J.2a_LWMP_II_drawings_1_of_4.pdf
PDF 12 MB Posted
- Solicitation number
- 72066919R00007
About this file
Attachment J.2a LWMP II drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BOQs_For_Bellemue-_A01.xlsx | XLSX spreadsheet | |
| WASH__RFP_1282019-_Amendment.pdf | ||
| WASH_Qs&As-1302019.pdf | ||
| Watermain_BOQ_-_A01_-_FINAL.xlsx | XLSX spreadsheet | |
| J.3b_IndividualConnectionSurveyReport.xlsx | XLSX spreadsheet | |
| J.1_Technical_Specification_WEP.pdf | ||
| J.2c_LWMP_II_drawings_3_of_4.pdf | ||
| J.11_Contact_details_for_WASH_in_HF.pdf | ||
| Water_Expansion_&_WASH_Services_RFP_12122018.pdf | ||
| J.8_Past_Performance_Sheet.rtf | RTF text file | |
| J.3c_BOQ_and_Cost_Est_Watermain_Expansion_-_final.xlsx | XLSX spreadsheet | |
| J.5_Final_Technical_Spec._WASH_in_HF.pdf | ||
| J.4_HF_design,_specs_&_BOQ.zip | ZIP file | |
| J.7_Bio-data_sheet_AID1420-17.doc | DOC document | |
| J.10_SF_LLL_Disclosure_of_Lobbying_Activities.pdf | ||
| J.2d_LWMP_II_drawings_4_of_4_Rev01.pdf | ||
| J.6_AFR-EnvReviewForm-20Dec2010_(3).pdf | ||
| J.2b_LWMP_II_drawings_2_of_4.pdf | ||
| J.3a_Connection_heat__map.pptx | PPTX presentation | |
| J.9__Branding_and_Marking_Template.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPUBLIC OF LIBERIA
UNITED STATES AGENCY FOR INTERNATIONAL
DEVELOPMENT
LIBERIA MUNICIPAL WATER PROJECT II
WATERMAIN EXPANSION PROJECT
SANNIQUELLIE AND VOINJAMA, LIBERIA
DATE: OCTOBER 26, 2018
This project was made possible by the United
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
AutoCAD SHX Text
SHEET COUNT
AutoCAD SHX Text
SHEET REF
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
GENERAL DRAWINGS
AutoCAD SHX Text
AutoCAD SHX Text G-001
AutoCAD SHX Text
COVER SHEET
AutoCAD SHX Text
AutoCAD SHX Text G-002
AutoCAD SHX Text
INDEX SHEET
AutoCAD SHX Text
AutoCAD SHX Text C-001
AutoCAD SHX Text
LEGEND, SYMBOLS, AND ABBREVIATIONS
AutoCAD SHX Text
AutoCAD SHX Text C-002
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
AutoCAD SHX Text C-003
AutoCAD SHX Text
PROJECT LOCUS MAP
AutoCAD SHX Text
SHEET COUNT
AutoCAD SHX Text
SHEET REF
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
SHEET COUNT
AutoCAD SHX Text
SHEET REF
AutoCAD SHX Text
SHEET TITLE
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
CIVIL DRAWINGS
AutoCAD SHX Text
AutoCAD SHX Text C-S102
AutoCAD SHX Text
SANNIQUELLIE PIPE A STA. 00+00 TO 11+50
AutoCAD SHX Text
VOINJAMA
AutoCAD SHX Text
CIVIL DRAWINGS
AutoCAD SHX Text C-V100
AutoCAD SHX Text
VOINJAMA KEY MAP
AutoCAD SHX Text C-V101A
AutoCAD SHX Text
VOINJAMA PIPE A STA. 9+50 TO 20+50
AutoCAD SHX Text C-V102
AutoCAD SHX Text
VOINJAMA PIPE A STA. 20+50 TO 30+50
AutoCAD SHX Text C-V103
AutoCAD SHX Text
VOINJAMA PIPE A STA. 30+50 TO 38+03
AutoCAD SHX Text C-V104
AutoCAD SHX Text
VOINJAMA PIPE B STA. 00+00 TO 11+03 PIPE C STA. 8+00 TO 11+37
AutoCAD SHX Text C-V105
AutoCAD SHX Text C-V106
AutoCAD SHX Text
AutoCAD SHX Text C-S103
AutoCAD SHX Text
SANNIQUELLIE PIPE B STA. 00+00 TO 6+00
AutoCAD SHX Text
AutoCAD SHX Text C-S104
AutoCAD SHX Text
SANNIQUELLIE PIPE B STA. 6+00 TO 16+00
AutoCAD SHX Text
AutoCAD SHX Text C-S105
AutoCAD SHX Text
SANNIQUELLIE PIPE B STA 16+00 TO 27+00
AutoCAD SHX Text
AutoCAD SHX Text C-S106
AutoCAD SHX Text
SANNIQUELLIE PIPE B STA 27+00 TO 38+00
AutoCAD SHX Text
AutoCAD SHX Text C-S107
AutoCAD SHX Text SANNIQUELLIE PIPE B STA. 38+00 TO 40+04 PIPE C STA. 00+00 TO 3+50 PIPE D STA. 00+00 TO 2+50 PIPE E STA. 00+00 TO 9+50
AutoCAD SHX Text
AutoCAD SHX Text C-S108
AutoCAD SHX Text
SANNIQUELLIE PIPE C STA. 3+50 TO 15+48
AutoCAD SHX Text
AutoCAD SHX Text C-S109
AutoCAD SHX Text
SANNIQUELLIE PIPE D STA. 2+50 TO 14+00
AutoCAD SHX Text
AutoCAD SHX Text C-S110
AutoCAD SHX Text
SANNIQUELLIE PIPE E STA. 9+50 TO 19+79
AutoCAD SHX Text
AutoCAD SHX Text C-S111
AutoCAD SHX Text SANNIQUELLIE PIPE F STA. 5+00 TO 11+10 PIPE G STA. 00+00 TO 4+50 PIPE H STA. 00+00 TO 2+50
AutoCAD SHX Text
AutoCAD SHX Text C-S112
AutoCAD SHX Text
SANNIQUELLIE PIPE G STA. 4+50 TO 14+87
AutoCAD SHX Text
AutoCAD SHX Text C-S113
AutoCAD SHX Text
SANNIQUELLIE PIPE H STA. 2+50 TO 7+50 PIPE G1 STA. 00+00 TO 4+50
AutoCAD SHX Text
AutoCAD SHX Text C-S114
AutoCAD SHX Text
SANNIQUELLIE PIPE G1 STA. 4+50 TO 14+75
AutoCAD SHX Text
AutoCAD SHX Text C-S115
AutoCAD SHX Text
SANNIQUELLIE PIPE H STA. 7+50 TO 12+19 PIPE I STA. 00+00 TO 6+50
AutoCAD SHX Text
AutoCAD SHX Text C-S116
AutoCAD SHX Text
SANNIQUELLIE PIPE I STA. 6+50 TO 16+10
AutoCAD SHX Text
AutoCAD SHX Text C-S117
