BOQs_For_Bellemue-_A01.xlsx

XLSX spreadsheet 62 KB Posted

Attached to
Water Pipe Expansion and provision of WASH Services in Health Facilities
Solicitation number
72066919R00007
Issued by

About this file

BOQ for Bellemue- Amendment

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summarized BOQ

SUMMARY Bellemue Clinic:$ - 0
A. WASH
No.ComponentsCOST (US$)
A1Water Supply
A1.1Construction of 1 Bore hole$ - 0
A1.2Water Extraction$ - 0
A1.3Water Tower$ - 0
SUB TOTAL:$ - 0
A2Sanitation
A2.1All latrines and Bath Units$ - 0
SUB TOTAL:$ - 0
A3Hygiene
A3.1Construction of all 5 Hand washing basin, 1 Tap stand and installation of 1 Sink$ - 0
SUB TOTAL:$ - 0
A4Waste Management
A4.1Construction of 1 Placenta Pit, and repair of current Incinerator and fence$ - 0
SUB TOTAL:$ - 0
Grand Total - WASH$ - 0
B. ENERGY
No.ComponentsCOST (US$)
B1.Cost for DC energy only, as required$ - 0
Grand Total - WASH$ - 0
C. WASH + ENERGY FOR EQUIPMENT
NO.COMPONENTSCOST (US$)
A.WASH needs for the facility$ - 0
B.Energy to powered the equipment$ - 0
GRAND Total for WASH + Energy$ - 0

Borehole

Addendum 01
BORE HOLE CONSTRUCTION - Bellemue, Bong Co.
No.DESCRIPTIONQtyUnitRATE (US$)AMOUNT (US$)
1BOQ for Borehole which can be adjusted after geophysical survey. This borehole is estimated at a depth of 178.2ft which is 54meters
1.1Preparation: allowance for clearing of site of all unwanted vegetations and forgien materials and proper disposal to an anthurized dumping site.1L/s0.00
1.2Security: barracate or enclose site from unauthorized entry and user, ensuring kids and intruders have no access1L/s0.00
1.3Allow for transporting of excess excavated materials from site and proper disposal1Ls0.00
1.4Signs and Stamps: ensure a labelled sign board during construction and a parmanant sign and stamped on structure upon completion by the contractor1L/s0.00
SUB TOTAL0.00
2Borehole drilling using down-the-hole hammer equipment as follows:
2.1Drilling 8½inch through overburden (approx. 25ft depth per borehole)3LM$ - 0
TOTAL COST OF MATERIAL$ - 0
LABOUR COST @25% MATERIAL COST$ - 0
SUB TOTAL$ - 0
3.0Borehole lining and installation
3.1Install temporary flush jointed casing OD=8inch in overburden and recover casing on completion of borehole (25ft)5LM$ - 0
3.2Install uPVC casing OD=4.4, ID=4 inch, thickness 0.19inch with flush threaded joints (118.8ft per borehole).12LM$ - 0
3.3Install uPVC screen OD=4.4inch, ID=4 inch, thickness 0.19inch slotted with min. 10% open area, with flush threaded joints (29.7ft per borehole).3LM$ - 0
3.4Install uPVC bottom cap and sand trap OD=4.4inch, ID=4inch, thickness 0.19inch (1 per borehole).1Item$ - 0
3.5Gravel pack borehole with 0.15748incs gravel2inch$ - 0
3.6Prepare and install grouting with portland cement (see specifications)1cyd$ - 0
TOTAL COST OF MATERIAL$ - 0
LABOUR COST @25% MATERIAL COST$ - 0
SUB TOTAL$ - 0
4.0Cleaning, development and testing
4.1Cleaning and development of borehole by airlifting (single pipe method)(average 6 hours per borehole)6Per hour$ - 0
4.2Yield testing (pump at constant rate for 6 hrs, monitor recovery for 3 hrs or until original level reached) incl. fuel, equipments, labour, bringing to site, installation and removal of all testing equipment (see specifications).1Item$ - 0
4.3Yield testing of boreholes for mechanised pump installation (3-step drawdown test) incl. fuel, equipments, labour, bringing to site, installation and removal of all testing equipment (see specifications).1Item$ - 0
4.4Yield testing of boreholes for mechanised pump installation (24 hour constant discharge test followed by 12 hour recovery test) (see specifications)1Item$ - 0
4.5Disinfect borehole (min. 50mg. chlorine/litre) incl. supply of chemicals1Item$ - 0
4.6Water quality analysis of borehole (physical and chemical parameters on completion of drilling, bacteriological parameters after disinfection of borehole).1Item$ - 0
4.7Fit suitable safety cap to top of casing to protect borehole from contamination (see specifications).1Item$ - 0
TOTAL COST OF MATERIAL$ - 0
LABOUR COST @25% MATERIAL COST$ - 0
SUB TOTAL$ - 0
5Abandoned boreholes (Dry wells)
5.1Backfill abandoned holes with drill cuttings to surface (see specifications).1Item$ - 0
5.2Make a provision for 20% compensatory rate for dry well drilling1Item$ - 0
TOTAL COST OF MATERIAL$ - 0
LABOUR COST @25% MATERIAL COST$ - 0
SUB TOTAL$ - 0
SUMMARY
TOTAL$ - 0
15% Overhead cost, transportation and Profit Margin:$ - 0
Grand Total - Construction of Borehole$ - 0

