B05 Amend A00004.pdf

PDF 697 KB Posted

Attached to
Crownpoint Staff Quarters Replacement Federal contract opportunity
Solicitation number
75H70124R00004
Issued by
Department of Health and Human Services Indian Health Service

About this file

This document provides details for a federal contract solicitation to replace existing staff quarters in Crownpoint, New Mexico. The Indian Health Service is seeking construction services through a firm fixed price contract to demolish twenty-five existing units and construct three single family homes, six quadplex units, and three duplex units. Additional details include a $10 million construction magnitude, a site visit on November 14, 2023, a 730-day period of performance from notice to proceed, and requirements to register in the System for Award Management and check for solicitation amendments on sam.gov. The contract will be awarded using lowest price technically acceptable criteria. The response is due by the dates and times listed in the solicitation, which can be found on SAM.gov along with the associated wage determination, plans, specifications, and hazardous materials report.

View the file

Other files for this federal contract opportunity

Other files attached to Crownpoint Staff Quarters Replacement, newest first.
File Type Posted
NM20240002.pdf PDF
B05 Amend A00006.pdf PDF
A103r2.pdf PDF
B05 Amend A00005.pdf PDF
A001r2.pdf PDF
A601r1.pdf PDF
A124r1.pdf PDF
A001r1.pdf PDF
A312r1.pdf PDF
B05 Amend A00004.pdf PDF
B05 Amend A00003.pdf PDF
B01 Attachment J11 - CPSQ SITEWORK PHASING C004.pdf PDF
B01 Attachment J10 - Crownpoint Staff Quarters Geotechnical Report.pdf PDF
B05 Amend A00002.pdf PDF
B05 Amend A00001.pdf PDF
B01 Attachment J07 Subcontracting Plan.docx DOCX document
B01 Attachment J05 Location Map.pdf PDF
B01 Attachment J02 CPSQ 100CD Drawings.pdf PDF
B01 Attachment J04 CPSQ Building Demolition LImits.pdf PDF
B01 Attachment J01 WD NM20230002.pdf PDF
B01 Attachment J09 PPQ.docx DOCX document
B01 Attachment J06 CPSQ Hazardous Material Report.pdf PDF
B01 RFP 75H70124R00004.pdf PDF
B01 Attachment J08 Company Specialized Experience Form Construction.docx DOCX document
B01 Attachment J03 CPSQ 100CD Specification.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

The purpose of this amendment is to:

1) Include a list of questions from prospective offerors and the responses (6 pages)

2) Include a revised Section J to include attachments: (3 attachments)

- A0001r1

- A124r4

- A312r1

NOTICE TO OFFERORS: Offerors must acknowledge receipt of any and all amendments by number and all amendments by number and date on their cover letter in their offeror or by submitting a signed copy of the SF30. All other terms and conditions remain unchanged.

Question and Answers Crownpoint Staff Quarters Replacement

75H70124R00004

Item Section Question Response

1 Will Domestic Material be required for this project?

Refer to Section I of the solicitation, clause 52.225-9.

2 What Entity or Agency is Funding this project?

IHS and Service unit are funding this project.

Plan sheet C400

Engineer Utility notes #15 give a description of a 1” service line with a 5/8x3/4 meter setter. Sheet C401 water key notes show 1 ½ service connections and fittings. Could you clarify service line size? If the service line size is 1 ½ are you asking for SCH40?

Material, construction and testing should conform to 2008 NTUA Technical Specifications – found on the informational attachment “Water System Improvement Projects”

The pipe should by Polyethylene (PE) 200 PSI. SIDR 9 in conformance with ASTM D2239. See Sections 3.07.02 to 3.07.05 for saddles, stops and fittings for line connections.

4 Sheet C400

This shows the existing sewer line is 10” Ductile Iron. If so are you tapping into the DI for service connections or cutting in the connection? If you are tapping what kind of saddle would you allow for a tap? If you are cutting in the connection, could you provide a spec for the lining for the MJ fittings?

For all material and testing, please Reference 2008 NTUA Technical Specifications found at the following link -found on the informational attachment “Water System Improvement Projects”

Service connections to existing pipe can be by saddle type fittings per NTUA Technical Specifications 4.03.04. Ductile Iron Wastewater Pipe Fittings. Also reference NTUA standard WWS-1 shown as detail 13 on Sheet C703. Saddle is SDR 35 PVC

Could provide the existing pipe size and type for the water service connections?