AutoCAD SHX Text
SANNIQUELLIE PIPE J STA. 00+00 TO 12+00
AutoCAD SHX Text
AutoCAD SHX Text C-S118
AutoCAD SHX Text
SANNIQUELLIE PIPE J STA. 12+00 TO 21+53
AutoCAD SHX Text
AutoCAD SHX Text C-S119
AutoCAD SHX Text
SANNIQUELLIE PIPE K STA. 00+00 TO 8+58 PIPE L STA. 00+00 TO 2+50
AutoCAD SHX Text
AutoCAD SHX Text C-S120
AutoCAD SHX Text
SANNIQUELLIE PIPE L STA. 2+50 TO 4+33 PIPE M STA. 00+00 TO 9+80
AutoCAD SHX Text
AutoCAD SHX Text C-S121
AutoCAD SHX Text
SANNIQUELLIE PIPE N STA. 00+00 TO 13+50
AutoCAD SHX Text C-S122
AutoCAD SHX Text
SANNIQUELLIE PIPE N STA. 13+50 TO 26+50
AutoCAD SHX Text
AutoCAD SHX Text C-S123
AutoCAD SHX Text
SANNIQUELLIE PIPE N STA. 26+50 TO 34+00
AutoCAD SHX Text
AutoCAD SHX Text C-S124
AutoCAD SHX Text
SANNIQUELLIE PIPE N STA 34+00 TO 44+02
AutoCAD SHX Text
AutoCAD SHX Text C-S125
AutoCAD SHX Text
SANNIQUELLIE PIPE PIPE P STA. 00+00 TO 9+00
AutoCAD SHX Text
AutoCAD SHX Text C-S126
AutoCAD SHX Text
SANNIQUELLIE PIPE P STA. 9+00 TO 10.85 PIPE Q STA. 00+00 TO 9+00
AutoCAD SHX Text
AutoCAD SHX Text C-S127
AutoCAD SHX Text
SANNIQUELLIE PIPE Q STA. 9+00 TO 19+13
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C-S128
AutoCAD SHX Text
AutoCAD SHX Text C-S129
AutoCAD SHX Text
SANNIQUELLIE PIPE R STA. 11+00 TO 23+20 PIPE R1 STA. 00+00 TO 3+50
AutoCAD SHX Text
AutoCAD SHX Text C-S130
AutoCAD SHX Text
SANNIQUELLIE PIPE R1 STA. 3+50 TO 14+26
AutoCAD SHX Text
AutoCAD SHX Text C-S131
AutoCAD SHX Text
SANNIQUELLIE PIPE S STA. 00+00 TO 10+50
AutoCAD SHX Text
AutoCAD SHX Text C-S132
AutoCAD SHX Text
SANNIQUELLIE PIPE S STA. 10+50 TO 22+50
AutoCAD SHX Text
AutoCAD SHX Text C-S133
AutoCAD SHX Text
SANNIQUELLIE PIP S STA. 22+50 TO 32+50
AutoCAD SHX Text
AutoCAD SHX Text C-S134
AutoCAD SHX Text SANNIQUELLIE PIPE S 32+50 TO 33+34 PIPE S2 STA 00+00 TO 110+50 PIPE T STA. 8+00 TO 10+98
AutoCAD SHX Text
AutoCAD SHX Text C-S135
AutoCAD SHX Text
SANNIQUELLIE PIPE S2 STA. 10+50 TO 16+67
AutoCAD SHX Text
AutoCAD SHX Text C-S136
AutoCAD SHX Text
SANNIQUELLIE PIPE T STA 00+00 TO 8+00
AutoCAD SHX Text
AutoCAD SHX Text C-S137
AutoCAD SHX Text
SANNIQUELLIE PIPE U1 STA. 00+00 TO 9+82 PIPE V1 STA. 00+00 TO 3+00
AutoCAD SHX Text
AutoCAD SHX Text C-S138
AutoCAD SHX Text
AutoCAD SHX Text C-S139
AutoCAD SHX Text
SANNIQUELLIE PIPE V1 STA. 3+00 TO 14+00
AutoCAD SHX Text
AutoCAD SHX Text C-S140
AutoCAD SHX Text
SANNIQUELLIE PIPE V1 STA. 14+00 TO 19+32
AutoCAD SHX Text
AutoCAD SHX Text C-S141
AutoCAD SHX Text
SANNIQUELLIE PIPE W1 STA. 10+50 TO 20+71
AutoCAD SHX Text
SANNIQUELLIE PIPE R STA 00+00 TO 11+00
AutoCAD SHX Text
SANNIQUELLIE PIPE W1 STA. 00+00 TO 10+50
AutoCAD SHX Text C-S101
AutoCAD SHX Text
SANNIQUELLIE PIPE A STA: 11+50 TO 22+64
AutoCAD SHX Text C-V107
AutoCAD SHX Text
VOINJAMA PIPE C 00+00 TO 8+00
AutoCAD SHX Text C-V108
AutoCAD SHX Text
VOINJAMA PIPE D STA. 00+00 TO 8+00
AutoCAD SHX Text C-V109
AutoCAD SHX Text
VOINJAMA PIPE D STA. 8+00 TO 11+83
AutoCAD SHX Text C-V110
AutoCAD SHX Text VOINJAMA PIPE E STA. 00+00 TO 5+06 PIPE F STA. 00+00 TO 3+15 PIPE G STA. 00+00 TO 2+00
AutoCAD SHX Text C-V111
AutoCAD SHX Text
VOINJAMA PIPE G STA. 2+00 TO 11+23
AutoCAD SHX Text C-V112
AutoCAD SHX Text
VOINJAMA PIPE H STA. 00+00 TO 7+00
AutoCAD SHX Text C-V113
AutoCAD SHX Text
VOINJAMA PIPE H STA. 7+00 TO 19+00
AutoCAD SHX Text
VOINJAMA PIPE I STA. 00+00 TO 12+00
AutoCAD SHX Text C-V115
AutoCAD SHX Text
VOINJAMA PIPE I STA. 12+00 TO 19+91
AutoCAD SHX Text C-V116
AutoCAD SHX Text
VOINJAMA PIPE J STA. 00+00 TO 11+00
AutoCAD SHX Text C-V117
AutoCAD SHX Text
VOINJAMA PIPE J STA. 11+00 TO 22+45
AutoCAD SHX Text C-V118
AutoCAD SHX Text
VOINJAMA PIPE K STA. 00+00 TO 12+00
AutoCAD SHX Text C-V119
AutoCAD SHX Text
VOINJAMA PIPE K STA. 12+00 TO 23+50
AutoCAD SHX Text C-V120
AutoCAD SHX Text
VOINJAMA PIPE K STA. 23+50 TO 26+56 PIPE Q STA. 00+00 TO 10+00
AutoCAD SHX Text C-V121
AutoCAD SHX Text
VOINJAMA PIPE L STA. 4+00 TO 14+79
AutoCAD SHX Text C-V122
AutoCAD SHX Text
VOINJAMA PIPE L STA. 00+00 TO 4+00 PIPE M STA. 00+00 TO 8+00
AutoCAD SHX Text C-V123
AutoCAD SHX Text
VOINJAMA PIPE M STA. 8+00 TO 20+00
AutoCAD SHX Text C-V124
AutoCAD SHX Text
VOINJAMA PIPE M STA. 20+00 TO 32+00
AutoCAD SHX Text C-V125
AutoCAD SHX Text
VOINJAMA PIPE M STA. 32+00 TO 44+00
AutoCAD SHX Text C-V126
AutoCAD SHX Text
VOINJAMA PIPE N STA 00+00 TO 6+00
AutoCAD SHX Text C-V127
AutoCAD SHX Text
VOINJAMA PIPE N STA. 6+00 TO 17+50
AutoCAD SHX Text C-V128
AutoCAD SHX Text C-V129
AutoCAD SHX Text
VOINJAMA PIPE Q STA. 10+00 TO 15+76
