Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
CONSTRUCT FRC HOMEPORT ASTORIA, ASTORIA, OR; Task Order Announcement 70Z05022RABCD0001; Amendment 0008: See Continuation Pages.
USCG FDCC DET SEATTLE
915 SECOND AVE, RM 2664
SEATTLE, WASHINGTON 98174-1011
70Z05022RABCD0001
1 29
04/01/2022
01/20/2022
SOLICITATION NO. 70Z05022RABCD0001 IS AMENDED AS FOLLOWS:
I. CHANGES TO SPECIFICATIONS AND APPENDICES
SPECIFICATIONS SECTION 01800 1.7.3.14
INSERT:
Section 01800-1.7.3.1.4 Overhead Insulated Rolling or Coiling (Service) Doors:
Provide electrically motor operated with emergency chain hoist for FRC Cutter Storage rooms in the permanent MWD Facility and at all overhead locations for the modular MWD Facility. Unless more stringent design requirements are determined by Designer of Record, the doors shall be designed to withstand a basic wind speed required by the Structural portion of the Specifications, without evidencing permanent deformation or disengagement of door components and to remain operable under uniform pressure (velocity pressure) of 20 lbs/sq. ft. (960 Pa) wind load, acting inward and outward. Curtain material shall be an insulated galvanized steel slat with the exterior slat face being minimum 20 gauge and inside slat face being minimum 24 gauge. Insulation shall be foamed-in-place, closed cell urethane.
Bottom bar shall be reinforced extruded aluminum face with full depth insulation and exterior skin slat to match curtain material and gauge. Fabricate interlocking sections with cast iron end locks. Provide end locks as required to meet specified wind load. Finish on outside and inside slat surfaces shall be the manufacturer’s factory or shop applied coating system consisting of a phosphate treatment followed by baked-on polyester powder coat with a minimum 2.5 mils cured film thickness. Colors shall be as selected from the manufacturer’s standard color range.
Provide counter balance shaft assembly, brackets, hood (with same finish as door slats), full weatherstripping of door and hood and including a bottom bar with weather/sensing edge (automatic reversing control by an automatic sensing switch) with neoprene or rubber astragal extending full width of door bottom bar. Provide a lockable slide bolt on coils side of bottom bar at each jamb extending into slots in guides.
Motor Operator: Industrial duty – rated for maximum of 20 cycles per hour UL listed, totally enclosed gear head operator(s) of size and capacity recommended by door manufacturer for size and type of door;
complete with electric motor and factory pre-wired motor control terminals, maintenance free solenoid actuated brake, emergency manual chain hoist and 3-button OPEN/CLOSE/STOP control station(s).
Motor shall be high starting torque, industrial type, protected against overload with an auto-reset thermal sensing device. Primary speed reduction shall be heavy-duty, lubricated gears with mechanical braking to hold the door in any position. Operator shall be equipped with an emergency manual chain hoist assembly that safely cuts operator power when engaged. A disconnect chain shall not be required to engage or release the manual chain hoist. Provide an integral motor-mounted interlock system to prevent damage to door and operator when mechanical door locking devices (padlocks) are provided. The motor shall be removable without affecting the limit switch settings.
Amendment 0008 2
SPECIFICATIONS SECTION 1.7.6.1
DELETE
1.7.6.1 Cranes and Hoists
Provide an overhead electric travelling crane with a minimum capacity of 3 tons. The primary use of the crane is to lift engines from the OTH-V patrol boat. Engines will be lifted vertically, then transported horizontally to open shop space. Crane shall be designed with minimum 12’-0” hook height, structural supports, and functionality to carry out necessary engine repairs. The crane shall be controlled via a pendant pushbutton station suspended from an independent festooned messenger track system. Crane shall be in compliance with CMAA 70.
Prior to initial use, the new crane shall be tested in accordance with OSHA 1910.179 Overhead and Gantry Cranes Regulations. Include testing results in O&M documentation
INSERT:
1.7.6.1 Cranes and Hoists
Provide an overhead electric travelling crane with a minimum capacity of 3 tons. The primary use of the crane is to lift engines from the OTH-V patrol boat. Engines will be lifted vertically, then transported horizontally to open shop space. Crane shall be designed with minimum 13’-6” hook height, structural supports, and functionality to carry out necessary engine repairs. The crane shall be controlled via a pendant pushbutton station suspended from an independent festooned messenger track system. Crane shall be in compliance with CMAA 70.
Prior to initial use, the new crane shall be tested in accordance with OSHA 1910.179 Overhead and Gantry Cranes Regulations. Include testing results in O&M documentation.
SPECIFICATIONS SECTION 01800 1.14
1.14.1 VISUAL SURVEILLANCE SYSTEM (VSS):
Provide a VSS surveillance and recording system, including all wiring, equipment, and components required to provide complete VSS camera coverage of vehicle access points, building entries/exits, building lobbies, WAT Shop entries, Telecommunications Room entry, and the pier. VSS cameras may be mounted on buildings, an antenna tower, or other structures as required for site coverage.
