Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
CONSTRUCT FRC HOMEPORT ASTORIA, ASTORIA, OR; Task Order Announcement 70Z05022RABCD0001; Amendment 0005: See Continuation Pages.
USCG FDCC DET SEATTLE
915 SECOND AVE, RM 2664
SEATTLE, WASHINGTON 98174-1011
70Z05022RABCD0001
1 15
03/17/2022
01/20/2022
SOLICITATION NO. 70Z05022RABCD0001 IS AMENDED AS FOLLOWS:
I. CHANGES TO SPECIFICATIONS AND APPENDICES
SPECIFICATIONS SECTION 01800 1.19.1.4.1:
INSERT
Section 01800-1.19.1.4.1 Clean Sand Fill Verification Method: Hydrographic surveys must be conducted before and after placement of clean sand layer, and a verification report must be submitted to the Government.
SPECIFICATIONS SECTION 01800 1.19.10:
DELETE
One of the sides of the dredged area along the pier as indicated in the site plan shall be a nearly vertical box cut.
SPECIFICATIONS SECTION 01800 1.7.3.1.2:
DELETE
1.7.3.1.2 All other exterior doors and frames shall be Fiberglass Reinforced Plastic (FRP) with a seamless, minimum 15 mil thick gel coat color finish that is applied at the time of manufacturing. Doors shall be 1-3/4” inches thick with reinforced frame perimeters, hinge pockets, lockset and closer locations and polyurethane core construction between the FRP face panels. Any vision light openings or louvers required shall be installed by the door manufacturer at the time of manufacture. Provide vision lights where noted or specified. Glazing shall meet the requirements of the Large Missile Test of ASTM E 1996. All doors shall be fully weather stripped and include a heavy-duty fiberglass or metal threshold that prevents drafts, dirt, water, and insect entry.
INSERT
1.7.3.1.2 All other permanent building exterior doors and frames shall be Fiberglass Reinforced Plastic (FRP) with a seamless, minimum 15 mil thick gel coat color finish that is applied at the time of manufacturing. Doors shall be 1-3/4” inches thick with reinforced frame perimeters, hinge pockets, lockset and closer locations and polyurethane core construction between the FRP face panels. Any vision light openings or louvers required shall be installed by the door manufacturer at the time of manufacture. Provide vision lights where noted or specified. Glazing shall meet the requirements of the Large Missile Test of ASTM E 1996. All doors shall be fully weather stripped and include a heavy-duty fiberglass or metal threshold that prevents drafts, dirt, water, and insect entry.
SPECIFICATIONS SECTION 01800 1.4.7.1:
Amendment 0005 2
DELETE
1.4.7.1 Sanitary Sewer System Materials
Provide all materials, equipment, labor, testing, and miscellaneous related items to provide sanitary sewage lines necessary for distribution and services to the building. The following materials are not allowed for sanitary sewer piping: clay pipe and fittings, concrete pipe and fittings, steel pipe, or asbestos-cement pipe. Ductile iron pipe shall conform to ASTM A746 with AWWA C110 or AWWA C153 fittings. PVC pipe shall conform to ASTM D3034 or F949 with pipe and fittings made from material that conforms to ASTM D1784. HDPE shall conform to AWWA C901 or AWWA C906, PE 3408 material, pressure class 160 psi, DR 11.
Provide sanitary sewer pump out stanchion connection at each floating dock and peristaltic sanitary sewer pump out pier. Provide all materials, equipment, labor, testing, and miscellaneous related items to provide sanitary sewage lines necessary for distribution and services to the docks and moorings. The following materials are not allowed for sanitary sewer piping: clay pipe and fittings, concrete pipe and fittings, steel pipe, or asbestos-cement pipe. Ductile iron pipe shall conform to ASTM A746 with AWWA C110 or AWWA C153 fittings. PVC pipe shall conform to ASTM D3034 or F949 with pipe and fittings made from material that conforms to ASTM D1784. Piping for floating docks and mooring and on pier shall be HDPE and shall conform to AWWA C901 or AWWA C906, PE 3408 material, pressure class 160 psi, DR 11. Piping shall include flexible hoses at float to gangway, gangway to pier, and pier to upland connections. Provide check valve in concrete vault immediately upland of pier. Pump out shall be UL certified as complete system.