AutoCAD SHX Text
CIVIL DETAILS
AutoCAD SHX Text C-501
AutoCAD SHX Text
CIVIL DETAILS - SERVICE CONNECTION
AutoCAD SHX Text C-502
AutoCAD SHX Text C-503
AutoCAD SHX Text C-504
AutoCAD SHX Text
CIVIL DETAILS - THRUST BLOCKS
AutoCAD SHX Text
CIVIL DETAILS - HYDRANT & CONCRETE SURFACE
AutoCAD SHX Text
CIVIL DETAILS - MISCELLANEOUS WATER DETAILS
AutoCAD SHX Text
AutoCAD SHX Text C-S100
AutoCAD SHX Text
SANNIQUELLIE KEY MAP
AutoCAD SHX Text C-S109A
AutoCAD SHX Text
SANNIQUELLIE PIPE D STA. 14+00 TO 17+00
AutoCAD SHX Text C-V101
AutoCAD SHX Text
VOINJAMA PIPE A STA. 00+00 TO 9+50
AutoCAD SHX Text C-V114
AutoCAD SHX Text
VOINJAMA PIPE H STA. 19+00 TO 30+57
AutoCAD SHX Text
VOINJAMA PIPE M STA. 44+00 TO 55+90
AutoCAD SHX Text
VOINJAMA PIPE N STA. 17+50 TO 21+59
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C-505
AutoCAD SHX Text
CIVIL DETAILS - WATERMAIN STREAM CROSSING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C-V130
AutoCAD SHX Text
VOINJAMA PIPE R STA. 0+00 TO 13+00
AutoCAD SHX Text
AutoCAD SHX Text C-V131
AutoCAD SHX Text
VOINJAMA PIPE R STA. 13+00 TO 25+06
AutoCAD SHX Text
AutoCAD SHX Text C-V132
AutoCAD SHX Text
VOINJAMA PIPE S STA. 0+00 TO 11+00
AutoCAD SHX Text
AutoCAD SHX Text C-V133
AutoCAD SHX Text
VOINJAMA PIPE S STA. 11+00 TO 19+34
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Projectwide\General\LMWP-G-002.dwg 10/22/2018 5:09:36 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text G-002
AutoCAD SHX Text
INDEX SHEET
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-G-002
AutoCAD SHX Text
INDEX OF DRAWINGS LIBERIA MUNICIPAL WATER PROJECT II
W
W
X
OFW
D
UGE
RS
C
This project was made possible by the United
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering IQC Contracts.
I S
S U
E D
F
O R
C
O N
S T
R U
C T
I O
N
FINAL
SUBMITTAL
AutoCAD SHX Text
%%USINGLE LINE
AutoCAD SHX Text
%%UDOUBLE LINE
AutoCAD SHX Text
DIAPHRAGM VALVE
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
FLOW METER
AutoCAD SHX Text
GLOBE VALVE
AutoCAD SHX Text
PLUG VALVE / ECCENTRIC PLUG VALVE
AutoCAD SHX Text
FLANGED CONNECTION
AutoCAD SHX Text
GROOVED PIPE COUPLING
AutoCAD SHX Text
%%UOUTLET DOWN
AutoCAD SHX Text
%%UOUTLET UP
AutoCAD SHX Text
WYE
AutoCAD SHX Text
REDUCER
AutoCAD SHX Text
ECCENTRIC REDUCER
AutoCAD SHX Text
CLEANOUT, CAP OR PLUG
AutoCAD SHX Text
CROSS
AutoCAD SHX Text
TEE
AutoCAD SHX Text
90%%D BEND
AutoCAD SHX Text
45%%D BEND
AutoCAD SHX Text
LATERAL
AutoCAD SHX Text
HYDRANT
AutoCAD SHX Text
PROPOSED WATER LINE
AutoCAD SHX Text
EXISTING WATERLINE
AutoCAD SHX Text
TEMPORARY BLOW-OFF VALVE
AutoCAD SHX Text
SURVEY CONTROL POINT
AutoCAD SHX Text
WATER LEVEL
AutoCAD SHX Text
TREE
AutoCAD SHX Text
X MM LEG LENGTH FILLET WELD ALL AROUND
AutoCAD SHX Text
KIOSK
AutoCAD SHX Text
CURB BOX
AutoCAD SHX Text
FLEXIBLE COUPLING
AutoCAD SHX Text
VALVE HANDLE
AutoCAD SHX Text
%%UDOUBLE LINE
AutoCAD SHX Text
%%USINGLE LINE
AutoCAD SHX Text
%%USINGLE
AutoCAD SHX Text
%%UDOUBLE
AutoCAD SHX Text
%%USINGLE
AutoCAD SHX Text
%%UDOUBLE
AutoCAD SHX Text
%%UPIPES: VALVES, METERS, CONNECTIONS
AutoCAD SHX Text
%%UPIPES: BENDS AND APPURTENANCES
AutoCAD SHX Text
%%ULINETYPES
AutoCAD SHX Text
%%USYMBOLS
AutoCAD SHX Text
%%UABBREVIATIONS
AutoCAD SHX Text
%%USYMBOLS (CONTINUED)
AutoCAD SHX Text
THRUST BLOCK
AutoCAD SHX Text
ELEVATION
AutoCAD SHX Text
SURVEY BENCHMARK
AutoCAD SHX Text
TEST PIT
AutoCAD SHX Text
TP
AutoCAD SHX Text APPROX: APPROXIMATELY APPROXIMATELY DICL: DUCTILE IRON CONCRETE-LINED DUCTILE IRON CONCRETE-LINED DIP: DUCTILE IRON PIPE DUCTILE IRON PIPE EL/ELEV: ELEVATION ELEVATION FT: FOOT OR FEET FOOT OR FEET HORIZ: HORIZONTAL HORIZONTAL HDPE HIGH-DENSITY POLYETHYLENE PIPE HIGH-DENSITY POLYETHYLENE PIPE IN: INCH OR INCHES INCH OR INCHES MJ: MECHANICAL JOINT MECHANICAL JOINT NTS: NOT TO SCALE NOT TO SCALE PVC: POLYVINYL CHLORIDE POLYVINYL CHLORIDE RCP: REINFORCED CONCRETE PIPE REINFORCED CONCRETE PIPE RP: RAW WATER INTAKE PUMP RAW WATER INTAKE PUMP S.S.: STAINLESS STEEL STAINLESS STEEL STA: STATION STATION TYP: TYPICAL TYPICAL uPVC: UNPLASTICIZED POLYVINYL CHLORIDE UNPLASTICIZED POLYVINYL CHLORIDE W WATER/WELLWATER/WELL
AutoCAD SHX Text
PROPOSED WATERLINE PENDING ELEVATION ASSESSMENT
AutoCAD SHX Text
OVERFLOW WATER
AutoCAD SHX Text
DRAIN LINE
AutoCAD SHX Text
UNDERGROUND ELECTRICAL WIRING
AutoCAD SHX Text
RAW SEWAGE PIPE
AutoCAD SHX Text
CHEMICAL LINE
AutoCAD SHX Text
BM-##
AutoCAD SHX Text APPROXIMATE LOCATION OF EXISTING KIOSK: ALL KIOSKS ARE STANDARD TYPE EXCEPT AS NOTED.