Water Extraction

Energy for water supply- Bellemue Clinic, Bong Co.
Energy needed to power water to the facilityRATE (US$)AMOUNT (US$)
1.0SQF Flex Grundfos-2 Complete with solar water pumping System Kit -Bill of Quantity
1.1Monocrystalline Solar module with 25 years warranty (250W-36.6V)4Pcs0.00
1.2Pump Sqflex 11 Grundfos-21pcs0.00
1.3DIN Rail 150VDC 15AmpsBraker double4pcs0.00
1.4Splice Kits for Submissible Pump1L/s0.00
1.5Grounding Lay in TIN Plated CU W/ss srew10pcs0.00
1.6Grundfos Sqflex Water level Switch1pc0.00
1.7Lightining arrester to 0-300VDC1pc0.00
1.8MC4 Solarline 2PV Arry output cable 30'' #8 AWG -1roll0.00
1.9Grundfos Sqflex CU200 interface box pump controller1pc0.00
1.10Safety Switch (60Ah)3pcs0.00
1.11Midnite Solar MNPV3 combiner Box for 150VDC or 600VDC Brakers1roll0.00
1.12Grinding elements(plate, rod and Cable)1L/s0.00
1.13Grundfos SQF Flex Solar Water Pump 5 - Year extended Warranty1Pc0.00
1.14Assorted electrical tape1L/s0.00
TOTAL$ - 0
LABOUR COST @25% MATERIAL COST$ - 0
SUB TOTAL$ - 0
SUMMARY
TOTAL:$ - 0
Overhead cost, transportation and Profit Margin$ - 0
GRAND TOTAL - WATER EXTRACTION$ - 0

Water Tower

WATER TOWER AND SUPPLY - Bellemue Clinic, Bong Co.
No.DESCRIPTIONQtyUnitRATE (US$)AMOUNT (US$)
1.0Elevated RC water tower with water tank :

Construct a (12ft X 7.83ft X 32ft) reinforced Concrete tower, install 1000 gallon polytanks and connect all relevant accessories; Excavation of foundation and other related earth works for proper construction of the water tower; including construction of a water treatment room under water tower, casting flat top with RC concrete casted roof, ensuring all works are done as per the drawings and specifications, including installation of steel gate, required cable and lines, columbo and ensuring treatment room is functional upon full completion of all works.