INSERT:
1.4.7.1 Sanitary Sewer System Materials
Provide all materials, equipment, labor, testing, and miscellaneous related items to provide sanitary sewage lines necessary for distribution and services to the building. The following materials are not allowed for sanitary sewer piping: clay pipe and fittings, concrete pipe and fittings, steel pipe, or asbestos-cement pipe. Ductile iron pipe shall conform to ASTM A746 with AWWA C110 or AWWA C153 fittings. PVC pipe shall conform to ASTM D3034 or F949 with pipe and fittings made from material that conforms to ASTM D1784. HDPE shall conform to AWWA C901 or AWWA C906, PE 3408 material, pressure class 160 psi, DR 11.
Provide sanitary sewer pump out stanchion connection at each floating dock and peristaltic sanitary sewer pump out pier. Provide all materials, equipment, labor, testing, and miscellaneous related items to provide sanitary sewage lines necessary for distribution and services to the docks and moorings. The following materials are not allowed for sanitary sewer piping: clay pipe and fittings, concrete pipe and fittings, steel pipe, or asbestos-cement pipe. Ductile iron pipe shall conform to ASTM A746 with AWWA C110 or AWWA C153 fittings. PVC pipe shall conform to ASTM D3034 or F949 with pipe and fittings made from material that conforms to ASTM D1784. HDPE pipe shall conform to AWWA C901 or AWWA C906, PE 3408 material, pressure class 160 psi, DR 11. Piping for floating docks and mooring and on pier shall be HDPE or ductile iron. Piping shall include flexible hoses at float to gangway, gangway to pier, and pier to upland connections. Provide check valve in concrete vault immediately upland of pier. Pump out shall be UL certified as complete system.
SPECIFICATIONS SECTION 01800 1.11.2.2:
Amendment 0005 3
Sanitary force main collection-holding-transfer (CHT) piping shall be sized for 150 GPM flow from any one of four pier utility connection stations. Piping shall be cement-lined ductile iron with restrained fittings between dock connections and the pier pump station (see Civil). Two transfer connection stations shall be provided per floating dock in boat fore and aft locations. Each transfer connection assembly shall be provided with isolation valve, check valve, and 4” bronze female quick coupler with plug and chain. All exposed piping shall be provided with insulation and stainless steel jacketing.
INSERT
Sanitary force main collection-holding-transfer (CHT) piping shall be sized for 150 GPM flow from any one of four pier utility connection stations. Piping may be cement-lined ductile iron with restrained fittings or high-density polyethylene with fused joints between dock connections and the pier pump station (see Civil). Two transfer connection stations shall be provided per floating dock in boat fore and aft locations. Each transfer connection assembly shall be provided with isolation valve, check valve, and 4” bronze female quick coupler with plug and chain. All exposed piping shall be provided with insulation and stainless steel jacketing.
SPECIFICATIONS SECTION 01800 1.11.3.11:
DELETE
Provide one emergency combination shower and eye/face wash to the Boat Bay. Combination fixture shall meet ANSI Z358.1 standard. Unit shall feature impact resistant eyewash/face wash, 10” impact resistant showerhead and include emergency sign. Design the combination unit so that the components can be operated individually from a common fixture supply line. Provide self-cleaning, non-clogging eye and face wash with quick-opening, full-flow, stay-open valves, stainless steel eye, and face wash receptor with float-off dust caps. Install where required by OSHA, IPC, and IMC or where indicated on the plans. Mount the emergency sign on the wall in immediate proximity of the shower fixture. Water supplied to the emergency shower/eye and face wash fixture shall be tempered.
INSERT
Provide one emergency combination shower and eye/face wash to the Boat Bay. Combination fixture shall meet ANSI Z358.1 standard. Unit shall feature impact resistant eyewash/face wash, 10” impact resistant showerhead and include emergency sign. Design the combination unit so that the components can be operated individually from a common fixture supply line. Provide self-cleaning, non-clogging eye and face wash with quick-opening, full-flow, stay-open valves, stainless steel eye, and ABS/plastic face wash receptor with float-off dust caps. Install where required by OSHA, IPC, and IMC or where indicated on the plans. Mount the emergency sign on the wall in immediate proximity of the shower fixture. Water supplied to the emergency shower/eye and face wash fixture shall be tempered.
