J.2d_LWMP_II_drawings_4_of_4_Rev01.pdf
PDF 20 MB Posted
- Solicitation number
- 72066919R00007
About this file
Attachment J.2d LWMP II drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BOQs_For_Bellemue-_A01.xlsx | XLSX spreadsheet | |
| WASH__RFP_1282019-_Amendment.pdf | ||
| WASH_Qs&As-1302019.pdf | ||
| Watermain_BOQ_-_A01_-_FINAL.xlsx | XLSX spreadsheet | |
| J.3b_IndividualConnectionSurveyReport.xlsx | XLSX spreadsheet | |
| J.1_Technical_Specification_WEP.pdf | ||
| J.2c_LWMP_II_drawings_3_of_4.pdf | ||
| J.11_Contact_details_for_WASH_in_HF.pdf | ||
| J.2a_LWMP_II_drawings_1_of_4.pdf | ||
| Water_Expansion_&_WASH_Services_RFP_12122018.pdf | ||
| J.8_Past_Performance_Sheet.rtf | RTF text file | |
| J.3c_BOQ_and_Cost_Est_Watermain_Expansion_-_final.xlsx | XLSX spreadsheet | |
| J.5_Final_Technical_Spec._WASH_in_HF.pdf | ||
| J.4_HF_design,_specs_&_BOQ.zip | ZIP file | |
| J.7_Bio-data_sheet_AID1420-17.doc | DOC document | |
| J.10_SF_LLL_Disclosure_of_Lobbying_Activities.pdf | ||
| J.6_AFR-EnvReviewForm-20Dec2010_(3).pdf | ||
| J.2b_LWMP_II_drawings_2_of_4.pdf | ||
| J.3a_Connection_heat__map.pptx | PPTX presentation | |
| J.9__Branding_and_Marking_Template.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This project was made possible by the United
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Voinjama\LMWP-C-V110.dwg 10/22/2018 5:21:32 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-V111
AutoCAD SHX Text
VOINJAMA
AutoCAD SHX Text
PIPE H STA 7+00 TO 19+00
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-V110
AutoCAD SHX Text
SEE SHEET C-V110 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
SEE SHEET C-V112 FOR CONTINUATION
and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Voinjama\LMWP-C-V110.dwg 10/22/2018 5:21:36 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-V112
AutoCAD SHX Text
VOINJAMA
AutoCAD SHX Text
PIPE H STA 19+00 TO 30+57
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-V110
AutoCAD SHX Text
SEE SHEET C-V111 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text CONTRACTOR TO CAP END OF PROPOSED 100MM PVC WATERMAIN AND PROVIDE THRUST BLOCK AS NECESSARY
AutoCAD SHX Text
PROPOSED TEST PIT
AutoCAD SHX Text
PROPOSED TEST PIT
AutoCAD SHX Text CONTRACTOR TO INSTALL AIR RELEASE VALVE AND GATE VALVE IN PROPOSED WATERMAIN COORDINATE LOCATION WITH ENGINEER INSTALL LWSC CONCRETE MARKER
AutoCAD SHX Text
PROPOSED WATERMAIN STREAM CROSSING, SEE DETAIL (TYP)
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
PROPOSED 100MM x 100MM x 50MM TEE
N
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Voinjama\LMWP-C-V113.dwg 10/22/2018 5:21:54 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-V113
AutoCAD SHX Text
VOINJAMA
AutoCAD SHX Text
PIPE I STA 0+00 TO 12+00
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-V113
AutoCAD SHX Text
SEE SHEET C-V114 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
TRANSMISSION DRIVE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
EXISTING FIRE HYDRANT SERVICE AND HYDRANT TO REMAIN
AutoCAD SHX Text PROPOSED CONNECTION TO EXISTING 150MM PVC WATERMAIN VIA A CUT IN TEE. CONTRACTOR TO INSTALL 150MM x 150MM x 100MM TEE
AutoCAD SHX Text
PROPOSED THRUST BLOCK
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
EXISTING 150MM GATE VALVE (TYP)
AutoCAD SHX Text
EXISTING 150MM PVC WATERMAIN TO REMAIN AND PROTECTED IN PLACE
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
AutoCAD SHX Text CONTRACTOR TO INSTALL AIR RELEASE VALVE IN PROPOSED WATERMAIN. CONTRACTOR TO COORDINATE LOCATION WITH ENGINEER.
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
PROPOSED 100MM x 100MM x 50MM TEE
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Voinjama\LMWP-C-V113.dwg 10/22/2018 5:22:02 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-V114
AutoCAD SHX Text
VOINJAMA
AutoCAD SHX Text
PIPE I STA 12+00 TO 19+91
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-V113
AutoCAD SHX Text
SEE SHEET C-V113 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
MANGO STREET
AutoCAD SHX Text
EXISTING 150MM PVC WATERMAIN TO REMAIN AND PROTECTED IN PLACE
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text CONTRACTOR TO CONNECT TO EXISTING 150MM PVC WATERMAIN VIA A CUT IN TEE. CONTRACTOR TO INSTALL 150MM x 150MM x 100MM TEE
AutoCAD SHX Text
PROPOSED THRUST BLOCK
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text APPROXIMATE LOCATION OF STREAM CROSSING WITHOUT CULVERT. CONTRACTOR TO INSTALL DI PIPE ON CONCRETE SUPPORTS. DI PIPE TO EXTEND PAST STREAM CROSSING MINIMUM OF 1 M.