1.14.1.1 Dome cameras shall be pan-tilt-zoom, interior 180 degree cameras, and exterior 180 degree panoramic cameras. Cameras must be TAA Compliant. Cameras shall be color CCD type, at minimum 1080p at 25-30 fps or better, minimum 0.16-lux light sensitivity for color and .03 for black and white, automatic white balance, electronic shutter, and shall be weatherproof type or mounted in a weatherproof enclosure where installed outdoors. Cameras in outdoor locations shall be rated for operation from -20 degrees F to 110 degrees F without supplementary heating or cooling, function at 100% humidity, and be designed to resist damage in heavy wind and other site-specific weather conditions. Provide all required mounting hardware and accessories required for camera operation, including sunshields, fans, etc. All exterior cameras must be rated for NEMA 4x to protect against salt spray corrosion. Provide wiring and accessory equipment as required for multiple camera display on monitor(s) in the site. VSS system shall be compatible with Base ExacqVision Pro system. Coordinate
Amendment 0008 3 camera locations and exterior lighting to avoid interference. Basis of Design: Axis Communications models Q6155-E, Q3708-PVE, P3225-V Mk II, and P3225-LVE Mk II or equivalent.
1.14.1.2 Monitor(s) shall have minimum 24” color LCD screen display with minimum 1920x1080 resolution at 30 fps. System shall have capability for split screen display of all cameras or selection of individual camera display.
1.14.1.3 Network video recorder (NVR) shall have capability of simultaneous recording, viewing, and play back of each camera input, shall be networkable and shall have hard drive capacity sufficient for a minimum 30 days recording time per channel at 30 fps.
1.14.2 WIRING METHODS SHALL BE IN ACCORDANCE WITH SECTION 1.13 “ELECTRICAL
SYSTEMS.”
1.14.3 TESTING
Provide non-destructive operational tests of security systems as required to demonstrate system operation. Provide operational tests of VSS systems as required to demonstrate system operation, including operation of the DVR and operation of pan, tilt, and zoom controls for each camera, as applicable. Equipment shall not be placed in service until testing has been completed and test results have been evaluated by the Contracting Officer.
1.14.4 OPERATIONS AND MAINTENANCE MANUAL
Provide Operations and Maintenance Manual for Security and VSS systems in accordance with Specification 01781.
1.14.5 TRAINING
Provide training for operation and maintenance of each system in accordance with Specification 01781;
provide a minimum of 2 hours training for each system (2 hours for each VSS and NVR).
INSERT:
1.14.1 Security System
Security system shall include intrusion detection systems (IDS). Provide intrusion detection systems, including all wiring, equipment and components required to provide intrusion coverage for the Weapons Augmentation Team Shop and Telecommunications Room (Restricted Areas), exterior doors, and exterior windows. Intrusion detection systems shall include a control panel, balanced magnetic switches on doors, break glass sensors or motion sensors on windows, volumetric detectors, access controls (CAC Card readers), electric strikes, and other equipment as required to provide intrusion protection for the facility.
1.14.1.1 The IDS shall be zoned and programmable so that the system can be set not to go into alarm when the programmed entry code is entered in the door access control for entry into a protected space when a protected space is occupied for normal operations.
1.14.1.2 Provide a secondary battery power supply for the system with capacity for system operation for a minimum of 4 hours standby followed by 15 minutes alarm. Provide a remote alarm notification at Base Police Office.
Amendment 0008 4
1.14.1.3 Line supervision shall be incorporated to detect any signal cutting, shorting, or splicing of the transmission line. Attempts at gaining access to, or substitution or neutralization of any sensor shall be detected and signaled. An alarm shall be indicated at the alarm control center within one second of a line tamper attempt. Dedicated terminal junction boxes for sensor inputs and connecting cables shall be securely welded or locked and provided with tamper switches. Junction boxes containing phone lines, which carry alarm system signals do not need to be locked, welded, or alarmed.
1.14.1.4 The Premise Control Unit (PCU), which houses the systems electronics and control functions must also be located within the protected area. Similarly, IDS card readers or other control devices shall be located within the IDS perimeter and not, for example, located outside the primary access control door. Card Readers may be located in vestibules separating the primary access control door from an inner convenience entrance. The IDS shall be maintained and tested in accordance with applicable regulations and manufacturer’s instructions. The Coast Guard Security Manager must approve all IDS installations and modifications.
1.14.1.5 Balance Magnetic Switches (BMS):
1.14.1.5.1 BMS shall be surface mounted or recessed and shall have a minimum of two encapsulated reed switches. The BMS shall be installed on the upper portion of the door on the side of the door facing the interior of the protected space. The switches shall activate when any disturbance in the balanced magnetic field occurs. Each BMS shall have an over current protective device, rated to limit current to 80 percent on the switch capacity. The BMS shall be rated for a minimum lifetime of one million operations.
1.14.1.5.2 The maximum permissible delay on BMS activation upon entry is 30 seconds. This is the time permitted for authorized personnel to enter their access code to disarm the IDS after entering through the one authorized entry door. After 30 seconds the alarm must be responded as an unauthorized entry. Emergency exit door alarm sensors shall remain active at all times.
1.14.1.5.3 BMS must meet the UL standard UL 634 Motion sensors (ultrasonic, passive infrared, etc.). Sensors shall be activated and continuously monitored during normal operations. The IDS utilized in a Restricted area must be fully contained within that space and physically and electrically separated from other IDS systems installed throughout the facility.
