This geotechnical exploration report provides recommendations for the Crownpoint Staff Quarters Replacement project. The report details subsurface soil conditions at the site through six soil test borings drilled to fifteen feet below grade. Near-surface soils consist primarily of silty clayey sands with groundwater not encountered. Laboratory testing indicates moderate collapse and expansive potential. The report provides foundation, earthwork, excavation, and drainage recommendations for shallow spread footings, post-tension slabs, retaining walls, flatwork, and pavements. Allowable bearing pressures, settlement estimates, lateral earth pressures, and corrosion potential testing results are also included.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
www.ATEKEC.com
111 South Weber Drive, Chandler, Arizona 85226 – Office 480-659-8065 2015 North Forbes Boulevard, Suite 103, Tucson, Arizona 85745 – Office 520-638-8142
GEOTECHNICAL EXPLORATION REPORT
CROWNPOINT SOUTH QUARTERS
HOUSING
CROWNPOINT, NEW MEXICO
Prepared for:
Johnson Smitthipong & Rosamond Associates, Inc.
5210 East Williams Circle, Suite 600 Tucson, Arizona 85711
Prepared by:
ATEK Engineering Consultants, LLC 111 South Weber Drive, Suite 1 Chandler, Arizona 85226
ATEK Project # 210064
March 3, 2022
111 SOUTH WEBER DRIVE, SUITE 1 WWW.ATEKEC.COM P (480) 659-8065
CHANDLER, AZ 85226 F (480) 656-9658
March 3, 2022 ATEK Project #210064
Attention: Daniel Hargreaves, LEED Associates
Johnson Smitthipong & Rosamond Associates, Inc 5210 East Williams Circle, Suite 600 Tucson, Arizona 85711
Regarding: Geotechnical Exploration Report
Project: Crownpoint South Quarters Housing
Crownpoint, New Mexico
Dear Mr. Hargreaves, ATEK Engineering Consultants, LLC is pleased to present the attached Geotechnical Exploration Report for the Crownpoint South Quarters Housing located in Crownpoint, New Mexico within the Navajo Nation. The purpose of our study was to explore and evaluate the subsurface conditions at the proposed site to develop preliminary geotechnical engineering recommendations for project design and construction.
Based on our findings, the site is considered suitable for the proposed construction, provided geotechnical recommendations presented in the attached report are followed. Specific recommendations regarding the geotechnical aspects of the project design and construction are presented in the attached report. The recommendations contained within this report are dependent on the provisions provided in the Limitations and Recommended Additional Services sections of this report.
We appreciate the opportunity of providing our services for this project. If you have questions regarding this report or if we may be of further assistance, please contact the undersigned.
Sincerely, ATEK Engineering Consultants, LLC
Antonio Lopez, P.E. (AZ) Armando Ortega, P.E.
Project Manager Principal Geotechnical Engineer
Distribution: (1) Addresses (Electronic Copy)
TABLE OF CONTENTS
1. INTRODUCTION
Project Description
Purpose
Scope of Services
2. FIELD EXPLORATION
General
Soil Test Borings
Percolation Test Boring
3. LABORATORY TESTING
4. GENERAL SITE CONDITIONS
Surface Conditions
Subsurface Conditions
Groundwater Conditions
Geologic Hazards
4.4.1. Liquefaction Potential
4.4.2. Collapsible Soils
4.4.3. Expansive Soils
Seismic Considerations
5. ENGINEERING ANALYSES AND RECOMMENDATIONS
Earthwork
5.1.1. Frost Heave
5.1.2. Spread Footing
5.1.3. Conventional Slab
5.1.4. Post-Tension (PT) Slabs
5.1.5. Concrete Flatwork
5.1.6. Pavement Site Preparation and Grading
5.1.7. Aggregate Base Course
5.1.8. Engineered Fill
Excavation
5.2.1. Trench Backfill
5.2.2. Temporary Excavations
5.2.3. Permanent Excavations and Slopes
Structures
5.3.1. Shallow Spread Footings
5.3.1.1. Structural slabs (post-tensioned or reinforced mat-
type slabs)
5.3.1.1.1. .................................................. Expansive Lots
5.3.2. Resistance to Lateral Loads
5.3.2.1. Wall Drainage
5.3.2.2. Backfill Placement
Moisture Protection
Corrosion Potential
5.5.1. Electrical Resistivity
5.5.2. Corrosion to Concrete
Pavement Areas
6. CLOSURE
Limitations
Recommended Additional Services
APPENDIX A – Site Location Map APPENDIX B – Sample Location Plan APPENDIX C – Field Study and Boring Logs APPENDIX D – Laboratory Test
Geotechnical Exploration 210064 Crownpoint South Quarters Housing Crownpoint, New Mexico Page 1 of 25
1. INTRODUCTION
This report presents the results of our geotechnical exploration for the Crownpoint
South Quarters Housing project located in Crownpoint, New Mexico. A Site Location
Map is presented in Appendix A of this report. The following sections of this report describe our understanding of the project and our scope of services.
Project Description
The project consists of the demolition and reconstruction of 46-units within an existing subdivision in Crownpoint, New Mexico within the Navajo Nation. The new development will consist of one and two bedroom single family homes, two-bedroom duplex unit and one and two bedroom quadplex unit. The construction of the new development will be wood frame supported on spread footings or post-tension slab on ground. The construction for the 46 units will be completed in two phases, 33 units for Phase I and
13 units for Phase II.
Purpose
The purpose of this geotechnical study was to evaluate the general surface and subsurface conditions at the site, and to present preliminary recommendations related to geotechnical aspects of design and construction of the proposed project.
Scope of Services
Our study included a site reconnaissance, subsurface exploration, soil sampling, field and laboratory testing, engineering analyses, and preparation of this report. This report presents preliminary geotechnical recommendations for design and construction of proposed structures. The recommendations contained in this report are subject to the limitations presented herein. Attention is directed to the “Limitations” section of this report.