PROPOSED TEST PIT
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Voinjama\LMWP-C-V115.dwg 10/22/2018 5:22:20 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-V115
AutoCAD SHX Text
VOINJAMA
AutoCAD SHX Text
PIPE J STA 0+00 TO 11+00
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-V115
AutoCAD SHX Text
SEE SHEET C-V116 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
GREEN STREET
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
EXISTING FIRE HYDRANT SERVICE AND HYDRANT TO REMAIN
AutoCAD SHX Text
EXISTING 150MM PVC WATERMAIN TO REMAIN AND PROTECTED IN PLACE (TYP)
AutoCAD SHX Text
EXISTING 150MM PVC WATERMAIN TO REMAIN AND PROTECTED IN PLACE (TYP)
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
CONTRACTOR TO CONNECT TO EXISTING 150MM WATERMAIN VIA A CUT IN TEE. CONTRACTOR TO INSTALL 150MM x 150MM x 100MM TEE
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Voinjama\LMWP-C-V115.dwg 10/22/2018 5:22:26 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-V116
AutoCAD SHX Text
VOINJAMA
AutoCAD SHX Text
PIPE J STA 11+00 TO 22+45
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-V115
AutoCAD SHX Text
SEE SHEET C-V115 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
EXISTING 150MM GATE VALVE
AutoCAD SHX Text
EXISTING 150MM PVC WATERMAIN TO REMAIN AND PROTECTED IN PLACE (TYP)
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text CONTRACTOR TO CONNECT TO EXISTING 150MM WATERMAIN VIA A CUT IN TEE. CONTRACTOR TO INSTALL 150MM x 150MM x 100MM TEE
AutoCAD SHX Text CONTRACTOR TO INSTALL AIR RELEASE/BLOW-OFF VALVE AND GATE VALVE AT HIGH POINT OF PROPOSED WATERMAIN CONTRACTOR TO COORDINATE LOCATION WITH ENGINEER
AutoCAD SHX Text
PRIVATE CONNECTION TO HOSPITAL TO BE COORDINATED WITH ENGINEER
AutoCAD SHX Text
PROPOSED TEST PIT
AutoCAD SHX Text
PROPOSED WATERMAIN STREAM CROSSING, SEE DETAIL (TYP)
AutoCAD SHX Text PROPOSED 100MM x 100MM x 50MM TEE
PROPOSED 100MM GATE VALVE
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Voinjama\LMWP-C-V117.dwg 10/22/2018 5:22:45 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-V117
AutoCAD SHX Text
VOINJAMA
AutoCAD SHX Text
PIPE K STA 0+00 TO 12+00
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-V117
AutoCAD SHX Text
SEE SHEET C-V118 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
EXISTING 150MM PVC WATERMAIN TO REMAIN AND PROTECTED IN PLACE (TYP)
AutoCAD SHX Text CONTRACTOR TO FIELD VERIFY EXISTING 150 MM PVC WATERMAIN STUBOUT AND REMOVE CAP TO CONNECT TO PROPOSED 100MM WATERMAIN. INSTALL 150MM TO 100MM REDUCER AS NECESSARY
AutoCAD SHX Text
EXISTING TEE WITH GATE VALVES AND THRUST BLOCK TO REMAIN
AutoCAD SHX Text
EXISTING FIRE HYDRANT SERVICE AND HYDRANT TO REMAIN
AutoCAD SHX Text
EXISTING 150MM GATE VALVE (TYP)
AutoCAD SHX Text
PROPOSED TEST PIT
PROPOSED WATERMAIN STREAM CROSSING, SEE DETAIL (TYP)
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Voinjama\LMWP-C-V117.dwg 10/22/2018 5:22:50 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-V118
AutoCAD SHX Text
VOINJAMA
AutoCAD SHX Text
PIPE K STA 12+00 TO 23+50
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-V117
AutoCAD SHX Text
SEE SHEET C-V117 FOR CONTINUATION
AutoCAD SHX Text
SEE SHEET C-V119 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
PROPOSED WATERMAIN STREAM CROSSING, SEE DETAIL (TYP)
AutoCAD SHX Text
PROPOSED TEST PIT
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
AutoCAD SHX Text CONTRACTOR TO INSTALL AIR RELEASE VALVE AND GATE VALVE IN PROPOSED WATERMAIN. CONTRACTOR TO COORDINATE LOCATION WITH ENGINEER.
