Summary Total

USAID Liberia
Watermain Expansion Project
Attachment J-3 Bill of QuantitiesAddendum 01
Summary Total Sheet
Project CityTotal Cost
Sanniquellie Total Cost$ - 0
Voinjama Total Cost$ - 0

Total Watermain Expansion Project Cost $ - 0

Sanniquellie

USAID Liberia
Watermain Expansion Project
Sanniquellie Detailed CostsAddendum 01
Sanniquellie Detailed Project Costs
CLIN No.Item No.Item DescriptionQtyUnitUnit CostTotal Cost
S-11.01Total allocation of performance and payment bonds for Sanniquellie1Lump Sum$ - 0
S-22.01Mobilization for Sanniquellie
(not to extend 7% of the total contract value)1Lump Sum$ - 0
S-33.01Deliverables and as-builts
(refer to Section F of the contract)1Lump Sum$ - 0
S-44Watermain Installation
S-44.0150 mm HDPE watermain - furnish, install and complete in place; includes all DI fittings, bends, including survey, staking out, clearing, excavation, shoring, sand bedding, compaction in layers, backfill, restoration3,439Linear FEET$ - 0
S-44.02100 mm PVC watermain - furnish, install and complete in place; includes all DI fittings, bends, including survey, staking out, clearing, excavation, shoring, sand bedding, compaction in layers, backfill, restoration40,701Linear FEET$ - 0
S-44.0350 mm Gate valve and box - furnish, install and complete in place; for gate valve installed for the new watermain5Each$ - 0
S-44.04100 mm Gate valve and box - furnish, install and complete in place; for gate valve installed for the new watermain62Each$ - 0
S-44.05150 mm Gate valve and box - furnish, install and complete in place; for gate valve installed for the existing watermain29Each$ - 0
S-44.06200 mm Gate valve and box - furnish, install and complete in place; for gate valve installed for the existing watermain4Each$ - 0
S-44.07Connect to existing watermain - furnish, install and complete all DI fittings, couplings and material for connections to the existing watermain; including excavation and verification of existing watermain size, material and type; including cutting, patching and surface (road) repair; includes protection of existing structures and water utility assets.27Each$ - 0
S-44.0850 mm Tee - furnish, install and complete in place2Each$ - 0
S-44.0950x50x100 mm Tee - furnish, install and complete in place1Each$ - 0
S-44.1100x100x50 mm Tee - furnish, install and complete in place10Each$ - 0
S-44.11100x100x100 mm Tee - furnish, install and complete in place8Each$ - 0
S-44.12100x100x150 mm Tee - furnish, install and complete in place1Each$ - 0
S-44.13150x150x100 mm Tee - furnish, install and complete in place17Each$ - 0
S-44.14150x100x150 mm Reducing Tee - furnish, install and complete in place1Each$ - 0
S-44.15200x100x200 mm Reducing Tee - furnish, install and complete in place1Each$ - 0
S-44.16200x100x200 mm Tee - furnish, install and complete in place2Each$ - 0
S-44.17150 to 100 mm Reducer - furnish, install and complete in place4Each$ - 0
S-44.18200 to 100 mm Reducer - furnish, install and complete in place1Each$ - 0
S-44.1950 mm end cap - furnish, install and complete in place3Each$ - 0
S-44.2100 mm end cap- furnish, install and complete in place7Each$ - 0
S-44.21Thrust blocks - Portland cement concrete - furnish, install and complete in place250Cubic Yards$ - 0
S-44.2250 mm air release / blow-off valve above ground - furnish, install and complete in place, including concrete support; including connection to watermain Tee; including 50mm gate valve, 50 mm valve and pipework per detail; approved shop drawing required.11Each$ - 0
S-44.23Concrete filled pipe bollards - furnish, install and complete in place at air release / blow-off valves location; two bollards installed at each air release/blow-off valve location22Each$ - 0
S-44.24Concrete monument to indicate LWSC pipeline, installed at the deadend of pipe installed; shop drawing approval required.7Each$ - 0
S-44.25Excavation below grade, complete as requested by the Engineer; prior approval must be provided by the Engineer.350Cubic Yards$ - 0
S-44.26Trench rock excavation, complete as requested by the Engineer; contractor must have proper equipment to complete the work; prior approval must be provided by the Engineer.250Cubic Yards$ - 0
S-44.27Bank run gravel, furnish, install and complete in place as required for roadway subbase patching and other as requested by the Engineer; prior approval must be provided by the Engineer.600Cubic Yards$ - 0
S-44.28Watermain stream crossing - furnish, install and complete in place a stream crossing; includes all DI fittings, bends, concrete anchors/support necessary to secure watermain across or under a stream / road culvert; shop drawing required for approval prior to start of the work; crossings will vary depending on the existing conditions of the stream crossing; detail provided for guidance.8Each$ - 0
S-44.29Allowance for dewatering during excavation and proper disposal of water pumped from the trench1Lump Sum$ - 0
S-4Total Watermain$ - 0
Allowances for Watermain Installation
S-4A4A.01Implementing the Sanniquellie EMMP per the approved plan in the contract; environmental measure must be in place to receive monthly percentage of the total value. EMMP must comply with USAID Reg 22 CFR 216.1Lump Sum$ - 0

