A601r1.pdf

PDF 235 KB Posted

Attached to
Crownpoint Staff Quarters Replacement Federal contract opportunity
Solicitation number
75H70124R00004
Issued by
Department of Health and Human Services Indian Health Service

About this file

This document contains a notice for a federal contract solicitation and related scope of work. The Indian Health Service is seeking construction services to replace existing substandard housing units in Crownpoint, New Mexico with 33 new staff quarters. The scope of work involves demolishing 25 existing units and constructing 3 single family homes, 6 quadplex multi-family homes, and 3 duplex multi-family homes. The contract type will be firm fixed price with a period of performance of 730 calendar days from notice to proceed. The magnitude of construction is anticipated to be over $10 million. A pre-bid site visit will take place on November 14, 2023, with proposals due based on dates in the full solicitation. The contractor must register in the System for Award Management and the North American Industry Classification System code for this procurement is 236116 for new multifamily housing construction.

View the file

Other files for this federal contract opportunity

Other files attached to Crownpoint Staff Quarters Replacement, newest first.
File Type Posted
NM20240002.pdf PDF
B05 Amend A00006.pdf PDF
A103r2.pdf PDF
B05 Amend A00005.pdf PDF
A001r2.pdf PDF
B05 Amend A00004.pdf PDF
A124r1.pdf PDF
A001r1.pdf PDF
A312r1.pdf PDF
B05 Amend A00004.pdf PDF
B05 Amend A00003.pdf PDF
B01 Attachment J11 - CPSQ SITEWORK PHASING C004.pdf PDF
B01 Attachment J10 - Crownpoint Staff Quarters Geotechnical Report.pdf PDF
B05 Amend A00002.pdf PDF
B05 Amend A00001.pdf PDF
B01 Attachment J07 Subcontracting Plan.docx DOCX document
B01 Attachment J05 Location Map.pdf PDF
B01 Attachment J02 CPSQ 100CD Drawings.pdf PDF
B01 Attachment J04 CPSQ Building Demolition LImits.pdf PDF
B01 Attachment J01 WD NM20230002.pdf PDF
B01 Attachment J09 PPQ.docx DOCX document
B01 Attachment J06 CPSQ Hazardous Material Report.pdf PDF
B01 RFP 75H70124R00004.pdf PDF
B01 Attachment J08 Company Specialized Experience Form Construction.docx DOCX document
B01 Attachment J03 CPSQ 100CD Specification.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

t

Z

TR

I

AR

Da

EC

ni g

UONA,

.A.S.

VERNON

ROSAMOND

ee S d:

ET

I AFIC

ON .R

EG

I S

TER

ED ARCH I TEC

T

EXPIRES:

RVI

HP S

NI

D

C E

I

A

A N

HE TL H SE

E

H

N M E

AR P

T

OF

T

C D

SU

S

A

E

TAE L &H

N

VI

S E R

UM

A

H

A

B

C

D

1 2 3 4 5

1 2 3 4 5

Sheet Number:

Sheet Title:

Checked By:

Drawn By:

Scale:

Project No:

Issue Date:

Consultants:

JOHNSON SMITTHIPONG &

ROSAMOND ASSOCIATES, INC.

5210 E Williams Cir Ste 600 Tucson, AZ 85711

(520) 547-7904 www.jsrarchinc.com

U. S.

DEPARTMENT OF

HEALTH AND

HUMAN SERVICES

INDIAN HEALTH SERVICE

NAVAJO AREA OFFICE

/2 9/ :2 1:

A M

Au to de sk D oc s:

//2 1-

IH

S C ro w np oi nt S Q v /2 1- A rc h C

PS

Q C en tra l 2 2.

rv t

A601

ROOM FINISH

SCHEDULES

HARGREAVES

PARKER

21-050 2/22/22

100% CD

CROWNPOINT STAFF

QUARTERS

CROWNPOINT, NM 87313

1 BEDROOM FINISH SCHEDULE

No. Room Name Floor Finish Base Finish Wall Finish

Clg Finish Clg Height RemarksNorth East South West

S101 VEST LV1 WD1 - PT1 PT1 PT1 PT2

S102 FOYER LV1 WD1 - PT1 - PT1 PT2

S103 HALL LV1 WD1 PT1 - PT1 PT1 PT2

S104 MASTER BED LV1 WD1 PT1 PT1 PT1 PA2 PT2

S104a CLOSET LV1 WD1 PT1 PT1 PT1 PT1 PT2 S104b MSTR BATH LV1 WD1 PT1 PT1 PT1 PT1 PT2 S104c MSTR W/C LV1 WD1 PT1 PT1 PT1 PT1 PT2