SPECIFICATIONS SECTION 01800 1.11.5.1:
DELETE
Modular Buildings and Boat Bay: Provide tankless, instantaneous electric hot water heaters sized to serve sinks, lavatories, and showers in the Modular Buildings. Provide electric tank-type water heater, Amendment 0005 4 located in the Boat Bay mechanical room, with storage volume sufficient to operate one emergency eye/face wash and shower combination fixture at OSHA-prescribed temperature, flow rate, and duration.
INSERT
Modular Buildings and Boat Bay: Provide water heater(s), per 1.11.1.3, sized to serve sinks, lavatories, and showers. Provide tank-type water heater, per 1.11.1.3, located in the mechanical room, with storage volume sufficient to operate one emergency eye/face wash and shower combination fixture at OSHA-prescribed temperature, flow rate, and duration.
SPECIFICATIONS SECTION 01800 1.11.5.2:
DELETE
Permanent MWD Building: Provide high efficiency gas-fired water heater(s) with glass lined tank. Hot water shall be stored at 140°F and tempered to 110°F using a thermostatic mixing valve assembly. Tank shall be of sufficient heating capacity to serve all building fixtures and for storage volume sufficient to operate one emergency eye/face wash and shower combination fixture at OSHA prescribed temperature, flow rate, and duration. Hot water shall be recirculated to minimize delivery time to fixtures. Domestic hot water recirculation system shall include pump system and circuit setter(s) to continuously circulate hot water in the system. The time taken for the domestic hot water to reach a minimum 5°F temperature rise at any fixture outlet shall be no more than 10 seconds. Tankless point-of-use water heaters may be used where feasible in the Permanent MWD Building. Connect the water heating system to the building's monitoring system. Provide data including firing, supply water temperature, return water temperature, and status of recirculating pump, and allow control of auto isolation valves.
INSERT
Permanent MWD Building: Provide high efficiency water heater(s) with glass lined tank. Hot water shall be stored at 140°F and tempered to 110°F using a thermostatic mixing valve assembly. Tank shall be of sufficient heating capacity to serve all building fixtures and for storage volume sufficient to operate one emergency eye/face wash and shower combination fixture at OSHA prescribed temperature, flow rate, and duration. Hot water shall be recirculated to minimize delivery time to fixtures. Domestic hot water recirculation system shall include pump system and circuit setter(s) to continuously circulate hot water in the system. The time taken for the domestic hot water to reach a minimum 5°F temperature rise at any fixture outlet shall be no more than 10 seconds. Tankless point-of-use water heaters may be used where feasible and allowed by 1.11.1.3. Connect the water heating system to the building's monitoring system. Provide data including firing, supply water temperature, return water temperature, and status of recirculating pump, and allow control of auto isolation valves.
SPECIFICATIONS SECTION 01800 1.8.7.1:
DELETE
Design and construct new 200-foot-long by 15-foot-wide monolithic post-tensioned concrete floating dock systems with minimum pontoon segment (individually casted concrete pontoon with two side walls, two end walls, and top deck and bottom slab) length of 30 feet (or maximum segment weight of 140,000 pounds). Individual pontoons (pre-tensioned or reinforced concrete float modules) shall be
Amendment 0005 5 rigidly connected together by post-tensioning. Flexible hinge connections will be not be allowed. The concrete float manufacturer shall have a minimum of five years of experience constructing floating concrete docks of 100-foot minimum length intended for use in seawater. The shore ties shall be positioned approximately as shown. Each floating dock shall be independently guided by float guide piles such that any one dock could be removed from service if necessary.
