Attachment J.2c LWMP II drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BOQs_For_Bellemue-_A01.xlsx | XLSX spreadsheet | |
| WASH__RFP_1282019-_Amendment.pdf | ||
| WASH_Qs&As-1302019.pdf | ||
| Watermain_BOQ_-_A01_-_FINAL.xlsx | XLSX spreadsheet | |
| J.3b_IndividualConnectionSurveyReport.xlsx | XLSX spreadsheet | |
| J.1_Technical_Specification_WEP.pdf | ||
| J.11_Contact_details_for_WASH_in_HF.pdf | ||
| J.2a_LWMP_II_drawings_1_of_4.pdf | ||
| Water_Expansion_&_WASH_Services_RFP_12122018.pdf | ||
| J.8_Past_Performance_Sheet.rtf | RTF text file | |
| J.3c_BOQ_and_Cost_Est_Watermain_Expansion_-_final.xlsx | XLSX spreadsheet | |
| J.5_Final_Technical_Spec._WASH_in_HF.pdf | ||
| J.4_HF_design,_specs_&_BOQ.zip | ZIP file | |
| J.7_Bio-data_sheet_AID1420-17.doc | DOC document | |
| J.10_SF_LLL_Disclosure_of_Lobbying_Activities.pdf | ||
| J.2d_LWMP_II_drawings_4_of_4_Rev01.pdf | ||
| J.6_AFR-EnvReviewForm-20Dec2010_(3).pdf | ||
| J.2b_LWMP_II_drawings_2_of_4.pdf | ||
| J.3a_Connection_heat__map.pptx | PPTX presentation | |
| J.9__Branding_and_Marking_Template.docx | DOCX document |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
This project was made possible by the United
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S131.dwg 10/22/2018 5:17:11 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S134
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE S STA 32+50 TO 33+34, PIPE S2 STA
AutoCAD SHX Text
0+00 TO 110+50, PIPE T STA 8+00 TO 10+98
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S131
AutoCAD SHX Text
SEE SHEET C-S136 FOR CONTINUATION
AutoCAD SHX Text
SEE SHEET C-S133 FOR CONTINUATION
AutoCAD SHX Text
SEE SHEET C-S135 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE (TYP)
AutoCAD SHX Text PROPOSED 100MM x 100MM x 100MM TEE WITH THRUST BLOCK
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
CONTRACTOR TO INSTALL 100MM TEE AND TRUST BLOCK
AutoCAD SHX Text
PROPOSED 100 MM END CAP
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S131.dwg 10/22/2018 5:17:15 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S135
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE S2 STA 10+50 TO 16+67
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S131
AutoCAD SHX Text
SEE SHEET C-S134 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text CONTRACTOR TO CAP END OF PROPOSED 100MM WATERMAIN. CONTRACTOR TO INSTALL AIR RELEASE VALVE AND PROVIDE THRUST BLOCK AS NECESSARY
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
AutoCAD SHX Text
CONTRACTOR TO INSTALL AIR RELEASE VALVE/BLOW-OFF VALVE AND GATE VALVE
PROPOSED 100MM x 100MM x 50MM TEE
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S136.dwg 10/22/2018 5:17:29 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S136
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE T STA 0+00 TO 8+00
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S136
AutoCAD SHX Text
SEE SHEET C-S134 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING 150MM PVC STUB OUT AND CONNECT PROPOSED 100MM WATERMAIN WITH REDUCER AS NECESSARY.
AutoCAD SHX Text
EXISTING PVC TEE AND THRUST BLOCK
AutoCAD SHX Text
EXISTING GATE VALVE (TYP)
EXISTING 100MM PVC WATERMAIN TO REMAIN AND PROTECTED IN PLACE.
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S137.dwg 10/22/2018 5:17:46 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S137
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE U1 STA 0+00 O 9+82
AutoCAD SHX Text
PIPE V1 STA 0+00 TO 3+00
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S137
AutoCAD SHX Text
SEE SHEET C-S138 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
EXISTING 150MM PVC WATERMAIN TO REMAIN AND PROTECTED IN PLACE
AutoCAD SHX Text PROPOSED CONNECTION TO EXISTING 150MM PVC WATERMAIN VIA A CUT IN TEE. CONTRACTOR TO INSTALL 150MM x 150MM x 100MM TEE.