AutoCAD SHX Text
STATIONING
AutoCAD SHX Text 1+00
AutoCAD SHX Text C-001
AutoCAD SHX Text
LEGEND, SYMBOLS,
AutoCAD SHX Text
AND ABBREVIATIONS
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-001
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Projectwide\Civil\LMWP-C-001.dwg 10/22/2018 5:09:50 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text A
AutoCAD SHX Text
FINAL SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
TJK
AutoCAD SHX Text
LMWP
13-JULY-2018
and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
AutoCAD SHX Text C-002
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-002
AutoCAD SHX Text
1. THE SATELLITE PHOTOGRAPH USED AS A BASE IMAGE FOR SANNIQUELLIE WAS TAKEN ON THE SATELLITE PHOTOGRAPH USED AS A BASE IMAGE FOR SANNIQUELLIE WAS TAKEN ON JANUARY 3, 2011. THE PROJECTION IS BASED ON UTM ZONE 29 NORTH AND THE DATUM IS WGS 84. THE IMAGE RESOLUTION IS 0.5 METER. THE IMAGE WAS OBTAINED FROM DIGITAL GLOBE, INC., OF 1601 DRY CREEK DRIVE / SUITE 260 / LONGMONT, COLORADO 80503 / 303-684-4000 / 303-684-4562 FAX / WWW.DIGITALGLOBE.COM. 2. THE SATELLITE PHOTOGRAPH USED AS A BASE IMAGE FOR VOINJAMA WAS TAKEN ON FEBRUARY THE SATELLITE PHOTOGRAPH USED AS A BASE IMAGE FOR VOINJAMA WAS TAKEN ON FEBRUARY 5, 2011. THE PROJECTION IS BASED ON UTM ZONE 29 NORTH AND THE DATUM IS WGS84. THE IMAGE RESOLUTION IS 0.5 METER. THE IMAGE WAS OBTAINED FROM GEOEYE INC. OF 12076 GRANT STREET / THORNTON, COLORADO 80241 / 703-450-9570 / 703-450-9570 FAX / WWW.GEOEYE.COM. 3. THE CONTRACTOR SHALL VISIT THE PROPOSED PIPE ALIGNMENT PRIOR TO BIDDING SO AS TO BE THE CONTRACTOR SHALL VISIT THE PROPOSED PIPE ALIGNMENT PRIOR TO BIDDING SO AS TO BE PRIOR TO BIDDING SO AS TO BE TO BIDDING SO AS TO BE COMPLETELY FAMILIAR WITH EXISTING CONDITIONS AND PROPOSED REQUIREMENTS. THE CONTRACTOR IS RESPONSIBLE TO VERIFY INFORMATION AND DIMENSIONS. 4. THE CONTRACTOR SHALL INFORM HIM/HERSELF REGARDING FLOOD AND TIDAL WATER LEVELS IN THE CONTRACTOR SHALL INFORM HIM/HERSELF REGARDING FLOOD AND TIDAL WATER LEVELS IN THE AREA IN WHICH WORK IS BEING PERFORMED. ALL INFORMATION REGARDING LEVELS IN THE POSSESSION OF THE ENGINEER IS AVAILABLE FOR USE BY THE CONTRACTOR. 5. THE FLOOD CONDITION OF THE BEE RIVER IN SANNIQUELLIE IS NOT DOCUMENTED. A REVIEW THE FLOOD CONDITION OF THE BEE RIVER IN SANNIQUELLIE IS NOT DOCUMENTED. A REVIEW OF HISTORIC LIBERIA HYDROLOGICAL SERVICE RECORDS FROM 1973 TO 1981 INDICATES THE RECORDS ARE INCOMPLETE (GAPS OF RECORDS ARE MISSING) BUT A MAXIMUM STAGE DEPTH READING OF 2.94 METERS WAS OBSERVED. THIS READING OCCURRED IN SEPTEMBER 1977. THE LOCATION AND DATUM OF THESE READINGS ARE NOT DOCUMENTED. 6. THE FLOOD CONDITION OF THE ZELIBA RIVER IN VOINJAMA IS INDICATED TO BE AT A DEPTH OF THE FLOOD CONDITION OF THE ZELIBA RIVER IN VOINJAMA IS INDICATED TO BE AT A DEPTH OF 3.75 METERS IN THE APPENDIX MATERIAL OF THE FINAL DESIGN FOR VOINJAMA, AS PREPARED BY GKW CONSULTING ENGINEERS. THE FLOOD IS CONSIDERED TO HAVE A FLOW RATE OF APPROXIMATELY 36.9 CUBIC METERS PER SECOND. THE LOCATION AND DATUM OF THESE READINGS ARE NOT DOCUMENTED. 7. THE CONTRACTOR SHALL PREPARE AN ENVIRONMENTAL MITIGATION MONITORING PLAN (EMMP) THE CONTRACTOR SHALL PREPARE AN ENVIRONMENTAL MITIGATION MONITORING PLAN (EMMP) FOR APPROVAL BY USAID AND IMPLEMENT PLAN THROUGHOUT PROJECT. 8. THE CONTRACTOR SHALL CONFINE OPERATIONS AND ACTIVITIES FOR CONSTRUCTION PURPOSES THE CONTRACTOR SHALL CONFINE OPERATIONS AND ACTIVITIES FOR CONSTRUCTION PURPOSES WITHIN THE LIMITS OF WORK, PROPERTY LINES, STREET LINES, EASEMENTS, AND RIGHTS-OF-WAY AS SHOWN ON OR INTENDED BY THE DRAWINGS. 9. ALL AREAS DISTURBED DURING CONSTRUCTION AND ALL NEW GRADING AREAS ARE TO BE ALL AREAS DISTURBED DURING CONSTRUCTION AND ALL NEW GRADING AREAS ARE TO BE LOAMED AND SEEDED UNLESS OTHERWISE SPECIFIED. 10. LOCATION OF ELECTRICAL DUCTS AND SERVICES ARE APPROXIMATE ONLY. FINAL LOCATION IS TO LOCATION OF ELECTRICAL DUCTS AND SERVICES ARE APPROXIMATE ONLY. FINAL LOCATION IS TO BE DETERMINED IN THE FIELD BY THE CONTRACTOR. 