Crownpoint, New Mexico Page 2 of 25
2. FIELD EXPLORATION
General
Prior to the start of drilling, the New Mexico 811 Center and the Navajo Nation Public
Utility Authority was contacted to locate existing utilities at the boring locations. The field exploration was performed on February 9, 2022. Six (6) soil borings were drilled to a depth of fifteen (15) feet below existing grade. Additionally, two (2) percolation test borings were drilled to a depth of three (3) feet. The soil test borings were drilled using a truck mounted CME-75 power drill rig equipped with 7.25 inch outside diameter hollow stem augers. The percolation test borings were drilled using a 15-inch outside diameter solid stem auger. The borings were located in the field at the approximate locations shown on the Sample Location Plan included in Appendix B of this report.
Upon completion of the borings, the boreholes were backfilled with excavated materials.
Soil Test Borings
Disturbed and relatively undisturbed samples were taken at the direction of the field engineer during drilling operations. Relatively undisturbed samples of the subsurface materials were obtained using a California sampler with a 2.5-inch inside diameter and a 3.0-inch outside diameter. Disturbed samples were obtained using a Standard
Penetration/Split Spoon Sampler (SPT) with a 1.5-inch inside diameter and 2.0-inch outside diameter. The California and the SPT samplers were driven 12 and 18 inches, respectively, using a 140-pound hammer falling 30 inches, and blow counts for successive 6-inch penetration intervals were recorded. After the sampler was withdrawn from the borehole, the samples were removed, sealed to minimize moisture loss, and submitted to the laboratory.
Crownpoint, New Mexico Page 3 of 25
Soil classifications made in the field from auger cuttings and samples were re-evaluated in the laboratory after further examination and testing. The soils were classified in accordance with the Unified Soil Classification System presented in Appendix C.
Sample classifications, blow counts recorded during sampling, and other related information, were recorded on the soil boring logs. The boring logs are presented in
Appendix C. The information presented on the logs are a combination of factual and interpretive information. Lines delineating subsurface strata and group symbols are based on field observations made at the time of the field study. Actual subsurface lines delineating subsurface strata may be gradual and vary.
Percolation Test Boring
Percolation testing was completed in general accordance with the State of New Mexico
Environmental Department procedure. The percolation depths and recorded rates are presented in the following table.
Percolation
Test Location
Percolation Depth Below
Existing Grade (feet)
Percolation
Rate (min/inch)
P-1 3.0 60
P-2 3.0 45
Siltation, vegetation growth and other factors tend to slow percolation rates within the basin. The percolation rates provided above are unfactored field measurements and a proper reduction factor should be applied in the retention design.
The excavation of the retention basin should be accomplished with light weight excavation equipment to avoid compaction of the exposed native soils. No traffic should be allowed within the retention basin after construction. It should be noted that compaction of the basin will reduce the infiltration rates. If compaction within
Crownpoint, New Mexico Page 4 of 25 the basin floor occurs, the exposed surface should be scarified to a minimum depth of
8-inches and left uncompacted.
3. LABORATORY TESTING
Selected soil samples from the borings were tested in the laboratory for classification purposes and to evaluate their engineering properties. The laboratory tests included:
• Gradation;
• Atterberg limits;
• Moisture content;
• One-dimensional consolidation;
• Expansion index test;
• Organic content test;
• pH tests;
• Resistivity tests;
• Sulfate content;
• And chloride content.
A brief description of each test performed on the soil samples and the results are presented in Appendix D of this report.
4. GENERAL SITE CONDITIONS
Surface Conditions
The project site is located in the northwestern-most physiographic province in New
Mexico called the Colorado Plateaus. The rock formations specific to the Crownpoint area consists of thick sequences of undeformed but uplifted Cretaceous aged (145 to
66 Mya) sedimentary rocks known as the Crevasse Canyon Formation (oldest), Mancos
Shale, Point Lookout Sandstone, and Menefee Formation (youngest)11 . Each of these bedrock formations reflect the transitional environment from a marine (interbedded shale, claystone, and siltstone) to coastal plain (coarse-grained sandstone, siltstone)
Geologic Map of the Crownpoint Quadrangle, McKinley County, New Mexico. Robertson, Jacques.
Prepared by United States Geological Survey, Map GC-1596. 1987.
Crownpoint, New Mexico Page 5 of 25 during the Cretaceous period. Dissected, cliff-bench mesas, and wide plateaus form the general topography of the area.
Specific to the project site, the surficial geology is mapped as colluvium, a type of soil deposit formed from the erosion of the surrounding steep-sloped rock outcrops and deposited by wind or water as weakly consolidated deposits of Clayey Sand (SC) and
Sandy Lean Clay (CL). The proximity to existing rock outcrops creates highly variable soil horizons that can grade quickly to decomposed extremely weak mudstone. The development of the infrastructure within the project area has obscured much of this surficial geology.
Subsurface Conditions
As indicated by the exploratory borings, in general the surface consists of Clayey Sand
(SC) and Sandy Lean Clay (CL) with low plasticity. These soils were found to have a relative firmness of soft to firm. The underlying subsurface soils encountered during our field exploration consisted of Clayey Sand (SC), Sandy Lean Clay (CL) with low to high plasticity and Silty Sand (SM) with no plasticity. These soils were found to have a relative firmness ranging from soft to hard and a relative density of very dense.
Weathered and decomposed bedrock was encountered at depths ranging from 10 feet to 15 feet below the existing grade. This bedrock consisted of weathered and decomposed Mudstone. For additional information see Boring Logs presented in
Appendix C.
Groundwater Conditions
Groundwater was not encountered within the soil test borings. It is anticipated that groundwater will not be a factor in design or construction of the planned improvements.
It should be noted that soil moisture conditions within the area may vary depending on rainfall and/or runoff conditions not apparent at the time of our field study.