S-4B 4B.01 Compaction testing for trench backfill; as requested by the Engineer 1 Lump Sum $ - 0

Pressure testing and disinfection for watermainEstimated QtyUnitTotal Cost
S-4C4C.01Pressure testing and disinfection completed and successful for proposed watermain44,140Linear FEET$ - 0

S-4D 4D.01 Test pit, complete in place at locations agreed upon with the Engineer; prior approval required from the Engineer. 8 Each $ - 0

5Private Service ConnectionsEstimated QtyUnitTotal Cost
S-55.01Contractor shall provide the labor, equipment and tools to complete private service connections

Unit cost per one private connection. Contractor will only be paid for the actual number of private connection installed based on inspection and certification in the field. Cost includes excavation, sand bedding material, concrete and backfilling necessary to complete the connection. Total private connections shall not exceed the quantity specified in this line item. USAID will indicate to the contractor the location of the private connections. 500 Each $ - 0

S-6 6 Private Service Connections Materials only - Furnish and Deliver to site

The Bid Line Items 6.01 - 6.09 are for private service connection materials only and costs to deliver to site. Labor and incidental costs associated with the private connection installation are include under Bid Line Item 5.01. Excess materials will be safely stored at the water treatment plant.QtyUnitTotal Cost
S-66.01A50mm (2") Saddle for 1" service line50each$ - 0
S-66.01100mm (4") Saddle for 1" service line150each$ - 0
S-66.02150mm (6") Saddle for 1" service line150each$ - 0
S-66.03200mm (8") Saddle for 1" service line150each$ - 0
S-66.0425mm (1") corporation stop at saddle500each$ - 0
S-66.0525mm (1") shut off valve prior to the meter500each$ - 0
S-66.0625 mm (1") HDPE pipe connecting saddle to the water meter unit; furnish and complete in place per approved shop drawing for each service connection; approximately 60 feet per service connection, includes additional material to be stored at the water utility.30,000Linear FEET$ - 0
S-66.07Water meter unit: includes 1"x3/4" water meter per specifications and approved shop drawing; 1" and 3/4" galvanized piping and bends; concrete pad; back flow preventer; refer to drawing detail; entire water meter unit shop drawing required for approval.500each$ - 0
S-66.0820 mm (3/4") HDPE pipe connecting meter to yard tap or to business; furnish and complete in place per approved shop drawing for each service connection; approximately 15 feet from water meter to yard tap7,500Linear FEET$ - 0
S-66.09Private connections to home or business will include a yard tap, furnish and complete in place; including concrete support fastened to the yard tap; galvanize iron pipe, faucet; approved shop drawing is required.500each$ - 0
S-6Total Private Connection Materials$ - 0

S-7 7 Furnish and Deliver Additional Service Connections Materials - to be stored at the water treatment plant

For Bid Line Items 7.01 - 7.09, the Contractor shall furnish, deliver and correctly store the materials at the specified water treatment plant. Costs are associated with materials and delivery costs only, no labor cost for installation shall be included.