INSERT
Design and construct new 200-foot-long by 15-foot-wide monolithic post-tensioned concrete floating dock systems with minimum pontoon segment (individually casted concrete pontoon with two side walls, two end walls, and top deck and bottom slab) length of 25 feet and maximum segment weight of 140,000 pounds. Individual pontoons (pre-tensioned or reinforced concrete float modules) shall be rigidly connected together by post-tensioning. Flexible hinge connections will be not be allowed. The concrete float manufacturer shall have a minimum of five years of experience constructing floating concrete docks of 100-foot minimum length intended for use in seawater. The shore ties shall be positioned approximately as shown. Each floating dock shall be independently guided by float guide piles such that any one dock could be removed from service if necessary.
SPECIFICATIONS SECTION 01801 2.10.2:
DELETE
Provide heating and air conditioning to offset envelope losses and interior loads. The system shall cool to an indoor air temperature of 76 degrees F dry bulb and heat to an indoor air temperature of 70 degrees F dry bulb. The cooling load shall account for heat from equipment and people in the space. Provide dedicated split systems to cool telecommunications spaces. Heating and cooling will be provided by air-cooled heat pumps. At a minimum, separate HVAC equipment should be provided for each modular structure. All heating and cooling piping, ductwork, equipment, and accessories shall have a vapor barrier jacket and shall be insulated consistent with the minimum requirements of ASHRAE 90.1-2016.
INSERT
Provide heating and air conditioning to offset envelope losses and interior loads. The system(s) shall cool to an indoor air temperature of 76 degrees F dry bulb and heat to an indoor air temperature of 70 degrees F dry bulb. The cooling load shall account for heat from equipment and people in the space.
Provide dedicated split systems to cool telecommunications spaces. Heating and cooling will be provided by air-cooled heat pumps. At a minimum, separate HVAC equipment should be provided for each modular structure.
Toilet and laundry rooms in the modular buildings shall be provided heating equipment and cooling shall be via thermostatically controlled mechanical ventilation equipment. Cooling ventilation rate shall be sized to maintain indoor space temperatures of 10 deg F below outdoor ambient during cooling season.
All heating and cooling piping, ductwork, equipment, and accessories shall have a vapor barrier jacket and shall be insulated consistent with the minimum requirements of ASHRAE 90.1-2016.
APPENDIX K
Amendment 0005 6
Appendix K
INSERT
Appendix K – With Updated Draft EA as of March 2022. Provided attached.
APPENDIX A
DELETE
Appendix A – Sheet A106
INSERT
Revised Appendix A – Sheet A106 (attached)
DELETE
Appendix A – C-001 & C-003
INSERT
Revised Appendix A – C-001 & C-003 (attached).
II. CHANGES TO THE TASK ORDER ANNOUNCEMENT:
DELETE
Task Order Announcement
INSERT
Revised Task Order Announcement dated 3/15/2022.
III. THE FOLLOWING ANSWERS TO QUESTIONS/PRE-PROPOSAL INQUIRIES ARE
PROVIDED:
NOTE: PPI numbers reflect the numbers tracked on the Coast Guard’s PPI log. This amendment includes answers to some but not all of the PPIs received. As a result, numbering and serialization may be out of order in the section below.
3. Section 01800 (1.7.3.1.2) states all exterior doors and frames shall be Fiberglass Reinforced Plastic (FRP), but the door schedule on Drawing A-601 states HM or hollow metal. Please confirm if the contractor shall proceed with FRP or HM doors. This applies at both Option 1 and Option 2 items.
Amendment 0005 7
Answer: Option 2 must be FRP doors, see revised Spec Section 01800-1.7.3.1.2 included in this amendment. Sheet A601 applies only to Option 1.
7. Section 01800-1.5 Geotechnical paragraph 1.5.3 states: “Contractor shall assume that ground improvements are required at the site due to the presence of liquefiable spoils.” These ground improvements include deep soil mixing or possibly driving steel piles. Will these ground improvements be required under Option item 1, Design Build Modular MWD facilities, considering these are temporary facilities?
Answer: Section 01800-1.5.3 is part of the Base Bid. See Appendix A - Sheet CU101.
28. Sanitary Sewer 01800, Paragraphs 1.4.7, 1.11.2.2, and Drawing CU101. For Sanitary Sewer Piping on Floats/Pier, please confirm if material type shall be DIP (Per 01800 - 1.11.2.2) or HDPE (per 01800 - 1.4.7)
Answer: See Revised Spec Section 01800-1.4.7.1 and Revised spec Section 01800-1.11.2.2, both included with this amendment.