The water line is 250mm or 6”. NTUA has as-built information for the water, sewer and gas. This information should be provided to the contractor for use in planning and construction.

6 Sheet C301

Sheet C301 has 2 existing lines that will need to be lowered per sheet C705 detail.

Could you provide the existing pipe size and type?

8” runs north-south and 6” runs east west.

Use detail 30 for crossing cover dimensions

7 Is AASHTO required for the 24” & 30” HDPE on sheet C301?

Refer to 12/C702.

Units 3020, 3021, and 3032 to 3039 are highlighted on the Building Demolition Limits and are not on the Hazardous Materials Report, can the contractor price the abatement for the units not in the Hazardous Materials Report using the survey for unit 3023?

Yes, a contractor can use the price for unit 3023 and be verified by contractor after awarded contract.

Units 3025 to 3031 are listed as part of the contract for demolition in the Hazardous Materials Report and these units are not highlighted on the Building Demolition Limits, is the contractor to demolition units 3025 to 3031 and 3040 as part of the contract?

Refer to sheets A101 and A103 for units to be removed and locations of new units.

Units 3019-2, 3022, 3023, 3024, 3025, 3026, 3027, 3028, 3029, 3030 shall be demolished under phase 2 scope.

Section B, B.2. Contract Pricing CLIN #0017 and 0018 states “Remove only damages curb and gutter and sidewalk” however, the quantity of damaged curb and gutter and sidewalk are not shown on the plans.

Can the Government provide a drawing showing the location and limits for the damaged curd and gutter and sidewalk to be replaces?

See the revised price schedule.

Section B

Price Schedule

It appears that 35 new housing units rather than the 33 referenced in the RFP and plans are shown in the Schedule of Prices. I believe this may be due to CLIN 0009 showing quantity 2 duplexes rather than 1.

Is CLIN 0009 intended to only refer to lot 3044/3045?

It is 33 units per the SOW and RFP. CLIN 0009 was revised to 1 Duplex (from 2). CLIN 0009 description was revised to LOT 3019.

CLIN 0013 was revised to LOT 3044/45.

(See revised Section B)

Section B

Price Schedule

Is the sitework demo and construction listed as phase 1 in CLINS 0004 & 0011 under the Base pricing intended to correspond with phase 1 of the new housing units construction shown on A103?

Similarly, is the sitework demo and construction listed as phase 2 under the Options pricing in CLINS 0015 & 0016 intended to correspond to phase 2 shown on A103? If that is the intent, the number of new housing units listed in the Base and Options pricing sections do not match the number of units listed in phase 1 and phase 2 on A103 respectively. Or is the sitework demo and construction phases 1 and 2 independent of the housing units new construction phases 1 and 2? Said another way, is there a plan that shows what civil demo and new civil construction is considered phase 1 and what is considered phase 2?

Refer to red lined C004 attached showing the Sitework Phase I and Phase 2. See Attachment J11 and revised Section J

Regarding sheet A204, the Key Note 05 52 Metal Patio Railing. The specification book does not include a Metal Patio Railing section nor is it in the Table of Contents.

We are unsure what to bid for these.

Refer to D1/A511 and Section 323119 - Decorative Metal Fences and Gates.

In sections 22 11 16, 22 11 20, and 22 13 16, the specifications reference Section 22 05 48 "Vibration and Seismic Controls for Plumbing Piping and Equipment". I don't see that section in the specifications. Please advise.

Section 22 05 48 "Vibration and Seismic Controls for Plumbing Piping and Equipment" references shall be removed from sections: 22 11 16, 22 11 20, and 22 13 16.

On Sheet G001 Codes and Standards I mentions to uses 2021 IBC Code. Then on the structural sheet S001 it states to use the 2018 IBC Code. Can we get clarification of which code to use for the plans?

Contractor shall apply International Residential Code (IRC) 2021 to 1 Bedroom plans, Two Bedroom plans, Two Bedroom ADA plans, and Duplex plans.

Contractor to shall apply International Building Code (IBC) 2021 to Quadplex plans.

In review of the plans provided on SAMS.gov we did not find a copy of the Geotechnical Report for the project. Please provide.

The Geotechnical Report will be added as Attachment J10. Please see the attached document and a revised section J.

B.2, CLIN 0001: It states to verify quantities 2021 HM report for each building. Does this mean IHS would like to do a HAZMAT full sampling again? Do a full HAZMAT report? Please verify the intent of the bid item

Verify the items identified as hazardous waste are still present and included in the abatement plan to be submitted for approval. No additional testing is required.