S-77.01Furnish and deliver 100mm (4") Saddle for 1" service line163each$ - 0
S-77.02Furnish and deliver 150mm (6") Saddle for 1" service line162each$ - 0
S-77.03Furnish and deliver 200mm (8") Saddle for 1" service line81each$ - 0
S-77.04Furnish and deliver 25mm (1") corporation stop at saddle406each$ - 0
S-77.05Furnish and deliver 25mm (1") shut off valve prior to the meter406each$ - 0
S-77.06Furnish and deliver to site 25 mm (1") HDPE pipe24,360Linear FEET$ - 0
S-77.07Furnish and deliver to site water meter unit: includes 1"x3/4" water meter per specifications and approved shop drawing; 1" and 3/4" galvanized piping and bends; back flow preventer; refer to drawing detail; entire water meter unit shop drawing required for approval.406each$ - 0
S-77.08Furnish and deliver to site 20 mm (3/4") HDPE pipe6,090Linear FEET$ - 0
S-77.09Furnish and deliver to site private connection detail materials that include a yard tap; galvanize iron pipe, faucet; approved typical shop drawing is required.406each$ - 0
S-7Total Additional Private Connection Materials$ - 0
8Air conditioner installation
S-88.01Furnish and install 162,000 BTU/hr air cooling system for the Sanniquellie water treatment plant battery building; shop drawing approval of the equipment and installation methods required; includes all equipment, materials, labor to complete the work1Lump Sum$ - 0
9Generator shelter
S-099.01Furnish and install generator shelter based on approved shop drawing; generator shelter must cover existing generator at the Sanniquellie water treatment plant, including metal support posts, zinc roof structure and concrete foundation for the post. Footprint area for the generator shelter shall be no less than 20 feet x 10 feet coverage area, and allow for all required access to the generator.1Lump Sum$ - 0
Sanniquellie Total CostCOST ESTIMATE$ - 0
Notes:Repair to street crossings incidental to watermain costs and Contractor must factor into unit rate based their understanding of the site.
Stream crossing bid items include all materials to complete pipe installation over a stream crossing, including concrete support, DI pipe and fittings per the drawing detail and approved shop drawing.
Materials are specified in metric units; length quantity is specified in feet and cubic yards.
Watermain pipe work includes all DI fittings, bends, pressure testing and disinfection; includes excavation, sand borrow, compaction and backfilling to complete the watermain installation in place. Reducers and Tees are paid for under separate line items. Pipe installation includes clearing, grubbing, surveying, excavation, pipe bedding, select backfill, compaction.

Service connection labor price must include excavation, tools, equipment and labor to complete the private connection from water main to yard tap or as specified