44. Electrical 01800, Paragraph 1.13 and Drawing ES-101. If Option 3 is awarded for optional FRC Position Floats, shall the Spare Conduits installed as part of the Base Bid on the Pier/Floats be used for cabling being routed to Power Mound #3/4, or shall additional conduits be installed with spares all the way back to Upland Distribution Substation to allow for the Optional Floats.
Answer: Option 3 includes providing additional conduits, with spares, back to the upland distribution system
50. Please define the starting and ending dates for the in-water work restriction window for this task order.
Answer: Section 01800-01111-3.1.1 defines the standard in water work window (IWWW) at this location. The USCG is initiating the request for an exemption from NMFS that would allow demolition and dredging to occur outside of this window if needed; however, the contractor is responsible for obtaining any permits outside of the normal work window. For proposal purposes, contractors are to assume that no NMFS exemption will be granted. Pile driving or other actions that produce high levels of noise or vibration in the estuarine environment would still be restricted to the normal IWWW.
51. Please provide a copy of any and all permit applications (along with any accompanying backup materials) that have been submitted to date for this task order.
Answer: No permit applications have been completed by the Government up to this point. The Biological Assessment, and Incidental Harassment Authorization documentation are in preparation and
Amendment 0005 8 have not yet been submitted to the regulatory agencies. The Government will provide these documents after they have been submitted to the agencies and will do so via a future amendment if the timing of the submissions occurs before the proposal due date.
55. Plumbing - Per 1.11.3.7, The opening statement says to provide one electric water cooler and to install per ADA requirements. The plans indicate a solitary water cooler. To meet ADA requirements for both wheelchair bound persons and cane impaired persons a bi-level unit is required or the addition of an permanent (always full) cup dispense at an appropriate height. Is a bi-level unit w/bottle filer to be provided or a solitary electric water cooler w/ bottle filler and cup dispenser?
Answer: Provide ADA bi-level electric water cooler w/bottle filler. See revised floor plan A103-Rev 1 (included with Amendment 0004) to accommodate the unit. See attached for basis of design unit.
Revise plan dimension as needed if different unit is selected.
56. Plumbing - Per 1.11.3.11, the eyewash bowl is to be impact resistant but then states it is to be a stainless steel receptor. Stainless steel is not considered as impact resistant. Does the USCG want impact resistant ABS/Plastic receptor or stainless steel receptor?
Answer: Provide ABS/Plastic receptor in lieu of stainless steel to meet the impact resistant requirement.
See revised Spec section 01800 1.11.3.11 included in this amendment.
59. Plumbing - Per 1.11.3.13, various floor drains are to be provided with a trap primer to inhibit trap evaporation. Is a sustainable waterless trap seal device as allowed by the International Plumbing Code an acceptable alternative to the water type trap primer valve and piping as noted in RFP?
Answer: The use of waterless trap seal devices is acceptable.
60. Plumbing - Per 1.11.5.1, provide Tankless electric water heater for Modular Building and provide electric tank type storage unit for the Boat Bay. Is it acceptable for the contractor to provide the specified water heater types as directed by para 1.11.5.1 in lieu of the direction given in para 1.11.1.3?
Answer: Provide in compliance with Section 1.11.1.3. See revised Spec Section 01800-1.11.5.1.
62. Plumbing - Per 1.11.5.2, provide high efficiency tank type gas water heater for MWD Building. Is it acceptable for the contractor to provide the specified water heater type as directed by the USCG in para
1.11.5.2 in lieu of the direction given in para 1.11.1.3?
Answer: Provide in compliance with Section 1.11.1.3. See revised spec section 01800-1.11.5.2.
included with this amendment.
Amendment 0005 9
69. Plumbing - Plan A 1 MWD Plan MK Shop and Boat Bay: Please confirm that the Sump Trench and grate in this space is a non-piped holding pit.
Answer: Provide sump trench to meet CSTO BMF paragraph 2.2.6.1. Added CSTO for reference in Amendment 0004.