1.14.1.6 Motion Detection: Restricted Areas not continuously manned must have Passive Infrared (PIR) motion detectors installed. PIR sensors shall be installed so that complete coverage is obtained throughout the protected area.
1.14.2 Visual Surveillance System (VSS):
Provide a VSS surveillance and recording system including all wiring, equipment, and components required to provide complete VSS camera coverage of vehicle access points, building entries/exits, building lobbies, WAT Shop entries, Telecommunications Room entry,. VSS cameras may be mounted on buildings, an antenna tower or other structures as required for site coverage.
Amendment 0008 5
1.14.2.1 Dome cameras shall be pan-tilt-zoom, interior 180 degree cameras, and exterior 180 panoramic cameras. Cameras must be TAA Compliant. Cameras shall be color CCD type, at minimum 1080p at 25-30 fps or better, minimum 0.16-lux light sensitivity for color and .03 for black and white, automatic white balance, electronic shutter and shall be weatherproof type or mounted in a weatherproof enclosure where installed outdoors. Cameras in outdoor locations shall be rated for operation from -20 degrees F to 110 degrees F without supplementary heating or cooling, function at 100% humidity, and be designed to resist damage in heavy wind and other site-specific weather conditions. Provide all required mounting hardware and accessories required for camera operation including sunshields, fans, etc. All exterior cameras must be rated for NEMA 4x to protect against salt spray corrosion. Provide wiring and accessory equipment as required for multiple camera display on monitor(s) in the site. CCTV system shall be compatible with existing Base ExacqVision Pro system. Coordinate camera locations and exterior lighting to avoid interference. Basis of Design: Axis Communications models Q6155-E, Q3708-PVE, P3225-V Mk II, and P3225-LVE Mk II or equivalent.
1.14.2.2 Monitor(s) shall have minimum 24” color LCD screen display with minimum 1920x1080 resolution at 30 fps. System shall have capability for split screen display of all cameras or selection of individual camera display.
1.14.2.3 Network video recorder (NVR) shall have capability of simultaneous recording, viewing and play back of each camera input, shall be networkable and shall have hard drive capacity sufficient for a minimum 30 days recording time per channel at 30 fps.
1.14.3 Wiring methods shall be in accordance with Section 1.13 “Electrical Systems”.
1.14.4 Testing
Provide non-destructive operational tests of security systems as required to demonstrate system operation. Provide operational tests of VSS systems as required to demonstrate system operation, including operation of the DVR and operation of pan, tilt and zoom controls for each camera, as applicable. Equipment shall not be placed in service until testing has been completed and test results have been evaluated by the Contracting Officer.
1.14.5 Operations and Maintenance Manual
Provide Operations and Maintenance Manual for Security and VSS systems in accordance with Specification 01781.
1.14.6 Training
Provide training for operation and maintenance of each system in accordance with Specification 01781;
provide a minimum of 2 hours training for each system (2 hours for IDS, 2 hours for VSS and NVR).
SPECIFICATIONS SECTION 01800 1.8.10
1.8.10 DOCK UTILITIES
Amendment 0008 6
Support the utilities from the undercarriage or side of the gangway truss, with flex connections to the wharf and floating dock, capable of accommodating the vertical tidal variations and horizontal gangway rollout travel distance. Once the utilities reach the dock, provide means of connection to internal chaseways and handholes that are cast into the precast concrete dock. The approximate dock utility riser locations are provided in the RFP drawings and are positioned to minimize the hose and cable run lengths on the deck for the standard Bow-South mooring arrangement. Provide new stainless steel or fiberglass underdeck utility supports on the fixed wharf for routing utilities to the new gangway platform location. Utility supports for water hose bibs and fire protection standpipes shall be rigid supports for riser piping capable of withstanding forces and loads anticipated during operation, including a 200-pound force applied perpendicular to the riser at the top of the pipe assembly. See Section 1.4.6 for water and fire protection system requirements and Section 1.4.7 for sanitary sewer system requirements.
INSERT
1.8.10 DOCK UTILITIES
Support the utilities from the undercarriage or side of the gangway truss, with flex connections to the wharf and floating dock, capable of accommodating the vertical tidal variations and horizontal gangway rollout travel distance. Once the utilities reach the dock, provide means of connection to internal chaseways and handholes that are cast into the precast concrete dock. The approximate dock utility riser locations are provided in the RFP drawings and are positioned to minimize the hose and cable run lengths on the deck for the standard Bow-South mooring arrangement. Provide above-deck routing or in-deck (internal chaseways) routing for utilities on the fixed wharf. Utility laterals crossing the width of the fixed wharf shall be located in internal chaseways. Provide new stainless steel or fiberglass utility supports on the fixed wharf for routing utilities to the new gangway platform location. Utility supports for water hose bibs and fire protection standpipes shall be rigid supports for riser piping capable of withstanding forces and loads anticipated during operation, including a 200-pound force applied perpendicular to the riser at the top of the pipe assembly. See Section 1.4.6 for water and fire protection system requirements and Section 1.4.7 for sanitary sewer system requirements.