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
PROPOSED 150MM GATE VALVE
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE (TYP)
AutoCAD SHX Text
PROPOSED THRUST BLOCK
AutoCAD SHX Text
CONTRACTOR TO INSTALL 100MM PVC TEE WITH GATE VALVES AND THRUST BLOCK.
AutoCAD SHX Text CONTRACTOR TO CAP END OF PROPOSED 100MM WATERMAIN AT PROPERTY LINE OF HOSPITAL. CONTRACTOR TO INSTALL AIR RELEASE VALVE AND PROVIDE THRUST BLOCK AS NECESSARY INSTALL LWSC CONCRETE MARKER
AutoCAD SHX Text
PROPOSED TEST PIT
AutoCAD SHX Text
PROPOSED WATERMAIN STREAM CROSSING, SEE DETAIL (TYP)
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S139.dwg 10/22/2018 5:18:00 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S138
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE V1 STA 3+00 TO 14+00
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S139
AutoCAD SHX Text
SEE SHEET C-S137 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
SEE SHEET C-S139 FOR CONTINUATION
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text CONTRACTOR TO INSTALL AIR RELEASE VALVE/BLOW-OFF VALVE. CONTRACTOR TO COORDINATE LOCATION WITH ENGINEER.
AutoCAD SHX Text
PROPOSED TEST PIT
AutoCAD SHX Text
PROPOSED WATERMAIN STREAM CROSSING, SEE DETAIL (TYP)
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S139.dwg 10/22/2018 5:18:05 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S139
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE V1 STA 14+00 TO 19+32
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S139
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
SEE SHEET C-S138 FOR CONTINUATION
AutoCAD SHX Text
EXISTING 200MM GATE VALVE (TYP)
AutoCAD SHX Text CONTRACTOR TO FIELD VERIFY LOCATION OF TO EXISTING 200MM TEE WITH END CAP AND CONNECT PROPOSED 100MM WATERMAIN VIA A 200 MM TO 100 MM REDUCER
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
EXISTING 200MM PVC WATERMAIN TO REMAIN AND PROTECTED IN PLACE
AutoCAD SHX Text
EXISTING FIRE HYDRANT SERVICE AND HYDRANT TO REMAIN
EXISTING 200MM PVC WATERMAIN WITHIN TAILWAY CULVERT TO REMAIN AND PROTECTED IN PLACE and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text PROPOSED SECURITY FENCE WITH RAZOR WIRE AND CONCRETE 36"-HIGH, 8"-WIDE CONCRETE FOOTING (SEE SHEET C-M-502 FOR DETAILS)
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S141.dwg 10/22/2018 5:18:23 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S140
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE W1 STA 0+00 TO 10+50
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S141
AutoCAD SHX Text
SEE SHEET C-S141 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
EXISTING 150MM PVC WATER MAIN TO REMAIN AND PROTECTED IN PLACE
AutoCAD SHX Text
EXISTING 150MM PVC WATER MAIN TO REMAIN AND PROTECTED IN PLACE
AutoCAD SHX Text
EXISTING 150MM TEE WITH GATE VALVES
CONTRACTOR TO FIELD VERIFY EXISTING 150MM STUBOUT AND CONNECT PROPOSED 100MM WATERMAIN WITH REDUCER AS NECESSARY.