Crownpoint, New Mexico Page 6 of 25
Geologic Hazards
4.4.1. Liquefaction Potential
Based on the site soils and groundwater conditions encountered at the project site during this study, the preliminary potential for soil liquefaction is considered to be negligible.
4.4.2. Collapsible Soils
Collapsible soils are soils with the potential for a decrease in volume with an increase in external load or moisture content. These soils are typically found in areas of alluvial deposits with semi-arid to arid climates. Based on the information collected during our field study and subsequent laboratory testing, we anticipate collapse-susceptible soils will be encountered during construction. Based on ASTM D 5333, a calculated collapse potential, IC, of the tested undisturbed ring samples collected during our field study resulted in 3.0 percent indicating a moderate collapse potential.
4.4.3. Expansive Soils
Expansive soils are soils with the potential for an increase in volume with an increase in moisture content. Based on the information collected during our field study and subsequent laboratory testing, we anticipate expansive-susceptible soils will be encountered during construction. Based on ASTM D 4829, the expansive potential of the remolded sample collected during our field study, in the upper 5 feet, indicated a moderate expansive potential.
Seismic Considerations
The project site is located in northwes New Mexico which is an area of low seismic activity. The following values were developed using the Structural Engineers
Association by Location (https://seismicmaps.org), ASCE 7-16 as referenced by the 2021
Crownpoint, New Mexico Page 7 of 25
International Building Code (IBC) and are based on knowledge of local geologic conditions, and subsurface soils encountered during our study. A 100-foot soil test boring was not advanced during our field study. The geographic coordinates listed below were used in developing the seismic design factors.
Central Latitude…………………………………………………35.676474˚
Central Longitude……………………………………………-108.150388˚
5. ENGINEERING ANALYSES AND RECOMMENDATIONS
Earthwork
All existing structural remnants, fill, pavement, topsoil, vegetation and organic soils should be removed from below structural areas. Frozen soils should not be used as engineered fill. The following sections present earthwork recommendations based on our understanding of the project, the finding of our field exploration, results of the laboratory tests and engineering analysis. Based on the finding of our field exploration, laboratory test results and engineering analysis, it is our opinion that the proposed
Seismic Design Factors Value
Site Class D
Fa, Site Coefficient 1.6
Fv, Site Coefficient 2.4
Ss, Mapped Spectral Acceleration at 0.2‐second Period 0.180 g
S1, Mapped Spectral Acceleration at 1.0‐second Period 0.060 g
SMS, Spectral Acceleration at 0.2‐second Period Adjusted for Site Class 0.289 g
SM1, Spectral Acceleration at 1.0‐second Period Adjusted for Site Class 0.145 g
SDS, Design Spectral Response Acceleration at 0.2‐second Period 0.192 g
SD1, Design Spectral Response Acceleration at 1.0‐second Period 0.097 g
Crownpoint, New Mexico Page 8 of 25 construction can be supported on a foundation system as presented in the following sections.
5.1.1. Frost Heave
This project is in an area with an anticipated frost depth of thirty (30) inches. To protect against frost heave, the use of fine-grained soils should be avoided in and around structural areas. The potential for snowpack adjacent to the structural areas may allow significant moisture to increase into fills around the outer edge of foundations therefore the exterior should be graded for positive drainage away from the structural areas.
Also, to reduce the potential for moisture migration through earthwork operations, refer to section 5.5 of this report.
5.1.2. Spread Footing
To ensure all structural elements of the previous structure have been removed, the existing surface soils should be removed to a minimum depth of two (2) feet below bottom of proposed spread footing elevation. The excavation of the site soils should be within the entire footprint of the structure and extend laterally for a minimum distance of five (5) feet beyond the perimeter of structure. The exposed subsurface soils should be scarified to a depth of (eight) 8-inches: moisture conditioned to within two (2) percent of optimum moisture content and compacted to a minimum of 92 percent of maximum dry density. The excavated material should then be moisture conditioned to within two (2) percent of optimum moisture content and compacted to a minimum of 92 percent of maximum dry density and used as engineered fill to within two (2) feet of finished pad elevation. Optimum moisture content and maximum dry density should be determined by American Society for Testing and Materials (ASTM) D
1557.
Crownpoint, New Mexico Page 9 of 25
5.1.3. Conventional Slab
Engineered Fill material meeting the recommendations presented in section 5.1.8 of this report should be placed within two (2) feet of the finished pad elevation. These soils should be moisture conditioned to within two (2) percent of optimum moisture content and compacted to a minimum of 92 percent of maximum dry density. Optimum moisture content and maximum dry density should be determined by ASTM D 1557.
5.1.4. Post-Tension (PT) Slabs
To ensure all structural elements have been removed, the existing surface soils should be removed to a minimum depth of two (2) feet below lowest PT slab elevation or below thickened edge. The exposed native soils below PT slab should be scarified to a depth of 8-inches: moisture conditioned to within two (2) percent of optimum moisture content and compacted to a minimum of 92 percent of maximum dry density. The excavated material should then be moisture conditioned to within two (2) percent of optimum moisture content and compacted to a minimum of 92 percent of maximum dry density and used as engineered fill to bring site to grade. Optimum moisture content and maximum dry density should be determined by ASTM D 1557.
5.1.5. Concrete Flatwork
The site soil exhibits expansive characteristics. To decrease the potential for post-construction movement the site soils should be replaced with one (1) foot of non-expansive Engineered Fill (Low Frost Susceptible) material meeting the recommendations presented in section 5.1.8 of this report. The exposed native soils should be scarified to a depth of 6-inches: moisture conditioned to within two (2) percent of optimum moisture content and compacted to a minimum of 92 percent of maximum dry density. Engineered Fill should be moisture conditioned to within two (2) percent of optimum moisture content and compacted to a minimum of 92 percent of
Crownpoint, New Mexico Page 10 of 25 maximum dry density. Optimum moisture content and maximum dry density should be determined by ASTM Test Method D 1557.
