J.2b_LWMP_II_drawings_2_of_4.pdf
PDF 12 MB Posted
- Solicitation number
- 72066919R00007
About this file
Attachment J.2b LWMP II drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BOQs_For_Bellemue-_A01.xlsx | XLSX spreadsheet | |
| WASH__RFP_1282019-_Amendment.pdf | ||
| WASH_Qs&As-1302019.pdf | ||
| Watermain_BOQ_-_A01_-_FINAL.xlsx | XLSX spreadsheet | |
| J.3b_IndividualConnectionSurveyReport.xlsx | XLSX spreadsheet | |
| J.1_Technical_Specification_WEP.pdf | ||
| J.2c_LWMP_II_drawings_3_of_4.pdf | ||
| J.11_Contact_details_for_WASH_in_HF.pdf | ||
| J.2a_LWMP_II_drawings_1_of_4.pdf | ||
| Water_Expansion_&_WASH_Services_RFP_12122018.pdf | ||
| J.8_Past_Performance_Sheet.rtf | RTF text file | |
| J.3c_BOQ_and_Cost_Est_Watermain_Expansion_-_final.xlsx | XLSX spreadsheet | |
| J.5_Final_Technical_Spec._WASH_in_HF.pdf | ||
| J.4_HF_design,_specs_&_BOQ.zip | ZIP file | |
| J.7_Bio-data_sheet_AID1420-17.doc | DOC document | |
| J.10_SF_LLL_Disclosure_of_Lobbying_Activities.pdf | ||
| J.2d_LWMP_II_drawings_4_of_4_Rev01.pdf | ||
| J.6_AFR-EnvReviewForm-20Dec2010_(3).pdf | ||
| J.3a_Connection_heat__map.pptx | PPTX presentation | |
| J.9__Branding_and_Marking_Template.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This project was made possible by the United
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S113.dwg 10/22/2018 5:13:27 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S114
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE G1 STA 4+50 TO 14+75
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S113
AutoCAD SHX Text
SEE SHEET C-S113 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
EXISTING 150MM PVC WATERMAIN TO REMAIN AND PROTECTED IN PLACE (TYP).
AutoCAD SHX Text
PROPOSED THRUST BLOCK
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
AutoCAD SHX Text PROPOSED CONNECTION TO EXISTING 150MM PVC WATERMAIN VIA A CUT IN TEE. CONTRACTOR TO INSTALL 150MM x 150MM x 100MM TEE.
AutoCAD SHX Text
EXISTING KIOSK
and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S115.dwg 10/22/2018 5:13:43 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S115
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE H STA 7+50 TO 12+19
AutoCAD SHX Text
PIPE I STA 0+00 TO 6+50
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S115
AutoCAD SHX Text
SEE SHEET C-S113 FOR CONTINUATION
AutoCAD SHX Text
SEE SHEET C-S116 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
EXISTING 150MM PVC WATERMAIN TO REMAIN AND PROTECTED IN PLACE
AutoCAD SHX Text
EXISTING FIRE HYDRANT SERVICE AND FIRE HYDRANT WITH GATE VALVES AND THRUST BLOCK
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text CONNECT TO LOCATE AND FIELD VERIFY LOCATION, SIZE AND INVERT OF EXISTING 150MM PVC STUB. INSTALL NEW 100MM x 100MM x 150MM TEE AND CORRESPONDING GATE VALVES.
AutoCAD SHX Text
PROPOSED THRUST BLOCK
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
PROPOSED TEST PIT
AutoCAD SHX Text
PROPOSED WATERMAIN STREAM CROSSING, SEE DETAIL (TYP)
AutoCAD SHX Text
PROPOSED 100 MM GATE VALVE
AutoCAD SHX Text
PROPOSED 100 MM GATE VALVE
PROPOSED 100 MM GATE VALVE
and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S116.dwg 10/22/2018 5:14:00 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S116
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE I STA 6+50 TO 16+10
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S116
AutoCAD SHX Text
SEE SHEET C-S115 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
EXISTING 150MM PVC WATERMAIN TO REMAIN AND PROTECTED IN PLACE.