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Sanniquellie\LMWP-C-S141.dwg 10/22/2018 5:18:28 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-S141
AutoCAD SHX Text
SANNIQUELLIE
AutoCAD SHX Text
PIPE W1 STA 10+50 TO 20+71
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-S141
AutoCAD SHX Text
SEE SHEET C-S140 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text CONTRACTOR TO CAP END OF PROPOSED WATERMAIN. CONTRACTOR TO INSTALL AIR RELEASE VALVE/BLOW OFF VALVE AND GATE VALVE AND PROVIDE THRUST BLOCK AS NECESSARY INSTALL LWSC CONCRETE MARKER
AutoCAD SHX Text PROPOSED 100MM x 100MM x 50MM TEE
PROPOSED 100MM GATE VALVE
and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text
SELEGA RD SOUTH
AutoCAD SHX Text
PAUL AVE
AutoCAD SHX Text
PAUL AVE
AutoCAD SHX Text
SELEGA RD
AutoCAD SHX Text
SUGAR ST
AutoCAD SHX Text
BYPASS WAY
AutoCAD SHX Text
BYPASS WAY
AutoCAD SHX Text
TRANSMISSION DRIVE
AutoCAD SHX Text
TRANSMISSION DRIVE
AutoCAD SHX Text
GREEN ST
AutoCAD SHX Text
GREEN ST
AutoCAD SHX Text
MANGO ST
AutoCAD SHX Text
MANGO ST
AutoCAD SHX Text
PALM ST
AutoCAD SHX Text
MAIN ST
AutoCAD SHX Text
MAIN ST
AutoCAD SHX Text
MAIN ST
AutoCAD SHX Text
MAIN ST
AutoCAD SHX Text
KISSI RD
AutoCAD SHX Text
KISSI RD
AutoCAD SHX Text
BUEDU RD WEST
AutoCAD SHX Text
PEPPER ST
AutoCAD SHX Text
SORGHUM ST
AutoCAD SHX Text
BUEDU RD EAST
AutoCAD SHX Text
RUBBER ST
AutoCAD SHX Text
IRON ST
AutoCAD SHX Text
TIMBER CROSSING
AutoCAD SHX Text
GOLD ST
AutoCAD SHX Text
SNAKE WAY
AutoCAD SHX Text
NEW LIFE ST
AutoCAD SHX Text
TANK WAY
AutoCAD SHX Text C-V101
AutoCAD SHX Text C-V102
AutoCAD SHX Text C-V103
AutoCAD SHX Text C-V104
AutoCAD SHX Text C-V105
AutoCAD SHX Text C-V106
AutoCAD SHX Text C-V107
AutoCAD SHX Text C-V108
AutoCAD SHX Text C-V109
AutoCAD SHX Text C-V110
AutoCAD SHX Text C-V111
AutoCAD SHX Text C-V114
AutoCAD SHX Text C-V115
AutoCAD SHX Text C-V116
AutoCAD SHX Text C-V117
AutoCAD SHX Text C-V118
AutoCAD SHX Text C-V119
AutoCAD SHX Text C-V120
AutoCAD SHX Text C-V121
AutoCAD SHX Text C-V122
AutoCAD SHX Text C-V123
AutoCAD SHX Text C-V124
AutoCAD SHX Text C-V126
AutoCAD SHX Text C-V127
AutoCAD SHX Text C-V129
AutoCAD SHX Text C-V101A
AutoCAD SHX Text C-V128
AutoCAD SHX Text C-V125
AutoCAD SHX Text C-V112
AutoCAD SHX Text C-V115
AutoCAD SHX Text
PIPE A
AutoCAD SHX Text
PIPE B
AutoCAD SHX Text
PIPE M
AutoCAD SHX Text
PIPE N
AutoCAD SHX Text
PIPE D
AutoCAD SHX Text
PIPE H
AutoCAD SHX Text
PIPE I
AutoCAD SHX Text
PIPE Q
AutoCAD SHX Text
PIPE K
AutoCAD SHX Text
PIPE J
AutoCAD SHX Text
PIPE C
AutoCAD SHX Text
PIPE E
AutoCAD SHX Text
PIPE G
AutoCAD SHX Text
PIPE L
AutoCAD SHX Text C-V132
AutoCAD SHX Text C-V133
AutoCAD SHX Text
PIPE S
AutoCAD SHX Text C-V130
AutoCAD SHX Text C-V131
AutoCAD SHX Text
PIPE R
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Voinjama\LMWP-C-V100.dwg 10/22/2018 5:19:06 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 600'
AutoCAD SHX Text 600'
AutoCAD SHX Text 12000'
AutoCAD SHX Text
SCALE: 1" = 600'-0"
AutoCAD SHX Text C-V100
AutoCAD SHX Text
VOINJAMA
AutoCAD SHX Text
KEY MAP