5.1.6. Pavement Site Preparation and Grading
The pavement section presented in this report is based on the site soils encountered during our field exploration. The existing surface soils should be removed to a minimum depth of one (1) foot below bottom existing base course. The exposed subsurface soils should be scarified to a depth of (eight) 8-inches: moisture conditioned to within two
(2) percent of optimum moisture content and compacted to a minimum of 95 percent of maximum dry density. The excavated material should then be moisture conditioned to within two (2) percent of optimum moisture content and compacted to a minimum of 95 percent of maximum dry density and used as engineered fill to bring site to bottom of base course elevation. Optimum moisture content and maximum dry density should be determined by ASTM Test Method D 1557. Any material with a diameter larger than three (3) inches within the pavement area should be removed prior to base course placement.
5.1.7. Aggregate Base Course
Aggregate base used in support of Portland cement concrete and asphaltic concrete pavements should conform to the local governing agency and/or New Mexico
Department of Transportation (NMDOT) Standard Specification for Road and Bridge
Construction. A minimum of 4-inch layer of clean, granular material should be placed beneath concrete slabs to serve as a leveling base, and to aid in concrete curing. The material should conform to the gradation requirements set by the local governing agency. The use of moisture barriers beneath the floor slabs may be helpful, but is not a geotechnical requirement; however, the architect or the slab designer should evaluate their need.
Crownpoint, New Mexico Page 11 of 25
All aggregate base material should be placed in lifts not greater than eight (8) inches and compacted to a minimum of 92 percent of maximum dry density below Portland cement concrete and 96 percent of maximum dry density below asphaltic concrete pavements as determined by American Society for Testing and Materials (ASTM) Test
Method D 1557 or as specified by local specification. The moisture content during compaction should be maintained within two percent of optimum moisture content.
5.1.8. Engineered Fill
Engineered fill may consist of native soils and/or imported soils. Pea gravel and poorly-graded materials should not be used as engineered fill unless approved by the geotechnical engineer. All engineered fills should be compacted as noted in section 5.
1. Native soils can be used as fill material for the following:
• general site grading
• foundation areas
• up to 1-foot below slab
• foundation backfill
• pavement areas
2. Imported soils or native soils with low expansive potential could be used as fill material for the following:
• general site grading
• foundation areas
• exterior slabs
• foundation backfill
• pavement areas
• interior slabs
3. Imported soils (low-frost susceptible) should conform to the following:
Percent finer by weight
Gradation (ASTM C136)
3"………………………………………………………………………………….100
No. 4 Sieve ……………………………………………………………….25-60
No. 200 Sieve…………………………………………………………15 (max)
Expansion Index
Crownpoint, New Mexico Page 12 of 25
Expansion Index ……………………………………………………………20
Corrosion Potential (PPM)
Sulfate Content (ARIZ 733)………………………………………….1,000(max)
Chloride Content (ARIZ 736)……………………………………………500(max)
4. Imported soils below the frost depth (if required) should conform to the following:
Percent finer by weight
Gradation (ASTM C136)
3"………………………………………………………………………………….100
No. 4 Sieve ……………………………………………………………….50-100
No. 200 Sieve…………………………………………………………50 (max)
Expansion Index
Expansion Index ……………………………………………………………20
Corrosion Potential (PPM)
Sulfate Content (ARIZ 733)………………………………………….1,000(max)
Chloride Content (ARIZ 736)……………………………………………500(max)
5. Aggregate base should conform to New Mexico Department of Transportation
(NMDOT) Standard Specification for Road and Bridge Construction Section 207 and/or local governing specifications.
6. Frozen soils should not be used as fill or backfill.
7. The following are intended to guide in establishing adequate support for the conventional foundation elements:
• Any natural washes, depressions or new excavations which are to be filled, should be widened as necessary to accommodate compaction equipment and provide a level base for placing fill.
• Any engineered fill (backfill) materials placed beneath the foundations should meet the requirements for Engineered Fill Materials.
Crownpoint, New Mexico Page 13 of 25
• All footing excavations should be relatively level and free of loose or disturbed material and inspected by a qualified representative of the
Geotechnical Engineer.
8. All fill soils to be used beneath the foundations; slabs and pavements should be approved by the Geotechnical Engineer. Fill should be placed in 8-inch loose lifts, moisture conditioned to within 2 percent of optimum moisture content and compacted to a minimum of 92 percent of maximum dry density. Fill materials placed at depth greater than five (5) feet should be compacted to 96 percent of maximum dry density to finished grade elevation. Optimum moisture content and maximum dry density should be determined by ASTM Test Method D 1557.
Excavation
The field sampling and exploration was performed using a truck-mounted drill rig with
7 and ¼-inch outside diameter hollow stem augers. We present the following general comments regarding ease of excavation with the understanding that they are opinions based on the test borings. The project consultant and contractor should become familiar with this report including boring logs to evaluate potential hard dig conditions.
Please note that excavation characteristics are best evaluated by performing test excavations with the size and type of equipment the contractor plans on using at the site, which was not conducted as part of this study.
It is anticipated that excavations less than 10-feet deep in the site soils can most likely be accomplished by conventional earth moving equipment in good operating condition.
Sloughing and caving of near surface soils should be considered during grading operations. Please refer to Section 4 and the boring logs presented in Appendix C of this report for more information.
Crownpoint, New Mexico Page 14 of 25
5.2.1. Trench Backfill
Materials
Pipe zone backfill (i.e., material beneath and in the immediate vicinity of the pipe) should consist of soil with a maximum particle size less than one inch. Trench zone backfill (i.e., material placed between the pipe zone backfill and finished subgrade) may consist of soil that meets the requirements for structural fill provided above.
