PRICE PROPOSAL FORM

TOA #: TBD70Z5022RNEMETZ

D-17 FAMILY HOUSING, NEMETZ PARK SITE AT USCG BASE KODIAK, KODIAK, AK

BASE ITEM 1: Provide all necessary, supervision, labor, materials, transportation, equipment, permitting, and other ancillary services to design and construct 40 family housing units buildings #700, 701, 702, 703, 704, 705, 706, 707, 708, 710, 711, 712, 713, 714, 740, 741, 743, 745, 746, 747. The quantity/type of units shall be

(28) three-bedroom and (12) four-bedroom units in (20) duplex configurations shown on the RFP drawings.

Provide play area relocation; demolition; site work; utilities; landscaping; decks; fencing; curbing; paving; paint striping; sidewalks; signage; lighting and associated infrastructure for duplexes as located on RFP drawings to construct the project per RFP requirements. (Refer to Item Diagrams A, B, D, and Summary Site Plans 1 & 2).

Design Price: $ Construction Price: $

Base Item 1 Total Price: $

*BASE ITEM 1A:

Removal and disposal petroleum contaminated soil exceeding ADEC reporting levels off Base Kodiak

$____________________ per CY X 300 CYS = $_________________________

*Base Item 1B

Removal and disposal contaminated water exceeding ADEC reporting levels off Base Kodiak

$____________________ per GAL X 500 GALLONS =$_________________________

*Base Item 1C

Provide unit price for soil and water testing for PETROLEUM

$ per TEST x 20 TESTS = $ _______________________

*Note: FAR 52.211-18 – Variation in Estimate Quantities (Apr 1984) is applicable to Base Items 1A, 1B, and 1C.

BASE ITEM 2: Transition Roadway at S. Alyeska Ave: Provide all necessary supervision, labor, materials, transportation, equipment, permitting and other necessary ancillary services to design and construct a transition roadway segment at South Alyeska. Work shall include demolition; site work; landscaping; curbing; paving;

patching; paint striping; and signage within a 30’W X 120’L section of new roadway construction and grading 30’ outside each edge of pavement; transitioning to the existing South Alyeska road alignment southwest of Base Item 1 or the last awarded option, if any options are awarded. Work WILL NOT include construction of sidewalks. Utility improvements for water and sanitary sewer shall transition back to the existing utilities at the nearest logical location or sewer manhole. Roadway drainage shall be assessed to determine whether formal drainage structures will be constructed, depending on roadway and site drainage design. Construct the project per RFP requirements. There is only one transition roadway required, but the location of this roadway is dependent upon what is awarded. (Refer to Item Diagrams C, D, D2, & D3 and Summary Site Plans 1 & 2).

Base Item 2 Total Price: $

TOTAL BASE (ITEMS 1 & 2) shall be deemed to include all costs required for the specified work completed in accordance with the plans and specifications. (Refer to Item Diagrams A, B, D, D3 and Summary Site Plans 1 & 2).

TOTAL BASE (ITEMS 1 & 2): $______________________

TOTAL BASE (ITEMS 1, 1A, 1B, 1C & 2) shall be deemed to include all costs required for the specified work completed in accordance with the plans and specifications. (Refer to Item Diagrams A, B, D, D3 and Summary Site Plans 1 & 2).

TOTAL BASE PRICE (ITEMS 1, 1A, 1B, 1C & 2): $______________________________

OPTION ITEM 1, Duplex #749 only: Provide all necessary supervision, labor, materials, transportation, equipment, permitting and other necessary ancillary services to design and construct one duplex building #749 including site work; utilities; landscaping; decks; fencing and yard within fence, sidewalks near garages and entries, and associated infrastructure for this duplex as located on RFP drawings and shared infrastructure included in Base Items to construct the project per RFP requirements, within a 5’ building perimeter related to building #749. (Refer to Item Diagrams A, B, D, and Summary Site Plans 1 & 2).

Total Option Item 1: $

OPTION ITEM 2, Barometer Court Recreational Vehicle (RV) Parking Area: Provide all necessary, supervision, labor, materials, transportation, equipment, permitting and other necessary ancillary services to design and construct a Barometer Court Recreational Vehicle (RV) parking area, intersection, street, and turn around, landscaping, fencing, curbing, paving, paint striping, signage, lighting and associated infrastructure work outside unit residential specific utilities (5’ perimeter for utilities, and typical 15’ perimeter for site, fencing and landscaping) as shown on RFP drawings. Work shall include demolition, site work, utilities, storm water and drainage, and other site improvements to construct the project per RFP requirements.

(Refer to Item Diagram B, D, and Summary Site Plan 1).

Total Option Item 2: $

OPTION ITEM 3: Building #751: Provide all necessary supervision, labor, materials, transportation, equipment, permitting and other necessary ancillary services to design and construct Building #751. Work shall include demolition, site work, utilities, landscaping; decks; fencing and yard within fence; curbing; paving;

driveways; paint striping; sidewalks; signage; lighting; associated infrastructure; and a typical 15’ perimeter (to the North and South of this duplex) around building as shown on RFP drawings to construct the project per RFP requirements. (Refer to Item Diagram B, D, and Summary Site Plan 1).