1.1.1Site Preparation: Clearing & Grubbling of vegetation including the removal of existing tree (if any) and other objectionable materials at the construction site and proper disposal to an anthurized dumping site; including the decommissioning one old pit latrine and shower rooms1L/s$ - 0
1.1Profiling: Allow a provisional sum for profiling.1L/s$ - 0
1.2Excavation: excavation of trenches as per the line or elevation shown in the drawings; ensuring trenches are properly squared and alligned to receive concrete9.5Cu.yd$ - 0
1.4Backfilling: Fill exterior and interior walls of foundation either from the excavated materials or the nearest borrow pits, to the excavated foundation. Backfilling materials are to be compacted in 15cm horizontal layer up to the require level.7cu. Yd$ - 0
SUB TOTAL$ - 0
2.0Masonry work: complete and fully finish all masonry works including all concrete work, (Trenches, Columns, Beams, Slab,) Blocks laying, plastering, steel bending and application, Tile laying; ensuring full completion of all works
2.1Concrete work: Cast in situ concrete for R.C Concrete columns footing, Columns, R.C Beam, Slab, using a mix ratio of (1:2:4) as per the specification and drawing.11.07cu.yd$ - 0
2.1Provide 6" Thick Concrete Masonry Unit (CMU) blocks for Super-Structure to host the treatment walls, including (1:6 mix Ratio cement mortar and (1:5 Mix Ratio Plaster) and Plaster both side as per the specification and design35Sq.Yd$ - 0
2.1Steel Reinforcents: Provide 1/2'' Rebar for R.C columns footing, Columns, R.C Beam, Cutting, bending, placing and tying in position the require reinforcement as shown in the drawings and specifications74Pcs$ - 0
2.3Steel Reinforcents: Provide 1/4'' Stirrups for R.C Columns, R.C Beam, Cutting, bending, placing and tying in position the require reinforcement as shown in the drawings and specifications34Pcs$ - 0
2.1Allow a provisional sum for form works to include 1''X12''X14', 2''X4''X14', 2''X2''X14', round poles, assorted wire nails,1L/S$ - 0
2.2Ladder: provide and install 24' long 2'' galvanize pipe ladders from ground to the top of the tower as indicated in the drawings; ensuring it is firmly supported into walls6Pcs$ - 0
2.3Allow for provisional sum for 7' high solar panel base above water tank using 3'' anchor bar mounted into concrete and welding rod for the support panel for water extraction.1L/S$ - 0
2.4Colombo Blocks: Provide Decorative (Colombo) Blocks and erect including cement mortar as per the specification and drawings. The design of decorative blocks should be approved by the Site engineer to ensure proper outlook and ventilation.7Sq.Yd$ - 0
2.5Door: Provide and install 2mm steal gate at 3'-6' X7'-0'' at for the tretment unit for safeguiding of treatment unit.1Pc$ - 0
2.7Painting: Provide and apply two coats of hydrated Lime (white wash) and two coats of emulsion paint on interior and exterior walls.68Sq.Yd$ - 0
2.8Painting: Provide and apply two coat Blue Enamel Paint (Oil Paint) on Exterior walls five feet from the grid level, the color of the paint to be apply should be approved by the site engineer.19Sq.Yd$ - 0
2.9Provide chlorine 50kg Hypochloride (HTH)1barrel$ - 0
2.1Supply and install mini chhloine dozing unit/pump, manually or flow controled, 12 V DC powered , inluding all accessories.1Pcs$ - 0
2.1Provide and Install polytank of 500gals each with all necessary accessories; two polytanks on top of tower and (2" ball float valve installed in tank, washout valve, overflow pipe, non return valve, etc.) on the elevated tower ensuring proper alignment2pcs$ - 0
Total cost of material$ - 0
Labour cost @25% material cost$ - 0
Sub Total$ - 0
SUMMARY
Total$ - 0
Overhead cost, transportation and Profit Margin:$ - 0
GRAND TOTAL - WATER TOWER AND SUPPLY$0.00