If import material is used for pipe or trench zone backfill, we recommend it consist of fine-grained sand. In general, poorly graded coarse-grained sand and gravel should not be used for pipe or trench zone backfill due to the potential for site soil migration into the relatively large void spaces present in this type of material and water seepage along trenches backfilled with coarse-grained sand and/or gravel.
Recommendations provided above for pipe zone backfill are minimum requirements only. More stringent material specifications may be required to fulfill local codes and/or bedding requirements for specific types of pipes. We recommend the project
Civil Engineer develop these material specifications based on planned pipe types, bedding conditions, and other factors beyond the scope of this study.
Compaction Criteria
Backfill of trenches should utilize site soils with particle diameter less than 3-inches, in order to aid compaction and reduce potential differential settlement problems.
Backfilling of utility trenches should be in 12-inch maximum loose lifts, and compacted to a minimum of 90 percent and 92 percent of ASTM D-1557 (standard Proctor), in non-structural areas and structural areas, respectively. Please note that the local governing agency specifications may surpass these trench backfill requirements. Jetting, flooding, or puddling of cohesive backfill soils should not be utilized under any circumstances.
Crownpoint, New Mexico Page 15 of 25
5.2.2. Temporary Excavations
General
All excavations must comply with applicable local, state, and federal safety regulations including the current Occupational Safety and Health Administration (OSHA) Excavation and Trench Safety Standards. Generally, Construction site safety is solely the responsibility of the Contractor, who shall also be responsible for the means, methods, and sequencing of construction operations. We are providing the information below strictly as a service to our client. Under no circumstances should the information be interpreted that ATEK is assuming responsibility for construction site safety or the
Contractor’s activities; such responsibility is not being implied and should not be inferred.
Excavations and Slopes
The Contractor should be aware that slope height, slope inclination, or excavation depths (including utility trench excavations) should in no case exceed those specified in local, state, and/or federal safety regulations (e.g., OSHA Health and Safety
Standards for Excavations, 29 CFR Part 1926, or successor regulations). Such regulations are strictly enforced; and, if not followed, could result in substantial penalties to the Owner, Contractor, and/or earthwork subcontractor and/or utility subcontractors.
Near-surface soils encountered during our field study consisted predominantly of silty clayey sands. In our opinion, these soils would be considered a Type C soil when applying OSHA regulations. For this soils type OSHA recommends a maximum slope inclination of 1½(h):1(v) or flatter for excavations 20 feet or less in depth. Steeper cut slopes may be utilized for excavations less than 5 feet deep depending on the strength, moisture content, and homogeneity of the soils as observed in the field. Flatter slopes and/or trench shields may be required if loose, cohesionless soils and/or water are encountered along the slope face.
Crownpoint, New Mexico Page 16 of 25
Construction Considerations
Heavy construction equipment, building materials, excavated soil, and vehicular traffic should not be allowed within one-third the slope height from the top of any excavation.
Where the stability of adjoining buildings, walls, or other structures is endangered by excavation operations, support systems such as shoring, bracing, or underpinning may be required to provide structural stability and to protect personnel working within the excavation. Shoring, bracing, or underpinning required for the project (if any) should be designed by a professional engineer registered in the State of Arizona.
During wet weather, earthen berms or other methods should be used to prevent runoff water from entering all excavations. All runoff water should be collected and disposed of outside the construction limits.
5.2.3. Permanent Excavations and Slopes
We recommend all permanent cut and fill slopes in soil be constructed at a gradient no steeper than 3(h):1(v). During wet weather, erosion could become a problem. Proper drainage and maintenance are recommended. To reduce the potential for surface erosion, a berm or "V" ditch may be located at the top of slopes subject to significant overland water flows in order to intercept and redirect surface runoff.
Fill placed on slopes steeper than 5(h):1(v) should be benched into the existing slope. It is recommended that the slope face be compacted as presented in the earthwork section of this report.
Structures
The anticipated frost depth for the project area is 30-inches below existing site grade.
Therefore, concrete slabs and post-tensioned slab-on-ground foundations should have turn downs which extend below the anticipated frost depth.
Crownpoint, New Mexico Page 17 of 25
5.3.1. Shallow Spread Footings
Shallow spread footings bearing on engineered fill can be used to support the structures as recommended (See section 5.1). Recommended footing depths and allowable bearing pressures are presented below.
Allowable Bearing Pressure for Shallow Foundations
Footing Depth Below
Finished Grade (ft.)*
Allowable
Bearing Pressure
(psf)
2.5 2,000
3.0 2,500
*Note: Footing depth is defined as the depth below the lowest adjacent finished grade elevation within 5-feet of the edge of the footing.
A one-third increase may be applied to the design bearing pressures when considering short duration loads, such as wind and seismic.
Continuous footings and isolated column footings should have a minimum width of 16-inches and 24 inches respectively. The minimum widths are recommended for ease of construction, and to provide a margin of safety against a local or punching shear failure of the foundation soils. All footings should be reinforced to reduce potential distress caused by differential foundation movement.
All the footing excavations should be observed by the Geotechnical Engineer prior to placement of reinforcing steel and/or concrete. If subsurface conditions are encountered that are different than indicated by the borings, revised recommendations may be required.
Settlement of footings designed as recommended above are estimated not to exceed
1-inch. Differential settlements over, a horizontal distance of 50 feet between similarly
Crownpoint, New Mexico Page 18 of 25 loaded footings, are expected to be less than ½-inch and ¾-inch for wall and column footings, respectively. Significant moisture increases above those recommended for compaction could result in additional movements. In order to minimize the sensitivity of the structure to differential settlements, footings should be reinforced to allow for a degree of load redistribution should a localized zone of supporting soils become saturated.
5.3.1.1. Structural slabs (post-tensioned or reinforced mat-type slabs)
Structural slabs (post-tensioned or reinforced mat-type slabs) are recommended to support the structures.