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
LMWP-C-V100
and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Voinjama\LMWP-C-V101.dwg 10/22/2018 5:19:23 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-V101
AutoCAD SHX Text
VOINJAMA
AutoCAD SHX Text
PIPE A STA 9+50 TO 20+50
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-V101
AutoCAD SHX Text
SEE SHEET C-V101A FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text CONTRACTOR TO CAP PROPOSED 100MM HDPE WATERMAIN. CONTRACTOR TO INSTALL AIR RELEASE VALVE/BLOW-OFF VALVE AND GATE VALVE AND PROVIDE THRUST BLOCK AS NECESSARY INSTALL LWSC CONCRETE MARKER
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
SNAKE WAY
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
N
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Voinjama\LMWP-C-V101.dwg 10/22/2018 5:19:28 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-V101A
AutoCAD SHX Text
VOINJAMA
AutoCAD SHX Text
PIEP A STA 0+00 TO 9+50
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-V101
AutoCAD SHX Text
SEE SHEET C-V102 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
SNAKE WAY
SEE SHEET C-V101 FOR CONTINUATION
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Voinjama\LMWP-C-V101.dwg 10/22/2018 5:19:34 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-V102
AutoCAD SHX Text
VOINJAMA
AutoCAD SHX Text
PIPE A STA 20+50 TO 30+50
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-V101
AutoCAD SHX Text
SEE SHEET C-V101A FOR CONTINUATION
AutoCAD SHX Text
SEE SHEET C-V103 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
PROPOSED 50 MM HDPE WATERMAIN
AutoCAD SHX Text
SNAKE WAY
AutoCAD SHX Text CONTRACTOR TO INSTALL AIR RELEASE VALVE AND GATE VALVE CONTRACTOR TO COORDINATE LOCATION WITH ENGINEER
AutoCAD SHX Text
PROPOSED TEST PIT
AutoCAD SHX Text
PROPOSED WATERMAIN STREAM CROSSING, SEE DETAIL (TYP)
AutoCAD SHX Text
PROPOSED 100MM GATE VALVE
States Agency for International Development and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN WRITING FOR APPROVAL
PRIOR TO COMMENCING WORK.
4. CONTRACTOR TO FIELD VERIFY
LOCATION, DEPTH AND SIZE OF
EXISTING WATERMAIN PRIOR TO
MAKING CONNECTION FOR PROPOSED
WATERMAIN.
5. CONTRACTOR REQUIRED TO FURNISH
AND INSTALL ALL APPURTENANCES
REQUIRED TO CONNECT PROPOSED
WATERMAIN TO EXISTING WATERMAIN.
6. WHERE HDPE COUPLING IS INSTALLED,
CONNECTING TWO SECTIONS OF HDPE
PIPE, THE COUPLING SHALL BE
WRAPPED IN BURLAP SACK.
7. CONTRACTOR TO COMPLETE SAW
CUTS IN EXISTING PAVEMENT AS
APPROPRIATE TO COMPLETE PIPE
INSTALLATION. CONTRACTOR TO
REPAIR ALL PAVEMENT SECTION
REMOVED AND REPLACED IN-KIND.
CURBS SHALL BE RESTORED TO
EXISITNG CONDITION WHERE
APPLICABLE. COMPACTION TEST
RESULTS SHOULD MEET
SPECIFICATIONS. CONTRACTOR SHALL
COORDINATE WITH FIELD ENGINEER ON
LOCATION OF SAW CUTS PRIOR TO
COMMENCEMENT OF WORK.
8. PRIVATE CONNECTION LOCATIONS WILL
BE SPECIFIED BY USAID DURING
CONSTRUCTION. THE BOQ INCLUDES
THE NUMBER OF PRIVATE
CONNECTIONS TO BE INSTALLED.
9. CONTRACTOR REQUIRED TO
STAKEOUT, EXCAVATE, PREPARE,
INSTALL, BACKFILL, COMPACT, TEST,
AND DISINFECT ALL WATER MAIN.