Bill of Quantities - Restoration WASH Facilities

Page &P of &N

Sanitation

SANITATION Bellemue Clinic, Bong Co.
No.DESCRIPTIONQtyUnitRATE (US$)AMOUNT (US$)
1.0Construct one external pour flush toilets (4 compartment Gender balance as per MOH standard drawing (2 compartment for toilet & 2 shower) Please refer to the attached drawings and specifications
1.1Mobilization and Demobilization: This item include the contractor's general obligation for all charges in respect to all requirement. It include the establishment of his organization, camps accommodation, construction plan on site and their removal on completion of the contract, and also financing cost, risks, legal and contractual obligations and general items of cost not covered elsewhere1L/s$ - 0
1.2Signs and Stamps: ensure a labelled sign board during construction and a parmanant sign and stamped on structure upon completion by the contractor1L/s$ - 0
1.3Site Preparation: Clearing & Grubbling of vegetation including the removal of existing tree (if any) and other objectionable materials at the construction site and proper disposal to an anthurized dumping site; including the decommissioning one old pit latrine and shower rooms1L/s$ - 0
1.4Security: barracate or enclose site from unauthorized entry and user, ensuring kids and intruders have no access1L/s$ - 0
1.5Profiling: Allow a provisional sum for profiling.1L/s$ - 0
1.6Excavation: excavation of trenches as per the line or elevation shown in the drawings; ensuring trenches are properly squared and alligned to receive concrete15cu.yd$ - 0
1,7Backfilling: Fill exterior and interior walls of foundation either from the excavated materials or the nearest borrow pits, to the excavated foundation. Backfilling materials are to be compacted in 15cm horizontal layer up to the require level.16cu.yd$ - 0
SUB TOTAL$ - 0
2.0Masonry work: complete and fully finish all masonry works including all concrete work, (Trenches, Columns, Beams, Slab,) Blocks laying, plastering, steel bending and application, Tile laying; ensuring full completion of all works
2.1Concrete work: Cast in situ concrete for R.C Concrete columns/wall footing, Columns, R.C Tie Beam, Floor Slab, Lintel & Ramp using a mix ratio of (1:2:4) as per the specification and drawing.10.03cu.yd$ - 0
2.2Provide 6" Thick Concrete Masonry Unit (CMU) blocks for ( Foundation and Super-Structure) walls, including (1:6 mix Ratio cement mortar and (1:5 Mix Ratio Plaster) and Plaster both side as per the specification and design129Sq.Yd$ - 0
2.3Steel Reinforcents: Provide 12mm Rebar for R.C columns footing, Columns, R.C Tie Beam, & Lintel. Cutting, bending, placing and tying in position the require reinforcement as shown in the drawings and specifications35Pcs$ - 0
2.4Allow a provisional sum for all forms work1L/s$ - 0
2.5Steel Reinforcents: Provide 6mm Stirrups for R.C Columns, R.C Tie Beam, & Lintel. Cutting, bending, placing and tying in position the require reinforcement as shown in the drawings and specifications14Pcs$ - 0
2.6Roofing: Provide and instillation of 32 Guage Corrugated G.I sheet for the roof including the instillation/Erection of roof framing (Wall Plates, Ridges, Rafters, Purlins, Bracing & Facia Board etc. Nails, ties as per the specification and drawings . Lumber materials to be used are of good quality hard wood treated with anti-Termite or wood Preservative74Sq.Yd$ - 0
2.7Floor Tiling: Provide 12"x12" non slip Ceramic Floor Tile including (1:5 mix Ratio) for tile laying as per the specification and design29Sq.Yd$ - 0
2.8Wall Tiling: provide 12"x8" Ceramic Wall tile including (1:5 mix Ratio) for tile laying as per the specification and design113Sq.yd$ - 0
2.9Colombo Blocks: Provide Decorative (Colombo) Blocks and erect including cement mortar as per the specification and drawings. The design of decorative blocks should be approved by the Site engineer to ensure proper outlook and ventilation.2Sq.Yd$ - 0
2.1Doors: Provide and instillation of 35mm Flush Panel Door Complete including Wooden frame Hinges and Screews, Door facing properly assembled and finished with loocking arrangement (3 locks and keys for each door) including anti-termite treatment for the wooden frame size of door 3'-0''x7'-0''4Pcs$ - 0
2.1Painting: Provide and apply two coats of hydrated Lime (white wash) and two coats of emulsion paint on interior and exterior walls.258Sq.Yd$ - 0
2.1Painting: Provide and apply two coat Blue Enamel Paint (Oil Paint) on Exterior walls five feet from the grid level, the color of the paint to be apply should be approved by the site engineer.40Sq.Yd$ - 0
