714AP_1_SOW_Pelican_Island_NWR_Replace_Bunkhouse_Roof.pdf
PDF 217 KB Posted
- Attached to
- FL-PELICAN ISLAND NWR-BUNKHOUSE ROOF
- Solicitation number
- 140FC126R0010
About this file
This is a Statement of Work (SOW) for roof replacement construction services at the Pelican Island National Wildlife Refuge Bunkhouse in Vero Beach, Florida. The U.S. Fish and Wildlife Service, Department of the Interior, is contracting for the complete replacement of an existing asphalt architectural shingle roof with a tin-zinc coated copper double-lock standing seam metal roof (SSMR) assembly. The building, a single-story residential structure with cathedral ceilings on an 1,800-square-foot footprint built in 2018, sustained light hurricane damage in 2024. Primary work components include uninstalling and salvaging the rooftop photovoltaic system, performing roof tear-off and damage inspection, removing and patching skylights, providing the new roofing system, installing a new drainage system, and providing a new lightning protection system. The project is identified as IMD Project No. 714AP.
The contractor is responsible for all labor, equipment, materials, utilities, permitting (federal, state, and local), and security. Site access is limited to 6:30 AM–4:30 PM, Monday–Friday, excluding public holidays. The contractor must maintain roof waterproofness throughout construction and prepare for extreme weather events. Key submittal requirements include roof inspection and condition assessment reports, structural stability statements, wind uplift resistance calculations, system layouts, and electrical calculations for the lightning protection system. Warranty requirements are substantial: a minimum 5-year contractor installation warranty, 50-year or lifetime material warranties, a manufacturer's no-dollar-limit 5-year warranty issued directly to the Government, and a 20-year minimum paint finish warranty. Repairs under warranty must be completed within 7 days of notification. The contractor must comply with applicable OSHA regulations, federal/state/local building codes, and industry best practices. A preconstruction meeting will be held following issuance of the Notice to Proceed, and weekly construction reports and biweekly progress meetings are required.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
-for-
CONSTRUCTION SERVICES
-of-
Roof Replacement
-on the-
Bunkhouse (Asset No. 10067145)
-at the-
Pelican Island National Wildlife Refuge
4015 Wildlife Way, Vero Beach, FL 32963
IMD Project No: 714AP
U.S. Fish and Wildlife Service
Department of the Interior
Project Narrative
The Pelican Island National Wildlife Refuge Bunkhouse was designed in 2016 and built in 2018 as a residential, single-story building with cathedral ceilings on an 1,800-SF footprint. It is used as a quarters to house refuge staff onsite. The roof incurred light damage to shingles and other roofing components from Hurricane Milton in 2024.
The U.S. Fish and Wildlife Service is in need of construction services to replace the existing asphalt architectural shingle roof assembly with a more resilient, tin–zinc coated copper double-lock standing seam metal roof (SSMR) assembly over the existing structural insulated panel (SIP) roof structure. The building will be unoccupied during the completion of this Work.
1. LOCATION
A. The work site is located on the Pelican Island National Wildlife Refuge at:
4015 Wildlife Way, Vero Beach, FL 32963
1 PRIMARY WORK
A. This Work consists of the following Primary Work Components, described in the Work Plan (Attachment A):
1. Uninstall and Salvage Rooftop PV System
2. Roof Tear-Off and Damage Inspection
3. Remove and Patch Skylights
4. Provide New Roofing System
5. Provide New Drainage System
6. Provide New Lightning Protection System
2 AUXILIARY WORK
A. Transmit for review the information for materials and products to be installed via email to U.S. Fish and Wildlife Service COR. Action Submittals shall be returned within seven (7) calendar days. Refer to Specifications §01 33 00 for submittal procedures.
B. Refer to Specifications §01 32 00 (A) for Weekly Construction Reports C. Refer to Specifications §01 32 00 (B) for Schedules, to be submitted weekly.
D. Refer to Specifications §01 32 00 (C) (2) for Progress Meetings, to be held biweekly.
E. Refer to Specifications §01 20 00 for Payment Procedures, to be completed monthly.
F. Conduct daily cleanup of Site to result in safe and tidy work environment.
G. Safely and legally contain and dispose offsite all refuse and deconstructed materials produced by this Work.
3 SPECIFICATIONS AND REQUIREMENTS
A. Unless directly specified in the Solicitation Documents, comply with all applicable specifications provided in Attachment B: U.S. Fish and Wildlife Service, Southeast Region (4), Specifications for Construction Projects, Division 01 General Requirements, August 2025.
B. Refer to Specifications §01 41 00 for additional regulatory requirements.
C. All Work shall meet or exceed a standard of due diligence expected of industry professionals, shall be neat and tidy in appearance, and shall conform to all applicable Federal, State, and Local building codes, and industry best practices
D. All communications between the Contractor and U.S. Fish and Wildlife Service personnel shall be polite, professional, courteous, and respectful in nature.