&"-,Italic"Procurement Sensitive - Confidential Page &P of &N

Voinjama

USAID Liberia
Watermain Expansion Project
Voinjama Detailed CostsAddendum 01
Voinjama Detailed Project Costs
CLIN No.Item No.Item DescriptionQtyUnitUnit CostTotal Cost
V-11.01Total allocation of performance and payment bonds for Voinjama1Lump Sum$ - 0
V-22.01Mobilization
(not to extend 7% of the total contract value)1Lump Sum$ - 0
V-33.01Deliverables and as-builts
(refer to Section F of the contract)1Lump Sum$ - 0
4Watermain installation
V-44.0150 mm HDPE watermain - furnish, install and complete in place; includes all DI fittings, bends, pressure testing and disinfection, including survey, staking out, clearing, excavation, shoring, sand bedding, compaction in layers, backfill, restoration6,998Linear FEET$ - 0
V-44.02100 mm PVC watermain - furnish, install and complete in place; includes all DI fittings, bends, pressure testing and disinfection, including survey, staking out, clearing, excavation, shoring, sand bedding, compaction in layers, backfill, restoration27,615Linear FEET$ - 0
V-44.0350 mm Gate valve and box - furnish, install and complete in place; for gate valve installed for the new watermain8Each$ - 0
V-44.04100 mm Gate valve and box - furnish, install and complete in place; for gate valve installed for the new watermain34Each$ - 0
V-44.05150 mm Gate valve and box - furnish, install and complete in place; for gate valve installed for the existing watermain24Each$ - 0
V-44.05A200 mm Gate valve and box - furnish, install and complete in place; for gate valve installed for the existing watermain1Each$ - 0
V-44.06Connect to existing watermain - furnish, install and complete all DI fittings, couplings and material for connections to the existing watermain; including excavation and verification of existing watermain size, material and type; including cutting, patching and surface (road) repair; includes protection of existing structures and water utility assets.21Each$ - 0
V-44.0750 mm Tee - furnish, install and complete in place4Each$ - 0
V-44.07A100x50x50 mm Reducing Tee - furnish, install and complete in place1Each$ - 0
V-44.08100x100x50 mm Tee - furnish, install and complete in place10Each$ - 0
V-44.09100x50x100 mm Reducing Tee - furnish, install and complete in place2Each$ - 0
V-44.10100x100x100 mm Tee - furnish, install and complete in place2Each$ - 0
V-44.11150x150x100 mm Tee - furnish, install and complete in place10Each$ - 0
V-44.12150 mm Tee - furnish, install and complete in place2Each$ - 0
V-44.13150 to 100 mm Reducer - furnish, install and complete in place10Each$ - 0
V-44.14200x200x100 mm Tee - furnish, install and complete in place1Each$ - 0
V-44.1550 mm end cap - furnish, install and complete in place4Each$ - 0
V-44.16100 mm end cap - furnish, install and complete in place3Each$ - 0
V-44.17Thrust blocks - Portland cement concrete - furnish, install and complete in place185Cubic Yards$ - 0
V-44.18Concrete encasement for watermain through swamp, see drawings; including 6" concrete cover around the pipe, reinforced, shop drawing approval required.2Cubic Yards$ - 0
V-44.1950 mm air release / blow-off valve above ground - furnish, install and complete in place, including concrete support; including connection to watermain Tee; including 50mm gate valve, 50 mm valve and pipework per detail; approved shop drawing required.13Each$ - 0
V-44.20Concrete filled pipe bollards - furnish, install and complete in place at air release / blow-off valves location; two bollards installed at each air release/blow-off valve location26Each$ - 0
V-44.21Concrete monument to indicate LWSC pipeline, installed at the deadend of pipe installed; shop drawing approval required.7Each$ - 0
V-44.22Excavation below grade, complete as requested by the Engineer; prior approval must be provided by the Engineer.300Cubic Yards$ - 0
V-44.23Trench rock excavation, complete as requested by the Engineer; contractor must have proper equipment to complete the work; prior approval must be provided by the Engineer.350Cubic Yards$ - 0
V-44.24Bank run gravel, furnish, install and complete in place as required for roadway subbase patching and other as requested by the Engineer; prior approval must be provided by the Engineer.650Cubic Yards$ - 0
V-44.25Watermain stream crossing - furnish, install and complete in place a stream crossing; includes all DI fittings, bends, concrete anchors/support necessary to secure watermain across or under a stream / road culvert; shop drawing required for approval prior to start of the work; crossings will vary depending on the existing conditions of the stream crossing; detail provided for guidance.9Each$ - 0
V-44.26Dewatering during excavation and proper disposal of water pumped from the trench1Lump Sum$ - 0
V-4Total Watermain$ - 0
Allowances for Watermain Installation
V-4A4A.01Implementing the Voinjama EMMP per the approved plan in the contract; environmental measure must be in place to receive monthly percentage of the total value. EMMP must comply with USAID Reg 22 CFR 216.1Lump Sum$ - 0
V-4B4B.01Compaction testing for trench backfill; as requested by the Engineer1Lump Sum$ - 0
Pressure testing and disinfection for watermainEstimated QtyUnitTotal Cost
V-4C4C.01Pressure testing and disinfection completed and successful for proposed watermain34,613Linear FEET$ - 0

V-4D 4D.01 Test pit, complete in place at locations agreed upon with the Engineer; prior approval required from the Engineer. 11 Each $ - 0

5Private Service Connections
Estimated QtyUnitTotal Cost
V-55.01Contractor shall provide the labor, equipment and tools to complete private service connections

Unit cost per one private connection. Contractor will only be paid for the actual number of private connection installed based on inspection and certification in the field. Cost includes excavation, sand bedding material, concrete and backfilling necessary to complete the connection. Total private connections shall not exceed the quantity specified in this line item. USAID will indicate to the contractor the location of the private connections. 500 Each $ - 0