71. CONSTRUCTION ADMINISTRATION - Section 01802, para 1.11, specifies four site visits for each DOR, including the final inspection. Based on the size/complexity of the MWD facility, does the USCG still want four site visits for each DOR? Recommend two site visits for each DOR.
Answer: Yes, four site visits for each DOR is required
72. MARINE - Section 01800 1.8.7 Floating Docks – Currently, it is noted that the minimum length of pontoon segment is noted as 30 feet. However, this minimum length will likely cause segments to exceed the 140,000 lb. maximum weight. Please consider revising the minimum segment length to 20 feet or 25 feet to allow for more flexibility in construction and competition amongst suppliers.
Answer: The minimum segment length has been changed from 30 ft to 25 ft. See Revised Spec Section 01800-1.8.7.1.included in this amendment.
73. MARINE - Section 01800 1.18.2.1 Initial Gov. Permit Work – Please provide copies of all IHA, SHPO, Dredging Sampling, and EA documents not yet provided in the RFP.
Answer: See Appendix K for Draft EA and Dredge Sampling information. See Response to PPI 51 in this amendment for status of IHA.
74. MARINE - Section 01802 2.14.6 Structural Steel and Field Welding – It is noted that 30% of all field welds shall have non-destructive testing via x-ray and radiography. These measures are both costly and the methods require additional safety precautions. Please consider the following changes: a.)
Reduce frequency to include only PJP and CJP welds (visual only on fillet welds) and b.) allow use of UT equipment for NDT.
Answer: No change, requirements remain as written.
78.Reference Appendix D – Page 1: RFP provides a preliminary geotechnical report dated August 2021.
Page 1 of the report states that “This report will be superseded with updated design recommendations after additional explorations and laboratory testing is performed and design features have been evaluated.” When will the final geotechnical report be provided and will it include additional borings and laboratory testing?
Answer: No additional geotechnical reports will be provided by the Government. Per Section 1.5, The Contractor’s geotechnical consultant must conduct their own subsurface explorations and obtain
Amendment 0005 10 their own test data, and engineering analysis for the foundation design. The cost of the required geotechnical work shall be included in the base bid.
80. Reference 01800 – A-105, A1: To assist in the determination of the utility service pad mounted transformer, please provide the ratings and quantities of the electrical equipment that will be used in each workbench and shop.
Answer: Contractor to use provided Appendix A Drawings and FF&E in Section 1.17 as basis of design.
82. Due to the Non-Price proposal requirements for Factors 1 & 2 regarding permitting and the potential impact to the project critical path, can the following information be provided?
RFP identified the environmental approval processes listed below where USCG has prepared documents and is acting as the lead federal agency, and some coordination with associated federal agencies was started, but current status was either not provided, or stated as in progress and will be provided in amendment at a later date. Can the submission date, status and copies of the initiated government permits listed in 01800 – 1.18.2.1 be provided? Including but not limited to:
§ NEPA (Finding of no Significant Impact [FONSI]) § Endangered Species Act (ESA) Consultation (Biological Opinion / Letter of Concurrence) § Incidental Harassment Authorization (IHA) for marine mammals § Tribal Coordination and Section 106 for cultural resources § Portland Sediment Evaluation Team (PSET) Determination
Answer: The only documents currently available are the PSET SDM and the Draft EA. The PSET determination was provided with Amendment 0004. The Draft EA (updated and included as an attachment to this amendment) has not yet been released to the public. See answer to PPI 51 in this amendment for additional information on BA and IHA.
83. Will the USCG maintain the Federal lead and submit all the required consultation documents prepared for the above mentioned approvals, and/or any other federal permitting processes including the Joint Permit Application (JPA) for Army Corps Section 10, 404, Section 408 Permits, Section 401, or Coastal Zone Consistency Determination, local land use determinations, etc?
Answer: Yes, the USCG will be the lead federal agency but the contractor is required to identify, prepare and submit all permits. All permits and authorizations listed in this query are assumed likely to be needed, other than a Section 408 permit, which has been deemed unnecessary by the USACE.