SPECIFICATIONS SECTION 01800 1.4.6.2
Provide water service to the floating docks and moorings from the proposed looped water system. Water lines shall be located under the new platform, along the gangway, and along the docks. Provide flexible utility loop at the top and bottom of gangway for tidal fluctuations and at dock “bridge” locations to accommodate differential movements. Provide all materials, equipment, labor, testing, and miscellaneous related items (including hydrant flow test) to provide water distribution mains and service lines to the moorings. Fire protection system on pier and floats to be a dry standpipe system per NFPA 14, comply with NFPA 303 and IFC, and include all pipe, fittings, valves, fire department connections, support brackets, and appurtenances. Fire extinguishers to be per NFPA 10 and include fire extinguisher cabinets and fire extinguishers. Insulate all water piping where it is exposed to air under piers and at transition points from gangways to floats and piers above water line on float system to protect pipe from freezing. Exposed piping insulation shall be jacketed with stainless steel jacketing or high-density polyethylene sleeves. Heat trace pipes exposed to air as necessary to prevent freezing.
Amendment 0008 7
INSERT:
1.4.6.2 Provide water service to the floating docks and moorings from the proposed looped water system. Water lines shall be located above or internal to the new platform, along the gangway, and along the docks. Provide flexible utility loop at the top and bottom of gangway for tidal fluctuations and at dock “bridge” locations to accommodate differential movements. Provide all materials, equipment, labor, testing, and miscellaneous related items (including hydrant flow test) to provide water distribution mains and service lines to the moorings. Fire protection system on pier and floats to be a dry standpipe system per NFPA 14, comply with NFPA 303 and IFC, and include all pipe, fittings, valves, fire department connections, support brackets, and appurtenances. Fire extinguishers to be per NFPA 10 and include fire extinguisher cabinets and fire extinguishers. Insulate all water piping where it is exposed to air on piers and at transition points from gangways to floats and piers above water line on float system to protect pipe from freezing. Exposed piping insulation shall be jacketed with stainless steel jacketing or high-density polyethylene sleeves. Heat trace pipes exposed to air as necessary to prevent freezing.
SPECIFICATIONS SECTION 01800 1.12.1.15
1.12.1.15 Mechanical equipment shall be located inside dedicated mechanical rooms or where approved by USCG. In general, roof-mounted equipment is not acceptable. Layout of mechanical spaces shall provide adequate clearances and access around equipment for performing general maintenance including pulling coils and tube bundles, changing filters, and accessing motors. To provide adequate clearances, location of equipment and routing of piping and ductwork shall be coordinated with other trades including electrical panels and sprinkler piping. No HVAC circuit shall exceed 49 lbs of refrigerant.
INSERT:
1.12.1.15 Permanent Building mechanical equipment shall be located inside dedicated mechanical rooms or where approved by USCG. In general, heat rejection equipment shall be located on exterior grade and pad mounted and roof-mounted equipment is not acceptable. Layout of mechanical spaces shall provide adequate clearances and access around equipment for performing general maintenance including pulling coils and tube bundles, changing filters, and accessing motors. To provide adequate clearances, location of equipment and routing of piping and ductwork shall be coordinated with other trades including electrical panels and sprinkler piping. No HVAC circuit shall exceed 49 lbs of refrigerant and meet ASHRAE 15 & 34 requirements if adopted by local governing authority.
SPECIFICATIONS SECTION 01800 1.12.1.3
1.12.1.3 All areas, with the exception of the Supply Parts Storage, SCBA, Secure Storage, Cutter Storage rooms, Hazmat storage, Flammable storage, Welding shop, MK Shop, Boat Bay, Janitor’s closet, Vestibules, and the Mechanical/Electrical room, shall be conditioned to meet ASHRAE 55 standards, i.e., to 70°F in the winter and 76°F in the summer, in accordance with standard practices of the area. The HVAC
Amendment 0008 8 systems selected shall be designed to accommodate all building operations and, and the equipment selected shall ensure that the building is properly maintained within the desired parameters during “off-peak” conditions as well as “peak” conditions. The contractor shall be responsible for a site visit to obtain all of the equipment heat loads, periods of operation, and any other information relevant for use in running their HVAC analysis.
INSERT:
1.12.1.3 All areas, with the exception of the Supply Parts Storage, SCBA, Secure Storage, Cutter Storage rooms, Hazmat storage, Flammable storage, Welding shop, MK Shop, WAT Shop, EM Shop, Boat Bay, Janitor’s closet, Vestibules, WAT Shop, EM Shop, and Mechanical/Electrical room(s), shall be conditioned to meet ASHRAE 55 standards, i.e., to 70°F in the winter and 76°F in the summer, in accordance with standard practices of the area. The HVAC systems selected shall be designed to accommodate all building operations and, and the equipment selected shall ensure that the building is properly maintained within the desired parameters during “off-peak” conditions as well as “peak” conditions. The contractor shall be responsible for a site visit to obtain all of the equipment heat loads, periods of operation, and any other information relevant for use in running their HVAC analysis.
APPENDIX A
Appendix A – Sheet CD101
INSERT
Appendix A – Sheet CD101 REVISED
Appendix A – Sheet A601
Appendix A – Sheet A601 REVISED
Appendix A – Sheet CU101
Appendix A – Sheet CU101 REVISED
APPENDIX K
Appendix K
Amendment 0008 9
Appendix K – REVISED21MAR2022
II. CHANGES TO THE TASK ORDER ANNOUNCEMENT:
Revised proposal submission deadline.