2.1Provide 2'' diameter galvanize pipe as tap bar and 1'' diameter pipe Vertical Bar for support64ft$ - 0
Total Cost of Material$ - 0
Labour cost @25% material cost$ - 0
Sub Total$ - 0
3.0Plumbing works: Provide and install all plumbing fixtures and fittings as indicated in the drawings and specifications; including all pipes and assessories, Aquafer fittings and fixtures preferred
3.1Provide and install WC complete2set$ - 0
3.2Telephone shower and faucet: Provide & install telephone shower complete with double faucet.2set$ - 0
3.3Tissue Holder: provide and install tissue holder in toilets2Pcs$ - 0
3.4Handicap rail: provide and install handicap rails as indicated in the drawings; ensuring it is firmly supported into walls4Pcs$ - 0
3.5Face basin with stand: construct 36''x24'' concrete face basin fully cover with 12''x8'' ceremic wall tile with trap complete, heavy duty garden faucet, soap holder and mirror.2set$ - 0
3.6Allow a provisional sum for sweage pipes (4'' and 2'') and water lines for intake, discharge and distribution ( 1'', 3/4'') including fittings as per the specifications and drawings1L/s$ - 0
3.7Provide and install floor drain as per the specifications and designs6Pcs$ - 0
Total Cost of Material$ - 0
Labour cost @25% material cost$ - 0
Sub Total$ - 0
4.0Construct one External Septic Tank (14' X10' X 10') @ the latrine for the sludge.
4.1Profiling: Allow a provisional sum for profiling.1L/s$ - 0
4.2Excavation: excavation of trenches as per the line or elevation shown in the drawings; ensuring trenches are properly squared and alligned to receive concrete81Cy$ - 0
4.3Backfilling: Fill exterior walls of Septic Tank from the excavated materials and cast away surplus excavated materials to a convenient location.1L/s$ - 0
SUB TOTAL$ - 0
5.0Masonry works: Construct a 14' X 10' X 10' septic tank at the the latrine for waste water and sludge.
5.1Concrete work: Cast in situ concrete for R.C Concrete columns/wall footing, Columns, R.C Tie Beam, Floor Slab, Lintel & Ramp using a mix ratio of (1:2:4) as per the specification and drawing.4.3Cu.Yd$ - 0
5.2Provide 6" Thick Concrete hallow blocks for Foundation and Super-Structure walls, including (1:6 mix Ratio cement mortar and (1:5 Mix Ratio) and Plaster both side as per the specification and design58Sq.Yd$ - 0
5.3Steel Reinforcents: Provide 1/2'' Steel reinforcement for Columns, R.C Slab. Cutting, bending, placing and tying in position the require reinforcement as shown in the drawings and specifications35Pcs$ - 0
5.4Steel Reinforcents: Provide 1/4'' Steel reinforcement for Columns. Cutting, bending, placing and tying in position the require reinforcement as shown in the drawings and specifications5Pcs$ - 0
5.5Allow a provisional sum for Man hole4L/s$ - 0
5.60Allow provisional sum for form work1L/s$ - 0
Cost of Material$ - 0
Labour cost @25% material cost$ - 0
Sub Total$ - 0
6.0Rehabilitation of current 2 cubicle pour flush latrines: perform the rehabilitation of the current 2 cubicles pour flush latrines to include the plastering, placement of wall and floor tiles as required.
8.1Sand: Provide and use rough river sand for all masonry works, including construction of manhole, plastering and all cement work; free of dirt and unwanted materials and MUST be clean and clear0.5cu.yd$ - 0
8.2Cement: provide and use blue star Poland cement for all works9bags$ - 0
8.3Ceramic floor tiles: Provide & install Ceramic floor tiles (12''x12'') for the entire floor of constructed latrine, including shower rooms, toilets, etc. (Mortar ratio 1:2,pointed in white cement) @ 12pcs per pack2.5ctn$ - 0
8.4Ceramic wall tiles: Provide & Install Ceramic wall tiles (12''x8'') for toilets (Mortar ratio 1:2,pointed in white cement) at 5'-0" for all toilets and all internal walls and 7'-0" for all showers @ 16pcs per cartoons8ctn$ - 0
8.5White cement: provide and apply white cement, ensuring cleaned surface appearances upon completion of application0.5bags$ - 0
8.6Enamel paint: use enamel paint, Ocean blue2gals$ - 0
8.7Emulsion paint: use emulsion paint, White paint1buckets$ - 0
8.8Thinner: provide and use thinner for mixing and washing purposes0.5gals$ - 0
8.9Brushes and roller: provide and use assorted rollers and brushes1L/s$ - 0
Total Cost of Material$ - 0
Labour cost @25% material cost$ - 0
Sub Total$ - 0
SUMMARY
Total$ - 0
Overhead cost, transportation and Profit Margin$ - 0
GRAND TOTAL-SANITATION$ - 0