S105 COAT LV1 WD1 PT1 PT1 PT1 PT1 PT2

S106 LINEN LV1 WD1 PT1 PT1 PT1 PT1 PT2

S107 POWDER LV1 WD1 PT1 PT1 PT1 PT1 PT2

S108 LIVING LV1 WD1 PT1 - - PT1 PT2

S109 DINING LV1 WD1 PT1 PA1 - - PT2

S111 KITCHEN LV1 WD1 - PA1 PT1 PT1 PT2 SOFFIT PT2

S112 STOR LV1 WD1 PT1 PT1 PT1 PT1 PT2

S113 LAUN/STOR LV1 WD1 PT1 PT1 PT1 PT1 PT2

S114 GARAGE SC1 WD1 PT1 PT1 PT1 PT1 PT2

S115 MECH SC1 WD1 PT1 PT1 PT1 PT1 PT2

S116 OUT STOR SC1 WD1 - - PT1 PT1 PT2

2 BEDROOM FINISH SCHEDULE

No. Room Name Floor Finish Base Finish Wall Finish

Clg Finish Clg Height RemarksNorth East South West

S201 VEST LV1 WD1 - PT1 PT1 PT1 PT2

S202 FOYER LV1 WD1 - PT1 - PT1 PT2

S203 HALL LV1 WD1 PT1 - PT1 PT1 PT2

S204 MASTER BED LV1 WD1 PT1 PT1 PT1 PA2 PT2

S204A CLOSET LV1 WD1 PT1 PT1 PT1 PT1 PT2

S204B MSTR BATH LV1 WD1 PT1 PT1 PT1 PT1 PT2

S204C MSTR W/C LV1 WD1 PT1 PT1 PT1 PT1 PT2

S205 CLST LV1 WD1 PT1 PT1 PT1 PT1 PT2

S206 BATHROOM LV1 WD1 PT1 PT1 PT1 PT1 PT2

S207 LINEN LV1 WD1 PT1 PT1 PT1 PT1 PT2

S208 BEDROOM 2 LV1 WD1 PT1 PT1 PT1 PT1 PT2

S208A CLOSET LV1 WD1 PT1 PT1 PT1 PT1 PT2

S209 LIVING LV1 WD1 PT1 - - PT1 PT2

S210 DINING LV1 WD1 PT1 PA1 - - PT2

S211 KITCHEN LV1 WD1 - PT1 PT1 - PT2 SOFFIT PT2

S212 STOR LV1 WD1 PT1 PT1 PT1 PT1 PT2

S213 LAUN/STOR LV1 WD1 PT1 PT1 PT1 PT1 PT2

S214 MECH SC1 WD1 PT1 PT1 PT1 PT1 PT2

S215 GARAGE SC1 WD1 PT1 PT1 PT1 PT1 PT2

S216 OUT STOR SC1 WD1 - - PT1 PT1 PT2

DUPLEX UNIT 1 FINISH SCHEDULE

No. Room Name Floor Finish Base Finish Wall Finish

Clg Finish Clg Height RemarksNorth East South West

2.1201 VEST LV1 WD1 - PT1 PT1 PT1 PT2

2.1202 FOYER LV1 WD1 - PT1 - PT1 PT2

2.1203 HALL LV1 WD1 PT1 - PT1 PT1 PT2

2.1203C MSTR W/C LV1 WD1 PT1 PT1 PT1 PT1 PT2

2.1204 MASTER BED LV1 WD1 PT1 PT1 PT1 PA2 PT2

2.1204A CLOSET LV1 WD1 PT1 PT1 PT1 PT1 PT2

2.1204B MSTR BATH LV1 WD1 PT1 PT1 PT1 PT1 PT2

2.1205 CLST LV1 WD1 PT1 PT1 PT1 PT1 PT2

2.1206 BATHROOM LV1 WD1 PT1 PT1 PT1 PT1 PT2

2.1207 LINEN LV1 WD1 PT1 PT1 PT1 PT1 PT2

2.1208 BEDROOM 2 LV1 WD1 PT1 PT1 PT1 PT1 PT2

2.1208A CLOSET LV1 WD1 PT1 PT1 PT1 PT1 PT2

2.1209 LIVING LV1 WD1 PT1 - - PT1 PT2

2.1210 DINING LV1 WD1 PT1 PA1 - - PT2

2.1212 STOR LV1 WD1 PT1 PT1 PT1 PT1 PT2

2.1213 LAUN/STOR LV1 WD1 PT1 PT1 PT1 PT1 PT2

2.1214 MECH SC1 WD1 PT1 PT1 PT1 PT1 PT2

2.1215 GARAGE SC1 WD1 PT1 PT1 PT1 PT1 PT2

2.1216 OUT STOR SC1 WD1 - - PT1 PT1 PT2

DUPLEX UNIT 2 FINISH SCHEDULE

No. Room Name Floor Finish Base Finish Wall Finish