11. WHERE SHOWN IN THE DRAWINGS, EXISTING UTILITIES ARE APPROXIMATE. THE CONTRACTOR WHERE SHOWN IN THE DRAWINGS, EXISTING UTILITIES ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPERLY LOCATING AND COORDINATING ANY PROPOSED CONSTRUCTION ACTIVITY WITH THE APPLICABLE UTILITY OWNER. LMWP DOES NOT GUARANTEE THE ACCURACY OF UTILITY LOCATIONS OR THE COMPLETENESS OF THE UTILITIES SHOWN. THE LOCATIONS AND ATTRIBUTES OF SUBSURFACE AND ABOVE-GROUND UTILITIES HAVE BEEN COMPILED FROM AVAILABLE RECORD PLAN DATA AND NOTES, AS WELL AS FIELD OBSERVATIONS. CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES DURING CONSTRUCTION. 12. THE CONTRACTOR AGREES TO BE FULLY RESPONSIBLE FOR PRESERVING THE INTEGRITY OF ALL THE CONTRACTOR AGREES TO BE FULLY RESPONSIBLE FOR PRESERVING THE INTEGRITY OF ALL EXISTING UNDERGROUND UTILITIES AND SHALL BE FULLY RESPONSIBLE FOR ANY DAMAGE TO THESE UTILITIES WHICH MAY RESULT FROM THE CONTRACTOR'S WORK. 13. THE CONTRACTOR SHALL CONDUCT TEST PITS AS DIRECTED BY THE ENGINEER TO LOCATE THE CONTRACTOR SHALL CONDUCT TEST PITS AS DIRECTED BY THE ENGINEER TO LOCATE EXISTING UTILITIES AND SUBSURFACE FEATURES TO DETERMINE WHETHER TO RAISE, LOWER, OR RELOCATE PROPOSED UTILITIES OR TO VERIFY EXISTING CONDITIONS, SIZES, OR TYPES OF SUBSURFACE FEATURES. 14. STONE WALLS, FENCES, SIGNS, LIGHT POLES, ETC. SHALL BE REMOVED AS NECESSARY TO STONE WALLS, FENCES, SIGNS, LIGHT POLES, ETC. SHALL BE REMOVED AS NECESSARY TO PERFORM THE WORK AND BE REPLACED TO A CONDITION AT LEAST EQUAL TO THAT BEFORE CONSTRUCTION BEGAN, UNLESS OTHERWISE INDICATED. ALL SUCH WORK SHALL BE INCIDENTAL TO THE CONSTRUCTION OF THE PROJECT. 15. THE OPERATION OF THE EXISTING WATER SYSTEM SHALL BE MAINTAINED CONTINUOUSLY THE OPERATION OF THE EXISTING WATER SYSTEM SHALL BE MAINTAINED CONTINUOUSLY THROUGHOUT THE CONSTRUCTION PERIOD. THE CONTRACTOR SHALL COORDINATE THE SCHEDULING OF EQUIPMENT REMOVAL WITH THE ENGINEERS AND THE SUPERINTENDENT OF THE WATER FACILITIES. 16. THE CONTRACTOR SHALL REMOVE ALL COMPONENTS AND APPURTENANCES OF THE PREVIOUS THE CONTRACTOR SHALL REMOVE ALL COMPONENTS AND APPURTENANCES OF THE PREVIOUS WATER SYSTEM TO A DEPTH OF TWO FEET BELOW FINISH GRADE. THE CONTRACTOR SHALL BACKFILL AND COMPACT AS SPECIFIED TO FINISH GRADE. 17. THE CONTRACTOR SHALL NOT OPEN OR CLOSE ANY VALVES WHICH HOLD WATER IN THE THE CONTRACTOR SHALL NOT OPEN OR CLOSE ANY VALVES WHICH HOLD WATER IN THE SYSTEM. THE WATER SUPERINTENDENT WILL, ON 24 HOURS' ADVANCED NOTICE FROM THE CONTRACTOR, SCHEDULE THE OPENING AND/OR CLOSING OF VALVES REQUIRED BY THE CONTRACTOR FOR THE PURPOSE OF DRAINING, FILLING, OR ISOLATING WATER IN VARIOUS SECTIONS OF THE WATER SYSTEM. THE CONTRACTOR IS RESPONSIBLE FOR NOTIFYING IN WRITING AND WITH 24 HOURS' NOTICE ANY OCCUPANT, RESIDENT, OR WATER USER THAT THERE WILL BE A PERIOD OF DISRUPTED WATER SERVICE DUE TO A PLANNED SHUTDOWN APPROVED BY THE WATER SUPERINTENDENT. 18. ALL NEW CONCRETE STRUCTURES AND ALL NEW EXTERNAL FRAMES, COVERS, AND HATCHES ALL NEW CONCRETE STRUCTURES AND ALL NEW EXTERNAL FRAMES, COVERS, AND HATCHES POTENTIALLY SUBJECT TO VEHICLE LOADING AS DETERMINED BY THE ENGINEER SHALL BE DESIGNED FOR AASHTO HS20-44 LOADING AS A MINIMUM. 19. CONCRETE STRUCTURES SHALL BE SEALED AT ALL JOINTS (GASKET) AND CONNECTIONS (PIPE CONCRETE STRUCTURES SHALL BE SEALED AT ALL JOINTS (GASKET) AND CONNECTIONS (PIPE BOOTS) AND SHALL BE WATERPROOFED OVER THEIR ENTIRE EXTERIOR WITH AN ASPHALTIC COATING. 20. STRUCTURAL EXCAVATION AND DEWATERING SHALL BE SUBJECT TO THE APPROVAL OF THE STRUCTURAL EXCAVATION AND DEWATERING SHALL BE SUBJECT TO THE APPROVAL OF THE DESIGN ENGINEER. THE DEPTH OF STONE BEDS BENEATH STRUCTURES MAY VARY, SUBJECT TO EXISTING SOIL CONDITIONS. 21. LOCATION AND SIZE OF EQUIPMENT IS SHOWN IN AN APPROXIMATE WAY ONLY AND IS INTENDED LOCATION AND SIZE OF EQUIPMENT IS SHOWN IN AN APPROXIMATE WAY ONLY AND IS INTENDED AS A GENERAL CONFIGURATION. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE EXACT DIMENSIONS FOR THE IMPLEMENTATION OF THE PROPOSED WORK, INCLUDING LOCATION AND ELEVATION OF ALL: GRAVITY FLOW PIPES, PRESSURE PIPES, DRAINS, MANHOLE STRUCTURES, AND FORCE MAINS. 22. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ALL TEMPORARY AND PERMANENT IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE ALL TEMPORARY AND PERMANENT SUPPORT AND THRUST RESTRAINTS OF COMPONENTS FOR THE EXISTING AND PROPOSED FACILITIES IMPACTED BY THE CONTRACT. SUPPORT AND RESTRAINT SHALL BE SIZED, REINFORCED, AND POSITIONED SO AS TO SAFEGUARD THE CONDITIONS AND INTEGRITY OF THE PIPING, EQUIPMENT, AND APPURTENANCES, AND SHALL BE SUBJECT TO THE APPROVAL OF THE ENGINEER. 23. ALL POTABLE AND UTILITY WATER SUPPLY LINES SHALL BE INSTALLED WITH A MINIMUM OF 4'0" ALL POTABLE AND UTILITY WATER SUPPLY LINES SHALL BE INSTALLED WITH A MINIMUM OF 4'0" COVER EXCEPT AS NOTED ON THE PLANS. 24. ALL HORIZONTAL AND VERTICAL WATER PIPING FITTINGS SHALL BE ANCHORED BY THRUST ALL HORIZONTAL AND VERTICAL WATER PIPING FITTINGS SHALL BE ANCHORED BY THRUST BLOCKS OR THRUST ANCHORS OF ADEQUATE SIZE. 25. ALL WATER MAIN PIPING, FITTINGS, AND VALVES SHALL BE RATED FOR A WORKING PRESSURE ALL WATER MAIN PIPING, FITTINGS, AND VALVES SHALL BE RATED FOR A WORKING PRESSURE OF 175 PSI MINIMUM. 26. ALL HYDRANTS SHALL BE RATED FOR A WORKING PRESSURE OF 150 PSI MINIMUM. ALL HYDRANTS SHALL BE RATED FOR A WORKING PRESSURE OF 150 PSI MINIMUM. 27. LEGEND AND GENERAL NOTES DRAWINGS MAY CONTAIN MORE REFERENCES THAN ARE ACTUALLY LEGEND AND GENERAL NOTES DRAWINGS MAY CONTAIN MORE REFERENCES THAN ARE ACTUALLY ON THE INDIVIDUAL DRAWINGS. 28. THE CONTRACTOR SHALL COORDINATE ALL WORK INCLUDING EXCAVATION, CLEARING, GRUBBING, THE CONTRACTOR SHALL COORDINATE ALL WORK INCLUDING EXCAVATION, CLEARING, GRUBBING, AND OTHER CONSTRUCTION ACTIVITIES WHICH MUST BE PERFORMED AND ARE REQUIRED FOR THE RELOCATION OF ANY AND ALL UTILITIES. IT IS ANTICIPATED THAT THE RELOCATION OF UTILITIES WILL BE PERFORMED EARLY IN THE CONTRACT. THE NEW SERVICE SHOULD BE OPERATIONAL PRIOR TO DISCONNECTING THE EXISTING SERVICE. 29. ALL EXTERNAL PIPING IS TO BE FURNISHED AND INSTALLED BY THE CONTRACTOR. ALL EXTERNAL PIPING IS TO BE FURNISHED AND INSTALLED BY THE CONTRACTOR. 30. FLEXIBLE COUPLING SHALL BE FURNISHED AND INSTALLED AT ALL LOCATIONS WHERE BURIED FLEXIBLE COUPLING SHALL BE FURNISHED AND INSTALLED AT ALL LOCATIONS WHERE BURIED PIPES ENTER OR EXIT EXISTING OR PROPOSED CAST-IN-PLACE OR PRECAST CONCRETE STRUCTURES OR AS DIRECTED BY THE ENGINEER. 31. THE CONTRACTOR SHALL RECOGNIZE THE NEED FOR ANTI-BUOYANCE PROVISIONS AS SHOWN OR THE CONTRACTOR SHALL RECOGNIZE THE NEED FOR ANTI-BUOYANCE PROVISIONS AS SHOWN OR AS REQUIRED FOR ALL COMPONENTS OF THE PROJECT DURING AND AFTER CONSTRUCTION. ANTI-BUOYANCE PROVISIONS SHALL EXCEED THE 100-YEAR FLOOD OR HIGHEST RECORDED/RECOGNIZED FLOOD CONDITIONS BASED ON EMPTY AND UN-BACKFILLED VESSELS. 32. UNLESS NOTED OTHERWISE, PROVIDE VALVE BOX FOR ALL OUTDOOR UNDERGROUND VALVES. UNLESS NOTED OTHERWISE, PROVIDE VALVE BOX FOR ALL OUTDOOR UNDERGROUND VALVES. 33. REINFORCED CONCRETE PAVING SURFACES ARE PRESENT ON SOME ROADS IN VOINJAMA. REINFORCED CONCRETE PAVING SURFACES ARE PRESENT ON SOME ROADS IN VOINJAMA. SANNIQUELLIE ROADWAY SURFACES ARE GRAVEL OR COMPACTED NATURAL MATERIAL AND DO NOT INCLUDE ANY PAVEMENT OR CONCRETE ROADWAY SURFACE. 34. THE LIBERIA WATER AND SEWER CORPORATION (LWSC) OR GOVERNMENT OF LIBERIA (GOL) THE LIBERIA WATER AND SEWER CORPORATION (LWSC) OR GOVERNMENT OF LIBERIA (GOL) SHALL BE RESPONSIBLE FOR COORDINATING, CONFIRMING, AND RESOLVING ALL LAND RIGHTS AND CLAIMS AS PART OF THIS PROJECT. 35. PLAN SHEETS ARE NAMED AND ORDERED ACCORDING TO THE FOLLOWING CONVENTION: PLAN SHEETS ARE NAMED AND ORDERED ACCORDING TO THE FOLLOWING CONVENTION: D-CXXX, WHERE D = DISCIPLINE DESIGNATOR C = CITY NAME (BLANK FOR SHEETS NOT SPECIFIC TO A PARTICULAR CITY) XXX = NUMBER 36. THE DRAWING SET BEGINS WITH THE GENERAL DRAWINGS AND DISCIPLINE-SPECIFIC NOTES. THE DRAWING SET BEGINS WITH THE GENERAL DRAWINGS AND DISCIPLINE-SPECIFIC NOTES. THEREAFTER, DRAWINGS ARE ORDERED BY PROGRESSING THROUGH THE TREE DIAGRAM SUGGESTED BY THE TABLE BELOW, WITH THE CITY NAME AT THE TOP OF THE HIERARCHY AND THE DRAWING NUMBERS AT THE BOTTOM. THUS, DRAWINGS ARE GROUPED BY CITY, THEN BY DISCIPLINE, THEN BY NUMBER. 