AutoCAD SHX Text PROPOSED 100MM x 100MM x 50MM TEE
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Voinjama\LMWP-C-V117.dwg 10/22/2018 5:22:55 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-V119
AutoCAD SHX Text
VOINJAMA
AutoCAD SHX Text
PIPE K STA 23+50 TO 26+56
AutoCAD SHX Text
PIPE Q STA 0+00 TO 10+00
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-V117
AutoCAD SHX Text
SEE SHEET C-V118 FOR CONTINUATION
AutoCAD SHX Text
SEE SHEET C-V129 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
EXISTING 150MM PVC WATERMAIN TO REMAIN AND PROTECTED IN PLACE (TYP)
AutoCAD SHX Text CONTRACTOR TO FIELD VERIFY EXISTING 150 MM PVC WATERMAIN STUBOUT AND REMOVE CAP TO CONNECT TO PROPOSED 100MM WATERMAIN. INSTALL 150MM TO 100 MM REDUCER.
AutoCAD SHX Text
EXISTING 150MM GATE VALVE (TYP)
AutoCAD SHX Text PROPOSED REDUCING 100MM x 100MM x 50MM TEE WITH THRUST BLOCK AND GATE VALVES
AutoCAD SHX Text
EXISTING TEE AND THRUST BLOCK TO REMAIN
AutoCAD SHX Text
PROPOSED 50MM HDPE WATERMAIN
AutoCAD SHX Text
PROPOSED 50MM GATE VALVE
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Voinjama\LMWP-C-V120.dwg 10/22/2018 5:23:11 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-V120
AutoCAD SHX Text
VOINJAMA
AutoCAD SHX Text
PIPE L STA 4+00 TO 14+79
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-V120
AutoCAD SHX Text
SEE SHEET C-V121 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 50MM HDPE WATERMAIN
AutoCAD SHX Text CONTRACTOR TO CAP END OF PROPOSED 50MM WATERMAIN CONTRACTOR TO INSTALL AIR RELEASE/BLOW-OFF VALVE AND GATE VALVE AND PROVIDE THRUST BLOCK AS NECESSARY INSTALL LWSC CONCRETE MARKER
AutoCAD SHX Text
PROPOSED 50MM GATE VALVE
PROPOSED 50MM TEE
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Voinjama\LMWP-C-V121.dwg 10/22/2018 5:23:30 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-V121
AutoCAD SHX Text
VOINJAMA
AutoCAD SHX Text
PIPE L STA 0+00 TO 4+00
AutoCAD SHX Text
PIPE M STA 0+00 TO 8+00
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-V121
AutoCAD SHX Text
SEE SHEET C-V122 FOR CONTINUATION
AutoCAD SHX Text
SEE SHEET C-V120 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
PROPOSED 50MM HDPE WATERMAIN
AutoCAD SHX Text
EXISTING 150MM PVC WATERMAIN TO REMAIN AND PROTECTED IN PLACE
AutoCAD SHX Text
EXISTING FIRE HYDRANT SERVICE AND HYDRANT TO REMAIN
AutoCAD SHX Text
EXISTING 150MM GATE VALVE (TYP)
AutoCAD SHX Text
EXISTING TEE WITH GATE VALVES AND THRUST BLOCK
AutoCAD SHX Text CONTRACTOR TO FIELD VERIFY EXISTING 150MM PVC WATERMAIN STUBOUT CONNECT PROPOSED 50MM WATERMAIN. CONTRACTOR TO INSTALL 150MM TO 100MM REDUCER.
AutoCAD SHX Text CONTRACTOR TO INSTALL NEW 100MM x 100MM x 50MM TEE WITH GATE VALVES AND THRUST BLOCK.
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Voinjama\LMWP-C-V121.dwg 10/22/2018 5:23:35 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-V122
AutoCAD SHX Text
VOINJAMA
AutoCAD SHX Text
PIPE M STA 8+00 TO 20+00
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-V121
AutoCAD SHX Text
SEE SHEET C-V1234 FOR CONTINUATION
AutoCAD SHX Text
SEE SHEET C-V121 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
PROPOSED TEST PIT
PROPOSED WATERMAIN STREAM CROSSING, SEE DETAIL (TYP)
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Voinjama\LMWP-C-V121.dwg 10/22/2018 5:23:40 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-V123
AutoCAD SHX Text
VOINJAMA
AutoCAD SHX Text
PIPE M STA 20+00 TO 32+00
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-V121
AutoCAD SHX Text
SEE SHEET C-V124 FOR CONTINUATION
AutoCAD SHX Text
SEE SHEET C-V122 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text CONTRACTOR TO INSTALL AIR RELEASE VALVE AT HIGH POINT IN PROPOSED WATERMAIN CONTRACTOR TO COORDINATE LOCATION WITH ENGINEER
AutoCAD SHX Text
PROPOSED 50MM GATE VALVE
AutoCAD SHX Text
PROPOSED 50MM GATE VALVE
AutoCAD SHX Text PROPOSED 100MM x 50MM x 50MM TEE (APPROX STA 28+50)
PROPOSED 50MM HDPE WATERMAIN
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.