Revised TOA price proposal form with Option Item 3D.
III. THE FOLLOWING DOCUMENTS ARE ISSUED WITH THIS AMENDMENT:
Two (02) CAD zip Files provided as an attachment (reference PPI 15)
Appendix X – DRAFT Biological Assessment (BA)
IV. THE FOLLOWING QUESTIONS/PRE-PROPOSAL INQUIRIES WERE RECEIVED IN
RESPONSE TO THE SOLICITATION AND ARE BEING REVISED IN THIS
AMENDMENT 0008:
51. Please provide a copy of any and all permit applications (along with any accompanying backup materials) that have been submitted to date for this task order.
Revised Answer: No permit applications have been completed by the Government up to this point. The Biological Assessment is included as Appendix X with this amendment. The Incidental Harassment Authorization documentation are in preparation but will not be available prior to award.
114. 01800 1.7.6.1 Please provide hook height (hook to floor) minimum height for the required crane.
Revised Answer: RFP Section 01800- 1.7.6.1 has been revised to require 13.5 ft minimum crane hook height.
V. THE FOLLOWING ANSWERS TO QUESTIONS/PRE-PROPOSAL INQUIRIES ARE
PROVIDED:
Amendment 0008 10
NOTE: PPI numbers reflect the numbers tracked on the Coast Guard’s PPI log. This amendment includes answers to some but not all of the PPIs received. As a result, numbering and serialization may be out of order in the section below.
3. Section 01800 (1.7.3.1.2) states all exterior doors and frames shall be Fiberglass Reinforced Plastic (FRP), but the door schedule on Drawing A-601 states HM or hollow metal. Please confirm if the contractor shall proceed with FRP or HM doors. This applies at both Option 1 and Option 2 items.
Answer: Option 2 must be FRP doors, see revised Section 01800-1.7.3.1.2 provided with Amendment 0005. Sheet A601 applies only to Option 1.
8. Section 01800-1.5 Geotechnical paragraph 1.5.3 states: “Contractor shall assume that ground improvements are required at the site due to the presence of liquefiable spoils.” These ground improvements include deep soil mixing or possibly driving steel piles. Are we to provide these ground improvements costs under the Option item 2 – Permanent MWD Building?
Answer: See response to PPI 07 from Amendment 0005.
15. Please provide all available CAD files for the RFP bridging documents and USCG Base Astoria as-builts.
Answer: AutoCAD files are provided with this amendment as attachment.
61. Plumbing - Per 1.11.5.1, provide electric tank type storage unit for the Boat Bay. With storage volume sufficient to operate one emergency eye/face wash and shower combination. May a dedicated tempered water heater package be provided for the combination Emergency fixture instead of attempting to use the domestic water system water heater? This would avoids wasted energy, both standby losses and continual reheating of ~120-200 gallons of stored water, and possible premature failure of oversized water heating system.
Answer: Unclear what is being asked. If “dedicated tempered water heater package” referred to is an electric on-demand type water heater, this has been determined to exceed available electrical service and therefore is not allowed.
63. Plumbing - Per 1.11.5.2, provide high efficiency tank type gas water heater for MWD Building with storage volume sufficient to operate one emergency eye/face wash and shower combination. May a dedicated tempered water heater package be provided for the combination emergency fixture instead of attempting to use the domestic water system water heater? This would avoids wasted energy, both standby losses and continual reheating of ~120-200 gallons of stored water, and possible premature failure of oversized water heating system.
Amendment 0008 11
Answer: Unclear what is being asked. If “dedicated tempered water heater package” referred to is an electric on-demand type water heater, this has been determined to exceed available electrical service and therefore is not allowed.
131. Drawing CU-101 indicates in dashed boxes the two upland locations receiving Ground Improvements. The area where new building(s) are to be constructed has a single underground power ductbank shown. Please confirm if contractors can rely on this to be abandoned? If not, shall a new line (not shown in drawings) be installed to re-establish service to this location using a routing that goes around the building? At this time contractors do not have enough information to determine if any upstream or downstream impacts would occur if this utility were to be removed without re-routing.
Answer: Intercept and reroute the existing waterline and power ductbank, serving the existing “L” shaped building that crosses the NW corner of the “Zone of Ground Improvements Boundary” on CU- 101, to avoid this boundary area. Confirm ductbank raceways and cabling in the field. Demolish the other power ductbank heading West from the ”L” shaped building. See revised Sheet CD101 issued with this amendment.
132. Drawing CU-101 indicates in dashed boxes the two upland locations receiving Ground Improvements. The Zone 1 Area in front of Pier has significant existing utilities that obstruct the ground improvement work. Please confirm if contractors can rely on these utilities to be abandoned and thus can be removed locally to allow for the Ground Improvement work. If not, shall contractors include re-routing or bypassing of utilities to maintain service? At this time contractors do not have enough information to determine if any upstream or downstream impacts would occur if these utilities were to be removed without bypassing or providing temporary service.
Answer: Contractor to assume rerouting utilities unless Contractor obtains verification that existing utilities are not servicing adjacent buildings. Contractor is responsible for verifying whether these utilities are servicing adjacent buildings. If contractor verifies the utilities are servicing adjacent buildings the contract must reroute. If contractor verifies that the utilities do not service any adjacent buildings, the contractor is responsible for demolishing the utilities.