5.3.1.1.1. Expansive Lots
Expansive soil procedure design parameters were determined using the Post-Tensioning
Institute’s Standard Requirements for Design and Analysis of Shallow Post-Tension
Concrete Foundations on Expansive and Stable Soils dated 2019, the site soils classify as Expansive Soils (PTI-3):
Maximum Allowable Bearing Pressure, qa: 1250 psf (at grade)
Coefficient of Subgrade Reaction, k: 200 pci
Edge Moisture Variation Distance, em Center Lift Condition: 9.0 feet Edge Lift Condition: 4.6 feet
Maximum Differential Soil Movement, ym Center Lift Condition: 0.10 Edge Lift Condition: 0.80
Crownpoint, New Mexico Page 19 of 25
Post-tensioned slabs’ thickened or turn-down edges and/or interior beams should be designed and constructed in accordance with the requirements of the Post-Tensioning
Institute and the American Concrete Institute.
Structures bearing on prepared subgrade as presented in the above section 5.1.3 Post-
Tensioned Slabs may experience total settlements up to ½ -inch. Differential settlement is expected to be less than ¼-inch between similarly load areas. The majority of the settlement is expected to occur during construction. Additional foundation movements could occur if the supporting soils become wetted, please refer to Section 5.4 Moisture Protection.
5.3.2. Resistance to Lateral Loads
Proposed walls/structures that will retain soil must be designed to withstand lateral soil pressures. Cantilevered retaining walls, or unrestrained walls subject to lateral earth pressures, should be designed for Equivalent Fluid Pressure (EFP) of 37 Pounds
Per Cubic Foot (PCF). Restrained walls should be designed to withstand a residual or long-term at-rest (Ko) earth pressure condition of 55 PCF.
A passive EFP of 300 PCF may be used for shallow spread footings. A coefficient of friction of 0.36 is recommended for computing lateral resistance between the base of footing and soil in analyzing lateral loads. Vehicular surcharge loads and/or hydrostatic pressure will increase the recommended EFP.
Only cohesionless, free-draining granular materials should be used as backfill, adjacent to earth-retaining structures. We recommend that backfill directly behind the walls be compacted with light, hand-held compactors. Heavy compactors and grading equipment should not be allowed to operate within three (3) feet of the walls during backfilling, to avoid developing excessive temporary or long-term lateral soil pressures. Positive gravity drainage of the backfill should be provided.
Crownpoint, New Mexico Page 20 of 25
5.3.2.1. Wall Drainage
The above-recommended values do not include lateral pressures due to hydrostatic forces. Therefore, wall backfill should be free draining and provisions should be made to collect and dispose of excess water that may accumulate behind earth retaining structures. In cases where site soils become saturated an equivalent fluid pressure of
90 PCF should be used.
Wall drainage should be collected by continuous perforated drainpipes, filter fabric, and gravel connected to weep holes. The drainpipe must run parallel to the wall. We recommend drain rock consist of durable stone having 100 percent passing the 1-inch sieve and zero percent passing the No. 4 sieve. Synthetic filter fabric should have an equivalent opening size (EOS), U.S. Standard Sieve, of between 40 and 70, a permeability of at least 0.02 centimeters per second and minimum puncture strength of 50 pounds.
5.3.2.2. Backfill Placement
All backfill should be placed and compacted in accordance with recommendations provided within the Engineering Fill Section 5.1.8.
Moisture Protection
Soil support values reduce with an increase of moisture content. Therefore, positive drainage is essential to the successful performance of any structure. Good surface and subsurface drainage should be established during and after construction to prevent the soils below or adjacent to the structural areas and utility trenches from becoming wet.
Infiltration of water into utility or foundation excavations must be prevented during construction. The drainage design must route all storm and sprinkler water away from the structural areas in a positive manner. All water should be diverted away from areas where it could penetrate the ground surface near the structural areas. Watering of
Crownpoint, New Mexico Page 21 of 25 plants should be avoided adjacent to the buildings. Desert-type landscaping is advisable near the structural areas. Plants, which require more water, should be located and drained away from the structural areas.
Corrosion Potential
5.5.1. Electrical Resistivity
Electrical Resistivity of a soil is a measure of resistance to the flow of electrical current.
Corrosion of buried metal is an electrochemical process in which the amount of metal loss due to corrosion is directly proportional to the flow of electrical current (DC) from the metal into the soil. As a soil’s resistivity decreases, its corrosivity increases.
A commonly accepted correlation between soil resistivity and corrosivity towards ferrous metals is shown in the following table.
Resistivity (ohm-cm) Corrosivity Classification 0 to 1,000 Severely corrosive 1,000 to 2,000 Corrosive 2,000 to 10,000 Moderately corrosive Over 10,000 Mildly corrosive
Based on the laboratory tests as shown above, this soil would be considered “severely corrosive”. It should be noted that these corrosion conditions are for the soils at submerged moisture conditions. Resistivity at drier moisture contents would be less corrosive than the results of the test.
The pH values of the samples tested were neutral. In most cases, pH is not a significant factor in corrosion in the near-neutral pH range (5<pH<9).
Estimated life for various gage galvanized CMP, based on Figure 6.7 of the Handbook of
Steel Drainage & Highway Construction Products published by American Iron and Steel
Sample Location pH Resistivity (Ohm-cm)
Bulk Sample B-3 7.9 3,530
Crownpoint, New Mexico Page 22 of 25
Institute Fourth Edition, 1993, is tabulated below. Details of the laboratory test results are presented in the Appendix C of this report.
5.5.2. Corrosion to Concrete
Selected samples of the near-surface soils encountered at the site were subjected to chemical analysis for the purpose of corrosion assessment. The samples were tested for soluble sulfates, and soluble chlorides. The samples were tested in general accordance with Arizona Test Methods 733, and 736 for soluble sulfates, and soluble chlorides, respectively. The test results are provided in Appendix C.