91. Reference Appendix A, pg.. A-106, Section 01800, Para 1.17: The Storage Room indicated on drawing sheet A-106 includes the following items, but those items are not included in Section 1.17 of the RFP Section 01800. Please advise.
- 36" x 30" x 85" closed shelving units
Amendment 0005 11
- 36" x' 30" x 85" closed units
- 48" x' 30" x 85" closed shelving units
Answer: See updated Appendix A - Drawing Sheet A106 provided with this amendment.
92. Reference Appendix A, pg. A-106, Section 01800, Para. 1.17: The Office Area within the Supply Room shown on Sheet A-106 does not have the furniture completely called out. Is any of the furnishings without a reference required by the Contractor? If so, please provide a reference to the furnishings in Section 01800 1.17.
Answer: See updated Appendix A - Drawing Sheet A106 provided with this amendment.
93. Reference Appendix A, pg. A-106, Section 01800, Para. 1.17: There is an IT rack identified in the Support Office Area on Sheet A-106. Is this supplied and installed by the Government or by the Contractor? Also in the same Support Office, there is furniture shown but not identified, is this furniture Contractor supplied? If so, please provide a reference to the furnishings in Section 01800 1.17.
Answer: Contractor to provide and install all equipment racks in accordance with the requirements of Section 01800-1.16. All furniture is Contractor provided. See Revised Appendix A - Sheet A106 provided with this amendment.
97. Reference Appendix A, Section 01800, Para. 1.17: The following FF&E items are showing up in Section 01800 para 1.17 but do not appear to be showing up on the drawings. Please advise if these items are required and if so, please provide locations and quantities.
- T2 Table
- MC1 Mobile Tool Cart
- CMP1 Projector
- CRPS1 Projector Screen
- LECT Lecturn/podium
- WCUR1 Welding Curtain
Answer: Table T2 is shown on drawing A1 in the lunch/break room and labeled. CMP1, CRPS1, and LECT are shown on drawing A1 in the tech library 106. See updated drawing A1 for added WCUR1 in the Boat Bay. Quantities of FFE to be determined by contractor using RFP drawings. Updated Appendix A - Sheet A1 was provied with Amendment 0004.
103. 01800 1.8.6.2 The RFP directs the contractor to assume that both the permanent building and modular buildings are on a shallow foundation supported on ground improvements. Please confirm if the same level of ground improvements (1) area under the modular buildings and (2) same depth is required for Option 1 modular buildings or only required if the permanent building option is selected.
Can our design team make that determination for the modular buildings for bidding purposes?
Amendment 0005 12
Answer: See response to PPI 07 included in this amendment.
107. 01800 1.19.10 "Specification section 1.19.10 SIDE SLOPES - Dredging on side slopes shall follow, as closely as practicable, the lines indicated or specified. A two-foot horizontal allowance shall be made for dredging beyond the indicated or specified side slopes, except as provided herein. Side slopes at the side limits of the dredge area shall be 2:1 (horizontal:vertical). Project the side slope from the dredged bottom elevation at the limits of the dredge area line outward until it intersects the existing bottom of the adjacent waterway. Dredging on side slopes shall follow, as closely as practicable, the lines indicated on referenced drawings.
One of the sides of the dredged area along the pier as indicated in the site plan shall be a nearly vertical box cut.
- Please clarify where the vertical “box cut” side slope(s) is."
Answer: Delete the following sentence in Section 01800-1.19.10. “One of the sides of the dredged area along the pier as indicated in the site plan shall be a nearly vertical box cut.” See specification revision includedin this amendment. .
108. Appendix A C-001 Please provide additional information on requirements for the 2-foot sand layer “cap”. Required material gradation and testing. Placement tolerances, is 2-foot a minimum with an over placement allowance, an average, over and under placement tolerances. Verification of placement based on bathymetric survey only.