133. On Drawing V-101 Plan Grid C/4 there appears to be a Catch Basin that terminates into the water via an existing 6-inch Steel Culvert Pipe. The Eastern most portion of this drainage system will be in conflict with Zone 3 Improvement Work. Drawing CU-101 appears to request the contractor to install a new Catch Basin mid-span of the same 6-inch Outfall pipe for conveying surface discharge to the water.
Please confirm if the intent is to re-use the 6-inch Outfall pipe from this new Catch Basin to the water, or if contractors are to assume installing a new pipe for this segment that is not currently shown in Bold.
Answer: Intent is to re-use existing 6” outfall pipe.
134. In Appendix A, 01800 Section 1.7, A2, For Bid Option 2, the Overhead Doors shown on the Drawing A2 shown suggest full-glazed overhead doors, yet no note exists stating such. The
Amendment 0008 12 specification calls out glazing in doors, yet elevation and schedule don't differentiate (internal vs external etc.). Please clarify if full glazing is required at both the interior and exterior overhead doors for Bid Option 2.
Answer: Provide fully glazed sectional overhead doors at the Boat Bay and DC Shop as shown on Appendix A Sheet A2. Provide coiling overhead doors at the FRC Cutter Storage rooms as shown on Sheet A2. All interior overhead doors shall be fully glazed sectional doors. All overhead doors for the Option 1 modular MWD are to be coiling overhead doors as shown on drawing Appendix A - Sheets A- 203, A-204, & A-601.
135. In Appendix A, 01800 Section 1.7, A2, For Bid Option 2, small coiling doors (6-foot by 8-foot) appear to be only way in or out of the Cutter storage rooms. Can this be accomplished without door operator [aka like a mini storage unit]? The spec is vague regarding coiling versus sectional doors.
Please clarify what is required at these locations.
Answer; A door operator is required for coiling doors. See additional requirements inserted to RFP Section 01800-1.7.3.1.4 included with this amendment.
136. On Drawing A-601, please confirm in Bid Option 1 if any doors will require door lites. There does not appear to be any shown on the door schedule provided.
Answer: No, door lites are not required for the Option 1 Modular MWD.
142. Reference Appendix K - Pages 668-671: In section 4.16 of the EA (p. 83), it is specified that, "because avoidance and minimization are not feasible for this project, mitigation measures must be applied to reduce impacts on historic properties. USCG, Oregon SHPO, and other consulting parties, under Section 106 regulations, will agree to mitigation measures and capture them in a memorandum of agreement (MOA)." This is not a constraint, but that there could be some requirements to retain some of the characteristics that give pier 6 an historic visual appearance. Are there any anticipated requirements from this MOA that could affect the design build criteria/specifications?
Answer: The USCG has not determined the mitigation measures that will be implemented in the MOA.
We do not anticipate effects to the design at this time. For pricing purposes, offerors may assume mitigation measures will not impact design build criteria/specifications.
143. Section 01800 FF&E Paragraph 1.17 ‘Systems Furniture Installation’ states that “Systems furniture shall be installed by manufacturer-certified installers in accordance with manufacturers’ recommended instructions.” Standard practice for projects of this nature is that the labor to perform furniture installation is not paid a Davis-Bacon craft wage. Please confirm that, for the furniture only, the furniture installer is not obligated to pay a Davis-Bacon wage.
Answer: Furniture installers are not covered by the Davis Bacon Wage rate.
Amendment 0008 13
144. Reference Section 01800, Paragraph 1.4.6 and CD101. Drawing CD101 does not show the two existing water lines running north-south within the work area to be removed or abandoned in place. Will these utilities need to be preserved? Can these utilities be abandoned in place with plugs on each end if they are not required to be preserved?
Answer: The intent is to abandon the existing water lines after completion of the proposed water main loop system. The existing water mains may need to stay online if adjacent buildings require servicing from these existing mains. See revised Sheet CD101 issued with this amendment.
145. Reference Section 01800, Paragraph 1.4.4 and Drawing CS101 & CS102. Will wheel stops be required for parking stalls against the security fence and the north row of parking stalls?
Answer: Wheel stops are not required.
147. In Section 1.18.2.1 of the FRC Homeport Astoria Specifications, it is noted that the Government has initiated the Incidental Harassment Authorization process. Please indicate what Base design and/or Optional elements the IHA submittal is based on.
Answer: The IHA submittal and take estimate is based on the project description in the NEPA Draft EA.
See revised Appendix K provided with this amendment.
148. Has the Government initiated the consultation process under the Endangered Species Act? If so, can the Government supply the submittal materials?
Yes, it has been initiated, the Draft Biological Assessment is provided as Appendix X with this amendment.
149. Has the Government initiated the consultation process under the Magnuson Stevens Fishery Conservation and Management Act? If so, can the Government supply the submittal materials?
Answer: See response to PPI 148.
153. Reference Drawing C-007. The cross-section of the revetment shows thicknesses for armor rock and filter rock of about 6 feet and 3 feet, respectively (as scaled from other dimensions on the section).
