PRICE PROPOSAL FORM
TOA #: 70Z05022ABCD0001
CONSTRUCT FRC HOMEPORT ASTORIA
ASTORIA, OR
Base Item 1: Design-Build improvements at East Tongue Point at Astoria, OR to provide facilities to accommodate the Home-Porting of two Fast Response Cutters (FRCs). Facilities include a fixed pier, two floating docks, gangways between floating docks and pier, cutter shore tie utilities on the pier, underground utilities on shore, new pavement and parking, and security fence around the site. Provide all labor, material, equipment, mobilization, demobilization, permitting, construction support, quality control services, and ancillary items required for site development and construction, excluding items identified in Base Item 2 and Option Items.
Design Price: $______________________
Construction Price: $______________________
Total Base Item 1: $____________________
Base Item 2: Dredging requirements. Quantities identified in items under Base Item 2 are estimated quantities and are subject to the procedures in FAR 52.211-18 – Variation in Estimated Quantity (April 1984)
Base Item 2A Dredging of Dredge Area 1.
$____________________ per CY X 96500 78970 CY = $_________________________
Base Item 2B Clean Sand Fill of Dredge Area 1 $____________________ per CY X 18000 5060 CY = $ _________________________
Total All Base Items: $__________________
Option Item 1: Design-Build Price – Modular MWD Facilities Provide all labor, material, equipment, mobilization, demobilization, permitting, construction support, quality control services, and ancillary items required for site development and construction to provide modular or pre-fabricated Maintenance and Weapons Division (MWD) Facilities. Conceptual architectural layout is provided on Sheets A-101, A-102, A-103, A-104, A-105, A-106, A-201, A-202, A-203, A-204, and A-601. Additional disciplines and detailed information are provided in the RFP Section 01800 and 01801. If Option 1 is issued, Option 2 will not be issued.
Design Price: $______________________
Total Option Item 1: $____________________
Option Item 2: Design-Build Price – Permanent MWD Building Provide all labor, material, equipment, mobilization, demobilization, permitting, construction support, quality control services, and ancillary items required for site development and construction to provide a Permanent Maintenance and Weapons Division (MWD) Building. Conceptual architectural layout is provided on Sheet A1. If Option 2 is issued, Option 1 will not be issued.
Design Price: $______________________
Total Option Item 2: $____________________
Option Item 3: Design-Build Price – Additional Floating Dock and Expanded Dredge Area for 3rd
FRC
Provide all labor, material, equipment, mobilization, demobilization, permitting, construction support, quality control services, and ancillary items required for site development and construction related to provide a 3rd floating dock, and dredging for Dredge Area 2 and 3. Quantities identified under Option 3C are estimated quantities and are subject to the procedures in FAR 52.211-18 – Variation in Estimated Quantity (April 1984)
Option Item 3A
Design Price: $______________________
Option Item 3B 3rd Floating Dock
Construction Price: $______________________
Option Item 3C Dredging of Dredge Area 2 and 3.
$____________________ per CY X 41000 45250 CY = $_________________________
Total Option Item 3: $____________________
Option Item 4: Design-Build Price – Non-Critical Seawall Revetment Provide all labor, material, equipment, mobilization, demobilization, permitting, construction support, quality control services, and ancillary items required for site development and construction related to revetment repair and ground improvements in Zone 2 & 3.
Design Price: $______________________
Total Option Item 4: $____________________
TOTAL PRICE (Base Items, Option 1, Option 2, Option 3, and Option 4):
Options that are exercised, if any, will be exercised at time of award.
BETTERMENTS WILL NOT BE ACCEPTED. ALL INNOVATIVE, CREATIVE, OR COST SAVING
TECHNICAL PROPOSALS ARE TO BE INCLUDED AS PART OF THE TOTAL PRICE. OFFERORS
THAT INCLUDE LANGUAGE IN THEIR PROPOSALS CONTAINING CONDITIONS MAY BE
REJECTED.