Total Option Item 3: $

OPTION ITEM 4: Building #753: Provide all necessary supervision, labor, materials, transportation, equipment, permitting and other necessary ancillary services to design and construct Building #753. Work shall include demolition, site work, utilities, landscaping; decks; fencing and yard within fence; curbing;

paving; driveways; paint striping; sidewalks; signage; lighting; associated infrastructure, and a typical 15’ perimeter (to the North and South of this duplex) around building as shown on RFP drawings to construct the project per RFP requirements. (Refer to Item Diagram B, D, and Summary Site Plan 1).

Total Option Item 4: $

OPTION ITEM 5: Building #718: Provide all necessary supervision, labor, materials, transportation, equipment, permitting and other necessary ancillary services to design and construct Building #718. Work shall include demolition, site work, utilities, landscaping; decks; fencing and yard within fence; curbing;

paving; driveways; paint striping; sidewalks; signage; lighting; associated infrastructure, and a typical 15’ perimeter (to the North and South of this duplex) around building as shown on RFP drawings to construct the project per RFP requirements. (Refer to Item Diagram C and Summary Site Plan 2).

Total Option Item 5: $

OPTION ITEM 6: Building #720: Provide all necessary supervision, labor, materials, transportation, equipment, permitting and other necessary ancillary services to design and construct Building #720. Work shall include demolition, site work, utilities, landscaping; decks; fencing and yard within fence; curbing;

paving; driveways; paint striping; sidewalks; signage; lighting; associated infrastructure, and a typical 15’ perimeter (to the North and South of this duplex) around building as shown on RFP drawings to construct the project per RFP requirements. (Refer to Item Diagram C and Summary Site Plan 2).

Total Option Item 6: $

OPTION ITEM 7: Building #722: Provide all necessary supervision, labor, materials, transportation, equipment, permitting and other necessary ancillary services to design and construct Building #722 (including shared (75%) infrastructure). Work shall include demolition, site work, utilities, landscaping;

decks; fencing and yard within fence; curbing; paving; driveways; paint striping; sidewalks; signage; lighting;

associated infrastructure, and a typical 15’ perimeter (to the North and South of this duplex) around building as shown on RFP drawings to construct the project per RFP requirements. (Refer to Item Diagram C and Summary Site Plan 2).

Design Price: $

Total Option Item 7: $

OPTION ITEM 8: Building #721: Provide all necessary supervision, labor, materials, transportation, equipment, permitting and other necessary ancillary services to design and construct Building #721, including shared (25%) infrastructure. Work shall include demolition, site work, utilities, landscaping; decks;

fencing and yard within fence; curbing; paving; driveways; paint striping; sidewalks; signage; lighting;

associated infrastructure, and a typical 15’ perimeter (to the North and South of this duplex) around building as shown on RFP drawings to construct the project per RFP requirements. (Refer to Item Diagram C and Summary Site Plan 2).

Design Price: $

Total Option Item 8: $

OPTION ITEM 9: Building #724: Provide all necessary supervision, labor, materials, transportation, equipment, permitting and other necessary ancillary services to design and construct Building #724 (including shared (75%) infrastructure). Work shall include demolition, site work, utilities, landscaping;

decks; fencing; yard within fence; curbing; paving; driveways; paint striping; sidewalks; signage; lighting;

associated infrastructure, and a typical 15’ perimeter (to the North and South of this duplex) around building as shown on RFP drawings to construct the project per RFP requirements. (Refer to Item Diagram C and Summary Site Plan 2).

Total Option Item 9: $

OPTION ITEM 10: Building #723: Provide all necessary supervision, labor, materials, transportation, equipment, permitting and other necessary ancillary services to design and construct Building #723 (including shared (25%) infrastructure). Work shall include demolition, site work, utilities, landscaping;

decks; fencing and yard within fence; curbing; paving; driveways; paint striping; sidewalks; signage; lighting;

associated infrastructure, and a typical 15’ perimeter (to the North and South of this duplex) around building as shown on RFP drawings to construct the project per RFP requirements. (Refer to Item Diagram C and Summary Site Plan 2).

Design Price: $

Total Option Item 10: $

TOTAL PRICE (Base Price plus Option Items 1-10) $

Contractors that include language in their proposal containing conditions may be rejected.

BETTERMENT WILL NOT BE ACCEPTED. ALL INNOVATIVE, CREATIVE, OR COST SAVING

NON-PRICE PROPOSALS ARE TO BE INCLUDED AS PART OF THE TOTAL PRICE. OFFERORS

THAT INCLUDE LANGUAGE IN THEIR PROPOSALS CONTAINING CONDITIONS MAY

BE REJECTED.

THIS SPACE INTENTIONALLY LEFT BLANK