These layer thicknesses are larger than expected based on wave energy at the location (wave heights ~ 2 feet).
a. Please provide dimensions for the layer thickness of armor rock and filter rock, OR
b. Verify that the layer thickness of the armor rock and filter rock is to be determined through the design/build process
Amendment 0008 14
Answer: Per Sheet C-007, Section A, note 2, a concept for the revetment repair is provided. The Contractor is required to perform any necessary Design calculations and construction as required per the RFP specifications. Reference Appendices S, T, and U for existing riprap information. Design/Build team must design revetment repair regarding thicknesses of armor rock and filter rock layers.
154. Reference Drawing C-007. Section A on sheet C-007 shows the toe of riprap at an approximate elevation of -20ft, and the bottom of excavation for riprap at elevation close to -26ft.
Please confirm that the intent of the riprap section is that we should terminate the cut for riprap placement at elevation -16ft to match dredge depth shown on C-003, rather than extending significantly below the dredge and below the characterization performed for the in-water dredge/excavation.
Answer: Sheet C-007, Section A, note 2, provides a concept for the revetment repair, and does not specify these elevations. The Intent of the revetment repair section is for riprap placement to match bottom of dredge depth. Actual revetment repair to be determined through the design / build process.
155. ARCHITECTURAL/STRUCTURAL - Section 01800, para 1.7.3.4.2, states, “window and other exterior glass shall be low “E” meet the requirements of the Large Missile Test of ASTM E1996.” Para 1.7.3.5.1, states, “louvers shall be designed to meet the stringent criteria established by the Florida Building Code providing high volume flow rates, impact resistance, protection against water penetrations and high wind-loads.” Para 1.8.3.2 states the ultimate wind speed to be used is 110 MPH and Exposure D. Please confirm the design requirement in para 1.8.3.2 is to be used instead of Large Missile Test and Florida Building Code.
Answer: See response to PPI 52 issued with Amendment 0006.
156. CERTIFICATION - Section 01802, para 2.6.2, states the Interior Designer must be certified by the NCIDQ and GGP or GPCP. Section 01800, para 1.7.2.1.1, states the Interior Design must be certified by the NCIDQ and LEED accredited. Please confirm if the certification requirement is NCIDQ certification with GGP or GPCP OR NCIDQ certification with LEED accreditation.
Answer: See response to PPI 53 issued with Amendment 0004.
157. PLUMBING - Per 1.11.3.3, Urinals are to be 0.5 gpf siphon jet type. Are 0.5 gpf washout type urinals also acceptable?
Answer: See response to PPI 54 issued with Amendment 0004.
158. PLUMBING - Per 1.11.3.7, The opening statement says to provide one electric water cooler and to install per ADA requirements. The plans indicate a solitary water cooler. To meet ADA requirements for both wheelchair bound persons and cane impaired persons a bi-level unit is required or the addition
Amendment 0008 15 of an permanent (always full) cup dispense at an appropriate height. Is a bi-level unit w/bottle filer to be provided or a solitary electric water cooler w/ bottle filler and cup dispenser?
Answer: See response to PPI 55 issued with Amendment 0004.
159. PLUMBING - Per 1.11.3.11, the eyewash bowl is to be impact resistant but then states it is to be a stainless steel receptor. Stainless steel is not considered as impact resistant. Does the USCG want impact resistant ABS/Plastic receptor or stainless steel receptor?
Answer: See response to PPI 56 issued with Amendment 0005.
160. PLUMBING - Per 1.11.3.12, provide an ADA shower for both men and women and an additional Standard shower for Men. Shower head description for all units is a shower head with flexible hose (i.e., handheld shower).
a. Does the owner want handheld shower for Standard shower or a fixed shower head?
b. The response is a fixed shower head in the standard unit, does the owner want a fixed shower head along with a handheld shower head in the ADA showers?
Answer: See response to PPI 57 issued with Amendment 0006.
161. PLUMBING - Per 1.11.3.12, provide an ADA shower for both men and women and an additional Standard shower for Men. Shower head description for all units is a shower head shall be adjustable with a maximum flow rate of 1.5 gpm.
a. Is adjustable a reference to swivel, flow rate or spray pattern?
b. If a reference to flow rate or spray pattern, a USA made product most likely will not be available.
Answer: See response to PPI 58 issued with Amendment 0004.
162. PLUMBING - Per 1.11.3.13, various floor drains are to be provided with a trap primer to inhibit trap evaporation. Is a sustainable waterless trap seal device as allowed by the International Plumbing Code an acceptable alternative to the water type trap primer valve and piping as noted in RFP?
Answer: See response to PPI 59 issued with Amendment 0004.
163. PLUMBING - Per 1.11.5.1, provide Tankless electric water heater for Modular Building and provide electric tank type storage unit for the Boat Bay. Is it acceptable for the contractor to provide the specified water heater types as directed by para 1.11.5.1 in lieu of the direction given in para 1.11.1.3?
Answer: See response to PPI 60 issued with Amendment 0005.
Amendment 0008 16
164. PLUMBING - Per 1.11.5.1, provide electric tank type storage unit for the Boat Bay. With storage volume sufficient to operate one emergency eye/face wash and shower combination. May a dedicated tempered water heater package be provided for the combination Emergency fixture instead of attempting to use the domestic water system water heater? This would avoids wasted energy, both standby losses and continual reheating of ~120-200 gallons of stored water, and possible premature failure of oversized water heating system.
Answer: See response to PPI 61 included with this amendment.