If you wanted us to do a full haz mat report, wouldn’t that null and void CLIN 002 and 003 since CLIN 001 essentially says that the current hazmat report is not valid in terms as quantities? Please verify.

No hazardous materials report is required.

An abatement plan is required. The report is accurate as to location and quantities.

The architectural site plan show Phase 1 and Phase 2. The bidding format requires that we break out the streets into Phase 1 and Phase 2 along with other items in particular CLIN’s. We could not locate a plan that separates the civil work (streets, sidewalks, etc) into a Phase 1 and Phase 2.

Could you please send clarification.

See response in #12.

20 We could not find a window schedule.

Please confirm.

All windows are Type A and shall be 60”wx48”h

21 ADA Homes; Does the ADA houses take the same windows and all other houses?

All windows are Type A and shall be 60”wx48”h same as standard units

Glazing; it calls for Argon in the glazing which is not recommended for this altitude but it may after U-Value if taken out. Please confirm Argon is required.

Argon is required, match the performance requirements identified in the glazing schedule of the specification.

H.22 Inspections; It says contractor is responsible for all inspections. Is this only for material inspections or also inspectors hired or employed by IHS? Please clarify.

This is not for “inspections” by the government or representative.

For the Quadplex Option 2, can the Architect provide a complete cross section for the elevation change indicated on the units to be built on lots 3025, 3024, 3032, 3042, 3043, 3046, and 3047? The Civil and Architectural drawing don’t provide enough information on how the contractor is to address the elevation change in the Quadplexes that have this condition. Sheets S134.2 and S134.3 references General Post Tensioned Slab Keynotes 1 – “Verify all dimensions and conditions with Architecture Drawings. Dimensions not noted shall be per approved Architectural Drawings. Resolve any discrepancies with the Architect prior to construction." This condition shown on the Civil and Structural Drawings is not detailed in the Architectural drawings. The Structural drawing provide detail 115-Grade Step at Post Tension Slab on Grade on sheet S512 and detail 215-Wood Roof Trusses at Step in Roof.

Refer to sheet S124.1 and S144.1 and details 115/S512, 215/S522 for transitions at quadplexes option 2 located on lots 3046/3047, 3045/3042 refer to sheets C301, C302,C303 for grading elevations at these lots.

Quadplex located on lots 3031/3032/3033 is not currently part of project scope.

Refer to attached sheet A001r1, A312r1 and A124r1for building transition.

What are the lengths and heights for the retailing walls indicated in the Site Plan Keynotes #15-“Retailing Wall. Refer to Structural Plans”? There is not enough information on Sheet C201, C202, C203, C301, C302, and C303 indicating retaining walls to determine the length and height (top of wall or bottom of wall) on the noted locations retaining walls. The Retaining Wall Detail is shown on Sheet S503. Sheet A204 does not show retaining walls.

Retaining walls shown on plan are 4’ in total height per detail 24/S503. Wall represented graphically as short are to be 5’ in length. Walls represented graphically “longer” shall be 15’ in length.

Can you provide information regarding the product information for the carpeting for Crownpoint staff Quarters? It is listed on the room finish schedules in the drawings, but there is no specification provided

Remove CP1 from Sheet A601 and replace with LV1. No Carpet shall be installed on project.

Finish schedules A-601 for some units shows CP 1 in bedrooms, but there is no spec for this material. Could you help us with more info abut CP 1 material please?

Remove CP1 from Sheet A601 and replace with LV1. No Carpet shall be installed on project.

All Laundry room sub-panels need good clearance from Washers per NEC code. Is okay for surface mount electrical paneling?

Surface mounting of the electrical panels is not acceptable.

Panels shall be recessed mounted.

Currently on the finish schedule on sheet number A601 (page 139 of 184) they are calling out CP1 in the bedrooms. However, there is no reference to carpet material

Remove CP1 from Sheet A601 and replace with LV1. No Carpet shall be installed on project.

selection on the spec sheet or from the material schedule.

Keynote 7 on the civil plans (Sht. C200-204) call out for chain link fence, but there is nothing to note the height. What is the height of the fencing?

Chain-link fencing shall be 5’-0” tall from grade.

Please confirm that wall type P.1 is a 1 hour rated wall to roof deck above and clarify which detail is applicable at this location where the ceiling intersects wall type P.1.

Refer to attached sheet A001r1 for revised P.1 assembly.

Please confirm that 410A is the refrigerant of choice. It will no longer be sold by venders for complete installs beginning 2025 per EPA regulations.