Based on provisions of American Concrete Institute (ACI) 318 Section 4.3, Table 4.3.1, Requirements for Concrete Exposed to Sulfate-Containing Solutions a sulfate concentration below 0.10 percent by weight (1,000 ppm) is negligible. Based on the laboratory results, sulfate contents of the site soils tested indicate a negligible corrosion potential to concrete.
Based on the laboratory result of the sample collected for this project, chloride contents of the site soils tested indicate negligible corrosion potential.
Pavement Areas
The on-site soils should be suitable as pavement subgrade soils provided all unsuitable debris, rubble, oversized cobbles, etc. are removed. A flexible and/or rigid pavement is recommended for the pavement areas. The recommended pavement sections are based on the assumption that the subgrade soils are prepared in accordance with section 5.1 of this report.
Sample Location Design Life (yrs)
16 Gage 14 Gage 12 Gage
Bulk Sample B-3 90 110 160
Crownpoint, New Mexico Page 23 of 25
The flexible pavement section should consist of Central Plant Mix Asphaltic Concrete
Pavement (AC) on compacted Aggregate Base Course (ABC) as recommended in the table below. Flexible pavement should be placed in accordance with New Mexico
Department of Transportation (NMDOT) Standard Specification for Road and Bridge
Construction Section 416 and local municipality standards.
PAVEMENT AREAS
ASPHALT SURFACE
THICKNESS (IN)
AGGREGATE BASE
COURSE THICKNESS
(IN)
Residential Road 3.0 6.0
Our calculations for design of the pavements section is based upon our classification of the subsurface soils, the allowable 18 kips equivalent single axle loads, the site preparation and grading recommendations provided above. A design life of 20 years was used in design.
6. CLOSURE
Limitations
Our professional services have been performed using that degree and skill ordinarily exercised, under similar circumstances, by reputable Geotechnical Engineers practicing in this or similar localities. No warranty is expressed or implied.
The recommendations contained in this report are based on our field exploration, laboratory test results, and our understanding of the proposed construction. The subsurface data used in the preparation of this report was obtained from the test borings excavated during the field subsurface exploration. It is anticipated that some variations in the soil conditions will exist on-site. The nature and extent of variations may not be evident until construction occurs. If any conditions are encountered at this site that are different from those described in this report, we should be immediately notified so that we may make any necessary revisions to the recommendations
Crownpoint, New Mexico Page 24 of 25 contained in this report. In addition, if the scope of the proposed construction changes from that described in this report, our firm should also be notified.
It is the Client’s responsibility to see that all parties to the project including the designer, contractor, subcontractor, etc. are made aware of this report in its entirety.
The use of information contained in this report for bidding purposes should be done at the contractor’s option and risk.
This report is for the exclusive purpose of providing Geotechnical Engineering and/or testing information and recommendations. The scope of services for this project does not include, either specifically or by implication, any environmental assessment of the site or identification of contaminated or hazardous materials or conditions. If the owner is concerned about the potential for such contamination, other studies should be undertaken. This report has also not addressed the site geology and the possible presence of geologic hazards.
This report may be used only by the Client and only for the purposes stated, within a reasonable time from its issuance. Land use, site conditions (both on and off-site), or other factors may change over time, and additional work may be required with the passage of time. Any party, other than the Client, who wishes to use this report, shall notify ATEK of such intended use. Based on the intended use of this report, ATEK may require that additional work be performed and that an updated report be issued.
Recommended Additional Services
The recommendations provided in this report are based on the assumption that an adequate program of tests and observations will be performed during the construction.
These tests and observations should be performed by the Geotechnical Engineer’s representative and should include, but not limited to the following:
• Observe and document that any existing surficial vegetation and other
Crownpoint, New Mexico Page 25 of 25 deleterious materials have been removed from the site as required in site preparation section.
• Approve any material used as import to document that it meets the requirements outlined above before placement.
• Monitor the backfill procedures.
• Perform field density tests, as needed, to verify compaction compliance. The representative should monitor the progress of compaction and filling operations.
• Keep records of on-site activities and progress.
Observation of footing excavations should be performed prior to placement of reinforcing and concrete to confirm that satisfactory bearing materials are present.
Construction testing, including field and laboratory evaluation of fill and backfill materials, concrete and steel should be performed to determine whether applicable project requirements have been met.
APPENDIX A
Site Location Map
Project #: 210064
Date: 3/2/2022
Drawn by: ALE
Site Location Map - Sheet 1 of 1
Crownpoint South Quarters Housing
Crownpoint, NM
Basemap provided by Google Earth 111 South Weber Drive, Suite 1
LEGEND
Project area
APPENDIX B
Sample Location Plan
Project #: 210064
Date: 3/2/2022
Drawn by: ALE
Basemap provided by Google Earth
Boring Location Plan - Sheet 1 of 1
Crownpoint South Quarters Housing
Crownpoint, NM
B-1
111 South Weber Drive, Suite 1
LEGEND
Boring Location Percolation Test
B-2
B-3
B-4
B-5
B-6
P-1
P-2
APPENDIX C
FIELD STUDY AND BORING LOGS
APPENDIX C
FIELD STUDY
BORINGS
The subsurface conditions at the site were explored on February 9, 2022 by drilling soil borings using a truck mounted CME drill rig with 7.25-inch outside diameter hollow stem auger. The locations of soil test borings performed for this study are shown in Appendix B of this report.
The locations of borings were located by visual sighting and pacing from existing site features and, therefore, should be considered approximate. Actual boring locations may vary from those indicated in Appendix B.
Our field engineer maintained a log of the excavations; visually classified soils encountered according to the Unified Soil Classification System (USCS) (see USCS Table); and obtained samples of the subsurface materials.
SAMPLING PROCEDURES
Soil samples obtained from the borings were packaged and sealed in the field to reduce moisture loss and disturbance, and returned to our laboratory for further testing. After borings were completed, they were backfilled with the excavated soils.