6 Private Service Connections Materials only - Furnish and Deliver to site

The Bid Line Items 6.01 - 6.09 are for private service connection materials only and costs to deliver to site. Labor and incidental costs associated with the private connection installation are include under Bid Line Item 5.01. Excess materials will be safely stored at the water treatment plant.QtyUnitTotal Cost
V-66.01A50mm (2") Saddle for 1" service line50each$ - 0
V-66.01100mm (4") Saddle for 1" service line150each$ - 0
V-66.02150mm (6") Saddle for 1" service line150each$ - 0
V-66.03200mm (8") Saddle for 1" service line150each$ - 0
V-66.0425mm (1") corporation stop at saddle500each$ - 0
V-66.0525mm (1") shut off valve prior to the meter500each$ - 0
V-66.0625 mm (1") HDPE pipe connecting saddle to the water meter unit; furnish and complete in place per approved shop drawing for each service connection; approximately 60 feet per service connection, includes additional material to be stored at the water utility.30,000Linear FEET$ - 0
V-66.07Water meter unit: includes 1"x3/4" water meter per specifications and approved shop drawing; 1" and 3/4" galvanized piping and bends; concrete pad; back flow preventer; refer to drawing detail; entire water meter unit shop drawing required for approval.500each$ - 0
V-66.0820 mm (3/4") HDPE pipe connecting meter to yard tap or to business; furnish and complete in place per approved shop drawing for each service connection; approximately 15 feet from water meter to yard tap7,500Linear FEET$ - 0
V-66.09Private connections to home or business will include a yard tap, furnish and complete in place; including concrete support fastened to the yard tap; galvanize iron pipe, faucet; approved shop drawing is required.500each$ - 0
V-6Total Private Connection Materials$ - 0

7 Furnish and Deliver Additional Service Connections Materials - to be stored at the water treatment plant

For Bid Line Items 7.01 - 7.09, the Contractor shall furnish, deliver and correctly store the materials at the specified water treatment plant. Costs are associated with materials and delivery costs only, no labor cost for installation shall be included.

V-77.01Furnish and deliver to site 100mm (4") Saddle for 1" service line225each$ - 0
V-77.02Furnish and deliver to site 150mm (6") Saddle for 1" service line225each$ - 0
V-77.03Furnish and deliver to site 200mm (8") Saddle for 1" service line112each$ - 0
V-77.04Furnish and deliver to site 25mm (1") corporation stop at saddle562each$ - 0
V-77.05Furnish and deliver to site 25mm (1") shut off valve prior to the meter562each$ - 0
V-77.06Furnish and deliver to site 25 mm (1") HDPE pipe33,720Linear FEET$ - 0
V-77.07Furnish and deliver to site water meter unit: includes 1"x3/4" water meter per specifications and approved shop drawing; 1" and 3/4" galvanized piping and bends; back flow preventer; refer to drawing detail; entire water meter unit shop drawing required for approval.562each$ - 0
V-77.08Furnish and deliver to site 20 mm (3/4") HDPE pipe8,430Linear FEET$ - 0
V-77.09Furnish and deliver to site private connection detail materials that include a yard tap; galvanize iron pipe, faucet; approved typical shop drawing is required.562each$ - 0
V-7Total Additional Private Connection Materials$ - 0
8Air conditioner installation
V-88.01Furnish and install 162,000 BTU/hr air cooling system for the Voinjama water treatment plant battery building; shop drawing approval of the equipment and installation methods required; includes all equipment, materials, labor to complete the work1Lump Sum$ - 0
9Generator shelter
V-99.01Furnish and install generator shelter based on approved shop drawing; generator shelter must cover existing generator at the Voinjama water treatment plant, including metal support posts, zinc roof structure and concrete foundation for the post. Footprint area for the generator shelter shall be no less than 20 feet x 10 feet coverage area, and allow for all required access to the generator.1Lump Sum$ - 0

Voinjama Total Cost COST ESTIMATE $ - 0

Notes:Repair to street crossings incidental to watermain costs and Contractor must factor into unit rate based their understanding of the site.
Stream crossing bid items include all materials to complete pipe installation over a stream crossing, including concrete support, DI pipe and fittings per the drawing detail and approved shop drawing.
Materials are specified in metric units; length quantity is specified in feet and cubic yards.
Watermain pipe work includes all DI fittings, bends, pressure testing and disinfection; includes excavation, sand borrow, compaction and backfilling to complete the watermain installation in place. Reducers and Tees are paid for under separate line items. Pipe installation includes clearing, grubbing, surveying, excavation, pipe bedding, select backfill, compaction.
Service connection labor price must include excavation, tools, equipment and labor to complete the private connection from water main to yard tap or as specified