This is a Frequently Asked Questions (FAQs) document for a federal janitorial services solicitation. The contract is for one year of services (2024-2025) with the incumbent contractor being Reliance Contractors, Inc. (contract number 70Z03324PSEAT0113). Services begin at 2 p.m. daily except for the AIRFAC Building which starts at 8 a.m., with these schedules designed to minimize operational impact. The facility serves approximately 150 employees, though future staffing projections are not releasable.
Key operational details include: no secure areas currently require escorts; floor stripping and waxing can be performed outside Monday-Friday with COR approval; janitorial closets are available for storage and accessed via master keys provided to staff; Room 147 in the Hangar Building is no longer a janitor supply closet. The government provides utilities for equipment and chemical storage, and supplies can be shipped directly to the facility through Base Shipping and Receiving. The incumbent has no documented performance issues or cure notices. Bidders must determine appropriate staffing levels to meet Performance Work Statement requirements, with contract evaluation criteria found in Section M of the solicitation. The contract includes clauses requiring compliance with updated wage determinations, though the government does not track employee PTO or vacation accruals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FY26 AIRFAC Enclosure 2.doc | DOC document | |
| FY26 BASE Technical Exh 6.doc | DOC document | |
| FY26 BASE Technical Exh 3.doc | DOC document | |
| FY26 BASE Technical Exh 5.doc | DOC document | |
| FY26 BASE Technical Exh 2.doc | DOC document | |
| GCE_Base NB Janitorial 2026.pdf | ||
| FY26 BASE Technical Exh 1.doc | DOC document | |
| FY26 BASE Technical Exh 8 CDR.doc | DOC document | |
| FY26 BASE Technical Exh 7 Bldg Info.xlsx | XLSX spreadsheet | |
| FAR Provisions Clauses - Services.pdf | ||
| FY26 BASE Technical Exh 7 Base Map.doc | DOC document | |
| SF1449.pdf | ||
| Janitorial PWS 2026.doc | DOC document | |
| Cover_Janitorial Contract 2026.doc | DOC document | |
| FAR Provisions Clauses-Applicable- Services.pdf | ||
| HSAM Appendix G - Safeguarding of Sensitive Information for USCG.pdf | ||
| FY26 BASE Technical Exh 4.doc | DOC document | |
| FY26 AIRFAC Enclosure 1.doc | DOC document | |
| Wage Determination.txt | TXT text file |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FAQs
1. SF 1449 - What is the intent on the pricing for the form? Complete pricing for each year with totals only? This solicitation is only for one year. Please send bid for one year only.
1. b. Pricie breakdown for each building identified? Please clarify question.
2. Is this a new contract for services? If not, What is the current executed cost for services detail?
Previous contractor was Reliance Contractors, Inc. This information is publicly available on
USASpending.gov. 70Z03324PSEAT0113
3. The current tenant population is 150 employees. Are there any future projections for increases in staffing over the next 5 years? This information is not releasable. Contractor handles all staffing required to fulfill solicitation.
4. As written, services are not to start until 2 p.m. each day except the 8 a.m. start for AIRFAC
Bldg. Are these firms as written? Yes, these times are designed to have the least impact on operations.
5. How many secure areas require escorts and what building(s) are they located? This is covered in
TE6 and the PWS, section 2.5. None of the secure areas require an escort at this time.
6. Are floor stripping and waxing limited to Monday-Friday only? No, the contractor can request alternative work schedule from the COR, which will usually be granted unless there is a conflict with operations.
7. Could you please confirm the name of the current (incumbent) janitorial services contractor?
Reliance Contractors, INC
8. What is the total obligated value of the incumbent contract (base + all exercised option periods)?
This information is publicly available on USASpending.gov. 70Z03324PSEAT0113
9. What were the contract’s base-period length and the number and duration of any option periods exercised to date? 1 YEAR, 2024-2025
10. What cleanable square footage and scope of services does the incumbent contract cover? Same as current solicitation. Listed in PWS.
11. Have there been any scope, square-footage, or frequency changes since the incumbent award that we should factor into our pricing assumptions? All required scope, square-footage, and frequency of service relevant to the current solicitation can be found in the supporting documentation of the solicitation.
12. Are incumbent staffing levels and labor categories (e.g., full-time vs. part-time, supervisor presence) meeting the Government’s performance standards? It is up to the bidder to determine the appropriate staffing levels required to meet all requirements listed in the PWS and associated documents.