Bill of Quantities - Restoration WASH Facilities

Page &P of &N

Hygiene

Handwashing Basins / HYGIENE - Bellemue Clinic, Bong Co.
NO.DESCRIPTIONQTYUNITRATE (US$)AMOUNT (US$)
1.0Hand Washing Facilities: installation of 5 hand washing basins within Bellemue clinic; ensuring all hand washing basins are fully connected with running water supply and waste lines. These handwashing basins shall be located in the Post-patum ward, Short Stay, MCH, Screening rooms and at the OPD.
1.1Cement: provide and use blue star Poland cement for all works10bags$ - 0
1.2Sand: Provide and use rough river sand for all masonry works, including septic tank; free of dirt and unwanted materials and MUST be clean and clear1cu.yd$ - 0
1.3Crush rock: provide and use crushed rocks of sizes ranging from 3mm to 9mm for all works1cu.yd$ - 0
1.4Steel bars: provide and use rough steel rod 3/8'' for casting of handwashing slabs as indicated in the drawings and specifications5Pcs$ - 0
1.5Tie wire: using free of rust tie wires for positioning of all steel bars1roll$ - 0
1.6Form works: Provide for Wa-Wa (1''x12''x14') for all form works10Pcs$ - 0
1.7Ceramic tiles: Provide & Install Ceramic tiles (8''x12'') for handwashing basins (Mortar ratio 1:2, pointed in white cement) at 4'-0" @ 16pcs per cartoons20ctn$ - 0
1.8PVC pipe: Provide and install 1" pvc pipes for drainage5Pcs$ - 0
1.9Blocks: provide and use hollow 4" Masonry block for the construction of handwashing basin50Pcs$ - 0
1.10Floor drian: provide and use 3" floor drain5Pcs$ - 0
1.11Faucet: provide and install 2 faucet10Pcs$ - 0
TOTAL COST OF MATERIAL$ - 0
LABOUR COST @25% OF MATERIAL COST$ - 0
SUB TOTAL$ - 0
2.0Hand Washing Facilities: installation of 1 hand washing sink within the delivery room of Bellemue clinic; ensuring that it is fully connected with running water supply and waste lines appropriately connected to a soak away pit.
2.1Blocks: provide and use hollow 4" Masonry block for the construction of handwashing sink10Pcs$ - 0
2.2Cement: provide and use blue star Poland cement for all works1bags$ - 0
2.3Sand: Provide and use rough river sand for all masonry works, including septic tank; free of dirt and unwanted materials and MUST be clean and clear0.1Cu.Yd$ - 0
2.4Ceramic tiles: Provide & Install Ceramic tiles (8''x12'') for handwashing basins (Mortar ratio 1:2, pointed in white cement) at 4'-0" @ 16pcs per cartoons3Ctn$ - 0
2.5PVC pipe: Provide and install 2" pvc pipes for drainage1Pcs$ - 0
2.6Kitchen Sink: provide and install 1 set of Kitchen sink1Pcs$ - 0
TOTAL COST OF MATERIAL$ - 0
LABOUR COST@ 25% OF MATERIAL COST$ - 0
SUB TOTAL$ - 0
3.0Hand Washing Facilities: installation of 1 tap stand with 4 faucet on each side at the entrance of Bellemue clinic; ensuring that it is fully connected with running water supply.
3.1Cement: provide and use blue star Poland cement for all works3bags$ - 0
3.2Sand: Provide and use rough river sand for all masonry works, including septic tank; free of dirt and unwanted materials and MUST be clean and clear0.025cu.yd$ - 0
3.3Blocks: provide and use hollow 4" Masonry block for the construction of handwashing basin20Pcs$ - 0
3.4Ceramic tiles: Provide & Install Ceramic tiles (8''x12'') for handwashing basins (Mortar ratio 1:2, pointed in white cement) at 4'-0" @ 16pcs per cartoons5ctn$ - 0
3.5PVC pipe: Provide and install 1" pvc pipes with appropriate fitting for connection of faucet1L/s$ - 0
3.6Faucet: provide and install 2 faucet at each side of the tap stand4Pcs$ - 0
3.7Crush rock: provide and use crushed rocks of sizes ranging from 3mm to 9mm for all works0.05cu.yd$ - 0
TOTAL COST OF MATERIAL$ - 0
LABOUR COST @25% OF MATERIAL COST$ - 0
SUB TOTAL$ - 0
4.0Soak-Away Pit: construction of a soakaway pit to collect wastse water from handwashing stations at the entrance of Bellemue clinic.
4.1Cement: provide and use blue star Poland cement for all works10bags$ - 0
4.2Sand: Provide and use rough river sand for all masonry works, including septic tank; free of dirt and unwanted materials and MUST be clean and clear1cu.yd$ - 0
4.3Crush rock: provide and use crushed rocks of sizes ranging from 3mm to 9mm for all works1cu.yd$ - 0
4.4Steel bars: provide and use rough steel rod 3/8'' for casting of slabs as indicated in the drawings and specifications28Pcs$ - 0
4.5Blocks: provide and use hollow 6" Masonry block for the construction of handwashing basin177Pcs$ - 0
4.6Form works: Provide for Wa-Wa (1''x12''x14') for all form works14Pcs$ - 0
4.7Ground Poles: provide ground poles for the bracing of forms30Pcs$ - 0
4.82"x2"x14": provide and install (2''x2''x14') timbers purlins @ 3'-9" of center5Pcs$ - 0
TOTAL$ - 0
LABOUR COST @25% MATERIAL COST$ - 0
SUB TOTAL$ - 0
SUMMARY
TOTAL:$ - 0
Overhead cost, transportation and Profit Margin$ - 0
GRAND TOTAL - Hygiene$ - 0