Clg Finish Clg Height RemarksNorth East South West

2.2201 VEST LV1 WD1 - PT1 PT1 PT1 PT2

2.2202 FOYER LV1 WD1 - PT1 - PT1 PT2

2.2204 MASTER BED LV1 WD1 PT1 PT1 PT1 PA2 PT2

2.2204A CLOSET LV1 WD1 PT1 PT1 PT1 PT1 PT2

2.2204B MSTR BATH LV1 WD1 PT1 PT1 PT1 PT1 PT2

2.2204C MSTR W/C LV1 WD1 PT1 PT1 PT1 PT1 PT2

2.2205 CLST LV1 WD1 PT1 PT1 PT1 PT1 PT2

2.2206 BATHROOM LV1 WD1 PT1 PT1 PT1 PT1 PT2

2.2207 LINEN LV1 WD1 PT1 PT1 PT1 PT1 PT2

2.2208 BEDROOM 2 LV1 WD1 PT1 PT1 PT1 PT1 PT2

2.2208A CLOSET LV1 WD1 PT1 PT1 PT1 PT1 PT2

2.2209 LIVING LV1 WD1 PT1 - - PT1 PT2

2.2210 DINING LV1 WD1 PT1 PA1 - - PT2

2.2211 KITCHEN LV1 WD1 - PT1 PT1 - PT2 SOFFIT PT2

2.2212 STOR LV1 WD1 PT1 PT1 PT1 PT1 PT2

2.2213 LAUN/STOR LV1 WD1 PT1 PT1 PT1 PT1 PT2

2.2214 MECH SC1 WD1 PT1 PT1 PT1 PT1 PT2

2.2215 GARAGE SC1 WD1 PT1 PT1 PT1 PT1 PT2

2.2216 OUT STOR SC1 WD1 - - PT1 PT1 PT2

2 BEDROOM ADA FINISH SCHEDULE

No. Room Name Floor Finish Base Finish Wall Finish

Clg Finish Clg Height RemarksNorth East South West

A201 VEST LV1 WD1 - PT1 PT1 PT1 PT2

A202 FOYER LV1 WD1 - PT1 - PT1 PT2

A203 HALL LV1 WD1 PT1 - PT1 PT1 PT2

A204 MASTER BED LV1 WD1 PT1 PT1 PT1 PA2 PT2

A204A CLOSET LV1 WD1 PT1 PT1 PT1 PT1 PT2

A204B MSTR BATH LV1 WD1 PT1 PT1 PT1 PT1 PT2

A204C MSTR W/C LV1 WD1 PT1 PT1 PT1 PT1 PT2

A204D LINEN LV1 WD1 PT1 PT1 PT1 PT1 PT2

A205 CLST LV1 WD1 PT1 PT1 PT1 PT1 PT2

A206 BATHROOM LV1 WD1 PT1 PT1 PT1 PT1 PT2

A207 LINEN LV1 WD1 PT1 PT1 PT1 PT1 PT2

A208 BEDROOM 2 LV1 WD1 PT1 PT1 PT1 PT1 PT2

A208A CLOSET LV1 WD1 PT1 PT1 PT1 PT1 PT2

A209 LIVING LV1 WD1 PT1 - - PT1 PT2

A210 DINING LV1 WD1 PT1 PA1 - - PT2

A211 KITCHEN LV1 WD1 - PT1 PT1 - PT2 SOFFIT PT2

A212 STOR LV1 WD1 PT1 PT1 PT1 PT1 PT2

A213 LAUN/STOR LV1 WD1 PT1 PT1 PT1 PT1 PT2

A214 MECH SC1 WD1 PT1 PT1 PT1 PT1 PT2

A215 GARAGE SC1 WD1 PT1 PT1 PT1 PT1 PT2

A216 OUT STOR SC1 WD1 - - PT1 PT1 PT2

MATERIAL SCHEDULE

REF DESCRIPTION MANUFACTURER

BASE

WD1 WOOD BASE

FLOOR

LV1 LUXURY VINYL TILE ARMSTRONG FLOORING; AMERICAN PERSONALITY 12, LAKEHOUSE HICKORY LUXURY VINYL TILE -

BURNISHED HONEY

SC1 SEALED CONCRETE PROSOCO; CONSOILDECK POLISHGUARD CLEAR CONCRETE SEALER

WALL

PA1 PAINT - ACCENT 1

PA2 PAINT - ACCENT 2

PT1 PAINT

CEILING

GB1 GYPSUM BOARD CEILING

MISC

PL1 PLASTIC LAMINATE (TOP)

PL2 PLASTIC LAMINATE (FACE)

SS1 SOLID SURFACE

No. Date Description 1 12.20.23 Revision 1

File details come from the government source that posted it. Updated .