13. Are there any documented performance issues or cure notices associated with the incumbent that bidders should be aware of? No
14. Is dedicated on-site storage space available for contractor cleaning supplies and equipment? If so, please provide its location, square footage, and any security restrictions. Janitorial closets/locations can be found in the Enclosures and Technical Exabits. The only correction is:
Rm 147 in the Hangar Bldg. is no longer a Janitor Supply Closet. These closets all lock and can only be opened with the master key that is provided to the Janitorial staff when they arrive on site, as stated in the PWS, section 2.9. Regular access to these spaces is limited to security watch standers and maintenance personnel with issued keys.
15. Does the Government supply utilities (power, water) for equipment charging and chemical storage, or should those costs be built into our proposal? The government does provide utilities.
16. Will the Government furnish keys or access cards to storage areas, and what is the procedure for replacing lost credentials? This is covered in the PWS, section 2.9.
17. If no on-site storage is available, is there a designated staging area for daily use, and are there restrictions on delivery or removal times for supplies and equipment? The janitorial closets can be utilized for storage of equipment and supplies. Supplies can be shipped directly to the facility and will be received and set aside for the contractor by the Base Shipping and Receiving staff.
18. Could you please confirm the name of the current (incumbent) janitorial services contractor?
Reliance Contractors, INC
19. What is the total obligated value of the incumbent contract (base + all exercised option periods)?
This information is publicly available on USASpending.gov. 70Z03324PSEAT0113
20. What were the contract’s base-period length and the number and duration of any option periods exercised to date? 1 YEAR, 2024-2025
21. What cleanable square footage and scope of services does the incumbent contract cover? Same as current solicitation. Listed in PWS.
22. Have there been any scope, square-footage, or frequency changes since the incumbent award that we should factor into our pricing assumptions? All required scope, square-footage, and frequency of service relevant to the current solicitation can be found in the supporting documentation of the solicitation.
23. Are incumbent staffing levels and labor categories (e.g., full-time vs. part-time, supervisor presence) meeting the Government’s performance standards? It is up to the bidder to determine the appropriate staffing levels required to meet all requirements listed in the PWS and associated documents.
24. Are there any documented performance issues or cure notices associated with the incumbent that bidders should be aware of? No
25. Is dedicated on-site storage space available for contractor cleaning supplies and equipment? If so, please provide its location, square footage, and any security restrictions. Janitorial closets/locations can be found in the Enclosures and Technical Exabits. The only correction is:
Rm 147 in the Hangar Bldg. is no longer a Janitor Supply Closet. These closets all lock and can only be opened with the master key that is provided to the Janitorial staff when they arrive on site, as stated in the PWS, section 2.9. Regular access to these spaces is limited to security watch standers and maintenance personnel with issued keys.
26. Does the Government supply utilities (power, water) for equipment charging and chemical storage, or should those costs be built into our proposal? The government does provide utilities.
27. Will the Government furnish keys or access cards to storage areas, and what is the procedure for replacing lost credentials? This is covered in the PWS, section 2.9.
28. If no on-site storage is available, is there a designated staging area for daily use, and are there restrictions on delivery or removal times for supplies and equipment? The janitorial closets can be utilized for storage of equipment and supplies. Supplies can be shipped directly to the facility and will be received and set aside for the contractor by the Base Shipping and Receiving staff.
29. Who is the current contractor or service provider? Reliance Contractors, INC.
30. What is the current contract value and/or pricing structure? This information is publicly available on USASpending.gov. 70Z03324PSEAT0113
31. Do you anticipate any changes in quantity, volume, or scope over the duration of the contract?
There has been no major scope change over the lift of the contract
32. Has the scope of services changed over time under the current contract? No significant adjustments have been made to date
33. What criteria will you use to evaluate future vendors or bids? Please refer to section M of the solicitation on SAM.gov.
34. Are there any current employees? There is a current contract in place.
35. Will the contract be amendable to account for any wage determination increase with Base pay and fringe pay issued by the government throughout the duration of the current? The contract includes clauses requiring compliance with updated wage determinations.
36. Can the government provide a list of current employees, as well as subcontractors for the current contract? This information is not releasable.
37. Can the government provide hire dates, the accrued PTO, Sick, and vacation time upon contract end date for the current employees? And what will be paid by current contactor on contract end date? We do not track this data. This remains the responsibility of the contractor.
File details come from the government source that posted it. Updated .