Amendment No. 1_72052221R00002 final.pdf

PDF 310 KB Posted

Attached to
AMENDMENT NO. 1 to SOLICITATION - Building Climate Resilience (BCR) Activity Federal contract opportunity
Solicitation number
72052221R00002
Issued by
US Agency for International Development Honduras

View the file

Other files for this federal contract opportunity

Other files attached to AMENDMENT NO. 1 to SOLICITATION - Building Climate Resilience (BCR) Activity, newest first.
File Type Posted
Amendment No. 1_Attachment 1.g. Results Framework.pdf PDF
Amendment No. 1_Attachment 11 - Q&As Document.pdf PDF
Amendment No.1_Attachment 1.h. Estrategia de Monitoreo_Calidad de Agua.pdf PDF
Amendment No. 1_Attachment 3 - Branding Strategy.pdf PDF
Amendment No. 1_Attachment 1.f. Migration Indicators Guidance.pdf PDF
Amendment No. 1_Attachment 1.e. USAIDs Geotargeting Approach.pdf PDF
Amendment No. 1_Attachment 2 - Budget Template.xlsx XLSX spreadsheet
Amendment No. 1_Attachment 4 - Key Indvidual Certification.pdf PDF
Amendment No. 1_Attachment 1.i. Analisis Rápido de los Ecosistemas Críticos.pdf PDF
Amendment No. 1_72052221R00002 Revised RFPfinal.pdf PDF
Amendment No. 1_RFP Cover letter final.pdf PDF
RFP 7205221R00002Cover letter.pdf PDF
Attachment 9 - LCP 10OCT2021.pdf PDF
Attachment 5 - EBD Form No. AID 1420-17.doc DOC document
Attachment 4 - Key Indvidual Certification.pdf PDF
RFP 72052221R00002.pdf PDF
Attachment 10 - Subcontrating Plan.pdf PDF
Attachment 2 - Budget Template.xlsx XLSX spreadsheet
Attachment 1. d USAID_FY_2021_Honduras_Country_Roadmap_en_US.pdf PDF
Attachment 1. c USAID_FY_2020_Honduras_Country_Roadmap_en_US.pdf PDF
Attachment 1. a USAID_Honduras CDCS Public Version_CLEAN.pdf PDF
Attachment 8 - Sample Work Plan.pdf PDF
Attachment 1. b Western Honduras VA_ENGLISH_FINAL.pdf PDF
Attachment 7 - Past Performance Matrix.xlsx XLSX spreadsheet
Attachment 6 - LACIEE2105 ETD HO - Amend LACIEE1634 Extreme Poverty Sustainably Reduced.pdf PDF
Attachment 3 - Branding Strategy.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

72052221R00002 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

N/A

Not Applicable

720522

00000 USAID/Honduras

11/23/20210001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning _____1______

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

10/28/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to:

1. Extend the Deadline for Receipt of Proposals (RFP) stated in the Cover Letter and in

Block 9 of the SF-33 from November 29, 2021, at 3:00 p.m. Honduras Local time to Monday, December 6, 2021, at 3:00 p.m. Honduras local time. All other delivery instructions remain the same.

2. Add ATTACHMENT 11 - QUESTIONS AND ANSWERS DOCUMENT which contains answers in response to prospective offerors.

3. Update RFP Sections, as described in the following pages, to reflect revisions made as a result of the Questions and Answers Document (refer to ATTACHMENT 11).

4. Provide a revised version of RFP No. 72052221R0002 as amended. All changes have been

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Claudia Enriquez

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 9

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

72052221R00002/0001 highlighted in yellow.

All other terms, conditions and attachments not changed by this amendment remain the same.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

SOL-72052221R00002

BCR

(Building Climate Resilience Activity) Amendment No. 01

Extend the Deadline for Receipt of Proposals (RFP) stated in the Cover Letter and in Block 9 of the SF-33 from November 29, 2021, at 3:00 p.m. Honduras Local time to Monday, December 6, 2021, at 3:00 p.m. Honduras local time. All other delivery instructions remain the same.