AutoCAD SHX Text
EXISTING 150MM PVC WATERMAIN TO REMAIN AND BE PROTECTED IN PLACE.
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
PROPOSED THRUST BLOCK
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
PROPOSED CONNECTION TO EXISTING 150MM PVC WATERMAIN VIA A CUT IN PVC TEE. CONTRACTOR TO INSTALL 150MM x 150MM x 100MM TEE and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S117.dwg 10/22/2018 5:14:14 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S117
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE J STA 0+00 TO 12+00
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S117
AutoCAD SHX Text
SEE SHEET C-S118 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
EXISTING 150MM PVC WATERMAIN TO REMAIN AND PROTECTED IN PLACE.
AutoCAD SHX Text
EXISTING 150MM PVC WATERMAIN TO REMAIN AND PROTECTED IN PLACE.
AutoCAD SHX Text
EXISTING TEE TO REMAIN
AutoCAD SHX Text
EXISTING 150MM GATE VALVE (TYP)
AutoCAD SHX Text
PROPOSED THRUST BLOCK
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text PROPOSED CONNECTION TO EXISTING 150MM PVC WATERMAIN VIA A CUT IN TEE. CONTRACTOR TO INSTALL 150MM x 150MM x 100MM TEE
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
AutoCAD SHX Text
EXISTING THRUST BLOCK
AutoCAD SHX Text
EXISTING GATE VALVE TO REMAIN
AutoCAD SHX Text
EXISTING FIRE HYDRANT TO REMAIN AND BE PROTECTED IN PLACE.
N
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S117.dwg 10/22/2018 5:14:20 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S118
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE J SAT 12+00 TO 21+53
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S117
AutoCAD SHX Text
SEE SHEET C-S117 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
PROPOSED THRUST BLOCK
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
AutoCAD SHX Text PROPOSED CONNECTION TO EXISTING 150MM PVC WATERMAIN VIA A CUT IN TEE. CONTRACTOR TO INSTALL 150MM x 150MM x 100MM TEE
AutoCAD SHX Text
EXISTING 150MM PVC WATER MAIN TO REMAIN AND PROTECTED IN PLACE
EXISTING 150MM PVC WATER MAIN TO REMAIN AND PROTECTED IN PLACE
and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S119.dwg 10/22/2018 5:14:41 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S119
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE K STA 0+00 TO 8+58
AutoCAD SHX Text
PIPE L STA 0+00 TO 2+50
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S119
AutoCAD SHX Text
SEE SHEET C-S120 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
PROPOSED THRUST BLOCK (TYP)
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text PROPOSED CONNECTION TO EXISTING 150MM WATER MAIN VIA A CUT IN TEE. CONTRACTOR TO INSTALL A 150MM x 150MM x 100MM PVC TEE.
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
AutoCAD SHX Text
EXISTING 150MM WATERMAIN TO REMAIN AND PROTECTED IN PLACE (TYP)
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text PROPOSED CONNECTION TO EXISTING 150MM WATER MAIN VIA A CUT IN TEE. CONTRACTOR TO INSTALL A 150MM x 150MM x 100MM PVC TEE.
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
EXISTING FIRE HYDRANT SERVICE AND HYDRANT TO REMAIN (TYP)
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text NOTE: CONTRACTOR TO EXCAVATE NEAR KIOSK SERVICE LINE AND EXISTING MAINLINE TO FIND AND CONNECT TO LATERAL CROSSING THE STREET.
AutoCAD SHX Text
SEE ENLARGEMENT (BELOW LEFT)
SEE ENLARGEMENT (BELOW RIGHT)
and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S120.dwg 10/22/2018 5:14:54 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S120
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE L STA 2+50 TO 4+33
AutoCAD SHX Text
PIPE M STA 0+00 TO 9+80
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S120
AutoCAD SHX Text
SEE SHEET C-S119 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
EXISTING 150MM PVC WATERMAIN TO REMAIN AND PROTECTED IN PLACE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
PROPOSED THRUST BLOCK (TYP)
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE (TYP)
AutoCAD SHX Text PROPOSED CONNECTION TO EXISTING 150MM PVC WATERMAIN WITHIN CENTER OF STREET VIA A CUT IN TEE. CONTRACTOR TO SAWCUT EXISTING ROAD AS NECESSARY AND INSTALL 150MM x 150MM x 100MM PVC TEE.