Healthcare Waste Management

HEALTHCARE WASTE MANAGEMENT - Bellemue, Bong Co.
NO.DESCRIPTIONQTYUNITRATE (US$)AMOUNT (US$)
1.0Placenta Pit: construction cost for a new pit
1.1Preparation: allowance for clearing of site of all unwanted vegetations and forgien materials and proper disposal to an anthurized dumping site;1L/s$ - 0
1.2Security: barracate or enclose site from unauthorized entry and user, ensuring kids and intruders have no access1L/s$ - 0
1.3Excavation: excavation of trenches as per the drawings; ensuring trenches are properly squared and alligned10cu.yd$ - 0
1.4Backfilling: backfill and compact in layers; ensuring usage of required backfilling materials2cu.yd$ - 0
1.5Cement: provide and use blue star Poland cement for all works34bags$ - 0
1.6Sand: Provide and use rough river sand for all masonry works, including septic tank; free of dirt and unwanted materials and MUST be clean and clear2.85Cu.Yd$ - 0
1.7Crush rock: provide and use crushed rocks of sizes ranging from 3mm to 9mm for all works2.85Cu.Yd$ - 0
1.8Steel bars: provide and use rough steel rod 1/2'' for casting of slabs as indicated in the drawings and specifications50pcs$ - 0
1.9Tie wire: using free of rust tie wires for positioning of all steel bars1roll$ - 0
1.10Form works: Provide for Wa-Wa (1''x12''x14') for all form works48pcs$ - 0
1.11Assorted wire Nails: use 4" and 3" wire nails1Ctn$ - 0
1.12Blocks: provide and use hollow 4" Masonry block for the construction of base for the manhole cover10pcs$ - 0
1.13Steel bars: provide and use rough steel rod 1/4'' for locker hatch1pcs$ - 0
1.14Ground Poles: provide ground poles for the bracing of forms15pcs$ - 0
1.152"x2"x14": provide and install (2''x2''x14') timbers purlins @ 3'-9" of center6pcs$ - 0
TOTAL COST OF MATERIAL$ - 0
LABOUR COST @25% OF MATERIAL COST$ - 0
SUB TOTAL$ - 0
2.0Repair of Incinerator: The repair of the door of the Incinerator to create proper functionality
2.1Cement: provide and use blue star Poland cement for all works1bags$ - 0
2.2Sand: Provide and use rough river sand for all masonry works, including septic tank; free of dirt and unwanted materials and MUST be clean and clear0.08Cu.Yd$ - 0
2.3Steel Door: Provide and use steel door made of 4mm steel plate with appropriate lock and hinges for the incinerator1pcs$ - 0
2.4Anti-rust Paint: provide and use brown anti rust paint2qt$ - 0
TOTAL COST OF MATERIAL$ - 0
LABOUR COST @25% OF MATERIAL COST$ - 0
SUB TOTAL$ - 0
3.0Fencing of Waste Disposal Infrastructures: All works to include the fencing of waste disposal infrastructures with chian-link fence with galvanized poles at the required location as per detailed drawing.
3.1Excavation: excavation of fence trench as per the drawings; ensuring that the trench is properly squared and alligned4Cu. Yd$ - 0
3.2Profiling1L/s$ - 0
3.3Blocks: provide and use hollow 6" Masonry block for the construction of base for the fence cover350pcs$ - 0
3.4Cement: provide and use blue star Poland cement for all works, including plastering of fence wall35bags$ - 0
3.5Sand: Provide and use rough river sand for all masonry works, including septic tank; free of dirt and unwanted materials and MUST be clean and clear8Cu.Yd$ - 0
3.6Steel bars: provide and use rough steel rod 1/2'' for support of the fence and galvanized pillar24Pcs$ - 0
3.7Steel bars: provide and use rough steel rod 1/4'' for support of the fence and galvanized pillar5pcs$ - 0
3.8Tie wire: using free of rust tie wires for positioning of all steel bars1roll$ - 0
3.9Crush rock: provide and use crushed rocks of sizes ranging from 3mm to 9mm for all works4Cu.Yd$ - 0
3.10Wawa: using 1"x12"x14' to fabricate all forms works using the required dimensions and allowances4pcs$ - 0
3.11Galvanize Pole: Provide & use 3'' Galvanize pole as fencing pillar8Pcs$ - 0
3.12Chain-Link Fence: provide & use chain-link fabric fence for the fencing of waste infrastructures7roll$ - 0
TOTAL COST OF MATERIAL$ - 0
LABOUR COST @25% OF MATERIAL COST$ - 0
SUB TOTAL$ - 0
4.0Roofing of Waste Disposal Infrastructures: Installation of roofing above waste disposal infrastructure as per detailed drawing.
4.1Roofing sheets: Provide & install roofing sheet 32 gauge alloy zinc @ 20 sheets per bundle2bdls$ - 0
4.2Angle Bars: 3" angle bars, welded, installed above incinerator to support the roofing13pcs$ - 0
4.3Purling: provide and use (2''x2''x14') timbers purlins17Pcs$ - 0
4.4Galvanize Pole: Provide & use 3'' Galvanize pole roof truss16Pcs$ - 0
4.5Fascia board: provide and install 1"x8"x14' fascia board around the entire structure as indicated in the drawings and specifications6Pcs$ - 0
4.6Assorted wire Nails: use 4" and 3" wire nails1ctn$ - 0
4.7Nails: use required Zinc nails2Boxes$ - 0
4.8Carboline: provide and apply carboline to web members before fabrication or assembling of web members1gallon$ - 0
4.9Truss Welding1L/s$ - 0
TOTAL COST OF MATERIAL$ - 0
LABOUR COST @25% OF MATERIAL COST
SUB TOTAL$ - 0
5.0Painting and Beautification: Provide and paint the entire structure as per paintings and finishing specifications; ensuring all surfaces are smoothen and free of grease and foreign materials before the application of the limestone and subsequent paintings
5.1White wash: provide and use limestone lightly; one coat on the structure to give adhesion to applied paint1bags$ - 0
5.2Emulsion paint: use emulsion paint, White paint2buckets$ - 0
5.3Thinner: provide and use thinner for mixing and washing purposes2gals$ - 0
5.4Brushes and roller: provide and use assorted rollers and brushes1L/s$ - 0
TOTAL COST OF MATERIAL$ - 0
LABOUR COST @25% OF MATERIAL COST$ - 0
SUB TOTAL$ - 0
SUMMARY
TOTAL:$ - 0
15%$ - 0
GRAND TOTAL - HEALTH CARE WASTE MANAGEMENT$ - 0