LIST OF ATTACHMENTS
The following plates are attached and complete this appendix.
Unified Soil Classification System – C1 Log Key – C2 Charts and Definitions – C3 Terminology Used to Describe Soils – C4 Logs of Soil Borings
UNIFIED SOIL CLASSIFICATION SYSTEM
MAJOR DIVISIONS
USCS TYPICAL
SYMBOL DESCRIPTIONS
WELL-GRADED GRAVELS, GRAVEL-SAND
CLEAN GRAVELS GW MIXTURES WITH LITTLE OR NO FINES
WITH LESS THAN
GRAVELS
5% PASSING NO. 200
GP
POORLY-GRADED GRAVELS, GRAVEL-SAND
(More than half of
SIEVE MIXTURES WITH LITTLE OR NO FINES
coarse fraction is larger than
GM
SILTY GRAVELS, GRAVEL-SILT-SAND
the #4 sieve) GRAVELS WITH MIXTURES
COARSE OVER 12% PASSING
GRAINED NO. 200 SIEVE GC
CLAYEY GRAVELS, GRAVEL-SAND-CLAY
SOILS
MIXTURES
(More than half WELL-GRADED SANDS, SAND-GRAVEL of material
CLEAN SANDS WITH SW
MIXTURES WITH LITTLE OR NO FINES
is larger than LESS THAN 5% the #200 sieve)
SANDS PASSING NO. 200 POORLY-GRADED SANDS, SAND-GRAVEL
SIEVE
SP
MIXTURES WITH LITTLE OR NO FINES
(More than half of coarse fraction is smaller than SILTY SANDS, the #4 sieve) SANDS WITH OVER SM
SAND-GRAVEL-SILT MIXTURES
12% PASSING NO.
200 SIEVE SC
CLAYEY SANDS,
SAND-GRAVEL-CLAY MIXTURES
INORGANIC SILTS & VERY FINE SANDS,
ML SILTY OR CLAYEY FINE SANDS,
CLAYEY SILTS WITH SLIGHT PLASTICITY
SILTS AND CLAYS INORGANIC CLAYS OF LOW TO MEDIUM
CL PLASTICITY, GRAVELLY CLAYS,
(Liquid limit less than 50) SANDY CLAYS, SILTY CLAYS, LEAN CLAYS
FINE
GRAINED
OL
ORGANIC SILTS & ORGANIC SILTY CLAYS
SOILS OF LOW PLASTICITY
(More than half INORGANIC SILTS, MICACEOUS OR of material MH
DIATOMACEOUS FINE SAND OR SILT
is smaller than the #200 sieve) SILTS AND CLAYS
INORGANIC CLAYS OF HIGH PLASTICITY,
CH
FAT CLAYS
(Liquid limit greater than 50)
ORGANIC CLAYS & ORGANIC SILTS
OH
OF MEDIUM-TO-HIGH PLASTICITY
Note: Fine grained soils that plot within the hatched area on the Plasticity Chart, and coarse grained soils with between 5% and 12% passing No. 200 sieve require dual USCS symbols. (See KEY A-3 if provided)
UNIFIED SOIL CLASSIFICATION SYSTEM
Johnson Smitthipong & Rosamond Associates, Inc.
Crownpoint, New Mexico
KEY
C-1 Drafted By: ALE
Date: March, 2022
Project Number:
210064
LOG SYMBOLS
NON-STANDARD PENETRATION
BULK / GRAB SAMPLE SPLIT SPOON SAMPLER
(1.5-inch O.D. X 0.9-inch I.D.)
MODIFIED CALIFORNIA SAMPLER BDBGM SIZE CORE BARREL
(2 inch inside diameter) (1.65-inch I.D.)
GRAB SAMPLE BW44 SIZE CORE BARREL
(1.75-inch I.D.)
STANDARD PENETRATION HQ-3 SIZE CORE BARREL
SPLIT SPOON SAMPLER (2.4-inch I.D.)
(2.0-inch O.D. X 1.4-inch I.D.)
SHELBY TUBE
(3 inch outside diameter)
WATER LEVEL
(level after completion)
WATER LEVEL
(level where first encountered)
GENERAL NOTES
1. Lines separating strata on the logs represent approximate boundaries only. Actual transitions may be gradual.
2. No warranty is provided as to the continuity of soil or rock conditions between individual sample locations.
3. Logs represent general soil or rock conditions observed at the point of exploration on the date indicated.
4. In general, the Unified Soil Classification designations presented on the logs were based on visual classification in the field, modified where appropriate by visual classifications in the office, and/or laboratory gradation and index testing.
5. NA = Not Analyzed
LOG KEY
C-2 Drafted By: ALE
P L
A S T
IC
IT
Y
IN
D E
X
PE
R
C E
N T
P A
S
SI
N G
#2
SI
E
V E
60 GRADATION CHART
SILTS AND CLAYS - REFER TO PLASTICITY CHART
GM & GC - SM & SC -
REFER TO REFER TO
PLASTICITY CHART PLASTICITY CHART
BORDERLINE - REQUIRES DUAL SYMBOLS BORDERLINE - REQUIRES DUAL SYMBOLS
GW AND GP - REFER TO CC AND CU SW AND SP - REFER TO C C AND CU
10 20 30 40 50 60 70 80 90 100
PERCENT PASSING #4 SIEVE
PLASTICITY CHART
CH
CL
OH or MH
CL-ML
ML or OL
10 20 30 40 50 60 70 80 90 100
LIQUID LIMIT
DEFINITIONS OF SOIL FRACTIONS
SOIL FRACTION PARTICLE SIZE RANGE
Boulders Greater than 300mm (12in.)
Cobbles 300mm to 75mm (12in. to 3in.)
Coarse Gravel 75mm to 19mm (3in. to 3/4in.)
Fine Gravel 19mm (3/4in.) to No. 4 sieve Coarse Sand No. 4 sieve to No.