37. ELEVATION OF EXISTING GRADE IS BASED ON SURVEY CONDUCTED BETWEEN DECEMBER 2012 ELEVATION OF EXISTING GRADE IS BASED ON SURVEY CONDUCTED BETWEEN DECEMBER 2012 AND MARCH 2013 BY EARTH GEOLOGICAL CONSULTANCY. 38. CONTRACTOR TO PROVIDE 48" MINIMUM DEPTH OF COVER FOR PVC WATER MAIN AND 24" CONTRACTOR TO PROVIDE 48" MINIMUM DEPTH OF COVER FOR PVC WATER MAIN AND 24" MINIMUM CLEARANCE OF WATER MAIN BENEATH ALL CULVERTS. 39. CONTRACTOR TO CONDUCT EXPLORATORY TEST PITS AT EACH CULVERT CROSSING IN ADVANCE CONTRACTOR TO CONDUCT EXPLORATORY TEST PITS AT EACH CULVERT CROSSING IN ADVANCE OF WATER MAIN INSTALLATION TO DETERMINE FIELD CONDITIONS INCLUDING DEPTH, TYPE, AND MATERIAL OF CULVERTS. CONTRACTOR SHALL MAKE PROPER PREPARATIONS FOR INSTALLATION OF WATER MAIN AT THESE LOCATIONS. CONTRACTOR TO COORDINATE FINAL ALIGNMENT AND DESIGN EACH CULVERT CROSSING WITH FIELD ENGINEER PRIOR TO COMMENCING WORK. 40. PROFILES, WHERE SHOWN, ARE BASED ON SURVEY CONDUCTED BETWEEN DECEMBER 2012 AND PROFILES, WHERE SHOWN, ARE BASED ON SURVEY CONDUCTED BETWEEN DECEMBER 2012 AND MARCH 2013 BY EARTH GEOLOGICAL CONSULTANCY. CONTRACTOR SHALL VERIFY FIELD CONDITIONS AND INSTALL WATER MAINS WITH REQUIRED COVER AND CLEARANCE AND SHALL RESTORE THE SURFACE TO MAINTAIN DRAINAGE PATTERNS. 41. CONTRACTOR TO COORDINATE FINAL LOCATIONS OF HYDRANTS, KIOSKS, AND VALVES WITH FIELD CONTRACTOR TO COORDINATE FINAL LOCATIONS OF HYDRANTS, KIOSKS, AND VALVES WITH FIELD ENGINEER BASED ON FIELD CONDITIONS AND DISCUSSIONS WITH RESIDENTS IF REQUIRED. IN GENERAL HYDRANTS SHOULD BE LOCATED AT LOCAL HIGH POINTS AND LOCAL LOW POINTS ALONG THE LINE, TO ALLOW FOR AIR RELEASE AND FLUSHING, RESPECTIVELY. 42. PROPOSED REDUCERS ARE NOT SHOWN ON DISTRIBUTION SYSTEM DRAWINGS. PROPOSED REDUCERS ARE NOT SHOWN ON DISTRIBUTION SYSTEM DRAWINGS. 43. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DEWATERING OPERATIONS REQUIRED TO CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DEWATERING OPERATIONS REQUIRED TO SUCCESSFULLY COMPLETE THE PROJECT IN ACCORDANCE WITH REQUIREMENTS OF THE TECHNICAL SPECIFICATIONS. 44. CONTRACTOR SHALL BE RESPONSIBLE FOR SECURITY AND MAINTAINING A HEALTH AND SAFETY CONTRACTOR SHALL BE RESPONSIBLE FOR SECURITY AND MAINTAINING A HEALTH AND SAFETY PLAN DURING CONSTRUCTION, PROVIDING ALL NECESSARY PPE TO WORKERS. 45. CONTRACTOR SHALL BE RESPONSIBLE FOR DEVELOPING AND IMPLEMENTING AN ENVIRONMENTAL CONTRACTOR SHALL BE RESPONSIBLE FOR DEVELOPING AND IMPLEMENTING AN ENVIRONMENTAL MITIGATION AND MANAGEMENT PLAN (EMMP) BASED ON THE APPROVED LIBERIA EPA PERMIT, THAT THE CONTRACTOR IS RESPONSIBLE TO OBTAIN. 46. THE CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL ADJACENT TO CONSTRUCTION THE CONTRACTOR SHALL BE RESPONSIBLE FOR TRAFFIC CONTROL ADJACENT TO CONSTRUCTION ZONES AND PROVIDE WRITTEN TRAFFIC CONTROL PLAN FOR APPROVAL PRIOR TO COMMENCING WORK. ALL OPEN EXCAVATIONS SHALL BE CLEARLY MARKED, FENCED, AND SECURED AFTER HOURS. 47. ALL THRUST BLOCKS ARE TO BE INSTALLED PER SPECIFICATION AND DETAIL. ALL THRUST BLOCKS ARE TO BE INSTALLED PER SPECIFICATION AND DETAIL. 48. ALL NEW PIPE LINE ALIGNMENT IS SHOWN IN FEET TO MAINTAIN CONSISTENCY WITH AS-BUILT ALL NEW PIPE LINE ALIGNMENT IS SHOWN IN FEET TO MAINTAIN CONSISTENCY WITH AS-BUILT FROM CAPITOL IMPROVEMENT PROJECT (CIP). 49. ALL NEW PIPE SIZE (DIAMETER) IS SHOWN AS MM TO MATCH WITH THE PIPE CONNECTION ALL NEW PIPE SIZE (DIAMETER) IS SHOWN AS MM TO MATCH WITH THE PIPE CONNECTION INSTALLED IN THE CIP. 50. WHEN CONNECTING TO EXISTING WATEMAIN, CONTRACTOR SHALL PROTECT EXISTING WATER WHEN CONNECTING TO EXISTING WATEMAIN, CONTRACTOR SHALL PROTECT EXISTING WATER INFRASTRUCTURE, INCLUDING GATE VALVES, THRUST BLOCKS, AND CONCRETE, IN PLACE AND REPAIR AND REPLACE AND BACK FILL WITH COMPACTION AS NECESSARY.