10. CONCRETE THRUST BLOCKS
REQUIRED FOR ALL WATER MAIN
INSTALLATION, INSTALLED PER THE
SPECIFICATION AT BENDS, VALVES,
TEES, REDUCERS AND MORE.
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
REFERENCE
AutoCAD SHX Text
NUMBER:
AutoCAD SHX Text P:\44525\127-44525-16005\CAD\SheetFiles\Voinjama\LMWP-C-V101.dwg 10/22/2018 5:19:41 PM Jeffers, Scott
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
SYMB
AutoCAD SHX Text
APR
AutoCAD SHX Text
DWN BY:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
FILE NO.:
AutoCAD SHX Text
SUBMITTED BY:
AutoCAD SHX Text
CHK BY:
AutoCAD SHX Text
USAID LIBERIA MUNICIPAL WATER PROJECT II
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text H
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
L M W P II
AutoCAD SHX Text
LMWP
AutoCAD SHX Text
13-JUL-2018
AutoCAD SHX Text
AutoCAD SHX Text
FINAL DESIGN SUBMITTAL
AutoCAD SHX Text
13-JUL-18
AutoCAD SHX Text
MRH
AutoCAD SHX Text
AutoCAD SHX Text 60'
AutoCAD SHX Text 60'
AutoCAD SHX Text 120'
AutoCAD SHX Text
SCALE: 1" = 60'-0"
AutoCAD SHX Text C-V103
AutoCAD SHX Text
VOINJAMA
AutoCAD SHX Text
PIPE A STA 30+50 TO 38+03
AutoCAD SHX Text
SMM
AutoCAD SHX Text
SMM
AutoCAD SHX Text
MRH
AutoCAD SHX Text
TETRA TECH
AutoCAD SHX Text
LMWP-C-V101
AutoCAD SHX Text
SEE SHEET C-V102 FOR CONTINUATION
AutoCAD SHX Text
NO PROFILE INFORMATION AVAILABLE
AutoCAD SHX Text
SNAKE WAY
AutoCAD SHX Text
PROPOSED 100MM PVC WATERMAIN
AutoCAD SHX Text
EXISTING FIRE HYDRANT SERVICE AND HYDRANT TO REMAIN
AutoCAD SHX Text
EXISTING 150MM PVC WATERMAIN TO REMAIN AND PROTECTED IN PLACE (TYP)
AutoCAD SHX Text
EXISTING TEE WITH GATE VALVES AND THRUST BLOCK (TYP)
AutoCAD SHX Text CONTRACTOR TO FIELD VERIFY LOCATION OF EXISTING 150MM PVC WATERMAIN STUBOUT WITH CAP. CONTRACTOR TO REMOVE CAP AND THRUST BLOCK AND REDUCE DOWN TO 100MM AND CONNECT TO PROPOSED WATERMAIN
EXISTING 150MM GATE VALVE (TYP)
and the generous support of the American
People through USAID Global Architecture and
Engineering II IQC Contracts.
FINAL
DESIGN
SUBMITTAL
NOTES:
1. AIR RELEASE/BLOW-OFF VALVE
LOCATION TO BE PLACED AT HIGH OR
LOW POINTS AND DEAD ENDS AS
INSTRUCTED BY THE ENGINEER.
HYDRANT OUTLET TO BE ARRANGED TO
MINIMIZE EROSION TO SURROUNDING
AREA.
2. COMPLETE STREAM AND CULVERT
CROSSINGS PER THE APPROVED SHOP
DRAWING BASED ON DETAIL.
CONTRACTOR TO COORDINATE FINAL
ALIGNMENT AND DESIGN AT EACH
CULVERT CROSSING WITH FIELD
ENGINEER PRIOR TO COMMENCING
WORK. FINAL DESIGN FOR EACH
CULVERT SHOULD BE INCLUDED IN
AS-BUILTS.
3. CONTRACTOR SHALL TAKE CARE TO
AVOID CONTAMINATING EXISTING
WATER SYSTEM AND PREVENT
EROSION. CONTRACTOR SHALL
SUBMIT EXECUTION PLAN FOR THESE
ACTIVITIES IN…