COVER LETTER

In the Cover Letter of the RFP, delete the Closing Date for Phase One Proposals line in its entirety, and insert in lieu thereof with the following:

“Closing Date for Phase One Proposals: Monday, December 6, 2021”

STANDARD FORM 33 (SF33)

In Block 9 of SF-33, Delete “11/29/2021” and insert in lieu thereof “12/06/2021”

Update RFP Sections, as described in the following pages, to reflect revisions made as a result of the Questions and Answers Document (ATTACHMENT 11)

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

● Delete Section C.6 GEOGRAPHIC FOCUS in its entirety and insert in lieu thereof the following:

“ C.6 GEOGRAPHIC FOCUS

The Contractor shall focus on watersheds with representation of biologically significant ecosystems prioritizing those areas of high economic importance that can serve as sustainable models.

Geographic selection should also consider their influence in high-migration areas to deter migration. To this end, USAID Honduras has developed a geographic targeting approach (refer to Section J Attachment 1.e) to focus on the forty municipalities with highest outmigration according to current data. Final geographic selection will be subjected to USAID’s approval.”

SECTION F – DELIVERIES OR PERFORMANCE

● Under Section F.6 REPORTS AND DELIVERABLES OR OUTPUTS, Table F-1 List of required reports and their due dates, row #3 is hereby amended to read: “30 calendar days after award”.

● Under Section F.6 REPORTS AND DELIVERABLES OR OUTPUTS, Table F-1 List of required reports and their due dates, row #9 is hereby amended to read: “90 calendar days after award”.

● Under Section F.6.17 IRREGULAR MIGRATION ANALYSIS AND PLAN, delete item #4 in its entirety, and insert in lieu thereof the following:

“4. The Activity's Irregular Migration Analysis and Plan should be incorporated in the Monitoring, Evaluation and Learning (ME&L) plan and should clearly articulate a theory of change (ToC) that links Activity results to reduction of irregular migration. Activity's ToC must include proposed custom migration-related indicators at each appropriate level. USAID has developed, (Building Climate Resilience Activity) Amendment No. 01 and will continually review, a set of migration-related indicators (refer to Section J Attachment 1.f.) to be included in each Activity’s Monitoring, Evaluation, and Learning (ME&L) plan as appropriate. Upon award, the awardee must consult with USAID/Honduras to develop their method to measure impact on migration and contribute to USAID’s Collaborative Learning and Adaptation of migration indicators.”

SECTION H – SPECIAL CONTRACT REQUIREMENTS

● Under Section H.7 ADDITIONAL REQUIREMENTS FOR PERSONNEL COMPENSATION, delete item (a) Limitations, in its entirety, and insert in lieu thereof the following:

“(a) Limitations:

(1) Salary ranges for ALL the professional positions in this Contract will be established based on the market value, on duties and responsibilities of the position, in the country and locality of contract performance. The established range must be realistic and reasonable for the responsibilities of each position and must not be based on the salary history or the qualifications of the candidate selected. The salary ranges must be certified by the Contractor and submitted to the Contracting Officer with the proposal for approval. Upon establishment of the salary ranges of the professional positions, an appropriate candidate must be selected based on the qualifications sought for that position and the Contractor’s personnel practices. The Contractor must avoid “rank in person” salaries, which are in excess of the value and the responsibilities of the position. In addition, the salary ranges may not exceed the Contractor's established policy and practice, including the Contractor's established pay scale for equivalent classifications of employees. Creation of new administrative nonprofessional positions does not require USAID input.

(2) In addition, there is a ceiling on the reimbursable base salary or wage paid to personnel under the contract equivalent to the maximum annual salary rate prescribed in ADS 302, unless the Contracting Officer approves a higher amount. For the Agency policy and procedures, refer to: http://transition.usaid.gov/policy/ads/300/302.pdf.

All Cooperating Country Nationals (CCNs) and Third Country Nationals (TCNs) salaries must not exceed the Local compensation Plan (LCP). Approval of the Contractor’s budget does not absolve the Contractor’s duty to request and receive Mission Director’s approval prior to hiring CCN and TCN personnel whose salaries are above the LCP.”

SECTION J – LIST OF ATTACHMENTS

● Under Section J – LIST OF ATTACHMENTS, ATTACHMENT 1 – APPLICABLE DOCUMENTS add the following attachments:

“1.e. USAID’s Geotargeting Approach 1.f. Migration Indicators Guidance 1.g. Results Framework 1.h. Estrategia de Monitoreo_Calidad de Agua 1.i. Analisis Rápido de los Ecosistemas Críticos” http://transition.usaid.gov/policy/ads/300/302.pdf

(Building Climate Resilience Activity) Amendment No. 01

● Under Section J – LIST OF ATTACHMENTS, update the following attachments:

“ATTACHMENT 2 – BUDGET TEMPLATE

ATTACHMENT 3 – BRANDING STRATEGY

ATTACHMENT 4 – KEY INDIVIDUAL CERTIFICATIONS NARCOTICS OFFENSES and

DRUG TRAFFICKING”

● At the end of Section J – LIST OF ATTACHMENTS, add the following attachment:

“ATTACHMENT 11 – QUESTIONS AND ANSWERS DOCUMENT”

SECTION L – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS

● Delete Section L.8 – INSTRUCTIONS FOR PREPARATION OF PHASE ONE TECHNICAL PROPOSAL in its entirety and insert in lieu thereof the following:

“Offerors must submit a Phase One Technical Proposal and the items identified in "Annexes" (below) limited to ten (10) pages in total, that addresses the following two factors: Management Approach and Past Performance. The 10-page limit includes:

PHASE ONE TECHNICAL PROPOSAL:

Cover Letter and Executive Summary (not included in page limitation stated above) Table of Contents, list of acronyms, dividers (not included in page limitation stated above) Management Approach (not to exceed 7 pages) Past Performance (not to exceed 3 pages)

ANNEXES:

Draft Rapid Mobilization and Quick Startup plan (not to exceed 5 pages) Organizational Chart (not to exceed 1 page) CPARS, Performance in Using Small Business (SB) Concerns and other past performance information (no page limit)

All annexes/appendices for Phase One Technical Proposal must be written in English. All information from annexes must be referenced in the technical proposal and summarized and included in the annex section.

Factor 1: Management Approach

This section must describe how the proposed management approach will be carried out and coordinated to ensure successful implementation of the Activity, specifically under challenging contexts, including details on the draft Rapid Mobilization and Quick Startup Plan. It must also list subcontractors and the components of the SOW they will be responsible for and describe how the subcontractor's work will be coordinated and supervised. Finally, it must demonstrate how the

(Building Climate Resilience Activity) Amendment No. 01 organizational structure will support learning, flexibility and adaptation throughout the life of the Activity.

Factor 2: Past Performance

This section must include the Offeror’s relevant institutional experience, during the past three years, at the prime or first-tier subaward level, and demonstrate the extent to which the amount and relevance of the Offeror’s demonstrated experience has performed similar services, as described in the SOW, in challenging contexts. The Offeror will include relevant past performance information for itself, all partners of a joint venture, and each major subcontractor and include the appropriate CPARS reports (the most recent CPARS available for each of the three most recent and relevant contracts), if available.

CONTRACTOR PERFORMANCE INFORMATION [See Section M.3]

(a) The offeror (including all partners of a joint venture) must provide performance information for itself, the contractor teaming arrangements, if any, and each major subcontractor. Major subcontractors are those expected to perform at least 20% or a prominent part of the technical effort, and/or whose proposed cost exceeds 15% of the total estimated contract cost.

1. The Past Performance Matrix (see Section J Attachment 7) must include up to three of the most recent (in the last three years) and relevant awards (contracts, grants or agreements) for efforts similar to the work as in Section C for the offeror and up to three for each major subcontractor. The most relevant indicators of performance are size, scope, complexity, geographic location, and how recently they were performed.

2. For all contracts listed above that are not in CPARS, provide a list of contact names, job titles, mailing addresses, phone numbers, e-mail addresses, explanation of relevance to the proposed acquisition and a description of the performance to include:

Scope of work or complexity/diversity of tasks, Primary location(s) of work, Term of performance, Dollar value, and Contract type, i.e., fixed-price, cost reimbursement, etc.

USAID recommends that the Offeror alert the contacts that their names have been submitted and that they are authorized to provide performance information concerning the listed contracts if and when USAID requests it.

1. If extraordinary problems impact any of the referenced contracts, provide a short explanation and the corrective action taken (FAR 15.305(a)(2)).

(Building Climate Resilience Activity) Amendment No. 01

2. Describe any quality awards or certifications that indicate exceptional capacity to provide the service or product described in the statement of work. This information is not included in the page limitation.

3. Performance in Using Small Business (SB) Concerns (as defined in FAR 19.001)*.

(1) This section (d) is not applicable to offers from small business concerns

(2) As part of the evaluation of performance in Section M.3 of this solicitation, USAID will evaluate the extent the Offeror used and promoted the use of small business concerns under current and prior contracts. The evaluation will assess the extent small business concerns participated in these contracts relative to the size/value of the contracts, the complexity and variety of the work small business concerns performed, and compliance with your SB subcontracting plan or other similar small business incentive programs set out in the contract(s).