Answer: Appendix A - Sheet C-001 and C-003 have been updated to include additional Notes for sand material and placement tolerance. The verification method has been added as Spec Section 01800- 1.9.1.4.1, which is included in this amendment
110. UFC 3-400-01 appendix D The UFC does not require floor drains at emergency shower stations per UFC 3-420-01, Appendix D. However, some owner/end users prefer them. If provided, an oil water separator would be required, which can be a maintenance problem over time. Also, if the emergency shower station is within a hazmat/water reactive area - UFC 3-420-01, Appendix D, figure D-1 is required when a floor drain is present. Please confirm that owner/end use does not want a floor drain at the emergency shower station. If desired, please note that we do not consider the Boat Bay to meet the definition of a Hazmat/ Water reactive Area. Please confirm the Boat Bay is not considered a Hazmat/Water reactive area.
Answer: 1. Floor drain is not required for the Eye Wash. Eye wash is not located in a hazmat/water reactive area. 2. Boat Bay – is not Hazmat/ water reactive area. Floor drain is not required
112. UFC 3-400-01 appendix D UFC 3-420-01, Appendix D mentions to provide a water flow-initiated alarm at each Emergency shower or Eye-wash/shower. This wasn’t included in 01800,
1.11.3.11. Please confirm that an alarm and flashing strobe is required
Amendment 0005 13
Answer: Water flow-initiated alarm at each Emergency shower or Eye-wash/shower is not required.
115. 01800 1.12.1.11 states, "Exhaust shall be directed to the weather and shall have local control".
Please confirm that exhaust shall be routed to exterior of building and shall have local control
Answer: Confirmed, exhausts shall be routed to the exterior of the building and shall have local controls.
117. 1.12.1.11 requires that restrooms and laundry be air-conditioned. Specifically the modular building laundry room and men’s and women’s rooms open directly to the outdoors and don't connect to adjacent conditioned spaces. For energy efficiency and reduction in energy consumption these three specific spaces in the modular building would be best not air-conditioned. Please confirm that laundry, men’s, women’s in the modular building need only be ventilated and heated.
Answer: Toilet and Laundry in the modular building shall be cooled via thermostatically controlled mechanical ventilation equipment. See Revised Spec Section 01801-2.10.2 included with this amendment.
119. The RFP requires that piles are designed for a 50 year service life. Paragraphs 1.8.8 and 1.8.12.1 provide a list of acceptable methods for obtaining the 50 year service life. Are we required to comply by limiting the methods to those provided or may other options be included at the discretion of the designer of record?
Answer: Per Section 01800-1.8.12.1.1, piles shall be HDG with a sacrificial wall thickness. Beyond that, the contractor is not limited to the methods listed. Any method will be subject to Government review during design.
120. 01800 1.8 The RFP states that piles shall be hot dip galvanized at a minimum. It goes on to list other options "beyond the HDG". Are the other options intended to be in addition to HDG or in lieu of
HDG.
Answer: In addition to HDG.
121. 01800 1.8 Is it allowable to propose precast prestressed piles in lieu of steel if acceptable by the designer of record?
Answer: Steel piles have been used for initial permitting consultation and concept design. Precast prestressed piles may be used in lieu of steel if acceptable by the designer of record. However, it is the responsibility of the Contractor to obtain permits in a timely manner, and if precast piles use any other installation procedure or increase underwater coverage (increased pile number) that impact permit consultation, it would be at cost to the contractor.
Amendment 0005 14
128. Is the pier dry standpipe system required to be monitored by a pier fire alarm system? Or will valves be supervised with lock and chain? If fire alarm monitoring is required, is there any requirement for manual means to activate the fire alarm system on the pier? i.e. manual pull stations.
Answer: Fire alarm monitoring and fire alarm system devices are not required on the pier. A dry standpipe system installed per NFPA 14 does not require control valves or waterflow switches between the FDC and the hose valves/connections. If control valves are installed they should be chained and locked in the open position for supervision.
129. Are there any additional flow and pressure requirements for the pier standpipe system based on potential boats docked there? Or are we just required to provide the pressure and flow in accordance with NFPA 14 and NFPA 303?
Answer: To meet requirements of the FRC ILSP (Appendix L), the dry standpipe system shall be designed to deliver 500 gpm at 125 psi from each of the two hydraulically most remote hose connections, in lieu of 250 gpm at 100 psi per NFPA 14. Hydraulic calculation requirements shall otherwise meet NFPA 14 and NFPA 303.