AutoCAD SHX Text 200x100x200 REDUCING TEE
AutoCAD SHX Text
EXISTING 200 MM PVC WATERMAIN TO REMAIN AND PROTECTED IN PLACE
AutoCAD SHX Text CONTRACTOR TO INSTALL 100 MM TEE WITH CORRESPONDING GATE VALVES AND THRUST BLOCK.
100mm GATE VALVE (TYP) and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S121.dwg 10/22/2018 5:15:11 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S121
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE N STA 0+00 TO 13+50
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S121
AutoCAD SHX Text
SEE SHEET C-S122 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
EXISTING 150MM PVC WATERMAIN TO REMAIN AND PROTECTED IN PLACE
AutoCAD SHX Text
EXISTING GATE VALVE (TYP)
AutoCAD SHX Text
PROPOSED THRUST BLOCK
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text PROPOSED CONNECTION TO EXISTING 150MM PVC WATERMAIN VIA A CUT IN TEE. CONTRACTOR TO INSTALL 150MM x 150MM x 100MM TEE.
PROPOSED 100MM GATE VALVE
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S121.dwg 10/22/2018 5:15:16 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S122
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE N STA 13+50 TO 26+50
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S121
AutoCAD SHX Text
SEE SHEET C-S121 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
SEE SHEET C-S123 FOR CONTINUATION
and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S121.dwg 10/22/2018 5:15:21 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S123
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE N STA 26+50 TO 34+00
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S121
AutoCAD SHX Text
SEE SHEET C-S122 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
SEE SHEET C-S124 FOR CONTINUATION
AutoCAD SHX Text
CONTRACTOR TO INSTALL AIR RELEASE VALVE AT HIGH POINT ON PROPOSED WATERMAIN.
AutoCAD SHX Text
THRUST BLOCK (TYP)
AutoCAD SHX Text
PROPOSED 100 MM GATE VALVE
AutoCAD SHX Text
PROPOSED 100 MM GATE VALVE
PROPOSED 100 MM x 100 MM x 50 MM TEE and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S121.dwg 10/22/2018 5:15:27 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S124
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE N STA 34+00 TO 44+02
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S121
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
SEE SHEET C-S123 FOR CONTINUATION
AutoCAD SHX Text CONTRACTOR TO REPLACE EXISTING 150mm ELBOW WITH NEW TEE, GATE VALVE AND THRUST BLOCK.150x100x150 REDUCING TEE.
AutoCAD SHX Text EXISTING 150mm PVC PIPE
AutoCAD SHX Text EXISTING 150mm PVC PIPE
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S125.dwg 10/22/2018 5:15:44 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S125
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE P STA 0+00 TO 9+00
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S125
AutoCAD SHX Text
SEE SHEET C-S126 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING 150MM PVC STUB OUT AND CONNECT PROPOSED 100 MM PVC WATERMAIN WITH 150 MM TO 100 MM REDUCER.
AutoCAD SHX Text
EXISTING 150MM PVC WATERMAIN TO REMAIN AND BE PROTECTED IN PLACE
and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S126.dwg 10/22/2018 5:15:58 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S126
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE P STA 9+00 TO 10.85
AutoCAD SHX Text
PIPE Q STA 0+00 TO 9+00
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S126
AutoCAD SHX Text
SEE SHEET C-S125 FOR CONTINUATION
AutoCAD SHX Text
SEE SHEET C-S127 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 50MM HDPE WATERMAIN
AutoCAD SHX Text
PROPOSED 100 MM X 50 MM X 50MM TEE.
AutoCAD SHX Text
PROPOSED 50 MM CAP
AutoCAD SHX Text
PROPOSED 50 MM GATE VALVE (TYP)
AutoCAD SHX Text
PROPOSED 100 MM PVC WATERMAIN
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
R…