E. Follow all applicable OSHA regulations during the construction activity. Identify and immediately eliminate slip, trip, or fall hazards, and other workplace hazards, throughout the duration of this Work. Safety plan to emphasize fall protection and stop-work during lightning conditions.
F. Departure from Solicitation Documents for equivalent means and methods must be approved by the CO and COR in writing. Any departure does not preclude the Contractor from honoring warranty or other closeout conditions.
4 SITE ACCESS
A. The Project site is accessible by existing roads, but is closed to the public; gate and building access codes will be provided upon award.
B. Site access shall be limited to 6:30AM–4:30PM on Monday–Friday, except for public holidays. Refer to Specifications §01 11 40 (C) for additional information.
5 WORK CONDITIONS
A. Refer to Specifications §01 51 00 for temporary facilities.
B. Before work begins, the contractor shall coordinate with local utility companies to locate and protect all utilities traversing the Project.
C. Ensure that roof maintains waterproofness at all stages of the project and be prepared for any rainfall events, including extreme weather events, during the construction activity.
6 DIMENSIONS AND QUANTITIES
A. Dimensions provided are estimates, which have not been field-verified via survey by the Government. Bidders shall make their own measurements in preparation of their bid.
B. The Contractor is responsible to determine exact quantities in preparation for the Work.
7 GOVERNMENT-FURNISHED MATERIALS AND SERVICES
A. The Government will not provide labor, equipment, materials, utilities, or security.
B. The Government will perform inspections of the progress of Work for its own benefit, but the Contractor is responsible for performing inspections for quality control and quality assurance.
8 MATERIAL AND PRODUCT SUBMITTALS
A. Refer to Specifications §01 33 00 for Submittal Procedures. The following action submittals and informational submittals shall be provided at a minimum.
a. Action Submittals:
i. Refer to Specifications §01 34 00 for Baseline Submittal List
ii. Roof inspection and condition assessment report
iii. Roof structural stability statement
iv. Wind uplift resistance calculations, or approved equal
v. Layouts
1. SSMR assembly
2. Drainage system
3. Lightning protection system
vi. Gutter profile options
vii. Lightning protection system electrical calculations, or approved equal
b. Informational Submittals:
i. Safety plan
ii. Materials
1. SSMR
2. Underlayment
3. Drainage system
4. Lightning protection system
9 PERMITTING
A. The Contractor shall be responsible for procuring all necessary federal, state, and local permits for the construction activity.
10 PRECONSTRUCTION MEETING
A. Following the issuance of the Construction Notice to Proceed (NTP), a Preconstruction Meeting will be held by the U.S. Fish and Wildlife Service COR to review the Work requirements and to discuss any pertinent needs at the time. The COR may or may not elect to hold this meeting in-person.
a. Provide a project schedule reflective of the critical path and other phases of the Work for approval and acceptance into the contract file.
b. Provide meeting minutes to be submitted to U.S. Fish and Wildlife COR within 72 hours of Preconstruction Meeting for review and acceptance into the contract file.
11 PROJECT CLOSEOUT
A. Refer to Specifications §01 77 00 for Closeout Procedures.
B. Refer to Specifications §01 78 00 for Closeout Submittals.
12 WARRANTY
A. Provide a contractor installation warranty for a period not less than 5 years from the date of Government acceptance of the Work.
B. Provide a warranty for each material for a period not less than 50 years or “lifetime” from the date of Government acceptance of the Work.
C. Provide a manufacturer’s no-dollar-limit warranty for materials and workmanship on the roofing system for a period not less than 5 years from the date of Government acceptance of the work. The warranty must be issued directly to the Government. The warranty must provide that if within the warranty period the metal roofing system becomes non-watertight or shows evidence of corrosion, perforation, peeling paint, rupture or excess weathering due to deterioration of the roofing system resulting from defective materials or workmanship, the repair or replacement of the defective materials and correction of the defective workmanship must be the responsibility of the roofing system manufacturer.
D. Repairs that become necessary because of defective materials and workmanship while roofing is under warranty must be performed within 7 days after notification, unless additional time is approved by the Contracting Officer. Failure to perform repairs within the specified period of time will constitute grounds for having the repairs performed by others and the cost billed to the manufacturer.
E. Coating must not show a color change greater than 5 NBS color units in accordance with ASTM D2244, and not show chalking in excess of 10 in accordance with ASTM D4214.
Provide a minimum of 20 year warranty on paint finishes.
F. Warranties included beyond the above stated minimums provided in proposals may be considered a competitive component of the proposal.
— END OF STATEMENT OF WORK FOR CONSTRUCTION SERVICES —