The R410A refrigerant requirement shall be removed from project. Provide new HVAC equipment that is configured to use R454 refrigerant.

Is the only project tax applicable the Navajo Nation tax? meaning that federal and state tax will be exempt for this project?

As stated in Section B of the solicitation, all offerors are responsible for allowing for all applicable state, local and tribal (where applicable) taxes and fees within their bids and to perform their own due diligence in ascertaining them. The Contractor is responsible to pay all applicable Tribal fees and/or taxes, or applicable requirements that may be incurred as a result of this project. Failure on the part of the successful Offeror not to include these fees or the appropriate impacts will not constitute a request for an equitable adjustment to the contract price.

Yes, on sheets C100, C101, C102, C103, & C104 (page 8-12 on the drawings) it states in section 6 the removal of the existing fence. Is there exact footage that the owner would like to remove since it’s not very clear what amount of the fence will be removed.

Demolition Plan sheets (C100-C104) correspond with the Site Plan sheets (C200- C204). The fence to be demolished is called out on the Demolition Plan sheets.

Contractor can further compare/contrast with Site Plan sheets for proposed new fencing and tie-in locations to fencing to remain. Contractor can scale drawings to quantify footage of fencing to be removed.

No additional information is required to prepare the pricing for demolition of fencing.

We would like to inquire if Homestead Cabinets would suffice as an approved equal for the casework on this project.

https://www.homesteadcabinet.net/about-us

Contractor to follow section 012500 of specifications and to use CSI Form 13.1A with point by point comparison between specified product/requirements and substituted product.

Please confirm the exact number of each style of housing being developed:

• 1 Bedroom SF Floor Plan

• 2 Bedroom SF Floor Plan

• 2 Bedroom SF ADA Floor Plan

• Duplex Floor Plan

(1) - 1 Bedroom SF Floor Plan

(1) - 2 Bedroom SF Floor Plan

(1) - 2 Bedroom SF ADA Floor Plan (Lot 3017)

(3) - Duplex Floor Plan

(6) - Quadplex Floor Plan

• Quadplex Floor Plan Lot 3017 shall be used for the 2 Bedroom SF ADA Floor Plan.

Lots: 3031/3032/3033, 3034, 3035/3036/3037 and 3038/3039 are not included under this contract scope, refer to sheet A103 for construction limits.

Can you provide information regarding the product information for the carpeting for Crownpoint staff Quarters. It is listed on the room finish schedules in the drawings, but there is no specification provided

Remove CP1 from Sheet A601 and replace with LV1. No Carpet shall be installed on project.

Finish schedules A-601 for some units shows CP 1 in bedrooms, but there is no spec for this material. Could you help us with more info abut CP 1 material please?

Remove CP1 from Sheet A601 and replace with LV1. No Carpet shall be installed on project.

SECTION J

LIST OF ATTACHMENTS

The following listed attachments are a part of this solicitation and any resultant contract.

ATTACHMENT 1 – Construction Wage Determinations (NM20230002) ATTACHMENT 2 – CPSQ 100CD Drawings ATTACHMENT 3 – CPSQ 1000CD Specifications ATTACHMENT 4 – CPSQ Building Demolition Limits ATTACHMENT 5 – Location Map ATTACHMENT 6 – CPSQ Hazardous Material Report ATTACHMENT 7 – Subcontracting Plan ATTACHMENT 8 – Company Specialized Experience Form Construction ATTACHMENT 9 – Past Performance Questionnaire ATTACHMENT 10 – Crownpoint Staff Quarters Geotechnical Report

ATTACHMENT 11 – CPSQ SITEWORK PHASING C004

ATTACHMENT 12 – A0001r1 ATTACHMENT 13 – A124r1 ATTACHMENT 14 –A312r1

END OF SECTION

topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: A00004
Code[0]: 199
Code[1]:
AccountingData[0]:
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]:
Description[0]: see continuation page
FacilityCode[0]:
Code[2]:
IssuedBy[0]: Indian Health Service (IHS)

Division of Engineering Services (DES) - Seattle 701 5th Ave, Suite 1650 Seattle, WA 98104

NameandAddress[0]:
AdministeredBy[0]: See item 6
ContractIDCode[0]:
ReqNumber[0]:
AmendmentNo[1]: 75H70124R00004
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 9
EffectiveDate[0]: 12/28/23
Dated9B[0]: 10/24/2023
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: Off
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]: 1
CopiesReturned[0]:

File details come from the government source that posted it. Updated .