165. PLUMBING - Per 1.11.5.2, provide high efficiency tank type gas water heater for MWD Building.
Is it acceptable for the contractor to provide the specified water heater type as directed by the USCG in para 1.11.5.2 in lieu of the direction given in para 1.11.1.3?
Answer: See response to PPI 62 issued with Amendment 0005.
166. PLUMBING - Per 1.11.5.2, provide high efficiency tank type gas water heater for MWD Building with storage volume sufficient to operate one emergency eye/face wash and shower combination. May a dedicated tempered water heater package be provided for the combination emergency fixture instead of attempting to use the domestic water system water heater? This would avoids wasted energy, both standby losses and continual reheating of ~120-200 gallons of stored water, and possible premature failure of oversized water heating system.
Answer: See response to PPI 63 issued with this amendment.
167. PLUMBING - Per 1.11.5.2, provide recirculated hot water pump and circuit setters to minimize deliver times to fixtures. May an International Plumbing Code acceptable self-regulating, low energy, no maintenance, monitored hot water temperature maintenance cable system be provided in lieu of a circulated system to maintain hot water temperatures to the fixtures?
Answer: See response to PPI 64 issued with Amendment 0004.
168. PLUMBING - Para 1.11.5.2, in reference to the water heating system and the building monitoring system, states, “to allow control of isolation automatic control valves.” Where are the monitored control valves to be located? On the inlet and outlet of the water heaters?
Answer: See response to PPI 65 issued with Amendment 0004.
171. PLUMBING - Plan A 1 MWD Plan Flammable Storage space: A line of sight unobstructed path form Flammable Storage to the emergency eyewash/shower combo unit is not provided for this space.
Does the USCG want to relocate the emergency combo unit nearer to Flammable Storage or provide a piped or portable eyewash unit nearer to/within Flammable Storage?
Amendment 0008 17
Answer: See response to PPI 68 issued with Amendment 0004.
172. PLUMBING - Plan A 1 MWD Plan MK Shop and Boat Bay: Please confirm that the Sump Trench and grate in this space is a non-piped holding pit.
Answer: See response to PPI 69 issued with Amendment 0004.
173. PLUMBING - Per 1.11.5.2, the Modular Building water heater shall have capacity to serve sinks, lavatories, and showers. Showers are not depicted in the Modular Building plans provided. Is the Modular building to have shower units? If so, in what quantities?
Answer: See response to PPI 70 issued with Amendment 0006.
174. TELECOMMUNICATIONS - Will there be an Intrusion Detection System (IDS)?
Answer: Yes, see revised Section 01800- 1.14 issued with this amendment.
175. TELECOMMUNICATIONS - Will there be an Access Control System?
Answer: Yes, see revised Section 01800-1.14 issued with this amendment.
178. CONSTRUCTION ADMINISTRATION - Section 01802, para 1.11, specifies four site visits for each DOR, including the final inspection. Based on the size/complexity of the MWD facility, does the USCG still want four site visits for each DOR? Recommend two site visits for each DOR.
Answer: See response to PPI 71 issued with Amendment 0005.
179. Please confirm the intent of utility routing on the fixed pier. Section 01800 1.8.10 indicates to “provide new stainless steel or fiberglass underdeck utility supports on the fixed wharf for routing utilities to the new gangway platform location” which infers underdeck routing. Additionally, the concept drawings appear to reflect this assumption. However, UFC 4-150-2 suggests this is not preferred and discouraged - in such cases it is necessary, accommodations should be made for access ladders and platforms.
Answer: Per Sheet CU102, Note 2, pier utility layout is schematic. Specification 01800 1.8.10 & 1.4.6.2 revised with this amendment to provide above-deck or in-deck (chase) utility routing on the fixed wharf/pier.
Amendment 0008 18
180. Spec 01800 - 1.13.2.2 - Section states that the utility company owns the 24kV distribution system and 24kV step-down transformer. Confirm if the overhead and underground between utility pole along Railroad Ave and the pad mounted transformer is to meet utility installation requirements?
Answer: Confirmed, these are expected to meet the utility installation requirements.
181. Spec 01800 - 1.13.2.2 - Confirm where the point of demark for the pad mounted transformer is.
(Utility pole near Railrad Ave, or if the point of demark is to be at the transformer).
Answer: Per 1.13.2.2, the transformer shall be owned by the utility company.
184. CD101 - The site demolition plan calls out demolition of many items that appear to have been previously removed, based on observations during the site walk visit. However, it is unclear what the extent of demolition would be for underground elements. Do these previously removed items require removal of underground foundations and / or utility services? If so, are there as-built documents available for these? Please provide an updated demolition plan and / or clarify the scope.
Answer: See Response to PPI 132 included with this amendment.
185. Appendix V of the RFP Specifications includes a drawing of historic fueling facilities (potential gas plumes). This drawing was produced in 2004. Appendix A does not show the fuel line. Please confirm if the line was removed, abandoned, or still active. There may be a potential of contamination on or near the project site.
Answer: There is no as-built information of the existing fuel lines available.
186. The RFP Section 01800 Paragraph 1.4.7.4 does not mention the use of a fire alarm and control panel or alarms for Pump Station 1. Does this pump require fire alarm and monitoring, similar to Pump Station 2?