(3) In order for USAID to fully and fairly evaluate performance in this area, all offerors who are not small business concerns must do the following:

A. Provide a narrative summary of your organization's use of small business concerns over the past three years. Describe how you actually use small businesses--as subcontractors, as joint venture partners, through other teaming arrangements, etc. Explain the nature of the work small businesses performed--substantive technical professional services, administrative support, logistics support, etc. Describe the extent of your compliance with your SB subcontracting plan(s) or other similar SB incentive programs set out in your contract(s) and explain any mitigating circumstances if goals were not achieved.

B. To supplement the narrative summary in (A), provide a list of the recent contracts, (previous three years) for which you submitted subcontract reports to eSRS (FAR 52.219-9(d)(10) and a copy of any similarly recent subcontracting reports if they were not submitted to eSRS.

C. Provide the names and addresses of three SB concerns for us to contact for their assessment of your performance in using SB concerns. Provide a brief summary of the type of work each SB concern provided to your organization, and the name of a contact person, his/her title, phone number, and e-mail address for each.”

● Delete Section L.9 – INSTRUCTIONS FOR THE PREPARATION OF PHASE TWO FINAL TECHNICAL PROPOSAL in its entirety and insert in lieu thereof the following:

Offerors must submit a Phase Two Final Technical and Cost Proposal and the items identified in "Annexes" (below). The technical proposal is limited to forty (40) pages in total and must address the following two factors: Technical Approach, Key Personnel and Staffing Plan. The 40-page limit includes:

(Building Climate Resilience Activity) Amendment No. 01

PHASE TWO TECHNICAL PROPOSAL:

Cover Letter and Executive Summary (not included in page limitation stated above) Table of Contents, list of acronyms, dividers (not included in page limitation stated above) Technical Approach (not to exceed 30 pages) Key Personnel and Staffing Plan (not to exceed 10 pages)

ANNEXES:

Key personnel package which contains; CVs (maximum 2 pages per CV) for all key personnel (please see Section F.7), three references (1 page), Key Individual Certification (1 page), and Letter of Commitment (1 page).

All annexes/appendices for Phase Two Technical Proposal must be written in English. All information from annexes must be referenced in the technical proposal and summarized and included in the annex section.

The Technical Proposal and Cost Proposal must be kept separate from each other. Technical Proposals must not make reference to pricing data in order that the technical evaluation may be made strictly on the basis of technical merit.

Factor 3: Technical Approach

This section must include the technical approach that outlines in detail how the Offeror will implement the activities and meet the requirements of the contract. It must be complete and specific, and clearly demonstrate how the Offeror will achieve the goals and objectives and fulfill the implementation responsibilities. It must describe the critical activities including approaches to overcome identified challenges. The Offeror must also include in this section (within the 30-page limit for this factor):

Draft Monitoring, Evaluation and Learning, ME&L Plan (not to exceed 8 pages) Draft First-Year Work Plan (not to exceed 5 pages)

Factor 4: Key Personnel and Staffing Plan

This section must include a description of the roles, responsibilities, and minimum qualifications of all key personnel positions, organizational chart, and an explanation of why the key personnel are appropriate for the contract.

Additionally, Offerors must include a key personnel package which contains: CVs (maximum 2 pages per CV) for all key personnel (please see Section F.7), three references (1 page), Key Individual Certification (1 page), and Letter of Commitment (1 page). This key personnel package is not included in the page limitation stated above.

(Building Climate Resilience Activity) Amendment No. 01

Staffing Plan

In addition to these key personnel positions, the Contractor must present a staffing plan of additional personnel to contribute to the achievement of the three objectives described above.

The Contractor should also consider staff with expertise in areas such as climate adaptation, water management, biodiversity, grants management, and conflict resolution, among other areas. As part of its staffing plan, USAID encourages the Contractor to maximize the use of Honduran and regional organizations and experts. USAID expects the Contractor to not only achieve the tasks under each objective, but also to strengthen local capacity to sustain results and carry out similar activities in Honduras. Potential requests for Short-Term Technical Assistance (STTA) will state specific qualification requirements and, particularly for international STTA, include a justification that explains why the services to be provided cannot or should not be achieved through other means.”

[END OF AMENDMENT No. 01]

2021-11-24T08:51:36-0500
Claudia M Enriquez (affiliate)

File details come from the government source that posted it. Updated .