Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
CONSTRUCT FRC HOMEPORT ASTORIA, ASTORIA, OR; Task Order Announcement 70Z05022RABCD0001; Amendment 0010: See Continuation Pages.
USCG FDCC DET SEATTLE
915 SECOND AVE, RM 2664
SEATTLE, WASHINGTON 98174-1011
70Z05022RABCD0001
1 3
04/13/2022
01/20/2022
SOLICITATION NO. 70Z05022RABCD0001 IS AMENDED AS FOLLOWS:
I. CHANGES TO THE TASK ORDER ANNOUNCEMENT
Updated Davis Bacon Wage Determination
Corrected Price Proposal Form to remove redundant Total Option Item 3 line.
II. THE FOLLOWING ANSWERS TO QUESTIONS/PRE-PROPOSAL INQUIRIES ARE
PROVIDED:
233. Our team has been working with Pacific Power to get an estimate of their fees related to utilities (RFP 01800 1.13.2). Today they responded with the following statement: Can you exclude their fees from our requirement or provide a value that all contractors should include in their proposals. We just don’t know what to include as a cost for their involvement.
I do have other bidders on the project, since it is a bid process, I have told all other bidders to eliminate Pacific Power cost from their bid, as I don’t have all the information to give an accurate cost.
So I won’t be giving you a ballpark cost estimate. I will wait to discuss with the awarded contractor.
Answer: The Contractor is responsible for all associated utility company charges and costs, as per RFP Section 01800-1.13.2.2. Offerors must include costs for these utilities in their price proposals.
250. Please refer to amendment 005, PPI #50 response. This response directs the contractor to assume that in-water work would NOT be permitted outside of the normal IWWW. However, Appendix X provided in amendment 008 indicates that existing pier demolition & dredging would be planned to be completed outside of the IWWW. Please provide direction for all bidding contractors whether or not to assume in-water demolition & dredging would be permitted outside of the normal IWWW timelines as indicated in Appendix X.
Answer: As stated in response to PPI #50: The USCG is initiating the request for an exemption from NMFS that would allow demolition and dredging to occur outside of this window if needed; however, the contractor is responsible for obtaining any permits outside of the normal work window. For proposal purposes, contractors are to assume that no NMFS exemption will be granted. Pile driving or other actions that produce high levels of noise or vibration in the estuarine environment would still be restricted to the normal IWWW.
251. Can the USCG clarify the response to our PPI regarding site demolition requirements (AMD0008 PPI # 184, snippets below). The response directs to another PPI which does not answer the question.
The RFP drawings call for demolition of buildings that no longer exist per the site visit. Are the building foundations and / or their UG MEP services still in place? How do the bidders price the demo scope? We cannot assume demolition of buildings without clear documentation to complete a quantity estimate. Will the USCG clarify the demo scope to exclude these notes?
Amendment 0010 2
Answer: For bidding purposes, Contractor to assume building foundations and/or their UG MEP are still in place and must be demolished. There is no additional as-built information available.
THIS AMENDMENT INCLUDES THE LAST CONTRACTOR PRE-PROPOSAL INQUIRIES
THAT WILL RECEIVE RESPONSES. IF AN OFFEROR HAS SUBMITTED QUESTIONS
THAT HAVE NOT BEEN ADDRESSED, THAT OFFEROR MUST NOTIFY THE
GOVERNMENT IMMEDIATELY AT ADAM.M.BIRKLAND@USCG.MIL AND
WESLEY.M.WHISNER@USCG.MIL .
Amendment 0010 3 mailto:ADAM.M.BIRKLAND@USCG.MIL mailto:WESLEY.M.WHISNER@USCG.MIL
| SF30 |
| Amendment 10 Continuation Sheet |
File details come from the government source that posted it. Updated .