A103r2.pdf
PDF 3 MB Posted
- Attached to
- Crownpoint Staff Quarters Replacement Federal contract opportunity
- Solicitation number
- 75H70124R00004
About this file
This document contains details for a federal construction solicitation and the associated project opportunity. The Indian Health Service is seeking proposals to replace existing substandard housing units in Crownpoint, New Mexico with 33 new staff quarters through a firm fixed price construction contract. The scope of work involves demolishing 25 existing units known as Longmark homes and constructing 3 single family homes, 6 quadplex multi-family homes, and 3 duplex multi-family homes. The anticipated contract value is over $10 million. The performance period is 730 calendar days from the notice to proceed date. A site visit is scheduled for November 14, 2023, and interested offerors must RSVP one week in advance. Proposals are due in accordance with Federal Acquisition Regulation Part 36 using lowest price technically acceptable evaluation.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
x x
X X
LOT 2015 LOT 2016
LOT 3017
LOT 2012
LOT 2013
LOT 2014
LOT 3047
LOT 3046
LOT 3045
LOT 3044
LOT 3043
LOT 3042
LOT 2011 LOT 2010 LOT 2009
LOT 3020
LOT 3021LOT 2008
LOT 2007
LOT 2006
LOT 2001-1 LOT 2003 LOT 2004-1
LOT 3022
LOT 3024LOT 3026
LOT 3028
LOT 3030
LOT 3041
KING STREET
QUEEN STREET
SA
ND
PI
PE
R
SA
N D
PI
PE
R S
TR
EE
T
GARNETT STREET
MERCY STREET
LOT 3018-2
LOT 3019-1
LOT 3019-2
LOT 2001-2
LOT 2004-2 LOT 3023
LOT 3025
LOT 3027
LOT 3029
LOT 3031
LOT 3032
LOT 3033
LOT 3034
LOT 3035
LOT 3036
LOT 3037
LOT 3038 LOT 3039
LOT 3040
ST
RE
ET
LA
M B A R D
Y LA
N E
LOT 3018-1
PHASE I
(14 UNITS)
PHASE II
(19 UNITS)
FUTURE PHASE
(NOT IN SCOPE)
32 43
32 43
32 43
32 43
32 43
32 43
32 43
32 43
32 43
32 43
32 43
32 43
32 43
32 43
32 43
32 43
32 43
32 43 32 43
32 43
32 43 32 43
32 43
32 43
32 43
BUILDING TYPE:
1BR SINGLE FAMILY
2BR SINGLE FAMILY
DUPLEX(2BR)
QUADPLEX(1BR/2BR)
SITE LEGEND:
EXISTING CHAINLINK FENCE
NEW CHAINLINK FENCE
1' - 0"1' - 0"
5'
0" 2'
0"
6"
STEEL GATE FRAME
DIAMOND MESH
FENCE FABRIC
GATE FORK LATCH
STEEL GATE POST
CONCRETE
FOOTING
ELEVATION VIEW
4' - 0"
1'
6"
STEEL TOP RAIL
LINE POST; REFER TO
SPECIFICATIONS
CONCRETE
FOOTING
6" 1'
6"
1' - 0"
2'
0"
EXTERIOR WALL
CORNER
FENCE POST CORE
DRILLED INTO
APRON
3/
4"
CMU VENEER
t
Z
TR
I
AR
Da
EC
ni g
UONA,
.A.S.
VERNON
ROSAMOND
ee S d:
ET
I AFIC
ON
.R
EG
I S
TERED ARCH I TEC
T
EXPIRES:
RVI
HP
S
NI
D
C E
I
A
A N
HE TL H SE
E
H
N M E
AR P
T
OF
T
C D
SU
S
A
E
TAE L &H
N
VI
S E R
UM
A
H
A
B
C
D
1 2 3 4 5
1 2 3 4 5
Sheet Number:
Sheet Title:
Checked By:
Drawn By:
Scale:
Project No:
Issue Date:
Consultants:
JOHNSON SMITTHIPONG &
ROSAMOND ASSOCIATES, INC.
5210 E Williams Cir Ste 600 Tucson, AZ 85711
(520) 547-7904 www.jsrarchinc.com
U. S.
DEPARTMENT OF
HEALTH AND
HUMAN SERVICES
INDIAN HEALTH SERVICE
NAVAJO AREA OFFICE
1/ 2/
:4
2:
P M
Au to de sk
D oc s:
//2
1-
IH
S C ro w np oi nt S
Q v
/2 1-
A rc h
C
PS
Q C en tra l 2
3.
rv t
As indicated
A103
SITE PLAN NEW
UNITS
HARGREAVES
PARKER
21-050 2/22/22
100% CD
CROWNPOINT STAFF
QUARTERS
CROWNPOINT, NM 87313
1" = 60'-0"B1 SITE PLAN NEW UNITS
PHASE NOTES
A PHASE 1 - COORDINATE REMOVAL OF 14 +/- HOUSING
UNITS. REPLACE WITH EQUAL NUMBER OF UNITS.
B PHASE 2 - COORDINATE REMOVAL OF BALANCE OF
HOUSING UNITS. REPLACE WITH EQUAL NUMBER OF
HOUSING UNITS.
C SEQUENCE: COORDINATE REMOVAL WITH SAME
NUMBER OF REPLACEMENTS ie. (4) SINGLE
LONGMORE, SHALL BE REPLACED WITH (2)
DUPLEXES OR (1) QUADPLEX.
No. Date Description 2 01.02.24 Revision 2 - RFI 05
KEYNOTES
KEY # KEYNOTE TEXT
32 43 5'-0" CHAINLINK MAN GATE WITH LOCKABLE STEEL
FORK LATCH.
1/4" = 1'-0"B5 CHAINLINK 5'-0" MANGATE
3/4" = 1'-0"A5 5'-0" CHAINLINK FENCE FTG
1 1/2" = 1'-0"A4 EXTERIOR CORNER @ FENCE 2
File details come from the government source that posted it. Updated .