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Projectwide\Civil\LMWP-C-002.dwg 10/22/2018 5:09:58 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
SHEET REFERENCE LABEL
AutoCAD SHX Text
CITY
AutoCAD SHX Text
DISCIPLINE
AutoCAD SHX Text
NUMBER
AutoCAD SHX Text
S = SANNIQUELLIE
AutoCAD SHX Text
2XX ELEVATIONS
AutoCAD SHX Text
V = VOINJAMA
AutoCAD SHX Text
5XX DETAILS
(BLANK) = PROJECT-WIDE
N
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
SANNIQUELLIE
VOINJAMA
MONROVIA
SCHEMATIC MAP OF LIBERIA
SHOWING PROJECT CITIES, CAPITALS,
COUNTY LIMITS AND MAJOR RIVERS
SCALE: N.T.S
ATLANTIC OCEAN
SIERRA LEONE
GUINEA
COTE D'IVOIRE
AutoCAD SHX Text C-003
AutoCAD SHX Text
PROJECT LOCUS MAP
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-003
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Projectwide\Civil\LMWP-C-003.dwg 10/22/2018 5:10:09 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
MRH
N
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text
WATER TREATMENT PLANT SITE
AutoCAD SHX Text
ELEVATED WATER STORAGE TANK
AutoCAD SHX Text
ACTIVE RAILROAD LINE
AutoCAD SHX Text
MINI WATER YARD WELL S55 BOMASUAH COMMUNITY
AutoCAD SHX Text
MINI WATER YARD WELL S43 MANGO COMMUNITY
AutoCAD SHX Text C-S101
AutoCAD SHX Text C-S102
AutoCAD SHX Text C-S103
AutoCAD SHX Text C-S104
AutoCAD SHX Text C-S105
AutoCAD SHX Text C-S106
AutoCAD SHX Text C-S107
AutoCAD SHX Text C-S108
AutoCAD SHX Text C-S109
AutoCAD SHX Text C-S110
AutoCAD SHX Text C-S111
AutoCAD SHX Text C-S112
AutoCAD SHX Text C-S113
AutoCAD SHX Text C-S114
AutoCAD SHX Text C-S115
AutoCAD SHX Text C-S116
AutoCAD SHX Text C-S117
AutoCAD SHX Text C-S118
AutoCAD SHX Text C-S119
AutoCAD SHX Text C-S120
AutoCAD SHX Text C-S121
AutoCAD SHX Text C-S122
AutoCAD SHX Text C-S126
AutoCAD SHX Text C-S125
AutoCAD SHX Text C-S127
AutoCAD SHX Text C-S128
AutoCAD SHX Text C-S129
AutoCAD SHX Text C-S130
AutoCAD SHX Text C-S131
AutoCAD SHX Text C-S132
AutoCAD SHX Text C-S133
AutoCAD SHX Text C-S134
AutoCAD SHX Text C-S135
AutoCAD SHX Text C-S136
AutoCAD SHX Text C-S137
AutoCAD SHX Text C-S139
AutoCAD SHX Text C-S140
AutoCAD SHX Text C-S141
AutoCAD SHX Text C-S138
AutoCAD SHX Text C-S109A
AutoCAD SHX Text C-S123
AutoCAD SHX Text C-S124
AutoCAD SHX Text
PIPE A
AutoCAD SHX Text
PIPE B
AutoCAD SHX Text
PIPE D
AutoCAD SHX Text
PIPE W1
AutoCAD SHX Text
PIPE N
AutoCAD SHX Text
PIPE U1
AutoCAD SHX Text
PIPE C
AutoCAD SHX Text
PIPE I
AutoCAD SHX Text
PIPE G1
AutoCAD SHX Text
PIPE G
AutoCAD SHX Text
PIPE H
AutoCAD SHX Text
PIPE J
AutoCAD SHX Text
PIPE M
AutoCAD SHX Text
PIPE K
AutoCAD SHX Text
PIPE V1
AutoCAD SHX Text
PIPE R
AutoCAD SHX Text
PIPE P
AutoCAD SHX Text
PIPE Q
AutoCAD SHX Text
PIPE R1
AutoCAD SHX Text
PIPE R
AutoCAD SHX Text
PIPE S
AutoCAD SHX Text
PIPE S2
AutoCAD SHX Text
PIPE T
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S100.dwg 10/22/2018 5:10:47 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 600'
AutoCAD SHX Text 600'
AutoCAD SHX Text 1200'
AutoCAD SHX Text
SCALE: 1" = 600'-0"
AutoCAD SHX Text C-S100
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
KEY MAP
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
LMWP-C-S100
and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S101.dwg 10/22/2018 5:11:01 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text C-S101
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE A STA 11+50 TO 22+64
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S101
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text
SEE SHEET C-S102 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text CONTRACTOR TO CAP END OF PROPOSED WATERMAIN AND PROVIDE THRUST BLOCK AS NECESSARY. INSTALL LWSC CONCRETE MARKER IN LOCATION APPROVED BY ENGINEER
AutoCAD SHX Text
CONTRACTOR TO INSTALL AIR RELEASE VALVE AND GATE VALVE
PROPOSED 11 MM x 100 MM x 50 MM TEE and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S101.dwg 10/22/2018 5:11:06 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S102
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE A STA 0+00 TO 11+50
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S101
AutoCAD SHX Text
SEE SHEET C-S101 FOR CONTINUATION
AutoCAD SHX Text
SEE SHEET C-S103 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text CONTRACTOR TO CONNECT TO EXISTING 150 MM WATERMAIN VIA A CUT IN TEE. CONTRACTOR TO INSTALL 150 MM x 150 MM x 100 MM TEE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
EXISTING 150MM WATER MAIN TO REMAIN AND PROTECTED IN PLACE.
AutoCAD SHX Text
CONTRACTOR TO INSTALL AIR RELEASE VALVE AND GATE VALVES
AutoCAD SHX Text
EXISTING FIRE HYDRANT SERVICE AND HYDRANT TO REMAIN AND BE PROTECTED IN PLACE.
AutoCAD SHX Text CONTRACTOR TO CONNECT TO EXISTING 150 MM WATERMAIN VIA A CUT IN TEE. CONTRACTOR TO INSTALL 150 MM x 150 MM x 100 MM TEE
AutoCAD SHX Text
PROPOSED 150 MM GATE VALVE
AutoCAD SHX Text
PROPOSED 100 MM GATE VALVE
PROPOSED 11 MM x 100 MM x 50 MM TEE and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S103.dwg 10/22/2018 5:11:23 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S103
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE B STA 0+00 TO 6+00
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S103
AutoCAD SHX Text
SEE SHEET C-S102 FOR CONTINUATION
AutoCAD SHX Text
SEE SHEET C-S104 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
EXISTING 150MM WATERMAIN TO REMAIN AND BE PROTECTED IN PLACE.
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN.
AutoCAD SHX Text
EXISTING 150MM WATERMAIN TO REMAIN AND BE PROTECTED IN PLACE.
AutoCAD SHX Text PROPOSED CONNECTION TO EXISTING 150MM PVC WATERMAIN VIA CUT-IN TEE. CONTRACTOR TO INSTALL 150MM x 150MM x 100MM TEE AND THRUST BLOCK AS NECESSARY.
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE (TYP)
AutoCAD SHX Text EXISTING TEE AND FIRE HYDRANT SERVICE AND HYDRANT TO REMAIN AND PROTECTED IN PLACE
PROPOSED 100MM GATE VALVE
and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE…
This is the start of the file's text. The full file is on GovTribe.