Energy

Energy Supply- Bellemue Clinic, Bong Co.
No.DESCRIPTIONQtyUnitRATE (US$)AMOUNT (US$)
1.0Direct Current (DC) system and all materials
1.1Monocrystalline Solar module with (250W-31.1V, 8.05A Current, 8.28A Isc)5Pcs$ - 0
1.2Battery C20Gell/AGM-(820Ah-6V2Pcs$ - 0
1.3Charger Protection (MPPT Controller 24V-40Ah)1Pc$ - 0
Sub Total:$ - 0
2.0Over Current Protection
2.1Array Disconnect (15Ah)1pc$ - 0
2.3Circuit Breaker (Battery Bank- Charge Controller- 15 Ah1pc$ - 0
2.4Circuit Breaker ( Battery Bank-DC Loads 15Ah1pc$ - 0
Sub Total:$ - 0
3.0Cables
3.1Array -charge controller1# 8/2 AWG roll
3.3Battery to Inverter- DC-DC Converters1# 8/2 AWG roll$ - 0
3.4Battery - Charge Controller1AWG #8/2 roll$ - 0
3.5Inverter to Load1AWG # 10/2 roll$ - 0
Sub Total:$ - 0
4.0
4.1
4.2Grounding Rod1Pc$ - 0
4.3Lightening Arrestor DC1Pc$ - 0
4.3LED Lights15pcs$ - 0
4.4Socket15pcs$ - 0
4.5Switch4pc$ - 0
4.6Battery Rock1Pc$ - 0
4.7Cable Channel4pc$ - 0
4.8Junction Box1pc$ - 0
4.9Others (Screw, nails, eletrical tape Plywood 1'')1L/s$ - 0
Sub Total$ - 0
SUMMARY
TOTAL$ - 0
LABOUR COST @ 25% OF MATERIAL COST$ - 0
Overhead cost, transportation and Profit Margin:$ - 0
Grand Total - Energy Supply$ - 0