work to be performed. Task orders issued may be amended.

30. The term 'Warranty" shall mean Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, or design furnished, or workmanship performed by the Contractor or any subcontractor or supplier at any tier for a minimum of one year following acceptance by the Government of the Contractor's work.

31. Pre-Final Inspection - Pre-final Inspection is the Government Project Team inspection of the project where the Substantial Completion has been achieved and verified by the PO.

32. Final Inspection - Is the Government Project Team Inspection of the corrective work of the non-conforming items identified during the Pre-Final Inspection.

33. Aseptic Production Facilities (APF) – APFs are highly regulated facilities with specific statutes, codes, standards, regulations, and guidelines. NIH’s APFs include specialized facilities that produce therapeutic and diagnostic products for human use, inclusive of those required to follow current Good Manufacturing Practice (cGMP) regulations, aseptic processing (for those manufacturing biological products) and Phase-I and II clinical trial products (including pharmacy compounding of sterile products).